Download as pdf or txt
Download as pdf or txt
You are on page 1of 6

3rd IFAC Workshop on Advanced Maintenance Engineering, Service and Technology

3rd IFAC19-21,
October Workshop
2016.on Advanced
Biarritz, Maintenance Engineering, Service and Technology
France
3rd
3rd IFAC Workshop
IFAC19-21,
October 2016.on
Workshop on Advanced
Advanced
Biarritz, Maintenance
Available Engineering,
Maintenance
France Engineering, Service
Service and
and Technology
Technology
online at www.sciencedirect.com
October
October 19-21,
19-21, 2016.
2016. Biarritz,
Biarritz, France
France

ScienceDirect
IFAC-PapersOnLine 49-28 (2016) 191–196
Building
Building Information
Information Modeling
Modeling as
as Assest
Assest Management
Management Tool
Tool
Building
Building Information
Information Modeling
Modeling as
as Assest
Assest Management
Management Tool
Tool
A.J. Guillen*, A. Crespo*, J. Gómez*, V. González-Prida*, K. Kobbacy**, S. Shariff**
A.J. Guillen*, A. Crespo*, J. Gómez*, V. González-Prida*, K. Kobbacy**, S. Shariff**
A.J. Guillen*,
A.J. Guillen*, A.
A. Crespo*,
Crespo*, J.
J. Gómez*,
Gómez*, V.V. González-Prida*,
González-Prida*, K. K. Kobbacy**,
Kobbacy**, S.S. Shariff**
Shariff**
* School of Engineering, University of Seville, Seville, CP 41092
* School of Engineering, University of Seville, Seville, CP 41092
Spain (e-mail: **ajguillen@us.es,
School
School of adolfo@esi.us.es,
of Engineering,
Engineering, Universityjuanfrancisco.gomez@juntadeandalucia.es,
University of
of Seville,
Seville, Seville,
Seville, CP
CP 41092
41092
Spain (e-mail: ajguillen@us.es, adolfo@esi.us.es, juanfrancisco.gomez@juntadeandalucia.es,
Spain
Spain (e-mail:
(e-mail: ajguillen@us.es, vicente.gonzalezprida@gdels.com).
ajguillen@us.es, adolfo@esi.us.es,
adolfo@esi.us.es, juanfrancisco.gomez@juntadeandalucia.es,
juanfrancisco.gomez@juntadeandalucia.es,
vicente.gonzalezprida@gdels.com).
** Chair for Operations & Maintenance. University of Taibah, Medina, KSA (e-mail:
vicente.gonzalezprida@gdels.com).
vicente.gonzalezprida@gdels.com).
** Chair for Operations & Maintenance. University of Taibah, Medina, KSA (e-mail:
** Chair
** Chair for kobbacyk@gmail.com,
for Operations
Operations &
& Maintenance. samshariff@yahoo.com)
Maintenance. University
University of
of Taibah,
Taibah, Medina,
Medina, KSA
KSA (e-mail:
(e-mail:
kobbacyk@gmail.com, samshariff@yahoo.com)
kobbacyk@gmail.com,
kobbacyk@gmail.com, samshariff@yahoo.com)
samshariff@yahoo.com)
Abstract: BIM models are transforming the way buildings or, in more general terms, facilities or
Abstract: BIMaremodels
infrastructures are transforming
conceived, the way and
designed, constructed buildings
managed.or, But
in more general
current use ofterms, facilities or
BIM concentrates
Abstract:
Abstract: BIMBIMaremodels
models are
are transforming
transforming the
the way buildings
way and
buildings or, in
in more
or, But more general
general terms, facilities
facilities or
infrastructures conceived, designed, constructed managed. current use ofterms,
BIM concentrates or
on preplanning,
infrastructures
infrastructures are
aredesign,
conceived,
conceived,construction
designed,
designed, and project
constructed
constructed delivery
and
and rather
managed.
managed. But
But than maintenance
current
current use
use of
of BIM
BIM and operation
concentrates
concentrates
on preplanning, design, construction and project delivery rather than maintenance and operation
management.
on
on preplanning,
preplanning,Thisdesign,
despite construction
the fact that it
andis estimated
project that operation
project delivery rather and
rather thanmaintenance
than maintenancephase
maintenance and constitutes
and operation
management. Thisdesign,
despite construction and
the fact that it is estimated delivery
that operation and maintenance phase operation
constitutes
approximately
management.
management. 60%
This
This of the
despite
despite total
the
the lifecycle
fact
fact that
that it
it cost
is
is of a
estimated
estimatedfacility
that
that or building.
operation
operation and
and Asset Management,
maintenance
maintenance phase
phase which is a
constitutes
constitutes
approximately
broad discipline60% of the total
including lifecycle
Facilities cost of a facility
Management (FM), or building.
provide an Asset Management,
advance approach whichmore
getting is a
approximately
approximately 60%
60% of the total
of the total lifecycle
lifecycle cost of a facility
cost of a facility or building.
or building. Asset Management,
Asset Management, which
whichmoreis
is aa
broad discipline including Facilities Management (FM), provide an advance approach getting
efficiency
broad
broad and efficacy
discipline
discipline in theFacilities
including
including lifecycle Management
Facilities management of
Management building
(FM),
(FM), and facilities.
provide
provide an
an advance
advanceThis paper introduces
approach
approach getting
getting how
more
more
efficiency and efficacy in the lifecycle management of building and facilities. This paper introduces how
the development
efficiency
efficiency and of AMin
and efficacy
efficacy inthe
thislifecycle
particular field is going
management of to
of be supported
building and by the application
and facilities. This
This paper of BIM models
paper introduces how
the development of AMininthethislifecycle management
particular field is going building
to be supportedfacilities.
by the application introduces
of BIM modelshow
as
the
thekey tool that
development
development will
of
of allow
AM
AM in
inasset
this
this management
particular
particular information
field
field is
is going
going to
to system
be
be effective
supported
supported by
by implementation.
the
the application
application of
of BIM
BIM models
models
as key tool that will allow asset management information system effective implementation.
as key
key tool
as 2016,tool that
that will
will allow
allow asset
asset management
management information
information system
system effective
effective implementation.
implementation.
©
Keywords:IFAC (International
Building Federation
Information of Automatic
Model, BIM, Control)
Facilities Hosting by Elsevier
Management, FM, Ltd. All rights
Computer reserved.
Aids Facilities
Keywords: Building Information Model, BIM, Facilities Management, FM, Computer Aids Facilities
Management
Keywords: (CAFM),
Building
Keywords: Building PAS 1192-2,
Information
Information PAS
Model,
Model, 1192-3.
BIM,
BIM, Facilities Management, FM, Computer Aids Facilities
Facilities Management, FM, Computer Aids Facilities
Management (CAFM), PAS 1192-2, PAS 1192-3.
Management (CAFM), PAS 1192-2,
Management (CAFM), PAS 1192-2, PAS 1192-3. PAS 1192-3.
3:2014). So talking about BIM as a FM tool supposing, by
