Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

20mm Ø PPR PIPE GV FROM MAIN

GV P/M2 WATER SOURCE


SHO WC WC WC WC URI
F2

SHO P/M1

SHO GV F1

F3

FAU FAU FAU P/M3

A IN CE
M M UR
R O
F ER S O
A T
W
GVU F3

CHANGING ROOM RI 3
P/M

WATER LINE LAYOUT WC 2


P/M

WC
F2

SCALE 1:50M
I P E
P
P/M
1

PPR GV
F1

WC Ø FAU
m
WC 20m FAU
GV
FAU
SHO
SHO
S H O

CHANGING ROOM

ISOMETRIC OF WATER LINE LAYOUT


SCALE 1:50M

PUMP ROOM & CHANGING ROOM SMDC FLOOR PLAN P-1


100mm Ø PVC SOIL PIPE
SV
VSTR VSTR VSTR VSTR
CO
CO P/M2

WC WC WC WC URI
F2

P/M1

63mm Ø VSTR
F1

F3

63mm Ø VSTR
P/M3

63mm Ø VSTR
63mm Ø VSTR
SV
F3

E
P/M
3

P I P
IL CO
P/M

O
2

CHANGING ROOM
S
F2

SEWER LINE LAYOUT V C URI


SCALE 1:50M Ø P WC
1
P/M

m
F1

0 0 m WC
1
WC
CO WC

CHANGING ROOM

ISOMETRIC OF SEWER LINE LAYOUT


SCALE 1:50M

PUMP ROOM & CHANGING ROOM SMDC FLOOR PLAN P-2


CB CB CB TO PUBLIC
SEWER
FD
FD FD FD FD FD
P/M2

FD F2

O F
P/M1
RO IN
FD D R A
F1

F3

O F
RO IN

75MM Ø DOWNSPOUT
LAV LAV LAV P/M3
D R A

O F
RO IN

75MM Ø DOWNSPOUT
D R A

75MM Ø DOWNSPOUT
L I C
P U B
O
T ER
CHANGING ROOM
E W
STORM DRAIN LAYOUT S
SCALE 1:50M
F3

P/M

CB
3

P/M
2

F2

P/M
1

FD F1

CB FD
FD
B FD LAV
C FD LAV
FD LAV
FD
FD

CHANGING ROOM

ISOMETRIC OF STORM DRAIN LAYOUT


SCALE 1:50M

PUMP ROOM & CHANGING ROOM SMDC FLOOR PLAN P-3


PLUMBING LEGEND :

WC WATER CLOSET SV SEPTIC VAULT


INLET PIPE
HANDHOLE HANDHOLE HANDHOLE LAV LAVATORY DC DIGESTIVE CHAMBER
FD FLOOR DRAIN LC LEACHING CHAMBER
SD SHOWER DRAIN PVC POLY VINYL CHLORIDE
AIR
OUTLET OUTLET SPACE URI URINAL PPR POLYPROPYLENE
4" CO CLEANOUT WC WATER CLOSET
INLET
OUTLET OUTLET 10MM Ø BARS PIPE KS KITCHEN SINK SHO SHOWER
@ 0.80MTS. FILTER LEACHING
CHAMBER DIGESTIVE SP SOIL PIPE FAU FAUCET
EVERY CHAMBER
CHAMBER DP DRAIN PIPE HB HOSEBIB
HANDHOLE HANDHOLE HANDHOLE 3rd LAYER OF
6" THK. CHB
CHB SS SOIL STACK BS BIDET SPRAY
VSTR VENT STACK THRU ROOF WM WATER METER
RD ROOF DRAIN CV CHECK VALVE

0.20
INLET CB CATCH BASIN GV GATE VALVE

P DETAILED PLAN (SEPTIC VAULT) P DETAILED SECTION (SEPTIC VAULT)


2-2 SCALE 1:20 MTS. 2-2 SCALE 1:20 MTS. GENERAL PLUMBING NOTES :
3" THK. CONCRETE
COVER
1. ALL PLUMBING WORKS SHALL BE DONE IN ACCORDANCE WITH THE LATEST EDITION OF THE
NATIONAL PLUMBING CODE OF THE PHILIPPINES AND LOCAL REGULATIONS AND ORDINANCES.
100MM Ø PVC PIPE
100MM Ø PVC PIPE
2. THE PLUMBING CONTRACTOR SHALL LOCATE AND DETERMINE THE ACTUAL LOCATIONS OF
EXISTING SANITARY FACILITIES TO CONFIRM WITH THE PROPOSED DESIGN.

3. ALL PIPES SHALL BE INSTALLED AS INDICATED IN THE WORKING DRAWINGS. ANY


RELOCATION REQUIRED FOR PROPER EXECUTION OF OTHER TRADES SHALL BE UPON THE APPROVAL
OF THE SANITARY ENGINEER.

