Download as pdf or txt
Download as pdf or txt
You are on page 1of 6

Eastern Railway

( Howrah Division )

No. : AZ / Br. 26 / Uma Cons. / 186 Date : 28th December 2023

Divisional Engineer (III),


Eastern Railway,
Howrah.

Sub : Approval for inclusion of Non-Schedule Items for the work of "Providing RCC Jacketing with curtain wall, rebuilding of RCC retaining wall, wing wall and flooring at Bridge no. 26 in AN Branch line under AEN/KWAE."

Acceptance No. : HOWRAH DIVISION-ENGG/128_2021-22/00930100054751 , Dated. 20/05/2022.


Agreement No. : ER/HWH/Civil/2022/0082 , Dated. 30/08/2022.
Name of Agency : UMA CONSTRUCTION-RAIGANJ

The following items were not included in original Contract Agreement for the subject work,but as per site condition this item is essentially required which to be included for proper development of work.
Non-Schedule Items :

WPI
Rate as %
SL Month of WPI of Index as % increase
Description of Item Qty. Unit Rate Amount Remarks LAR No. & Date LAR Rate increase of Avg. Rate
No LOA LAR on Nov - of WPI
WPI
2023 (P)

4. HOWRAH DIVISION-
ENGG/09_2021-
22/00859550051908, March -
9,133.47 148.90 152.90 2.69% 9,379.16
Dated. 30/09/2022. 2022
( Rate : Rs. 9932.00 with
8.04% Below.)
Providing & laying in position 5. HOWRAH DIVISION-
M-30 grade concrete with For construction of ENGG/181_2021-
admixture reinforced concrete RCC box and slabs the 22/00898320043475, October -
1 39.20 Cum 9,385.11 3,67,896.31 8,994.42 140.70 152.90 8.67% 9,774.24 9,385.11
structural element or other but item is required so Dated. 18/10/2021. 2021
excluding cost of centering, being proposed. ( Rate : Rs. 9932.00 with
shuttering reinforcement etc. 9.44% Below.)
6. HOWRAH DIVISION-
ENGG/98_2021-
22/00898320047771, January -
8,466.04 143.80 152.90 6.33% 9,001.94
Dated. 06/01/2022. 2022
( Rate : Rs. 9932.00 with
14.76% Below. )
Demolition of masonry brick
1. LOA No.
work. PCC, RCC of existing
00903550030803, Dated. January -
pier/abutment, flooer, bed, 1,356.15 126.50 152.90 20.87% 1,639.18
12/01/2021. (Rate : 1674.46 2021
pavement etc at superstructure,
and 19.01% below)
sub-structure, founding level etc
as required at site with/without This item is not included
in the work schedule but 7. LOA No. :
mechanical means and shifting
will be required during 00926340090552, Dated. November -
2 debris and cleaning the site as 50.00 Cum 1,839.35 91,967.50 2,014.41 152.90 152.90 0.00% 2,014.41 1,839.35
placement of cast RCC 07/11/2023. ( Rate : Rs. 2023
per instruction of Engineer-in- boxes and slabs. So, this 1974.91 with 2% above )
charge. The rate includes all item is being processed.
labours, tools, plants, 8. LOA No. :
machineries, handling, re- 00926340088335, Dated.
October -
handling, lead up to 250m, lift, 05/10/2023. ( Rate : Rs. 1,854.64 152.10 152.90 0.53% 1,864.47
2023
transporting, carrying and all 1974.91 with 6.09% below
other incidental charges )
complete in all respect.