1. INTRODUCTION 3:2014). Solinktalking about BIM as a FM tool supposing, by
1. INTRODUCTION extension,
3:2014). So
3:2014). So talkingBIM and
talking about
about AM. BIM
BIM as as aa FM
FM tool tool supposing,
supposing, by by
1.
1. INTRODUCTION
INTRODUCTION extension, link BIM and AM.
Are Asset Management (AM) and BIM (Building extension,
extension, link
link BIM
BIM and
and AM.
AM.
Are Asset Management (AM) and BIM (Building AM approach allows connecting BIM technology application
Information
Are
Are Asset Modeling)
Management
Asset Modeling)
Management a natural
(AM) partnership?
(AM) and
and BIM BIM Both (Building
(Building are AM approach allows connecting BIM technology application
Information a natural partnership? Both are with
AM a relevant
AM approach
approach fact:connecting
allows
allows the necessity BIMof
BIM managingapplication
technology the asset
powerful
Information
Information research and
Modeling)
Modeling) development
a natural lines
a natural lines in this
partnership?
partnership? moment.
Both
Both TheThe
are
are with a relevant fact:connecting
the necessity oftechnology
managingapplication
the asset
powerful research and development in this moment. value.
with
with aWith
aWith this
relevant
relevant view,
fact: the
the
fact: the implementation
necessity
the implementation of of BIM
managing
necessity of managing should
the not
the asset
asset
integration
powerful
powerful of BIMand
research
research andtools within AMlines
development
development approach
lines in
in this
thisensure
moment.
moment. thatThethe
The value. this view, of BIM should not
integration of BIM tools within AM approach ensure that be considered
value. With this an isolate
view, the IT effort
implementationfor anof organization
BIM
BIM should not
should but
organization
integration
integration of obtains
BIM thewithin
tools resultsAM that expectsensure
approach (Lovethat et the
al.
the value. With thisanview,
be considered the implementation
isolate IT effort for anoforganization not
but
organization obtains the results that expects (Love et the
of BIM tools within AM approach ensure that al. integrated
be considered
be considered within an the asset
isolate
an the
isolate IT information
effort for system
an in
organizationthe asset
but
2014).
organization
organization obtains
obtains the results that expects (Love et al.
the results that expects (Love et al. integrated within assetITinformation
effort for an organization
system in the assetbut
2014). management
integrated
integrated within system.
within the (PAS
the(PASasset 1912-2:2013)
information
asset1912-2:2013) system
information system in the assetin the asset
2014).
2014). management system.
It is estimated that operation and maintenance phase management
management system. (PAS 1912-2:2013)
It is estimated that operation and maintenance phase The literaturesystem. (PASdespite
shows that, 1912-2:2013)
many attempts to BIM-FM
constitutes
It
It is approximately
is estimated
estimated that
that operation60% of the
operation andtotal
and lifecycle costphase
maintenance
maintenance of a
phase The literature shows that, despite manyprovide
attemptsgood to BIM-FM
constitutes approximately 60% ofcomponents
the total lifecycle cost of isa implementation
The
The literature
literature existthat,
shows
shows and despite
that, apparently
despite many attempts
manyprovide
attemptsgood to results,
to BIM-FM
BIM-FM
facility
constitutes
constitutes or building.
approximately Within 60% theof the total of
lifecycle this cost
cost of a implementation exist and apparently results,
facility or approximately
building. Within 60% theofcomponents
the total lifecycle
of thiscost costof isa they are still
implementation
implementation piecemeal
exist
exist and and
and FM cases
apparently showing
provide extensive
good
good results,use
interesting
facility or to
building.
facility or building. highlight
Within
Within those those
the related
components
the components to
of inadequate
this
of this cost
cost is is they are still piecemeal andapparently
FM cases showingprovide extensive results,
use
interesting to highlight related to inadequate of
they
theyBIM are are
still
are still lack (Kassem
piecemeal
piecemeal and
and etet
FM al., 2015;
cases
FMal.,cases Volk
showing
showing et al.,
extensive
extensive 2013).
use
use
interoperability
interesting to
interesting to between between
highlight different
highlight differentthose roles
related
those related and to stakeholders
inadequate of BIM are lack (Kassem 2015; Volk et al., 2013).
interoperability roles andto stakeholders
inadequate Moreover,
of
of BIM
BIM are
arecaselack
lack studies
(Kassem
(Kassem generally
et
et are
al.,
al., focused
2015;
2015; Volk
Volk on specifics
et
et al.,
al., FM
2013).
2013).
involved in the building
interoperability
interoperability between lifecycle.
between different For
different roles
rolesexample,
and a study by
and stakeholders
stakeholders Moreover, case studies generally are focused on specifics FM
involved in the building lifecycle. For example, a study by area and still
Moreover,
Moreover, case
case present
studiesmany
studies gaps, are
generally
generally issues and challenges
focused on specificsto
on specifics FMbe
the US National
involved
involved in
in the
the Institute
building
building of Standards
lifecycle.
lifecycle. For
For and Technology
example,
example, aa study
study by by area and still present many gaps, are focused
issues and challenges toFMbe
the US National Institute of Standards and Technology implemented
area and still correctly
present
area and still correctly
present many (Parsanezhad
many gaps, et
issues
gaps, issues al.,
and 2014). Perception
challenges
and2014).
challenges to
to be
be
(NIST)
the
the US
US showed
National
National thatInstitute
the annual
Institute of
of costs associated
Standards
Standards and
and toTechnology
inadequate
Technology implemented (Parsanezhad et al., Perception
(NIST) showed that the annual costs associated to inadequate of BIM (lack correctly
implemented
implemented of benefit(Parsanezhad
evidence, lack et of FM
et al., 2014). engagement),
Perception
interoperability
(NIST)
(NIST) showed
showed that among
that the software
the annual
annual systems
costs
costs was to
associated
associated $15.8 billion
inadequate of BIM (lack correctlyof benefit(Parsanezhad
evidence, lack al.,
of FM2014). Perception
engagement),
interoperability among software systems was to $15.8inadequate
billion standards
of
of BIM
BIM (lack and of
(lack policy (interoperability,
benefit evidence,
evidence, lacklacktools
of
of FM integration),
engagement), risk
(Gallaher et
interoperability
interoperability al. 2004).
among
amongTwo Two thirds
software
software of this
