Professional Documents
Culture Documents
National DRRM and Civil Defense Training Plan - Approved
National DRRM and Civil Defense Training Plan - Approved
CIVIL DEFENSE
TRAINING PLAN
2018 - 2022
OBJECTIVE ..................................................................................................................... 3
DURATION .................................................................................................................... 19
EFFECTIVITY .................................................................................................................. 20
NATIONAL DISASTER RISK REDUCTION AND
MANAGEMENT AND CIVIL DEFENSE
TRAINING PLAN
2018 – 2022
BACKGROUND
The Office of Civil Defense (OCD), pursuant to its mandate stipulated in Republic
Act (RA) 10121 to protect the communities during disasters, aims to be the
“Center of Excellence in Disaster Risk Reduction and Management (DRRM)” by
2020. While there are many factors that influence the realization of OCD’s vision
and mission, such as well-managed physical structures, accessible financial
resources, and strengthened external linkages and support, the core of the work
of OCD heavily relies on the capacities of its people. Such prompts the need to
ensure that the DRRM and civil defense practitioners are equipped with the
necessary knowledge and skills to be able to deliver the right services for the
communities.
Specifically, training and other capacity building activities in the field of DRRM
and civil defense are among the key services being offered by the OCD. Using
the train-the-trainers approach, the OCD was able to create a pool of DRRM
and civil defense subject matter experts to help strengthen the capacities of
government agencies, civil society organizations, private sector groups, and the
communities. Further, as new approaches and standards in DRRM and civil
defense emerge, the OCD continues to explore innovations to improve its
training methodologies.
1
equip the OCD employees and other civil defense practitioners with knowledge,
skills and competencies for more effective and efficient delivery of tasks and
responsibility given to them under the RA 10121.
Both the NDRRMETP and the CDETP are designed to prescribe standard titles,
programs of instruction, curricula, session guides, and training measures or
regulations as well as a recommended training budget programming to
optimize utilization of resources for the conduct of DRRM training and capacity-
building.
TRAINING ROADMAP
The goal of the OCD’s capacity-building efforts in DRRM and civil defense is to
improve the attainment of safer, adaptive and resilient Filipino Communities
towards sustainable development, as embodied in the National DRRM
Framework. To achieve this goal, a clear capacity-building and training
roadmap is fundamental. Based on the road map, the OCD CBTS shall
collaborate with the key NDRRMC member agencies and other partners to: (1)
develop the National DRRM Training Plan; (2) establish the Training Information
Management System; (3) implement monitoring and evaluation system; (4)
institutionalize training policies, (5) standardize training packages, and (6)
develop a robust training accreditation system.
2
OBJECTIVE
To provide strategic guide in the roll-out of the NDRRMETP and the CDETP, the
National DRRM and Civil Defense Training Plan is hereby prepared.As seen in the
above roadmap, the training plan forms part of the approaches of the OCD in
attaining the vision of the National DRRM Framework. Specifically, the objective
of the National DRRM and Civil Defense Training Plan is to provide systematic
approach in building the capacities of DRRM and Civil Defense practitioners
who will, in turn, provide capacity-building opportunities for other stakeholders
across all levels of governance. Such approach will contribute to the attainment
of safer, adaptive and resilient Filipino Communities towards sustainable
development, as embodied in the National DRRM Framework.
3
CONCEPTUAL FRAMEWORK
The National DRRM and Civil Defense Training Plan specifies the DRRM-Climate
Change Adaptation (CCA) and civil defense training courses to be offered,
which are categorized under the four (4)DRRM thematic areas: Prevention and
Mitigation, Preparedness, Response, and Rehabilitation and Recovery. This can
be attained by determining the requirements and needs of the target
participants in terms ofKSAtogether with their tasks or expected roles in the
society.