Page 1
Non-Schedule Items :

WPI
Rate as %
SL Month of WPI of Index as % increase
Description of Item Qty. Unit Rate Amount Remarks LAR No. & Date LAR Rate increase of Avg. Rate
No LOA LAR on Nov - of WPI
WPI
2023 (P)

1. LOA No.
00903550030803, Dated. January -
Earthwork in excavation in 114.32 126.50 152.90 20.87% 138.18
12/01/2021. (Rate : 141.15 2021
foundation of bridges, wing
and 19.01% below)
wall, drop wall, flooring etc. in
all class of soil, muck etc. The This item is not included
in the work schedule but 7. LOA No. :
rate is inclusive of necessary
will be required during 00926340090552, Dated. November -
3 shoring, strutting including all 250.00 Cum 158.44 39,610.00 169.80 152.90 152.90 0.00% 169.80 158.44
placement of cast RCC 07/11/2023. ( Rate : Rs. 2023
lead, lift, ascent, descent, boxes and slabs. So, this 166.47 with 2% above )
disposal of excavated earth to item is being processed.
suitable place outside Rly. land
8. LOA No. :
or as per the direction of site-in-
00926340088335, Dated. October -
charge. 156.33 152.10 152.90 0.53% 167.35
05/10/2023. ( Rate : Rs. 2023
166.47 with 6.09% below )

7. LOA No. :
00926340090552, Dated. November -
1,434.48 152.90 152.90 0.00% 1,434.48
07/11/2023. ( Rate : Rs. 2023
1406.35 with 2% above )
Extra over earthwork in cutting This item is not included
8. LOA No. :
in the work schedule but
in foundation, side drain, cross 00926340088335, Dated.
will be required during October -
4 drainetc over, Non Schedule 250.00 Cum 1,359.52 3,39,880.00 05/10/2023. ( Rate : Rs. 1,320.70 152.10 152.90 0.53% 1,327.70 1,359.52
placement of cast RCC 2023
Item Code 3 of Schedule A boxes and slabs. So, this 1406.35 with 6.09% below
during block period item is being processed. )
9. LOA No. :
00926340088145, Dated.
October -
03/10/2023. ( Rate : Rs. 1,309.45 152.10 152.90 0.53% 1,316.39
2023
1406.35 with 6.89% below
)

1. LOA No.
00903550030803, Dated. January -
983.36 126.50 152.90 20.87% 1,188.59
12/01/2021. (Rate : 1214.17 2021
and 19.01% below)
Supplying and placing in
position back fill materials This item is not included 2. LOA No.
behind abutment, wing walls in the work schedule but
10261820012448, Dated. December -
and return walls as per para 7.5 will be required during 1,318.70 123.00 152.90 24.31% 1,639.28
5 100.00 Cum 1,320.11 1,32,011.00 24/12/2019. (Rate : Rs. 2019 1,320.11
of Bridge sub-structure and placement of cast RCC
foundation code with materials boxes and slabs. So, this 1232.78 And 6.97% above)
of GW, GP, SW Groups as per item is being processed.
IS1498-1970 etc. 11. LOA No. :
10226430037687, Dated.
990.26 June - 2021 133.70 152.90 14.36% 1,132.46
30/06/2021. ( Rate : Rs.
1237.83 with 20% below)

Page 2
Non-Schedule Items :

WPI
Rate as %
SL Month of WPI of Index as % increase
Description of Item Qty. Unit Rate Amount Remarks LAR No. & Date LAR Rate increase of Avg. Rate
No LOA LAR on Nov - of WPI
WPI
2023 (P)

1. LOA No.
00903550030803, Dated. January -
14.29 126.50 152.90 20.87% 17.27
12/01/2021. (Rate : 17.64 2021
and 19.01% below)
Filling of ballast, sand, stone
dust into cement bag and This item is not included
in the work schedule but 2. LOA No.
placing spreading the same as
will be required during 10261820012448, Dated. December -
6 per direction of site in charge. 3,000.00 Each 20.67 62,010.00 18.92 123.00 152.90 24.31% 23.52 20.67
placement of cast RCC 24/12/2019. (Rate : Rs. 2019
The rate includes all lead, lift, boxes and slabs. So, this 17.69 And 6.97% above)
descend, ascend etc complete in item is being processed.
all respect.
7. LOA No. :
00926340090552, Dated. November -
21.22 152.90 152.90 0.00% 21.22
07/11/2023. ( Rate : Rs. 2023
20.80 with 2% above )

