Details the mentor. (Name, Contact No, and company email ID).
Collect the full details (approved plan, design drawings, working drawings,
about the ongoing works).
Ask the mentor / T.L to assign different works to different students’ term
wise so that all should understand about all works.
Spend time with company office works to interact about their role and
responsibilities in the company.
Sit along with mentor & T.L and schedule the works to be attended on site
week wise for the full period of the internship (minimum one and a half
month). Prepare a calendar of works.
Visit the site along with note book or writing pads and mobile with geo-tag
camera installation.
Note down the present stage of the works.
Take geo-tag photos of ongoing works along with all students and the
mentor and upload to WhatsApp group immediately.
Study the QMS and SMS adopted at site. Note down if any shortfalls are
there. Refer the Q.C and Safety aspects with the standards. Make a note of it.
Start concentrating on technical aspects on field thereafter every day:
Remember C3 theory defined by me i.e. (C-Cover, C-Compaction &
Curing).
Observe whether proper cover is given or not.
Observe whether proper compaction is being done or not.
Observe whether proper cutting is being done or not.
Do not simply observe. If they not being done properly, bring them
to the notice of the site engineer / mentor and get them rectified.
Recollect the technical matter whatever you have gained in the
college and corelate them with the standards (IS, MoRT&H and IRC
codes.
Every day activities along with photos and notes should be dropped
in WhatsApp group every day at the end i.e., by 6.00PM.
Preserve all the technical information gathered at site systematically.
If any clarification is required ask your guide immediately / drop
your requirement in the WhatsApp group.
IMP to note:
1. Any eventualities happen during the internship either at office or at site shall be
immediately brought to the notice of your mentor and guide.
2. Continue this pattern for every day’s work till the completion of internship.
3. Photos should show the presence of all the students.
4. Photos should show details of working at site.
5. Do not drop unnecessarily the same phots repeatedly.
6. Only T.L should upload the photos.
7. Attendance carries 10 marks by company and 10 marks by internal guides and
examiners based on the attendance in the company.
8. Orally it will be discussed with the external examiner at the end i.e., during ESA
about the attendance and marks will be given or deducted accordingly.
9. Any absence without the prior permission of the company mentor, guide and
coordinator will be view seriously which effects on your overall result.
10. If daily progress is not viewed will be taken for further action.
11. Consolidate the progress of one week and submit consolidated weekly progress to the
guide till the completion of the internship.
12. For systematic follow up of the technical aspects on field follow the check list provide
in Excel sheet for buildings.
13. For road works follow the IRC standards and report the progress.
14. Check list is enclosed once again with this.
Prof. V. H. Jadhav
Department Internship Coordinator (DIC).