4
TARGET PARTICIPANTS
According to the NDRRMETP, four (4) priority clienteles must be capacitated in
DRRM:
1. Local DRRM Councils (including local chief executives (LCEs))
2. Public sector employees
3. Private sector groups
4. Communities
Specifically, the communities are broken down into 14 basic society sectors as
derived from the classification of the National Anti-Poverty Commission (NAPC):
1. Farmers and landless rural 8. Youth and students
workers 9. Persons with disabilities
2. Artisanal fisherfolk 10. Victims of disasters and
3. Urban poor calamities
4. Indigenous cultural 11. Senior citizens
communities/indigenous peoples 12. Nongovernment organizations
5. Workers in the formal sector and (NGOs)
migrant workers 13. Children
6. Workers in the informal sector 14. Cooperatives
7. Women
Based on the above references, the following are the target participants of the
National DRRM and Civil Defense Training Plan:
5
TRAINING NEEDS ASSESSMENT
The following are the identified KAS requirements of each target participant per
DRRM thematic area, which shall serve as reference for the conduct of training
needs assessment (TNA):
6
PUBLIC SECTOR EMPLOYEES
Disaster Prevention and Mitigation Disaster Preparedness
- Hazard awareness - Contingency planning
- Risk assessment - Organizing disaster control groups
- Climate change awareness - Conducting drills and simulation exercises
- Awareness on DRRM and CCA policies - Inventory and warehousing of response tools,
- Assessment of structural integrity of buildings and equipment and assets
facilities - Prepositioning of disaster response resources
- Disaster risk financing and insurance - Conducting information, education and
- Public service continuity planning communication campaigns
- Environmental protection - Multi-stakeholder coordination
- Information management system
Disaster Response Disaster Rehabilitation and Recovery
- Incident command system - Mental health and psychosocial support
- Rapid damage assessment and needs analysis - Post-disaster needs assessment
- Basic life support and survival - Post-conflict needs assessment
- Management of emergency operations centers - Public-private partnership
- Critical incident stress debriefing - Livelihood programs and options
- Risk communication - Environmental protection
- Logistics management
7
- Community-based action planning
- Environmental protection
Disaster Response Disaster Rehabilitation and Recovery
- Incident command system - Mental health and psychosocial support
- Rapid damage assessment and needs analysis - Livelihood programs and options
- Basic life support and survival - Environmental protection
- Search, rescue and retrieval
- Critical incident stress debriefing
- Risk communication
8
Disaster Response Disaster Rehabilitation and Recovery
- Incident command system - Mental health and psychosocial support
- Rapid damage assessment and needs analysis - Post-disaster needs assessment
- Gender-responsive evacuation - Post-conflict needs assessment
- Management of evacuation centers - Public-private partnership
- Management of emergency operations centers - Rehabilitation and recovery planning
- Search, rescue and retrieval - Post-disaster inventory
- Operation of emergency telecommunications - Early recovery strategies
equipment - Integrating DRRM and CCA in development
- Management of the dead and the missing planning
- Distribution of food and non-food relief items - Accessing rehabilitation and recovery funds
- Critical incident stress debriefing - Livelihood programs and options
- Utilization of quick response fund - Environmental protection
- Activation of response clusters
- Risk communication and media management
- Minimum Initial Service Package
- Protection of vulnerable groups
- Provision of emergency health services
- Maintenance of law and order
- Crisis management
- Logistics management
Pursuant to OCD Office Order No. 182 s 2017: Guidelines on the Implementation
of OCD Disaster Risk Reduction and Management (DRRM) Training Courses,
specific guidelines and protocols on the conduct of TNA shall be developed by
the CBTS and the Human Resource Management and Development Division
(HRMDD), in collaboration with all concerned OCD services, offices, divisions,
sections and units. This includes the development of a TNA tool that is
appropriate for DRRM and civil defense practitioners.
Specifically, the CBTS will conduct TNA intended for DRRM and civil defense-
related training concerns. The HRMDD, on the other hand, will cater to OCD-
related competencies intended for “bridging” programs as part of career
development.
9
TRAINING COURSE OFFERINGS
The following are the training courses to be offered by the OCD for the pre-
identified target participants:
10
Incident Command 1 day Communities (workers in the formal
System Executive sector and migrant workers)
Course Local DRRM Councils
Public sector employees
Volunteers(including reservists)
Private sector groups
OCD employees
Basic Incident 3 days Communities (workers in the formal
Command System sector and migrant workers)
Training Local DRRM Councils
Public sector employees
Volunteers(including reservists)
Private sector groups
OCD employees
Integrated Planning 5 days Communities (workers in the formal
Course on Incident sector and migrant workers)
Command System Local DRRM Councils
Public sector employees
Volunteers(including reservists)
Private sector groups
OCD employees
Incident Command 5 days Communities (workers in the formal
System Position Courses sector and migrant workers)
Local DRRM Councils
Public sector employees
Volunteers(including reservists)
Private sector groups
OCD employees
All-Hazards Incident 5 days Communities (workers in the formal
Management Team sector and migrant workers)
Training Local DRRM Councils
Public sector employees
Volunteers(including reservists)
Private sector groups
