Irep 18 00671

You might also like

Download as pdf
Download as pdf
You are on page 1of 18
NY SANIKYU as ‘Docent No. apa ssAMs Pree METHOD STATEMENT | Sarone'w.oiuo. ‘hye Shonen No, epsom ‘Conective moinlenance repair of ange leak on fe no. 20" HPS-S81010301-106CS1P 1-4 (HP Sloam Line fo Drom SS1D0004A fist manual lation valve's upsiream fangs leak in A7 USS! Revision History and Highlights evn Descipionaf arse Dee | Aro 00 | fis Rabasaosed onto icin mspecsonrzanmendaon. | 09 Nov 2022 | NA. eacce Commu on recht Pe a “This MS valid eriy fort month arth approval dao, Cops or exacts of his MS ae considered oe UNCONTROLLED COPIES when printed. Transit producto and eating of his documents prohibited. us, Paget of 13 ‘SANICY SAUDI ARABIA CO. @ SARikYU METHOD STATEMENT SxTORP M0 no, SATORPIREP-NO, BEOSSAUS-PP OOS ‘Corectve mailenance repataf fange look on ne no. 20" HPS-S5101000%-TO4CSTPI-H {HP Steam Tine fo rum S6150006A fet nonualzeation vole's upsvoam flange leak) in A7 USSI TABLE OF CONTENTS. Section No. Description Page(s) 1.0 | Purpose and Scope 3 20 | Applicable Documents a4 30 | Seneral Requirements 410 40 | Attachments) 0-13 | “This MS eval ony ort month afer the approval dae. Copies or earacis fhe NS are consldored as UNCONTROLLED COPIES when printed Tranemi reproducton and eating ofthis documents ponies. Page 20f 13, SSANKYU SAUDI ARABIA CO. @SARikyu DOCUMENT No. : lssaus.rnonos METHOD STATEMENT = |Siroiriioo, Sa ‘Gaective maintenance repar of lange lek oni no, 20" HPS-551010901-104CS1P 1-4 (HP Stoom {ipa to Onan 851000064 ft monuol aan vave'supsaam flange laa in A USS] 4. PURPOSE AND SCOPE ‘To cany-ut the corectva maintenance acts by repaing the defective fnge() of fangs lak on Tie 90. 20-HPS-S5%011901-108CS1P'.H (HP Steam Line Yo Drum SS1D000GA test manual eaten ‘alie's upsveam Henge loa in AT USS. In order to provide a euficent crven tg i shal be ‘Conduct afl and ebm compance with SATORD minimum requroments Ths repa covers te folowing quay srsuranea aces bol rn ovr lo SATORP Oparaten. Noo: This mehod stent based ony onthe celeste IREP-16-00671 for tho gasket replacement thote oe ary acontnaiee or celocs found caring the opening of be Tanges, 2 supplementary Inspection ror wil be gen on tho nent sete, wheter Ris for Be ceplacement ote Bing ‘components oot 2. APPLICABLE DOCUMENTS. 2.1, PROJECT SPECIFICATIONS (CURRENT VERSION) 1+ JERESW.G11 Rav.04 Waking Requtemens fr On Pat Pipng + 2SAFEO24 Work Permit Procedure + Ping Iomatre Drawing + Pping and Insrument Diagram (Pan 1D) + Aoproved WPS: SANKYUIARCC-PI-GTSN-00 Rev. OD using ER7OS-S and E7018 + hoproved Weller Gusicaon and Job Claranco Card (JCC) ‘Mota Test corsteate TC) + Quality Dossiers 22. Proparation of Rewant Documents 22.1 SATORP Maintenance Group shal prpare the relevant erawlg, PAID, rtfeaton, ad werk order numer before proceeding wth he CM works 222 Eneires Work Pet system and appicable Job Safoly Anais (JSA) hed been Implements 22. Plot exciton (piprgeldng) wots. All now meters shall bo provided by SATORD Nainienanos (Brsioss Tos) wi Avaleble Matra Test Corea (WTC) and shal be ‘ube’ by CE GN2 fo SATORP ispacion for vow and approval. 224 GMS2 Infection tam shall prepa the comesponding Meliod Statement and tost ‘packaga maocordanee wih SATORP inspection Roport (REPY] ad shal be submited 1 [ERTORP mpoctonhintonance fr eve and approval 2244 Incaee the ahve under GMS2 eubcotsctods), they sal submit Beir ‘mamodslgy fea personel qualtestons and equipment eration ‘oteabor fer farther review ad approval. 