Driving S. H. rails 90R/52 kg or 7. LOA No. :


any section of rail below 00926340090552, Dated. November -
ground level at pier/abutment / 280.46 152.90 152.90 0.00% 280.46
07/11/2023. ( Rate : Rs. 2023
within the slope of 274.96 with 2% above )
embankment up to required
depth as per direction of site in This item is not included
charge. The rate includes in the work schedule but
8. LOA No. :
chiseling at one end with will be required during 00926340088335, Dated. October -
7 1,200.00 Metre 265.81 3,18,972.00 258.21 152.10 152.90 0.53% 259.58 265.81
placement of cast RCC 05/10/2023. ( Rate : Rs. 2023
contractors own arrangement
with derrick/ rope/pully boxes and slabs. So, this 274.96 with 6.09% below )
cap/monkey, cutting of rails, item is being processed.
trolleying/ leading of rails to
9. LOA No. :
the site etc. complete in all
00926340088145, Dated. October -
respect. The rail will be 256.02 152.10 152.90 0.53% 257.38
03/10/2023. ( Rate : Rs. 2023
supplied by Railway free of
274.96 with 6.89% below )
cost.

Driving S. H. rails 90R/52 kg or 7. LOA No. :


any section of rail below 00926340090552, Dated. November -
740.54 152.90 152.90 0.00% 740.54
ground level across to Railway 07/11/2023. ( Rate : Rs. 2023
track during Power block time 726.02 with 2% above )
up to required depth as per
direction of site in charge. The This item is not included 8. LOA No. :
rate includes chiseling at one in the work schedule but 00926340088335, Dated. October -
end with contractors own will be required during 681.81 152.10 152.90 0.53% 685.42
8 500.00 RM 701.85 3,50,925.00 05/10/2023. ( Rate : Rs. 2023 701.85
arrangement with placement of cast RCC
726.02 with 6.09% below )
derrick/rope/pulley boxes and slabs. So, this
cap/monkey, cutting of rails, item is being processed.
trolleying / leading of rails to
9. LOA No. :
the site etc. complete in all
00926340088145, Dated. October -
respect. The rail will be 676.00 152.10 152.90 0.53% 679.58
03/10/2023. ( Rate : Rs. 2023
supplied by Railway free of
726.02 with 6.89% below )
cost.

Page 3
Non-Schedule Items :

WPI
Rate as %
SL Month of WPI of Index as % increase
Description of Item Qty. Unit Rate Amount Remarks LAR No. & Date LAR Rate increase of Avg. Rate
No LOA LAR on Nov - of WPI
WPI
2023 (P)

1. LOA No. 00903550030803,


Dismantling of track of January -
Dated. 12/01/2021. (Rate : 242.48 126.50 152.90 20.87% 293.09
52kg/60kg rail with any type of 2021
299.40 and 19.01% below)
sleeper with removal of all This item is not included
in the work schedule but
fittings. The rate includes 2. LOA No. 10261820012448,
Per Track will be required during December -
9 cutting of rails, drilling hole, 30.00 351.12 10,533.60 Dated. 24/12/2019. (Rate : Rs. 321.86 123.00 152.90 24.31% 400.10 351.12
Metre placement of cast RCC 2019
removal of sleeper, guard rail 300.89 And 6.97% above)
boxes and slabs. So, this
and trolleying the same to item is being processed. 7. LOA No. :
bridge approaches as per 00926340090552, Dated. November -
360.18 152.90 152.90 0.00% 360.18
direction of site incharge. 07/11/2023. ( Rate : Rs. 353.12 2023
with 2% above )

