Monthly Report July 2018

Contents
1 Introduction .......................................................................................................................... 2
2 Scope of Works ..................................................................................................................... 2
3 LEED documentation submission ......................................................................................... 2
4 Implementation ..................................................................................................................... 3
4.1 Pollution Prevention................................................................................................................ 3
5 Progress Photographs ........................................................................................................... 3
6 Monitoring during this month .............................................................................................. 3

Table 1 : LEED documentation submission summary ............................................................................. 2

China Harbour Engineering Company Ltd Havelock City Colombo, ‐ Office & Shopping Mall
Monthly Report July 2018

1 Introduction

The Havelock City Commercial Development project site is located in Colombo 05, Sri Lanka,
bordering the main Havelock road. The site less than 10km away from the Colombo city center.

Project is to develop an office tower of 49 stories high and a shopping Mall of 5 stories high,
in addition, there are two basements for car parks.

The Office Tower provides premium office space and is designed to be a LEED certified
building and will be built to the highest standards. The Shopping center is developed as a
community level shopping mall serving the lifestyle needs of the catchment. The mega mall
comprises five floors of leading brands and retail stores, dining and entertainment experiences
amidst a state-of-the-art multiplex cinema.

2 Scope of Works

The Works to be executed under the Contract include but are not limited to the construction,
completion and maintenance of the proposed commercial development comprising of an office
tower 49 stories high with a gross floor area of approximately 73,000sq.m, and a shopping Mall
of 5 stories high, covering an area of approximately 26,000sq .m. In addition, there will be two
basements for car parks totaling approximately 33,000sq.m for the use of approximately 750
car parking slots.

3 LEED documentation submission

Erosion and Sedimentation Control Plan has been submitted for review and consent. Erosion
and Sedimentation Control Plan submission details are given in following table.

Table 1 : LEED documentation submission summary

Engineer’s
No. Version Ref. No Submitted date Consent Consent Date
status

Erosion and Sedimentation CHEC/HLCP/01.21/


01 18-July-2018
Control Plan O/000221

China Harbour Engineering Company Ltd Havelock City Colombo, ‐ Office & Shopping Mall
Monthly Report July 2018

4 Implementation

4.1 Pollution Prevention

During the reporting period following measures were taken at site to prevent pollution and
erosion

 To prevent loss of soil during construction by storm water runoff and wind erosion,
excavated topsoil is stock piled before transportation for reuse, stock pile is covered with
mesh for further protection.
 Wheels of the vehicles exiting the site are being washed in a washing bay to control
pollution of air with dust and particulate matter.
 Soil transporting vehicles trailers are covered with polyethylene sheets while
transportation in order to control air pollution with dust and particulate matter.
 Sediment basin with a controlled water release structure is used as sedimentation tank for
dewatering water before diversion and part of this water will be reused for toilet flushing
at site.
 Water spraying was carried out as dust control measure.
 Periodical monitoring and site inspection have been carried out.

5 Progress Photographs

Progress photographs for month of July 2018 is shown in Appendix A

6 Monitoring during this month

According to the maintenance schedule of Erosion and Sedimentation Control Plan,


following criterion were monitored at site and office during the reporting period.

 Stabilized Area
 Street Sweeping
 House Keeping
 Dust Control

China Harbour Engineering Company Ltd Havelock City Colombo, ‐ Office & Shopping Mall
Monthly Report July 2018

ANNEXTURE A
PROGRESS PHOTOGRAPHS

China Harbour Engineering Company Ltd Havelock City Colombo, ‐ Office & Shopping Mall
Monthly Report July 2018

Location
Batching
plant area

Boundary wall construction for batching plant area for dust prevention
Description

Location
Batching
plant area

Description Boundary wall construction for batching plant area for dust prevention

China Harbour Engineering Company Ltd Havelock City Colombo, ‐ Office & Shopping Mall
Monthly Report July 2018

Location
Site Limit

Soil transporting dump truck trailers covered to prevent air pollution with
Description
dust

Location

Site Limit

Soil transporting dump truck trailers covered to prevent air pollution with
Description
dust

China Harbour Engineering Company Ltd Havelock City Colombo, ‐ Office & Shopping Mall
Monthly Report July 2018

Location
Main
entrance
from
Havelock
road

Reuse of dewatering water for wheels washing at washing bay to prevent air
Description
pollution from dust and particulate matter

Location

Main
entrance
from
Havelock
road

Reuse of dewatering water for wheels washing at washing bay to prevent air
Description
pollution from dust and particulate matter

China Harbour Engineering Company Ltd Havelock City Colombo, ‐ Office & Shopping Mall
Monthly Report July 2018

Location
Site Limit

Description Dewatering using perforated casing to prevent sediment accumulation at tube well

Location

Northwest
side

Perforated casings used for dewatering to prevent sediment accumulation at tube


Description
well

China Harbour Engineering Company Ltd Havelock City Colombo, ‐ Office & Shopping Mall
Monthly Report July 2018

Location
Site Limit

This image is not good. Take the image


in SC plan report.

Protecting excavated soil by stockpiling and covering to prevent loss of soil by


Description
storm water runoff and wind erosion before transportation and reuse

Location

Site limit

Description Stabilizing excavation area maintaining proper slopes

China Harbour Engineering Company Ltd Havelock City Colombo, ‐ Office & Shopping Mall
Monthly Report July 2018

Location
Site Limit

Description Water spraying in the roads for dust control

Location

Northwest
side

Description Water spraying in the roads for dust control

China Harbour Engineering Company Ltd Havelock City Colombo, ‐ Office & Shopping Mall
Monthly Report July 2018

Location
Site Limit

Description Sedimentation tank for dewatering water before diversion

Location

Site

Description Housekeeping with garbage separation

China Harbour Engineering Company Ltd Havelock City Colombo, ‐ Office & Shopping Mall
Monthly Report July 2018

Location
Site Limit

Date required

Description Sweeping the roads for dust control

Location

Havelock road
side

Date required

Description Sweeping the roads for dust control

China Harbour Engineering Company Ltd Havelock City Colombo, ‐ Office & Shopping Mall
Monthly Report July 2018

Location
Site Limit

Description Stabilizing excavation area maintaining proper slopes

Location

Site Limit

Description Diverting surface runoff from disturbed area using earthen dikes