22.5 Onoe the NeledStatemant (MS) I approved, te coecve maintenance stiles ac ‘esting shal commencs 22.54 The approved MS shal be dtu to GMS2 AroaIncharge and Suppor geupe as rept gudaines. “This NG valdeniy or + man afer to approval dae, Copies or exacts of he MS are conldered as TneONTROLLED GOPES when pnd, Params ropditon an eling oh document pronbtd. | ms Page of 'SANKYU SAUDI ARABIA CO. NY SANIKYU DOCUMENT Wo. geassaus pone METHOD STATEMENT | Satone ono. ‘tis SATORPIREP.NO, | REPA.00671 ‘Corective manlenonce repatof ange lak one no, 20" HPS-561010301-104CSPI-H HP Steam {ine fo Dum SSTBOOOGA st menue elation valves Upsireem flange lect in AT USS! 226 227 2252 Incave he MS isnot approved by SATORP Inspacon o Martone! (peraton ebtabish naw top procedure for approval 2 SATORP iepocton. 12289 entproced tothe Repair Activity without any approved repel procede o ‘Syl Witton Agroement rom SATORP. SSATORP fra Usintonance Leader signature shal be required for Operation pony 4 and ‘2 wor pfomed alr working hous or on weekends, NOT REQUEST: A NOT requesis shall bo prepared and signed by Area Mintanance Leader eproved NDT requosts sal ba submited win business hours, teat 24 hours ‘n-advancod to specton focal port 3. GENERAL REQUIREMENTS 2.1. Rak Assessment ana ana 314 sar 318 Porto escutan of works, chock the etal conten at se for futher evluaton and sceossbly ore ej. no shalt slated properly by Operations before site repair wor Do not open the heads unt al pressure of nt is are éaind, and tho equipment ‘cooled tambon emporake, [creme caret ust be taken in all existing process Ines, instument conl lhe, ‘dectcasstom, and aher davis to avid unt ip and damage ofthe equpeent Prope procautions shal be ten (spacial cing, tol, equipment, of) o prone the Porsonl fom ny bao, dung aha alr he ropa. Provide warring sign ed sufisinttarieade on work area and only asigned personal hal be alowed ine aoa. Prov sats and workable seflold nan adequate acces, Continuous monitoring and Inspection shal be implemented to detect and cect unsafe practes wh performing wok stiles. £42, Method t: Gasket placoment 324 322 323 328 Ensues thatthe Soc. f his procedure was ipleneniod. Remove he michanical amp than dean the fanges surfaces. Peroan assessment and evaluation on bth anges faces Ife rom any defects. It the assessment and evaluation was found accepted, proceed forthe ination of he ‘ow gasket and peor ange assombly. Ifthe ascosrent and evaluation was found unaccepato de to lak alu, rocoed fr {no Yobown] uricnever the st pactel to appresch sat m Method 2 or. (Reus © final pro rom SATORP Inspection) ‘33, Mth 2: Wold Buik-ap ofthe Nange(s) gat 232 Entra ht the Seo. of his procoduro was imlomanog ‘The fang ae eal be decontamnates using actors or an equivalent solvnt “This MS eval ony ort month afer the approval date. Copies or extracts of his MS are considered as UNCONTROLLED COPIES when pina. Trane repyoducton and ating of ts documents prohibited, Page of 13 ‘SANITY SAUDI ARABIA CO. Ea SANKYU ‘DOCUMENT Wo, BEOSSAME PINON METHOD STATEMENT — | ExvonrWovo, hasan Shon MEP NO, eco [Carective mainlenance repar offange lok on ine no, 20" HPS- 68101080) 104631PI-H HP Steam tine to Brom 551B0004A fest manus slation valve's upstream flange leak) in A7 USS! ‘333 Glen and ameahiy roundoff the dloctvesocton fora ast Sm apt rm rqured ‘wa crfigraton for buldsp te have adoquste wo fusion tho caedod potas Inthe ‘asket aig sre i smoch metal whe austae conga, 2.34 Pero 100% Dye Penatent testing (OPT) aftr srface cleaning onthe existing mate ‘w-enaure that ne eising mata se am any base metal deers ber ha ase tthe fanges. 