000322-DTF-043-LEED ESC Progress Report 1 - July 2018
000322-DTF-043-LEED ESC Progress Report 1 - July 2018
000322-DTF-043-LEED ESC Progress Report 1 - July 2018
Contents
1 Introduction .......................................................................................................................... 2
2 Scope of Works ..................................................................................................................... 2
3 LEED documentation submission ......................................................................................... 2
4 Implementation ..................................................................................................................... 3
4.1 Pollution Prevention................................................................................................................ 3
5 Progress Photographs ........................................................................................................... 3
6 Monitoring during this month .............................................................................................. 3
China Harbour Engineering Company Ltd Havelock City Colombo, ‐ Office & Shopping Mall
Monthly Report July 2018
1 Introduction
The Havelock City Commercial Development project site is located in Colombo 05, Sri Lanka,
bordering the main Havelock road. The site less than 10km away from the Colombo city center.
Project is to develop an office tower of 49 stories high and a shopping Mall of 5 stories high,
in addition, there are two basements for car parks.
The Office Tower provides premium office space and is designed to be a LEED certified
building and will be built to the highest standards. The Shopping center is developed as a
community level shopping mall serving the lifestyle needs of the catchment. The mega mall
comprises five floors of leading brands and retail stores, dining and entertainment experiences
amidst a state-of-the-art multiplex cinema.
2 Scope of Works
The Works to be executed under the Contract include but are not limited to the construction,
completion and maintenance of the proposed commercial development comprising of an office
tower 49 stories high with a gross floor area of approximately 73,000sq.m, and a shopping Mall
of 5 stories high, covering an area of approximately 26,000sq .m. In addition, there will be two
basements for car parks totaling approximately 33,000sq.m for the use of approximately 750
car parking slots.
Erosion and Sedimentation Control Plan has been submitted for review and consent. Erosion
and Sedimentation Control Plan submission details are given in following table.
Engineer’s
No. Version Ref. No Submitted date Consent Consent Date
status
China Harbour Engineering Company Ltd Havelock City Colombo, ‐ Office & Shopping Mall
Monthly Report July 2018
4 Implementation
During the reporting period following measures were taken at site to prevent pollution and
erosion
To prevent loss of soil during construction by storm water runoff and wind erosion,
excavated topsoil is stock piled before transportation for reuse, stock pile is covered with
mesh for further protection.
Wheels of the vehicles exiting the site are being washed in a washing bay to control
pollution of air with dust and particulate matter.
Soil transporting vehicles trailers are covered with polyethylene sheets while
transportation in order to control air pollution with dust and particulate matter.
Sediment basin with a controlled water release structure is used as sedimentation tank for
dewatering water before diversion and part of this water will be reused for toilet flushing
at site.
Water spraying was carried out as dust control measure.
Periodical monitoring and site inspection have been carried out.
5 Progress Photographs
Stabilized Area
Street Sweeping
House Keeping
Dust Control
China Harbour Engineering Company Ltd Havelock City Colombo, ‐ Office & Shopping Mall
Monthly Report July 2018
ANNEXTURE A
PROGRESS PHOTOGRAPHS
China Harbour Engineering Company Ltd Havelock City Colombo, ‐ Office & Shopping Mall
Monthly Report July 2018
Location
Batching
plant area
Boundary wall construction for batching plant area for dust prevention
Description
Location
Batching
plant area
Description Boundary wall construction for batching plant area for dust prevention
China Harbour Engineering Company Ltd Havelock City Colombo, ‐ Office & Shopping Mall
Monthly Report July 2018
Location
Site Limit
Soil transporting dump truck trailers covered to prevent air pollution with
Description
dust
Location
Site Limit
Soil transporting dump truck trailers covered to prevent air pollution with
Description
dust
China Harbour Engineering Company Ltd Havelock City Colombo, ‐ Office & Shopping Mall
Monthly Report July 2018
Location
Main
entrance
from
Havelock
road
Reuse of dewatering water for wheels washing at washing bay to prevent air
Description
pollution from dust and particulate matter
Location
Main
entrance
from
Havelock
road
Reuse of dewatering water for wheels washing at washing bay to prevent air
Description
pollution from dust and particulate matter
China Harbour Engineering Company Ltd Havelock City Colombo, ‐ Office & Shopping Mall
Monthly Report July 2018
Location
Site Limit
Description Dewatering using perforated casing to prevent sediment accumulation at tube well
Location
Northwest
side
China Harbour Engineering Company Ltd Havelock City Colombo, ‐ Office & Shopping Mall
Monthly Report July 2018
Location
Site Limit
Location
Site limit
China Harbour Engineering Company Ltd Havelock City Colombo, ‐ Office & Shopping Mall
Monthly Report July 2018
Location
Site Limit
Location
Northwest
side
China Harbour Engineering Company Ltd Havelock City Colombo, ‐ Office & Shopping Mall
Monthly Report July 2018
Location
Site Limit
Location
Site
China Harbour Engineering Company Ltd Havelock City Colombo, ‐ Office & Shopping Mall
Monthly Report July 2018
Location
Site Limit
Date required
Location
Havelock road
side
Date required
China Harbour Engineering Company Ltd Havelock City Colombo, ‐ Office & Shopping Mall
Monthly Report July 2018
Location
Site Limit
Location
Site Limit
Description Diverting surface runoff from disturbed area using earthen dikes
China Harbour Engineering Company Ltd Havelock City Colombo, ‐ Office & Shopping Mall