4. ALL PIPES PASSING THROUGH WALLS BE PROVIDED WITH SLEEVES. ANGULAR SPACE
BETWEEN PIPE AND SLEEVE SHALL BE FILED WITH COAL TAR, ASPHALTIC COMPOUND OR ANY
OTHER MATERIAL FOUND EQUALLY APPROVED.
100MM THK. CHB 100MM THK. CHB

3" THK. CONCRETE 5. WRITTEN DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALED DIMENSIONS.
NOTE: COVER
1. MOUNTING DIMENSIONS SHALL BE VERIFIED 6. PROVIDE CONTROL VALVE FOR EACH GROUP OF FIXTURES.
BASED ON MANUFACTURER'S
RECOMMENDATION. PLAN SECTION 7. UNLESS OTHERWISE SPECIFIED, ALL PLUMBING FIXTURES SHALL BE PROPERLY VENTED,
2. ALL DIMENSIONS ARE IN MILLIMETERS
UNLESS OTHERWISE INDICATED. MAXIMUM DISTANCE OF VENTILATION FROM FIXTURE SHALL BE 1.50METERS MEASURED ALONG
P CATCH BASIN DETAIL THE LENGTH OF PIPE.
2-2 SCALE 1:10 MTS.
FINISHED WALL 8. ALL HORIZONTAL WASTE PIPING (75ØMM) AND SMALLER SHALL BE LAID WITH A MINIMUM
LAVATORY SLOPE OF (2%) PERCENT AND 100mm AND LARGER PIPES SHALL HAVE ONE PERCENT (1%) SLOPE.
38MM Ø VENT PIPE
NOTE:
FAUCET 1. MOUNTING DIMENSIONS SHALL BE VERIFIED BASED ON
MANUFACTURER'S RECOMMENDATION. 9. ALL FIXTURES OR GROUP OF FIXTURES SHALL BE EQUIPPED WITH INDIVIDUAL AIR CHAMBER.
2. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE CONCRETE WALL
ESCUTCHEON INDICATED.
PLATES VENT PIPE (SEE 10. SWEEP QUARTER BEND. ONE EIGHT BENDS WHEN THE CHANGE OF FLOW IS FROM
CONCRETE WALL WATER CLOSET
25MM Ø COLD PLANS FOR HORIZONTAL TO VERTICAL A SINGLE ONE EIGHT BEND COMBINATION MAY BE USED ONLY ON VENT
COLD WATER CONTINUATION PIPE.
WATER PIPE LINE
SUPPLY (SEE WATER CLOSET AND PIPE SIZE)
PLANS FOR COLD WATER
CONTINUATION 11. NO DOUBLE HUB OR DOUBLE TEE BRANCH SHALL BE USED ON HORIZONTAL SOIL OR WASTE
SUPPLY (SEE
AND PIPE SIZE) FINISHED LINES.
PLANS FOR
FLOOR
CONTINUATION
ISOLATING VALVE LINE
VENT PIPE (SEE AND PIPE SIZE) 12. PROVIDE PIPE SLEEVES AT WALL, COLUMNS OR SLAB ONE SIZE BIGGER THAN THE ACTUAL
P-TRAP PIPE SLEEVE (TYP)
PLANS FOR 100 (SEE PLANS FOR LINES PASSING THROUGH WALL COLUMN OR SLAB TO PROTECT FROM BREAKAGE.
WATER SUPPLY
METALLIC PIPE CONTINUATION (SEE PLANS FOR 50MM Ø VENT PIPE CONTINUATION
CLEANOUT SLEEVE AND PIPE SIZE) AND PIPE SIZE) 13. CLEANOUTS ARE REQURIED UNDER THE FOLLOWING CONDITIONS :
CONTINUATION
FINISHED 50MM Ø DRAIN PIPE
FLOOR PLAN AND PIPE SIZE) SECTION A. EVERY CHANGES IN HORIZONTAL DIRECTION
LINE B. EVERY 15.00M IN HORIZONTAL LINE OF PIPE
C. AT THE END OF ANY HORIZONTAL PIPE LINE
P TYPICAL LAVATORY INSTALLATION DETAIL P TYPICAL WATER CLOSET INSTALLATION DETAIL 14. ENGINEER-IN-CHARGE TO VERIFY ACTUAL LOCATION AND ELEVATION OF STREET DRAINAGE
2-2 SCALE NTS. 2-2 SCALE NTS.
AND STREET WATER MAINS FOR CONNECTION BEFORE CONSTRUCTION.

15. PROVIDE GRAVEL BEDDING FOR CATCH BASIN AND TRENCH BOTTOM SLAB, AND SAND
BACKFILL FOR ALL PVC PIPE AND CONCRETE PIPES FOR STORM AND SEWERAGE PIPES: REFER TO
DETAILS OF BEDDING AND BACKFILLING.

PUMP ROOM & CHANGING ROOM SMDC FLOOR PLAN P-4

You might also like