Chapter I

AUANTIFICATION
OF WORK

I
QUANTIFICATION OF WORK

Quantification of work output expected from the functionary and


indicators for assessment of his/her performance

lndicator for performance evaluation

I Engineer-in-Chiet 1) Successful completion of all programmes to the ex_


tent of grants available during the financial year

2 Chief Errgineer 1) Successful completion of all schemes under his con_


trol to the extent of grants made available in the fi-
nancialyear

3 Superintending Engineerl) Successful completion of all schemes under


his
control to the extent of grants made available in the
financialyear

4 Executive Engineer 1 ) Successful completion of all schemes under hiscon-,


trol to the extent of grants made availabe in the fi_
nancialyear
or
lncurring expenditure to an extent of Rs. 243.00
lakhs, which ever is higher

Dy. Executive Engineer, 1 ) Successful completion of all schemes under his con-
trol to the extent of grants made avairabre in the fi-
nancialyear
or
lncuning expenditure to an eXent of Rs. 60.90 lakhs,
which ever is higher

Section Officer 1) Satisfactory completion of all schemes under his con_


trol to the extent of grants made available in the fi-
nancialyear
or
lncuning expenditure to an extent of Rs. 16.40 lakhs,
which ever is higher

Dr .\,{ C.R.H.R,D. Institute of Andhra prades} lJ,a


Quantification of work Functionary Manual

lndicator for performance evaluation

7 Joint Director(Geologistl) To complete the identification and se.lection of


sources, for the programme entrusted to Hydro_
GeologicalWing

2) Success rate in setection of Bore well sites shall be


80%

Sehior Geologist 1) To complete the identification and selection of


sources, for the programme entrusted to Hydro_
GeologicalWing

2) Success rate in selection of bore well sites shall be


80o/o

I Junior Geologist 1) To complete the identification and selection of


sources, for the programme entrusted to Hydro_
Geological Wing particularly for pWS schemes and
CPWS Schemes

2) Success rate in selection of bore well sites shall be


80%

10 Ghemist 1) To conduct both chemicar & bacteriorogicar test of


water as fixed from time to time as fixed by Govt.
and to reviewAssistant Chemist and WaterAnalyst

11 Assistant Chemist 1) To conduct both chemicar & bacteriorogicar test of


water samples related to quality problems such as
Ffuoride, lron and Brackish, as entrusted or 200
samples in a month which ever is higher

12 Junior Water Analyst 1) To conduct both chemical & bacteriological test of


water samples as entrusted or 200 samples in a
month which ever is higher

132 - nr. n/.C."&,fl.R.D. huiitute of Andhra protlesh


-