systems cost
was was incurred
$15.8 as
billion standards and of benefit
policy (interoperability, tools FM engagement),
integration), risk
(Gallaher et al. 2004). thirds systems
of this cost waswas $15.8 billion
incurred as and uncertainty
standards
standards and
and (potential
policy
policy lack of interest
(interoperability,
(interoperability, tools
tools from investors,
integration),
integration), risk
risk
a(Gallaher
result of
(Gallaher et on
al.
et al. going
2004). Twofacility
thirdsoperation
of this costandwas maintenance
incurred
incurred as and uncertainty (potential lack of interest from investors,
a result of on2004).
goingTwo thirdsoperation
facility of this cost andwasmaintenance as creation
and
and new market
uncertainty
uncertainty and new
(potential
(potential lack
lack roles,
of
of validate
interest
interest from
from BIM data),
investors,
investors,
aactivities
a result
result of (Shen
of on et al. 2010).
on going
going facility The
facility sector and
operation
operation has realized
maintenance that creation new market and new roles, validate BIM data),
activities (Shen et al. 2010). The sector and maintenance
has realized that building
creation
creation physical
new
new market aspectand
market (create
new models
new roles, of existing
roles, validate BIMfacilities,
data),
information
activities
activities (Shen management
(Shen et
et al.
al. 2010).is oneThe
2010). of the
sectormain hasreasons
has realized of that
this building physical aspectand (create models validate
of existing BIM data),
facilities,
information
over cost. management
BIM is a holistic is oneThe sector
ofapproach
the main realized
toreasons of that
the design, this different
building
building management
physical
physical aspect
aspect strategies),
(create
(create information
models
models of
of existing
existingmanagement
facilities,
facilities,
information
information management
management is
is one
one of
of the
the main
main reasons
reasons of
of this
this different management strategies), information management
over cost. BIM is a holistic approach to the design, and technology
different
different management
management(data repetition and loss,
strategies),
strategies), overloadmanagement
information
information of data, use
construction
over
over cost.
cost. BIM
BIMand is ismanagement
aa holistic
holistic of these to
approach
approach facilities.
to the
the The
design,
design, and technology (data repetition and loss, overloadmanagement
of data, use
construction and management of these facilities. The of
and different
technology
anddifferent
technology software,
(data information
repetition
(data repetition and update),
loss,
and loss, overload
overload education
of data, and
of data, use
use
introduction ofand
construction
construction BIMmanagement
can addressed of this
of thesechallenge,
facilities. but Thenot of software, information update), education and
introduction ofand BIMmanagement
can addressed these
this facilities.
challenge, but Thenot skills,
of are
different
of different few examples
software,
software, resumed
information
information by Ashworth
update), education (2015).
and
alone. Incorporating
introduction
introduction of BIM
of BIM can canAM view
addressed andthis tools
challenge, appropriate
but
but not skills, are few examples resumed update),
by Ashworth education and
(2015).
alone. Incorporating AMaddressed
view and thistools
challenge, appropriate not However
skills,
skills, areone
are fewof
few the most resumed
examples relevant changes
by
by Ashworth appears(2015).
in the
operational
alone.
alone. and lifecycleAM
Incorporating
Incorporating AMinformation
view
view and
andcan tools
be incorporated
tools appropriate
appropriateinto However one ofexamples
the most resumed
relevant changes Ashworth appears(2015).
in the
operational and lifecycle information can be incorporated into attitude
However
However ofonethe of
one FMthe
of team
the most
most thatrelevant
becomeschanges
relevant more process
changes appears
appears oriented
in
in the
the
this model,and
operational
operational and all the
lifecycle stakeholders
information can
can be will have all into
incorporated the attitude of the FM team that becomes more process oriented
this model,and andlifecycle
all the information
stakeholders be incorporated
will have all into the and seeks
attitude
attitude of
of to identify
the
the FM
FM team
team process
that
that inefficiencies
becomes
becomes more
more that could
process
process oriented
orientedbe
information
this model,
this model, neededneeded
and
and all to
all take
the decisions.
stakeholders
stakeholders will have all the
the decisions. will have all the and seeks to identify process inefficiencies that could be
information to take mitigated
and
and seeks by to
seeksbytothe the adoption
identify
identify of
process
processBIM (Fukuda
inefficiencies et al., 2014).
that could
could be
information
information needed
needed to
to take
take decisions.
decisions. mitigated adoption of BIMinefficiencies
(Fukuda et al.,that 2014). be
BIM in the literature is more properly linked with facilities mitigated
mitigated by
by the
the adoption
adoption of
of BIM
BIM (Fukuda
(Fukuda et
et al.,
al., 2014).
2014).
BIM in the literature is more The growing rate of BIM users can pull the AM application
management
BIM
BIM in
in the (FM) than
the literature
literature is
is more
moreAM.properly
properly
linked with
But actually
linked
linked with FM facilities
can be
facilities The growing rate of BIMsimilarusers can pull the AM application
management (FM) than AM.properly
But actually with
FM facilities
can be development.
The
The growing
growing rate Following
rate of
of BIM users
users can
BIMsimilar approach
can pull
pull thethestandards
AM as PAS
AM application
application
understood
management
management as (FM)
a part than
or toolAM. of AM But (ISO:55000;
actually FMPAScan 1912-be development. Following approach standards as PAS
understood as a part or tool of AM (ISO:55000; PAScan
(FM) than AM. But actually FM 1912-be development.
development. Following similar approach standards as
Following similar approach standards as PAS
PAS
understood
understood as a part or tool of AM (ISO:55000; PAS 1912-
as a part or tool of AM (ISO:55000; PAS 1912-
2405-8963 ©
Copyright © 2016, IFAC (International Federation of Automatic Control)
2016 IFAC 191Hosting by Elsevier Ltd. All rights reserved.
Copyright
Peer review©under
2016 responsibility
IFAC 191Control.
of International Federation of Automatic
Copyright
Copyright © 2016 IFAC
© 2016 IFAC 191
191
10.1016/j.ifacol.2016.11.033
2016 IFAC AMEST
October
192 19-21, 2016. Biarritz, France A.J. Guillen et al. / IFAC-PapersOnLine 49-28 (2016) 191–196