1. LOA No.
Linking of track with new rails/existing
00903550030803, Dated. January -
rails at site to the proper alignment 277.03 126.50 152.90 20.87% 334.85
12/01/2021. (Rate : 342.06 2021
with 52/60 kg rails & PSC sleepers,
squaring, maintaining proper gauge, and 19.01% below)
alignment, cross-level, super elevation
etc. The rate includes the cost of three This item is not included
consolidation packings including that 2. LOA No.
in the work schedule but
of approx. 50 nos. of sleepers on
Per Track will be required during 10261820012448, Dated. December -
30.00 11,799.90 348.84 123.00 152.90 24.31% 433.64
10 approaches, greasing of pandrol clips, 393.33 24/12/2019. (Rate : Rs. 2019 393.33
lubrication of fish plated joints, Metre placement of cast RCC
boxes and slabs. So, this 326.11 And 6.97% above)
maintaining proper gaps at fish plated
joints by pulling/hacksaw cutting etc. item is being processed.
The rate includes supply of all
consumable stores like grease etc. with 7. LOA No. :
all lead, lift, ascent, descent, crossing 00926340090552, Dated. November -
track complete in all respect as per the 411.51 152.90 152.90 0.00% 411.51
07/11/2023. ( Rate : Rs. 2023
instruction of site engineer.
403.44 with 2% above )

Supplying and spreading of stone


ballast over bridge slab/box under 1. LOA No.
traffic block with the help of 00903550030803, Dated. January -
1,116.66 126.50 152.90 20.87% 1,349.71
gunny bags/empty cement bags 12/01/2021. (Rate : 1378.76 2021
etc. The rate include filling of and 19.01% below)
stone ballast into empty cement
bag/gunny bag and stacking at the
different bridge location before
This item is not included 2. LOA No.
traffic block where slab is to be
in the work schedule but 10261820012448, Dated. December -
placed and spreading the stone 1,383.56 123.00 152.90 24.31% 1,719.90
will be required during 24/12/2019. (Rate : Rs. 2019
11 ballast over the slab after slab 70.00 Cum 1,658.68 1,16,107.60 1,576.10
placement of cast RCC
placement and its approached 1293.41 And 6.97% above)
boxes and slabs. So, this
during traffic block as per direction
item is being processed.
of site-incharge. The rate includes
all lead, lift, ascend, descend,
crossing of track etc etc. The 7. LOA No. :
empty cement /gunny bag
00926340090552, Dated. November -
will be supplied by the contractor 1,658.68 152.90 152.90 0.00% 1,658.68
07/11/2023. ( Rate : Rs. 2023
which will be retained by the
contractor after completion of 1626.16 with 2% above )
work.

Page 4
Non-Schedule Items :

WPI
Rate as %
SL Month of WPI of Index as % increase
Description of Item Qty. Unit Rate Amount Remarks LAR No. & Date LAR Rate increase of Avg. Rate
No LOA LAR on Nov - of WPI
WPI
2023 (P)

1. LOA No.
00903550030803, Dated. January -
14.10 126.50 152.90 20.87% 17.04
12/01/2021. (Rate : 17.41 2021
and 19.01% below)

This item is not included


in the work schedule but 2. LOA No.
will be required during 10261820012448, Dated. December -
12 3 round consolidation packing 30.00 Numbers 19.52 585.60 17.03 123.00 152.90 24.31% 21.17 19.52
placement of cast RCC 24/12/2019. (Rate : Rs. 2019
boxes and slabs. So, this 15.92 And 6.97% above)
item is being processed.

10. LOA No. :


00873120030246, Dated. December -
16.68 125.40 152.90 21.93% 20.34
30/12/2020. ( Rate : Rs. 2020
15.96 with 4.5% above )

2. LOA No.
10261820012448, Dated. December -
1,644.44 123.00 152.90 24.31% 2,044.20
24/12/2019. (Rate : Rs. 2019
1537.29 And 6.97% above)

This item is not included


3. Acceptance No. :
Supplying of gas including gas in the work schedule but
OAH/2/16/2018-19/AZ,
cutting equipment & other will be required during August -
13 4.00 Numbers 2,012.18 8,048.72 Dated. 14/08/2018. (Rate : 1,597.34 120.10 152.90 27.31% 2,033.57 2,012.18
ancillary items. De-oxy- placement of cast RCC 2018
boxes and slabs. So, this Rs. 1648.44 and 3.10%
acetelence gas cylinder.
item is being processed. below)