38:5 Prohoalthotango a 125 dog. C using cote phoatng, 338 Once tho pchoating roach to 125 deg, C,proced fr the wo bu-up wile manning Poeaectgrice 25081, irs ig nd it cok wrpnaey bee $0, pant be Fe ‘eo un owed by tl rapactn S100 DPT oy GATOR nn NOT Some vas 4371, Pibro ptoming or NDT, beatin fromano sparen sa Sree adnate Cpa w he GSE napecton Enger ag 3.3.7.2 Allnon-desiructive testing (NDT) activities shall be coordinated with the SATORP- gee & inapecion Department. 338 Reforto to proveios slated below forthe PWHT. 338.1. PIT shal be cary-ut ater he completion and acoplance of DPT. Refer ‘able PHT inp Data and Reer'6 Cha), {338.2 The ons of pen nes sal be closed ff to elimina afi culation hat au Toner he tperature on he nie surface of tha or unless the nema, ‘Saco ales ele, 3383, Outg cool dow at 150°C once trached: shut he sess eovng machine {SPM on allow a tow morons toeeson tho temperate po tha removal Theinsutaton ot 180°C). (Refer to Chart). 339 Rofortothprovion stated below for NDT ater the PWHT. 33.9.4 Au competion ofthe PWT a hemiocoupls shal be removed, end the eens ‘acumen areas ground smoath fo clean ané sound meta. spectiod bythe eae aoc oeeedna reerbottpate ese ae hy gt Meramec aot Mio, 393 Yesterainaton shat be perlomes pot ater NDT a par JERESW.01 ee cet 29.94 Theproasten hardness estng este shal be expressed nel mmbes ee Pecans eee tat ne £1205 pepe rn sha ptm ar zine lth ud Pasa $10 Aue smn of he HT: mashed he gs ue exo nec egal merece 43.101 The gasat contact eurtacefreh shall be 3.2 to 6 pn fr spe wound gst Reterto ASME PCC-1 App. C Table 1 Recommended Gasket Contact Sunace [ms Page 5 of 13 'SANKYU SAUDI ARABIA CO. “This MSs val ony fo 1 month ater the approval dae. Copas or xracts of hie MS are consiored UNCONTROLLED COPIES whe printed, Transmit reproduction and eling of his document ponies @ SARikyu Document xo BessAus PI METHOD STATEMENT | Ssrorrwvono, Sham [Comective maintenance repar of flange look online ro. 20" HPS581010201-TO6CSIPI-H (HP Steam {ipa to Brum SSI50006A ft manual aaon valves usttaam flange look) in A7 USS Fish or Various Gasket Types 133.102 The machined seated fished srtace shal be evaluate using surtace Call be. erent 347 Once tho preheating reach 125 dg: C, posed fr he wang wile maining the raat persue the weld centaine 2s per marking shown in “Tiss MS svat aly far 1 month are approval dal. Copies o exact ofthis MS ar cosine 2 UNCONTROLLED COPIES whan pintd, ranma reproducten and edting of ths docimen! sre, us. Page Gof 13 ‘SANK SAUDI ARABIA CO. @ SARikYU METHOD STATEMENT | Sktore' nono. Sirs Docume No. BEIa-SSAMSPPOONE [Corective mainionance repar ol ange leak en tne ro. 20" HPS-551010901-I06CSIPI-H (HP Seam Line Ya Brum 851000064 fist manual taaton valve’ upstieam flange lek] in A7 USS eve Four Joh Contain EE [ome [S| oe Secestlow ‘rt 348 Refertothoweling provisions stated teow. 348.1. The welding acuity sal be prtormed using the approved WPS. 3482 For GTAWISMAW process; Welders W-ARIOTS, W-ARSE2, ané WARTS ot ‘auvalent registra subcontractor welder aha be uead ony for GTAWSSMAW lidng WPS No: SANKYU'ARCC-P1-GTSNO03.Rev00 slg ERIOSS and E08 onal pases lor P.NO,t materia bocale I'has 2 gualeaon on F-NO.S anita 243. The unfor prekesing and the lnepase temperate shall be controle, Ilnaned and montred unl tho camplan ofthe welding using PWHT noting mmebedoogy 349 fer tothe powon sated below for NOT before the PWHT. Aer fl welding ad the [ant areata cooing temperature below 50°C, the QC Inspector shall conducts vial Inspeton, towed by 100% DPT and RT by SATORP contact NDT Company. {34.9.1 DFT onthe root pss required bofer procooding fo the sequen passos. 