1192-2 and 1192-3, they have been recently developed where ¥ The BIM is shared digital representation founded on
the AM principles are connected and used together with BIM. open standards for interoperability. In addition to the
standardization needs, this point highlights the open
2. BACKGROUND character of BIM conception, in order to allow the
combined use of different software an application
2.1 BIM background (3D design, FM software and others) and to support
the successive software updates.
In the past decades, there had been a growing interest in the In order to illustrate the progressive introduction of capability
use of Building Information Models (BIM) by the or functionalities within the models, the following terms have
construction sector due to many benefits and resource savings been employed:
during design, planning, and construction of new buildings ¥ 2D models: classical 2D CAD model application.
(Eastman et al 2013). Despite the development of 3D
¥ 3D models: 3D design and tools. Parametric and
modelling started in the 1970s, BIM modelling was not
object oriented approach. 3D digitalization.
introduced in pilot projects until early 2000s to support
¥ 4D models: Scheduling and project sequencing. The
building design of architects and engineers (Volk et al. 2014).
capabilities of capture data and information
Comparing BIM with 2D CAD, this uses views and
representation is used for planning and control
representations that are difficult to check and update
project and construction execution.
considering that, if one view is modified, the rest should be
¥ 5D models: Cost estimating. Budget estimation and
revised too. Traditional 2D CAD only includes graphical
control of the construction phase.
entities in contrast to the intelligent contextual semantic of
BIM models that include geometric and non-geometric data, ¥ 6D models: Sustainability. Control of the impact of
characterizing, among others: the geometry, spatial construction and operation.
relationships, geographic information, quantities and ¥ 7D models: Facilities Management. Including
properties of building elements, cost estimates, material operation and maintenance planning and execution
inventories, project schedule and operation and maintenance. and the rest of life-cycle considerations.
BIM is an “object oriented” approach to CAD where In this “n-dimensional” treatment of the BIM applications it
designers and stakeholders work primarily with architectural is clearly showed the tendency to BIM and AM integration.
elements instead of vector based graphics. Objects have Despite this, the AM approach includes even more ambitious
“intelligence” that provide a certain degree of automation objetives than 7D models.