OCD employees
Training for Instructors 5 days Communities (workers in the formal
sector and migrant workers)
Local DRRM Councils
Public sector employees
Volunteers(including reservists)
Private sector groups
OCD employees
11
Community-based 5 days Communities (workers in the formal
DRRM Training of sector and migrant workers)
Trainers Local DRRM Councils
Public sector employees
Volunteers(including reservists)
OCD employees
Basic Public Service 3 days Communities (workers in the formal
Continuity Plan Training sector and migrant workers)
of Trainers Local DRRM Councils
Public sector employees
OCD employees
Emergency Operations 3 days Communities (workers in the formal
Center Training sector and migrant workers)
Local DRRM Councils
Public sector employees
Private sector groups
OCD employees
Rapid Damage 4 days Communities (workers in the formal
Assessment and Needs sector and migrant workers)
Analysis Training Local DRRM Councils
Public sector employees
OCD employees
Post-Disaster Needs 5 days Communities (workers in the formal
Assessment Training sector and migrant workers)
Local DRRM Councils
Public sector employees
OCD employees
Post-Conflict Needs 5 days Communities (workers in the formal
Assessment Training sector and migrant workers)
Local DRRM Councils
Public sector employees
OCD employees
Search, Rescue and To be Communities (workers in the formal
Retrieval Training determined sector and migrant workers)
(Collapsed, Water, Local DRRM Councils
Mountain, Urban, etc.) Public sector employees
OCD employees
Volunteers(including reservists)
12
OUTPUT, OUTCOME AND IMPACT INDICATORS
The following shall serve as output, outcome and impact indicators for
monitoring and evaluating the accomplishment of the training courses:
13
No. of women trained No. of communities
No. of indigenous cultural Communities will initiate more affected by disasters
communities/ indigenous DRRM programs at their will be minimized.
peoples trained respective levels. Implementation of
Quality 100% rating as good/satisfactory barangay-level DRRM
or better based on the training Communities will be capable of plans will be
evaluation forms self-help and survival during strengthened.
Timeliness Training conducted within the emergencies while waiting for
target date assistance from the disaster
responders.
Community- Quantity No. of workers in the formal Communities will be capable of No. of affected
sector and migrant workers self-help and survival during population and
First trained emergencies while waiting for casualties during
Responder No. of representatives of Local assistance from the disaster disasters will be
Training DRRM Councils trained responders. minimized.
No. of public sector employees
trained Communities will organize their Local incidents will be
No. of OCD employees trained respective CFRs. managed well at the
Quality 100% rating as good/satisfactory barangay levels.
or better based on the training Communities will practice
evaluation forms standard methods and Requirements for
Timeliness Training conducted within the approaches for response. assistance from city or
target date based on the APB municipal DRRMCs to
barangay DRRMCs will
be lessened.
Basic DRRM Quantity No. of OCD employees trained OCD employees will improve National, regional and
their orchestration of DRRM local risk levels will be
Training Quality 100% rating as good/satisfactory
efforts. reduced.
or better based on the training
evaluation forms
OCD employees will improve in DRRM programs will be
Timeliness Training conducted within the
terms of their performance of better implemented at
target date based on the APB
roles and responsibilities all levels, from national
stipulated in RA 10121. down to local.
Contingency Quantity No. of workers in the formal Individuals will initiate No. of affected
sector and migrant workers formulation of contingency population and
Plan Training trained plans in their respective casualties during
No. of representatives of Local agencies/offices/communities. disasters will be
DRRM Councils trained minimized.
No. of public sector employees Individuals will be able to
trained prepare for worst-case situations Availability of
No. of OCD employees trained for a particular disaster. resources during
Quality 100% rating as good/satisfactory disasters will be
or better based on the training Individuals will be able to pre- ensured.
evaluation forms position resources and pre-
Timeliness Training conducted within the arrange response mechanisms Requirements for
target date based on the APB in anticipation of worst-case assistance higher level
disaster situations. DRRMCs will be
lessened.
Incident Quantity No. of workers in the formal Individuals will be able to Conflicts among
sector and migrant workers exercise proper command and responders and
Command trained leadership during disaster confusions arising from
System No. of representatives of Local response. the catastrophic
Executive DRRM Councils trained situations brought
No. of public sector employees Individuals will be able to clarify about by disasters will
Course trained the delineation of roles and be minimized.
No. of representatives from responsibilities during disaster
private sector groups trained response. Accountability and
14
No. of volunteers (including cost-efficiency during
reservists) trained Individuals will be able to disaster response will
No. of OCD employees trained organize and integrate their be attained.
Quality 100% rating as good/satisfactory response activities and priorities
or better based on the training with other agencies during Priority needs of
evaluation forms emergencies. affected population
Timeliness Training conducted within the during disasters will be
target date based on the APB Responsible Officials will properly addressed,
practice proper delegation of
authority to Incident
Commanders during
emergencies.