10. LOA No. :


00873120030246, Dated. December -
1,606.47 125.40 152.90 21.93% 1,958.77
30/12/2020. ( Rate : Rs. 2020
1537.29 with 4.5% above )

1. LOA No.
Arrangement of JCB/Pay loader 00903550030803, Dated. January -
910.02 126.50 152.90 20.87% 1,099.94
for cutting and removal of hard 12/01/2021. (Rate : 1123.62 2021
compact stone product / earth and 19.01% below)
etc. from inside/outside track
and other miscellaneous works This item is not included
in the work schedule but
7. LOA No. :
like removal of encroachments 00926340090552, Dated. November -
will be required during 1,351.73 152.90 152.90 0.00% 1,351.73
14 etc after specific instruction by 50.00 Hour 1,234.26 61,713.00 07/11/2023. ( Rate : Rs. 2023 1,234.26
placement of cast RCC
ADEN. The debris will be boxes and slabs. So, this 1325.23 with 2% above )
thrown as per direction of site item is being processed.
in charge within a lead of 100m 8. LOA No. :
the rate includes hiring of 00926340088335, Dated.
October -
JCB/Pay Loader, consumable 05/10/2023. ( Rate : Rs. 1,244.52 152.10 152.90 0.53% 1,251.12
2023
oil, operator etc. 1325.23 with 6.09% below
)

Page 5
Non-Schedule Items :

WPI
Rate as %
SL Month of WPI of Index as % increase
Description of Item Qty. Unit Rate Amount Remarks LAR No. & Date LAR Rate increase of Avg. Rate
No LOA LAR on Nov - of WPI
WPI
2023 (P)

1. LOA No.
00903550030803, Dated. January -
333.98 126.50 152.90 20.87% 403.68
12/01/2021. (Rate : 412.37 2021
Assistance to Rly Crane working
and 19.01% below)
during day/night for removing
of existing girder or placement This item is not included
in the work schedule but 2. LOA No.
of bridge slab over
will be required during 10261820012448, Dated. December -
15 pier/abutment in traffic block 20.00 Hour 495.18 9,903.60 443.89 123.00 152.90 24.31% 551.80 495.18
placement of cast RCC 24/12/2019. (Rate : Rs. 2019
by employing at least 16 boxes and slabs. So, this 414.97 And 6.97% above)
labours for 8 hours shift. Labour item is being processed.
should be at site till completion
10. LOA No. :
of the traffic block.
00873120030246, Dated. December -
434.72 125.40 152.90 21.93% 530.05
30/12/2020. ( Rate : Rs. 2020
416.00 with 4.5% above )

1. LOA No.
Hire charges for one no. DG set 00903550030803, Dated. January -
290.62 126.50 152.90 20.87% 351.27
5KVA including labours, tools, 12/01/2021. (Rate : 358.84 2021
plant & equipment, fuel, and 19.01% below)
lubrication oil, operator, This item is not included
operation and maintenance in the work schedule but 2. LOA No.
with lighting arrangement by 6 will be required during 10261820012448, Dated. December -
16 20.00 Hour 407.83 8,156.60 354.39 123.00 152.90 24.31% 440.54 407.83
nos 500 watt Halogen with placement of cast RCC 24/12/2019. (Rate : Rs. 2019
fittings and 4 nos FL fittings boxes and slabs. So, this 331.30 And 6.97% above)
complete. This item should be item is being processed.
operated in case of emergency 7. LOA No. :
arises at site as decided by the 00926340090552, Dated. November -
431.69 152.90 152.90 0.00% 431.69
Engineer-in-charge. 07/11/2023. ( Rate : Rs. 2023
423.23 with 2% above )

Total = Rs. 19,30,120.43

Page 6