53492 Th» wot ieteal pondation shal be flush ground mostly a8 pe JERES-100, 5 "at 3493 Vial nspecton and DPT on tho new Wels shall be paxormed ater the pipe Inara an extn fter sh gd, 3494 Rasography losing shal be perarmed aller the scceplance of the visual Inspocton and DPT before PUT {34:10 Rofertothoprovlon stato bolow forthe PWHT. 34.101 PWAT shal be cary-ou aftr the conplaton an fal accoptanc of radiography testing, (Rafat Talo2: PWHT inal Data and Rete fo Chart) 134,102 Ths ends of open nes shal be closed oft einai aio ier that oul ower the temperate ont nia soca of the june the ea trace eso eet. “This MS i wala eny for 1 mon ater te approval dae. Copies or exact of hie MS are conrad a UNCONTROLLED COPIES when printed. Transmit reprducton and eng fs cocuront prone us Page 7of 18 'SANKYU SAUDI ARABIA CO. @SARikYU DocuMENTHNO. = BUaSSANS-IONE METHOD STATEMENT | Saronr woo. ‘tua Shrew mer no, | epsom ‘Conecive manienonce repair al fange lek on iano, 20"HPS-58101000)-106CS1Pi-H [HP Steam Tine fo Brom S€1b0006A fet manual eelon valves upsroam lange log] in A? USS "38:10.3 During cool down a 10°C one trachea: shutoff the ses reloving machine {Git fon alow a ow moron to sen th empeatre por th removal {heinzlaton(osiow 150°) (Refer Chart) 34.11 Refer tothe provision tated boow for NDT tere PHT. S:11.1 Aer comploon of ne PWHT al hemozouplos hall be removed, ae he ‘tachment reas grund smoath fo dean and sound ata, pects bythe Itspotor, the seas shall be examined by MT or PT ater gina. 134.112 AINDT Actes sal be coordinated to SATORP Inpacton Departmen {34.113 Veual examination sabe prtonmed proto oher NDT a8 per JERES-W-011 Sees {34.114 The prosion hardness esting eau shal be expressed in Brine number, 21d fh Hardness resus shal nol exceed to 20048 144.118 Fa ye ponetrant testing tal be prtormed ator the acoptancs of he ua ire |, 84.118 fxsogapy seg sabe pore aftr aezaptne othe al we ‘Rooclon nda OPT duce, Mt fetta een 14721 Ina ange wih the new genet ove fango alignment ron sess per roe net or 314.122 Bufo proceeding wih tho hyéotest, SATORP inselon mut be tii fr es sana an cone hs _ ness ag ifthe tno feasible or hydrostatic testing Retro the provisions stated below. «gra al rapare the recut possurotsting tals and Pressure gag: A minimum of wo (2) calbated Pressure gauges she have ‘range such a the at poste win 30% lo BO othe a range. = ranging 200 fo 4000 Pag capacity fo Test pressure of 1225 bars (77 pon) ene & adequate, (PGT &PC2) ‘Pressure rel valve: One (1) pressure ot valve sal be called prior {esting Vai ort et) PRY © 1906 psig capaci ‘ost marl Mala est mano as a capaci atest 120% sey marin test presoue & tmporanivent anol, hoses, et plugs & pated ‘GMS2 inspctos) and Support toam shal cay-cut sul nspecton once ithe oysem srt fase for hyolesing, roparo request of NDT in feu of toe tat (occoring to ppencht ht, ERES-4-004) The fom sal be ‘lms oy SATOR® Area Mantrance Leader 8 subritiadto SATORP Inebecon fr eve and aporval rir to sat the rep work “Tis MS i ld oir} por afer he approval dae. Copies or exacts of hie MS are conlored TNCONTROLLED COPIES wren piled. anemia eproducbon and edting of ths documents roid. us Page a of 18 'SANKYU SAUDI ARABIA CO. SARiKYU DOCUMENT No. BEOSSAMS- PROCS METHOD STATEMENT | Sxronrwono, neon SATONPIEP.NO. | IREDLAB6T (Corective maintenance epar af ange lek on fie no, 2™-HPS-581010001-106CS1P1-H (HP Seam {ine To bur S5150006A fie! manwaleelaion valves upstream ange tok] in A7 USS 2448 134:132 GUS2 inspira) and Support isan SHALL cary-out sual nspecton once {hay recat tm prossure gauges, PRV and eet mano! including accessories. 