Basic Incident Quantity No. of workers in the formal Incident Management Teams Conflicts among
sector and migrant workers (IMTs) will be organized. responders and
Command trained confusions arising from
System No. of representatives of Local IMTs will be able to exercise the catastrophic
Training DRRM Councils trained proper command and situations brought
No. of public sector employees leadership during disaster about by disasters will
trained response. be minimized.
No. of representatives from
private sector groups trained IMTs and disaster responders will Accountability and
No. of volunteers (including be able to clarify the cost-efficiency during
reservists) trained delineation of roles and disaster response will
No. of OCD employees trained responsibilities during disaster be attained.
Quality 100% rating as good/satisfactory response.
or better based on the training Priority needs of
evaluation forms IMT members will be able to affected population
Timeliness Training conducted within the harmonize activities and during disasters will be
target date based on the APB priorities during disaster properly addressed,
response.
Integrated Quantity No. of workers in the formal IMTs will improve their Conflicts among
sector and migrant workers performance during disaster responders and
Planning trained response using a thorough confusions arising from
Course on No. of representatives of Local planning process. the catastrophic
Incident DRRM Councils trained situations brought
No. of public sector employees IMTs will be able to exercise about by disasters will
Command trained proper command and be minimized.
System No. of representatives from leadership during disaster
private sector groups trained response. Accountability and
No. of volunteers (including cost-efficiency during
reservists) trained IMTs and disaster responders will disaster response will
No. of OCD employees trained be able to clarify the be attained.
Quality 100% rating as good/satisfactory delineation of roles and
or better based on the training responsibilities during disaster Priority needs of
evaluation forms response. affected population
Timeliness Training conducted within the during disasters will be
target date based on the APB IMT members will be able to properly addressed,
harmonize activities and
priorities during disaster
response.
Incident Quantity No. of workers in the formal IMTs will improve their Conflicts among
sector and migrant workers performance of their functions responders and
Command trained according to the Command confusions arising from
System No. of representatives of Local and General Staff positions. the catastrophic
Position DRRM Councils trained situations brought
No. of public sector employees IMTs will be able to exercise about by disasters will
Courses trained proper command and be minimized.
No. of representatives from leadership during disaster
15
private sector groups trained response. Accountability and
No. of volunteers (including cost-efficiency during
reservists) trained IMTs and disaster responders will disaster response will
No. of OCD employees trained be able to clarify the be attained.
Quality 100% rating as good/satisfactory delineation of roles and
or better based on the training responsibilities during disaster Priority needs of
evaluation forms response. affected population
Timeliness Training conducted within the during disasters will be
target date based on the APB IMT members will be able to properly addressed,
harmonize activities and
priorities during disaster
response.
All-Hazards Quantity No. of workers in the formal IMTs will improve their Conflicts among
sector and migrant workers performance of their functions responders and
Incident trained through enhanced team confusions arising from
Management No. of representatives of Local cohesion and dynamics. the catastrophic
Team Training DRRM Councils trained situations brought
No. of public sector employees IMTs will be able to exercise about by disasters will
trained proper command and be minimized.
No. of representatives from leadership during disaster
private sector groups trained response. Accountability and
No. of volunteers (including cost-efficiency during
reservists) trained IMTs and disaster responders will disaster response will
No. of OCD employees trained be able to clarify the be attained.
Quality 100% rating as good/satisfactory delineation of roles and
or better based on the training responsibilities during disaster Priority needs of
evaluation forms response. affected population
Timeliness Training conducted within the during disasters will be
target date based on the APB IMT members will be able to properly addressed,
harmonize activities and
priorities during disaster
response.
Training for Quantity No. of workers in the formal DRRM instructors will be Positive feedback to
sector and migrant workers organized. DRRM training will
Instructors trained increase.
No. of representatives of Local DRRM instructors will
DRRM Councils trained demonstrate better confidence Various stakeholders
No. of public sector employees and performance during the will be interested to
trained conduct of training. undertake DRRM
No. of representatives from initiatives.
private sector groups trained Delivery of DRRM training will be
No. of volunteers (including standardized in terms of
reservists) trained teaching-learning
No. of OCD employees trained methodologies and contents.
Quality 100% rating as good/satisfactory
or better based on the training
evaluation forms
Timeliness Training conducted within the
target date based on the APB
Community- Quantity No. of workers in the formal CBDRRM instructors will be Positive feedback to
sector and migrant workers organized. CBDRRM training will
based DRRM trained increase.