Nowadays the term BIM (Building Information Modelling) Governments around the world have recognized in general
can indicate a process, a discipline or a technology. This terms the inefficiencies affecting the construction industry.
model is much more than a 3D representation of the building. As a result, different regulatory initiatives have appear that
Its real strength and power lies in the knowledge database, either recommend or mandate the use of building information
which can be used in conjunction with other software to modelling as a strategy to address a declining productivity
deliver quick and reliable information in areas of (Kassem et al. 2015). In this case, the most significant
sustainability, estimating, structural analysis, demolition and reference is probably UK. UK has mandated BIM level 2 on
reconstruction (Zhang 2009). all centrally procured projects from 2016, including the
handover of digital data required for the operational phase
In this sense, the given definition of BIM by the Building (PAS 1192-2:2012). Although this mandate prescribes an
Smart Alliance introduces the following aspects that serve to operational handover specification, there is still a limited
understand the holistic view of BIM conception and its amount of research on the FM industry with regards to BIM.
potential: Due this, new research projects focused on getting use cases
for application of BIM in FM are being promoting.
¥ A digital representation of physical and functional
characteristics of a facility. Not only graphical
information of the building elements but also the rest 2.1 AM and FM background
of information types that can be used to manage all
the lifecycle phases: manufacture and vendor data, AM and FM are overlapped disciplines. The terms AM and
service and use requirements, operation and FM are often used interchangeably, although there are
maintenance data, performance parameters, energy differences in approach between the asset management and
consumption, etc. facilities management disciplines. FM is focused on the
¥ A shared knowledge resource for information about infrastructure and building sectors while AM has a broader
a facility, forming a reliable base for decision during application field. Especially in the building sector FM
its lifecycle. considered a consolidated profession (IFMA 2013). Both
¥ A platform for collaboration by different have generated their own standards or specifications and both
stakeholders at different phases of the facility have evolved their own language of preferred and defined
lifecycle in order to insert, extract, update or modify terms. The ISO 55000 lists FM among the asset management
information in the BIM support reflecting different activities. With this view FM can be considered as a part or
roles according to each stakeholder’s interest. tool of AM, since AM goes beyond FM providing a more
comprehensive view and more potential benefits.