8. Belore water fig on th stom, lees rs the aon the main est ‘man fens tha thas rap af hal SHALL case pressure drop. Nelo 4: WATER CHARACTERISTICS and TEMPERATURE » Thott media (Geeterabiy demineralized o dled water to bo used in possure {esting shel boat 17°C minum lmperature and consis NO more {han 100PPW of hore for Feri Seas Neo 2:The SATORP Procass Engineer shall rove the est med tat ‘Cou be ued including he stas water nays Wario th stom on tho usteam se ofthe manifold unt teed ‘onthe ope trporay mana fig pot). Ensures proper bbod-f ‘ppronmatly 60 minutos rarmum remove any enrapped a, avis restr crop easton and major ewer, proper aed was done, gradual eos the pressure ito equation ‘roca 25%, 40% to 75% of ha ot posse ae Pita 10 ‘mines to check nero ar no oaks or pressure cop on he system before ‘norasing the net Maher pressure, Note 1: ow sdeuate equalization time. Curry, Inspectors) match ‘mars the pesoue gauge needle and wr Be start mo on he {Goo (Osim tet Usual, only a fo minutes ae require fer ‘most alk conn, Ath est concn, thse te et ended twttn down on he ape and the spose IalsDatesccops anc ‘aes tpo to tt opot 34.133 When there's no ak as observed ding equation stage; stabilizes tho {ater ina ODM of he tea resure ana alto rnin tity (0) minutes {o'talighinoss ts. {14.184 Conduct propee Venting and Draining sates below: Allow groper venting FIRST though gradual po fly bed nti rrmalzad the este Aller he proper venting was don, dain the waar gradual to avoid he fet of nogve pressure vac). ‘The aposalof tho water sal be on tho trenchos an ot onthe lurcurngs of te ogame to vai osening fhe sat Inpermoaby of {he equipment and nearby sructres, [NOTSNLLIEU: the system not fate for ylang: then requst of NDT in eu of ee est ecard A JERES O00), he Yom shal oy amped Oy AtGat oa Mattar Coats wh slnnted fo OATOR? Iapection for roview ond approval porta sta the ropa wk. Reintatee ine wh neurons wit) flange algnmentvorifstion and bot tightening as por JERESL-IS, ‘Since th design tengerature of he lef 427°C, apply protective cong using Part ‘Sytem aver a JERES 001 “Ths MS eval aly for | mont aftr the approval dai. Cope or extract of his MS ae considered a= UNCONTROLLED COPIES wtan printed. ranma reproducton and edting of is documents pried Page 9 of 13, SSANKYU SAUDI ARABIA CO. << SANiKkYU ‘pocumen no. on-ssaats- Pane METHOD STATEMENT — | Extonrwono. ‘tveana SaTon® EPO, IREDLIC.0ert [Corrective mainionance repar offlange leak on tne ro, 20"-HPS-561010901-I06CS1PI-H (HP Steam tine fo bru 351000064 fis manual eoaton valve's upsaam longo la) in A7 USS ‘34:7 ‘ntl the now inmulaton metros per JERES-N-0001/JERSD-N-0012, ‘34,18 ter the ral accaplance, removed all unecessary stuctres Ike scaling and hor ted metres that cue obstcton onto acess fc 4. ATTACHMENT(S) 44, ATTACHMENT A - Approved WPS No: SANKYUARCC-PI-GTSNE009 Rev, 00, 42, ATTACHMENT BW map “This NSB val ely fo 1 ont ale te approval date, Cops or erat fhe MS ar coined UNCONTROLLED COPIES wren pnd, Tanga reproduction and eng ofthis docu profes Page 10 of 'SANKYU SAUDI ARABIA CO. Nv SANKYU ‘pocumen no. BeO-ssAMs.PPoa%e METHOD STATEMENT | Entonr wo no. ‘tvazaa SATORPIER-NO, —; REP-tW.0671 [Carrective mainlenance rear of fangoleak on no, 20"-HS-561010001-IO6CS1PI-H HP Steam {ine to bmn 35190006 fet mania! Holfion valve's upsttoam flango le in A7 USSL 1 Tecna Roe / Coaing Rate 10 SFC 2 Tenparaiue Range 0 OC a cing Terperchre are 4 Sect ine (ine