Training of No. of representatives of Local CBDRRM instructors will
Trainers DRRM Councils trained demonstrate better confidence Communities will be
No. of public sector employees and performance during the interested to initiate
trained conduct of training barangay-level DRRM
No. of volunteers (including programs.
reservists) trained Delivery of CBDRRM training will
16
No. of OCD employees trained be standardized in terms of
Quality 100% rating as good/satisfactory teaching-learning
or better based on the training methodologies and contents.
evaluation forms
Timeliness Training conducted within the
target date based on the APB
Basic Public Quantity No. of workers in the formal PSCP instructors will be Positive feedback to
sector and migrant workers organized. PSCP training will
Service trained increase.
Continuity No. of representatives of Local PSCP instructors will demonstrate
Plan Training DRRM Councils trained better confidence and Representatives from
No. of public sector employees performance during the government agencies
of Trainers trained conduct of training. will initiate the
No. of OCD employees trained formulation of their
Quality 100% rating as good/satisfactory Delivery of PSCP training will be respective PSCPs.
or better based on the training standardized in terms of
evaluation forms teaching-learning
Timeliness Training conducted within the methodologies and contents.
target date based on the APB
Emergency Quantity No. of workers in the formal EOC managers will have better Priority needs of
sector and migrant workers team cohesion and dynamics. affected population
Operations trained during disasters will be
Center No. of representatives of Local EOC managers will improve their properly addressed,
Training DRRM Councils trained coordination with Response
No. of public sector employees Clusters, DRRMC member Proper resource
trained agencies, other EOCs, and IMTs. allocation and
No. of volunteers (including prioritization will be
reservists) trained Decision making of EOC implemented during
No. of OCD employees trained managers during emergencies emergencies.
Quality 100% rating as good/satisfactory will be improved.
or better based on the training
evaluation forms
Timeliness Training conducted within the
target date based on the APB
Rapid Quantity No. of workers in the formal RDANA teams will be organized. Priority needs of
sector and migrant workers affected population
Damage trained Rapid assessment during disasters will be
Assessment No. of representatives of Local methodologies will be properly assessed and
and Needs DRRM Councils trained standardized. provided.
No. of public sector employees
Analysis trained Reporting of disaster damages
Training No. of OCD employees trained and impacts will be uniformed.
Quality 100% rating as good/satisfactory
or better based on the training
evaluation forms
Timeliness Training conducted within the
target date based on the APB
Post-Disaster Quantity No. of workers in the formal PDNA teams will be organized. Government
sector and migrant workers transparency and
Needs trained Long-term rehabilitation and accountability during
Assessment No. of representatives of Local recovery assessment rehabilitation and
Training DRRM Councils trained methodologies will be recovery phase will be
No. of OCD employees trained standardized. maintained.
Quality 100% rating as good/satisfactory
or better based on the training Calculation of losses, impacts Requirements for
evaluation forms and needs brought about by rehabilitation and
Timeliness Training conducted within the disasters will be more accurate, recovery following the
reliable and valid. aftermath of disasters
17
target date based on the APB will be properly and
equitably provided to
the affected
communities.
Post-Conflict Quantity No. of workers in the formal PCNA teams will be organized. Government
sector and migrant workers transparency and
Needs trained Long-term rehabilitation and accountability during
Assessment No. of representatives of Local recovery assessment rehabilitation and
Training DRRM Councils trained methodologies will be recovery phase will be
No. of OCD employees trained standardized. maintained.
Quality 100% rating as good/satisfactory
or better based on the training Calculation of losses, impacts Requirements for
evaluation forms and needs brought about by rehabilitation and
Timeliness Training conducted within the armed-conflict situations will be recovery following the
target date based on the APB more accurate, reliable and aftermath of armed-
valid. conflict situations will
be properly and
equitably provided to
the affected
communities.
Search, Quantity No. of workers in the formal Responders will practice No. of affected
sector and migrant workers standard methods and population and
Rescue and trained approaches for rescue. casualties during
Retrieval No. of representatives of Local disasters will be
Training DRRM Councils trained minimized.
No. of public sector employees
(Collapsed, trained
Water, No. of volunteers (including
Mountain, reservists) trained
No. of OCD employees trained
Urban, etc.) 100% rating as good/satisfactory
Quality
or better based on the training
evaluation forms
Timeliness Training conducted within the
target date based on the APB
18
ROLE OF OCD REGIONAL OFFICES
The OCD Regional Offices shall be responsible for the following:
FUNDING ARRANGEMENT
Funding for the implementation of the above training courses will be determined
based on the agreements during the formulation of the Annual Plans and
Budget (APB). The APB of the OCD Central and Regional Offices for training and
capacity-building will form part of the training plan as Annex.
DURATION
The duration for the Training Plan will be 2018 to 2022. The schedules for the
implementation of the specific training courses indicated in the training plan will
be determined based on the APB for the Fiscal Year.