Bill of Quantities for Large Rainwater Catchment (Barked) Guumeys - Completion Activities

Unit price
Item Description of work items Unit Qty Total/Costs USD
USD
Excavation Works
Sharpening the edges of interior side for existing excavated
barked.Note that 50m Length & 5m Deep is already
excavated.Keep in mind that the nature of the soil is hard and
needs driller to be used during the sharpening. Ls 1.0
Desilting by removing atleast 100cm deep the silts at the
bottom of Barked and collection Shallow well. This Includes
Laying Fine Sand On the Bottom of Barked to Receive the Lining
Sheet at 3cm Thick. m³ 364.0
Deeping of Silt trap at depth of 1m. The existing excavated
dimension for silt trap is 12.3 x 4 x 1m. Note that the nature of
the land is hard and needs driller to be used during the
excavation. m³ 49.2
Excavate Water Diversion Catchment Embackment in two
directions and direct them at inlet direction of the barked with
dimension of 200m Length x 50cm width x 1.0m height.
m³ 100.0
Complete the excavation and sharpening the edges of of
Pipeline trench directing to shallow well at depth of 7m x 1.8m
width x 1.5m deep. Note that 7m x 1.8m width x 3.5m is
already excavated.Note that the nature of the land is hard and
needs driller to be used during the excavation. m³ 30.0
Excavation of foundation trench locate at the upper barked
surroundings,Collection channel and Silt trap of dimension
180m long x 0.5m width x 0.5m.Note that the nature of the
land is hard and needs driller to be used during the excavation.
m³ 45.0
Excavation of Pipe posts of steel structure around the barked
surroudings and place them at 1.5m interval. The excavation
dimension 0.4m Length x 0.4m width x 0.5m Deep.
m³ 5.8
Backfill the Shallow well and Excavated 8 Inch Trench when the
construcition and lining activities completed Ls
Install lining geomembrane plastic sheet inside barked and Silt
Trap which is available to site construction. The trasporting and
loading the sheet from the Guumeys Control to barked site
must be included. Laying fine sand at bottom of barked cost has
to be also included. Sqm 1,500.0
Supply materials and construction roofing of steel sturcure
shaped like triangular gable Steel truss of 2.5m height and install
galvanized steel pipes of the following;
a. 3 Inch GI pipe Class B for Loadingtie Beam welding with King
Posts and Bracing
b. 3 Inch GI pipe Class B for King Posts
c. 1.5 Inch GF pipe Class B for Rafters and Bracings
All the structure must be welded properly. The truss spacing
will be 1.5m interval. Each Truss must be connected and welded
with 2 inch GI pipe to increase the cohesion strength between
roof trussess.The Roof sheet must be made of 600 micro meter
(0.6mm) steel plate galvanized and painted with epoxide red
powder bounded with ALUBEL profile.All the neccessary
ancillaries , like bolts , washers, nuts , amd anchoring devices of
roofing plate to the supporting frame must be provided and
implemented accordingly. This Price Also Includes Installation of
Gutter at 100m Long Shaped with 40cm x 40cm for Height and
Width.
m³ 850.0
Cast PCC M15 Concrete for 4 Inch Steel Posts at dimension of m³
0.4m Length x 0.4m width x 1m Deep in 72 Holes. 7 day must
be twicely cured. 11.5
Construction of Mansonry walls with cement morter at Barked
surroundings, Silt- Trap and Collection Channel at dimension of
173m long x 0.4m width x 0.9m Height(0.5m under GL and
0.4m Above GL) m³ 62.3
Construct outlet wash out as illustrated in the attached
drawings. Ls 1.0
Construction of Collection Shallow Well
supply all the necessary material and built Shallow well for
Water Collection, which will include :
A) Cast RCC at bottom slab Ø 4.20 x 0.20m made with class 20
concrete reinforced with steel bars in the ratio of 40 kg / cubic
meter
B) Cast RCC Rings of internal diameter Ø 3m x 7m which 1m
above the ground. This price includes Construction of ,
crystalline 0.5m mansonary stone wall thickness around the
Shallow Well To Help the Beneficiaries To Fetch Water Easily.
C) Cast RCC top slab Ø 4m x 0.15m made with class 25
concrete reinforced with steel bars in the ratio of 70 kg / each
cubic meter , the top slab will have 0.7 x 0.7m manhole.

Job 1.0
Manhole cover 0.7 x0.7m with 1.20mm steel plate installed on
the frame made with 5x5cm "L" section,electrically
welded.Supporting frame made with 6 x6 cm "L" steel sections
electrically welded fixed to the top slab with dowels. The cover
should be hinged to the supporting frame , both must be
equipped with eye-hooks for security pad lock. All steel
sections should be painted with three hands of enamel
Kg 1.0
supply and intall 0.6 x6.80m ladder , made with 2No, Ø40
x2mm x6.8m pipes and 32No.Ø24 x2 mm pipes both made with
AISI304 stainless steel. Electrically welded with electrodes steel
with C<5% . The ladder should be firmly fixed to the collection
chamber liner with steel dowels.
No 1.0
Grand Total - Completion of Guumeys Barked