Range) min Tur and 96 minuto 6 rites) Pia CT CCHART-1 PHT CHART “This WS valid eniy or + wan ter the approval dae. Copies or oxracs fhe MS are conlared UNCONTROLLED COPIES wten pint. renamital epraductn and edting of his documents rohibted ws Page 11 of 3 ‘SANK SAUDI ARABIA CO. Wiens Visit al athens AS-BUILT]| emeevemoreceriae sth | [ATTACHMENT 8 - WELD MAP “This MS i val ony for 1 month afer the aprovl dae. Coples or extract of tis MS are considered a UNCONTROLLED COPIES whe1pintd. ranma, reproduction and eling ofthis docamont sprohbed, ms Page 12 0f 13, SSANKYU SAUDI ARABIA CO. sie aly senan AS-BUILT ees [ATTACHMENT 8 — WELD MAP TMS ald | mh aie pcr dt, Cope ait iS Snare (CONTROLLED COPIES ten pines arama ropeducion and eing fis document is profes ms age 13 of 13 ‘SANK SAUDI ARABIA CO. sug, INSPECTION REPORT satorp SATORP Jubail Refinery Equipment: 651_STEANMIPS. cs Inopacion Report: IREP-48-00674 Pa not? General Data Date of Inapecton [18.ar-18 [Eawinment Number [51_STEAMHPS_5 FRepow io [IREP-e-c0671 [Asst Description _|Cl, HP STEAM <480 C CARBON STEEL [nepecied by — | Mehammad al, Rosi ine Number [ag-HS-S5i07b80T oHCSIPTH Uni 51 [nspecton Tar (NA Fd Sonics |551_STEAMIPS_ [atoal Famiy [os CARBON STEEL Wea PHT [NONE fivpearevent ‘naan [eearage [eral teak ype onspecion—_|Extomat [eakage Date fos Mare 18 ask Coverage [Not pliable esa Permanent eparReplacement Task Ades [Finding Summary Findings headline [action HP Steam ine Manual lscatien Valve Hangss Laake Net Appel Finding location dota Inspection mathoa Stem Ln tn SDAA Fran ton Yates Uparean i rpecton Fangs al Recommendations Summary 0 ‘shortiot ‘End dato | Recommendation Tyee IREP-TEORTT-OT [Neches carp sa te ronoverwren He cportty _[otsenaa [ori Attachments INA ‘Approval SATORP ‘Approval Lavel [Approval Level ‘Approval Level A (Superntondont) Rosi, Mohanta Ki al, waGout Date 88 [bate & Signature: to-aar-s8 pia Date & Si agile INSPECTION REPORT SATORP Jubail Refinery 551_STEAMHPS. 5 Imepecion Report: IRE-18-00074 Page 2042 Equipment [Findings Details [Star ak as cbservad by Operation an he HP slam in (27-APS 56 1010901-108081Pi-H) to S1DO0D0A fk Joel slate valve uncrea flanges (eter to aarhed PAID dann no. SAIER-PUSET-SKEC- 489120 and ISO [rang no, HPS SSTOFGSDT AD}. Iaccotnay, hau iter was conducted on fanges bolls by Malrenance to ares tho lak ut unsucess [ence naa Team decided to pul place alempoary mechanical lamp node to confine the lh |Remak: The leaked fanpas was loose onthe HP stam ln rom the HP steam main header where the steam i [permanerly cupped suo yen fem Balers No folilon valves avaale cong the cre ost eine for to be shutlown (ota reinory eulson). [Recommendation Detai IREP-t0-0067+-08 [basd on cur ngs, blow er the recmmendtens which have tobe implemented when the opportunity to ep ares Is. ine sha be peop elated by Operation as pet parson Proce p.teeretinecany nateomo! fara fo it ne om ary it oe ae [nin nspaston for th ange! acs epocon +, sket shal be placed if he leak was due tothe flue ofthe gasket end nt affected the flnges fae |s. supplementary ispecon rept recommendation wl be faved tho ine ange’ faces are found efstve frm the nspecton, o. ws Static Engineer sl be canted for any real requ on the gato valve if eed ris ecommended for Maitanance c prose the spare fango ad valvé incase ofthe replacement i regured, The lange end valve speceatens ooo few os 20 enn, aA ASME BI Teh ag Cl Te eck Raa lost Valve Size -20 inches, Matra - 218 Gr. WCB, Rang - Cass 600, Type - Parle Sie Gate, RF ange, Specietons-1SORUSI TR BB GO. 7

You might also like