192
2016 IFAC AMEST
October 19-21, 2016. Biarritz, France A.J. Guillen et al. / IFAC-PapersOnLine 49-28 (2016) 191–196 193

¥ Managing the value of the asset. AM supports the


realization of value while balancing financial,
environmental and social costs, risk, quality of
service and performance related to assets.
¥ Risk based decision-making. Effective control and
governance of assets by organizations is essential to
realize value through managing risk and
opportunity, in order to achieve the desired balance
of cost, risk and performance.
¥ Integrating the longer term activity of asset
management with the shorter term activity of asset
¥ Stakeholders’ treatment. The stakeholders
requirement but also the information exchange and
Fig. 1. Relation between AM, FM and O&M the suitable access to the information (right
information, to right person at the right moment)
FM is defined by EN 15221-1 as “the integration of processes ¥ The information requirement and its treatment. AM
within an organization to maintain and develop the agreed is intensive in data/information management. Asset
services which support and improve the effectiveness of its information system can be extremely large and
primary activities.”. The optimization of building operational complex and creating, controlling and documenting
phase is a complex issue. Together with its intrinsic this information is a critical function of the asset
complexity of such facilities, it has to be considered the management system.
legislation and sustainability demands, fitting with usage This last point reinforces the importance of information
requirements. (Zhang et al., 2009). This complex scenario is management in AM. The Information System is one of the
completed with the trend to outsourcing services, and the key elements in asset management systems (AMS) defined
introduction of procurement routes that include operation and by ISO 55000-1 (Fig. 2). An asset management system is a
maintenance in integrated supply contracts. FM as discipline set of interrelated and interacting elements of an organization,
provides a holistic view of the building operation and whose function is to establish the asset management policy
maintenance, an overall management of the resource and asset management objectives, as well as the processes
available towards the strategic objectives of facilities' users needed to achieve those objectives. In this context, the
and owners. Here is located the potential of FM rather than elements of an asset management system should be viewed as
the accumulation of maintenance task or new software a set of tools, including the information systems, which are
applications. FM is a broad concept, covering everything integrated to give assurance that the asset management
from real estate and financial management to maintenance activities will be delivered. For building asset management
and cleaning (Atkin and Brooks, 2009). this required information system could be implement from
the implementation of the BIM model.
The benefits of AM are proven in many industries and
business environments, improving the performance along the
lifecycle and the contribution to safety, health and protection
of the environment. Together with organizational
commitment to quality, performance or safety, it helps to
mitigate the legal, social and environmental risks associated
to accidents in industrial facilities. Asset Management, as a
discipline, allows organizations to optimize the whole life
value of managing assets portfolios. For a single
organization, the list of assets or portfolio may contain
diverse assets in nature, distributed over extensive
geographical areas, and may be subjected to differing
demand/utilization requirements. In agreement to ISO 55000,
AM can be applied to all kind of assets, including physical
assets (elements, inventory and properties) and intangibles
assets (leases, brands, digital assets, use rights, licenses, Fig. 2. AMS (Assets Management System) elements
intellectual property, etc.)
3. INFORMATION AND DATA MANAGEMENT &
The general principles of AM have been defined by the TECHNOLOGIES INTEGRATION
family of standards ISO 55000, ISO 55001, ISO 55002.
Among the aspects contained in this approach, those who can One of the key points of BIM application is the information
be described as more innovative, and representing a and data management. BIM development provides the
significant advance in the optimization of asset management, opportunity to get and manage more information with more
they may include: quality, incrementing its use and applicability. At the same
time, it is a great challenge to obtain such a powerful

193
2016 IFAC AMEST
October
194 19-21, 2016. Biarritz, France A.J. Guillen et al. / IFAC-PapersOnLine 49-28 (2016) 191–196

information system, including the integration of other Regarding what information should include a specific BIM
software and technologies that can be information sources. model; one important reference is about the BIM maturity
levels. PAS 1192-2 and PAS 1192-3 are both known as BIM
3.1 Information requirements and/or needs Level 2, in response to the UK Government’s Construction
Strategy published in 2011. Following this approach, four
maturity levels are distinguished, from level 0 to level 3. This
A first step in this process is the determination of information
level 2 includes:
needs. Two views have to be managed at the same time: the
election of the element breakdown structure for the “Managed 3D environment held in separate discipline
organization (until the so called intervention level) and the “BIM” tools with attached data. Commercial data managed
level of development of elements (LOD). Both views are by an enterprise resource platform. Integration on the basis of
connected but express different aspect of the system and its proprietary interfaces or bespoke middleware could be
elements. O&M task management is very sensible to final regarded as “pBIM” (proprietary). The approach may utilize
description of the system and, by extension, FM and AM. 4D programme data and 5D cost elements as well as
Jointly with this last consideration, there are two problems, operational systems.” In addition to this, collaboration at
totally opposite one to the other, that must be taken into BIM Level 2 is file-based in opposition to paper-based (BIM
account: Level 0) or through integrated web services (envisaged as
¥ Information filtering: Much of the information BIM Level 3 at the time of writing).
typically included in models is unnecessary for day-
to-day operations 3.2 Interoperability and standardization.
¥ New information needs: Relevant information for
maintenance and reliability management is not Interoperability is one of the keystones of BIM models and
present or is not reliable for advanced approaches. In its uses. Different organizations and roles take part along the
some cases it is possible to find CMMS or CAFM, building lifecycle. They may apply different software or may
but this can result an additional complication. demand different types of data. The Industry Foundation
Determining what Level of Development (LOD) is necessary Classes (IFC) is a standardized non-proprietary data format
to achieve the benefit for that specific model element. The for sharing and accessing construction and facility
Level of Development describes the level of completeness to management data, enabling interoperability between
which a Model Element is developed. There are several ways heterogeneous software applications. This format is described
that Level of Development can be documented. The most by the ISO 16739:2013 “Industry Foundation Classes (IFC)
widely accepted by the industry is LOD defined in the model for data sharing in the construction and facility management
progression specification and adopted in AIA E202 industries”. It is an open international standard for BIM data
that is exchanged and shared among software applications
Table 1. Level of Development descriptions. used by the various participants in a building construction or
facility management project.
Level of
development Description The Construction Operations Building Information Exchange
(LOD) (COBie) is a data exchange model for the publication of
LOD 100: Overall building massing indicative of area, building information subsets focused on delivering non-
Schematic height, volume, location and orientation may be
geometric information and asset data, rather that geometric
Design Model modelled in three dimensions or represented by
other data
information. It is a subset of the IFC, but may also be
LOD 200: Model Elements are modelled as generalized conveyed using spreadsheet. Initially COBie was developed
Design system or assemblies with approximate quantities, by the US Army Corps of Engineers as a method of
Development size, shape, location and orientation. Non- delivering O&Ms specific data in a standardized format,
Model geometric information may also be attached to delivered in a spreadsheet format.
model elements.
LOD 300: Model Elements are modelled as specific COBie helps capturing and using information essential to
Construction assemblies accurate in terms of quantity, sixe, support operations, maintenance and asset management. The
Documentatio shape, location and orientation. Non-geometric COBie file may contain data from consultants, the contractor,
n Model information may also be attached to model sub-contractors, suppliers, and even the client. Ultimately, the
elements data will provide information for the efficient operation and
LOD 400: Model Elements are modelled as specific management of the facility. COBie consists of multiple
Construction assemblies accurate in terms of quantity, sixe, sheets documenting attributes of the facility, its systems and
Model shape, location and orientation with complete
assets and details of their product types, warranties,
information assembly, and detailing information.
Non-geometric information may also be attached maintenance requirements etc. While the project is
to model elements developing, additional attributes, issues and documentation
LOD 500: Model Elements are modelled as constructed can be associated to specific items. UK government has
Record assemblies actual and accurate in terms of size, introduce de COBie format as principal part of Level 2 BIM
Model shape, location, quantity and orientation. Non- requirement that will be mandatory for all centrally procured
geometric information may also be attached to Government contracts from 2016. Level 2 BIM includes 3D
model elements

