** ON A/C ALL
TASK 20-52-24-700-000-012
Insulation Test (AIRBUS)
WARNING: BE CAREFUL WHEN YOU USE ELECTRIC TOOLS IN AREAS WHERE THERE ARE RISK
S OF EXPLOSION (FUEL TANKS, FUEL VAPOUR AREAS, ETC.). REFER TO YOUR LOC
AL REGULATIONS AND MAKE SURE THAT YOU OBEY THEM. SOME ELECTRIC TOOLS
SUCH AS HEAT GUNS, SOLDERING IRONS AND TOOLS WITHOUT INTRINSIC PROT
ECTION ARE NOT PERMITTED IN THESE AREAS.
CAUTION: ONLY DO THIS TEST FOR THE ELECTRICAL ITEMS SPECIFIED IN THIS PROCEDUR
E. YOU CAN CAUSE DAMAGE IF YOU DO THIS PROCEDURE FOR OTHER ITEMS.
1. General
A. Reason for the Job
- To do a check of the insulation between conductors and between conductors and the s
tructure.
- The insulation test is not applicable to standard wires (risks for personnel, wiring and
electrical components).
- To do a check of the integrity of standard wires, do continuity and short-circuit tests
(Refer to chapters 20-52-21 and 20-52-22).
B. Additional information
Do an insulation test of:
- AC generator feeders (between phases, phases and ground, neutral and ground),
- E routes cables of AC generators (PMG) and E route cables between AC generator and
protective panels,
- Battery feeders (G route cables),
- Battery support only if the support is not made of an insulating material. Do a test of
the insulation between the metallic battery support and the aircraft ground),
- Transformer Rectifier Unit feeders (G route cables),
- APU starter wires,
- Fuel pump supply cables,
- Ground power receptacle feeders (G route Cables),
- Auto Transformer Unit feeders (G routes cables),
- Static Inverter feeders (G route cables).
QT
REFERENCE DESIGNATION
Y
No specific 1 MEGOHMMETER 200 MOHMS - 500 VDC, 0.001 A MAX
B. Referenced Information
REVISION REVISION
CUSTOMIZATION AIRCRAFT TYPES DOCTYPES TITLE
DATE NUMBER
A320 A319 A321 20-52-24-700-000-012 - Insulation Test
ESPM 01-Nov-2023 47
A318 (AIRBUS)
TAIL NUMBER - MSN - FSN:
Print date: 2023-11-16 00:36:23
REFERENCE DESIGNATION
Ref. Fig. Insulation Test
3. Job Set-Up
SUBTASK 20-52-24-941-001-001
A. Preparation
- Connect the aircraft structure to the ground.
- Disconnect the lightning protection unit (LPU).
- Disconnect the wire, cable or feeder at each end.
CAUTION: MAKE SURE THAT THE WIRE IS DISCONNECTED AT EACH END BEFORE YOU DO TH
IS TEST.
IF THE WIRE IS NOT DISCONNECTED, THE VOLTAGE USED FOR THIS TEST CAN CA
USE DAMAGE TO EQUIPMENT.
5. Close-Up
SUBTASK 20-52-24-942-001-001
© AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.
2/4
11/16/2023 A318 / A319 / A320 / A321 - ESPM - 01-Nov-2023 - 20-52-24-700-000-012 - Insulation Test (AIRBUS)
REVISION REVISION
CUSTOMIZATION AIRCRAFT TYPES DOCTYPES TITLE
DATE NUMBER
A320 A319 A321 20-52-24-700-000-012 - Insulation Test
ESPM 01-Nov-2023 47
A318 (AIRBUS)
TAIL NUMBER - MSN - FSN:
Print date: 2023-11-16 00:36:23
REVISION REVISION
CUSTOMIZATION AIRCRAFT TYPES DOCTYPES TITLE
DATE NUMBER
A320 A319 A321 20-52-24-700-000-012 - Insulation Test
ESPM 01-Nov-2023 47
A318 (AIRBUS)
TAIL NUMBER - MSN - FSN:
Print date: 2023-11-16 00:36:23
TEST BETWEEN:
A AND B
A AND C
ETC ...
P_SP_205224_P1_00010001_01_00