194
2016 IFAC AMEST
October 19-21, 2016. Biarritz, France A.J. Guillen et al. / IFAC-PapersOnLine 49-28 (2016) 191–196 195

BIM models and project and asset information available in ¥ Allow introduce AM and FM from the very
COBie format (Carbonari et al 2015) beginning of the building lifecycle (designing and
constructions)
Particular technologies, such as the use of cloud computing, ¥ BIM software as interface: intelligent and detailed
passive RFID tags and 3D scanning, have facilitated added
representation of physical and functional
value to BIM in a Facility Management/Operations context
characteristics
(McArthur et.al 2015). Vice versa, the BIM potential aids in
the introduction and effective use of these technologies and Building Automation Systems (BAS) have a main role in
others as condition monitoring and predictive maintenance, new intelligent buildings. They conform the control system
energy consumption control, etc. Actually, these technologies of the building and include facilities control and the
can be seen as information sources that are integrated and interaction with users. These systems are going to produce
used in the building management through the BIM relevant information and will be one of the main sources for
implementation and its interoperability with rest of software FM. Once again, the problem to use these data is the
packages, which are linked to the operation and maintenance interoperability of BAS hardware/software with FMS and
of the building (Figure 3) BIM.
This environment of software interoperability of AM, with
BIM models as a central element, is totally aligned with the
E-maintenance principles, term that serves as a conceptual
support to general use and applications of ICTs in
maintenance. This is related to the effective introduction of
new capabilities at the service of maintenance and asset
management among lifecycle product stages. This approach
helps to understand the scope of maintenance evolution
provided by these technologies. Muller et al. (2008),
analyzing the potential improvements in the e-maintenance
concept application context, introduce the following
references to the maintenance tasks evolution:
¥ Cooperative/collaborative maintenance:
¥ Remote and on-line maintenance:
¥ Maintenance documentation/record and knowledge
capitalization and management
¥ Fault/failure analysis and predictive maintenance
Fig. 3. Environment of software interoperability of AM
3.3 BIM and AMS. PAS 1192-2 and PAS 1192-3
Facility Management Systems are software packages that
support the maintenance and management of a facility. It PAS 1192-2:2013 “Specification for information
helps to manage work orders, assets, inventory, and safety. management for the capital/delivery phase of construction
Some names that can be classified under Facility projects using building information modeling” and PAS
Management Systems include Computerized Maintenance 1192-3:2014 “Specification for information management for
Management Systems (CMMS), Computer-Aided Facility the operational phase of assets using building information
Management (CAFM), and Computerized Maintenance modeling”, are complementary documents that specified an
Management Information System (CMMIS). If an information management process to support building
organization has a FMS, it should be evaluated for its ability information modelling (BIM) Level 2, referred previously in
to support the BIM Data and Uses as defined in the previous this chapter in: (i) the capital/delivery phase of projects, PAS
steps. If an organization does not have a FMS, it is important 1192-2, (PIM, project information model); (ii) the O&M
that a proper one is selected. According to the interoperability phase PAS 1192-3. (AIM, Asset Information Model)
requirements of the building asset management approach, the
FMS should support the importing and/or exporting of data to PAS 1192-2, PAS 1192-3 applies to both, building and
other systems. It is especially important to consider the infrastructure assets, and the intended audience for these
integration and acceptance of BIM Data, i.e. FMS should documents includes organizations and individuals responsible
have the ability to import and/or export BIM data directly for the procurement, design, construction, delivery, operation
from the BIM Model. For this purpose, FMS have to support and maintenance of buildings and infrastructure assets. These
open standards for data transfer such as COBie. Finally FMS standards cross-reference with other existing standards
should be able to handle other graphical data such as concerned with the management of assets. In particular, are
photographs and plans and the interface with others closely related to the ISO 55000 series of standards that
technologies (BAS, Condition Monitoring, etc.). Comparing provide one overarching framework for the adoption and
with the simple application of CAFM or CMMS software, the implementation of PAS 1192-2 and PAS 1192-3.
use of BIM models aids in two aspects:
PAS 1192-2 focuses specifically on project delivery, where
the majority of graphical data, non-graphicaldata and

195
2016 IFAC AMEST
196
October 19-21, 2016. Biarritz, France A.J. Guillen et al. / IFAC-PapersOnLine 49-28 (2016) 191–196

documents, known collectively as the project information Gallaher, M. P., O’Connor, A. C., Dettbarn, J. L., and Gilday,
model (PIM), are accumulated from design and construction L.T. (2004). Cost Analysis of Inadequate Interoperability
activities. PAS 1192-3 focuses on the operational phase of in the U.S. Capital Facilities Industry. National Institute
assets. Progressively working through the various stages of of Standards and Technology.
the information delivery cycle (Fig 4), the requirements http://fire.nist.gov/bfrlpubs/build04/PDF/b04022.pdf
within this PAS culminate with the delivery of the as- ISO 55000:2013, Asset Management - Overview, principles
constructed asset information model (AIM). AIM is handed and terminology
over to the employer by the supplier once the PIM has been IFMA, International Facilities Management Association.
verified against what has been constructed and it is used to What is FM?, Accessed 28th May 2013, available at:
support the portfolio management activity for the life of the http://www.ifma.org/know-base/browse/what-is-fm
asset. 2013.
Kassem, M., Kelly G., Dawood, N., Serginson, M., Lockley,
S., (2015). BIM in facilities management applications: a
case study of a large university complex. Built
Environment Project and Asset Management Vol. 5 No.
3, 261-277
Love, P.E.D., Matthews, J., Simpson, I., Hill, A., Olatunji,
O.A., (2014). A benefits realization management
building information modelling framework for asset
owners. Automation in Construction 37, 1–10.
McArthur, J. J., (2015). A building information management
(BIM) framework and supporting case study for existing
building operations, maintenance and sustainability.
International Conference on Sustainable Design,
Engineering and Construction. Procedia Engineering 00
Muller, A., Marquez, A. C., & Iung, B. (2008). On the
concept of e-maintenance: Review and current research.
Reliability Engineering & System Safety, 93(8), 1165-
Figure 4.- AIM and PIM. The information delivery cycle
1187.
(PAS 1192-2:2013)
PAS 1192-2:2013, Specification for information management
for the capital/delivery phase of construction projects
6. CONCLUSIONS using building information modeling
The current evolution of the sector is promoting a great PAS 1192-3:2014, Specification for information management
increment of BIM applications. But these applications are for the operational phase of assets using building
mainly focus on design and construction. The use of BIM information modeling.
models for operation and maintenance phase is not so Parsanezhad, P., Tarandi, V., (2013). Is the age of facility
extended. For this reason, although there are a lot of manager’s papers boxes over? CIB World Building
references about the potential benefits of BIM use, there are Congress.
few references about the quantification and realization of Shen, W., Hao, Q., Mak, H., Neelamkavil, J., Xie, H.,
these benefits in practical cases for operational phases. In Dickinson, J., Thomas, R., Pardasani, A., and Xue, H.
conclusion, BIM benefits for AM are not well characterized. (2010). Systems integration and collaboration in
Methodologies and application frameworks have to be architecture, engineering, construction, and facilities
proposed and tested to develop reference use cases that will management: A review. Advanced Engineering
allow extending the knowledge about AM supported by BIM Informatics, 24(2), 196-207.
model as the base for an asset management information Volk, R., Stengel, J., Schultmann, F., (2014). Building
system. In this sense, the PAS 1192 standards series jointly Information Models (BIM) for existing buildings –
with the most general ISO 55000, are the main references for literature review and future needs. Automation in
this development process and for any particular Construction 38, pp.109-127.
implementation attempt. Zhang, X., Arayici, Y., Wu, S., Abbott, C., Aouad, G.,
(2009). Integrating BIM and GIS for large scale
REFERENCES (building) asset management: a critical review. Twelfth
International Conference on Civil, Structural and
Azhar, S., (2011). Building Information Modelling (BIM): Environmental Engineering Computing.
Trends, Benefits, Risks, and Challenges for the AEC
Industry. Leadership Manage. Eng., 11(3), 241–252.
EN 15221-1: 2006. European standard in facility
management–Part 1: Terms and definitions.
Fukuda, S., (2014), BIM for FM: A Case Support for
Business Life Cycle. PLM 2014, IFIP AICT 442, pp. 63-
74, 2014.

196

You might also like