Saudi Aramco 2616-ENG (03/99)

PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA YAA
ENGG CERT

LSS

KAPSARC & COMMUNITY PROJECTS DEPARTMENTS


ISSUED FOR IFC

DHAHRAN COMMUNITY HOUSING PROJECTS DIVISION


DESCRIPTION

10-01382-0008

EXPAND DHAHRAN RESIDENTIAL COMMUNITY


JO/EWO
01/21/2016 BI-01382

RESIDENTIAL AREA - PACKAGE – 6


DETAILED DESIGN
NO. DATE
REV

00

DISCIPLINE
ENGINEER
ANP
01/21/2016
DATE:
PROJECT
ENGINEER
LSS
01/21/2016
DATE:
CERTIFIED
CONSTRUCTION SPECIFICATIONS – ELECTRICAL
YAA

01/21/2016
DATE:
CONSTRUCTION
AGENCY
YAA

01/21/2016
DATE:
OPERATIONS
ASZ Prepared by:
01/21/2016
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

DECEMBER, 2015
(DCC) NO. _____________________
10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 1


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA YAA
ENGG CERT

TABLE OF CONTENTS
LSS

DIVISION 16 - ELECTRICAL .......................................................................................................................... 3


SECTION 16010 - BASIC ELECTRICAL REQUIREMENTS........................................................................... 3
SECTION 16050 - BASIC ELECTRICAL MATERIALS AND METHODS ....................................................... 7
SECTION 16110 - RACEWAYS .................................................................................................................... 11
SECTION 16111 - CABLE TRAYS ................................................................................................................ 17
SECTION 16112 - CABLE RUNWAY ............................................................................................................ 24
ISSUED FOR IFC

SECTION 16119 - UNDERGROUND DUCTS & MANHOLES ...................................................................... 26


DESCRIPTION

SECTION 16230 - WIRES AND CABLES ..................................................................................................... 33


SECTION 16124 - MEDIUM VOLTAGE CABLES ......................................................................................... 39
SECTION 16135 - CABINETS, BOXES, AND FITTINGS ............................................................................. 46
SECTION 16143 - WIRING DEVICES........................................................................................................... 51
SECTION 16170 - CIRCUITS AND MOTOR DISCONNECTS ..................................................................... 55
SECTION 16190 - SUPPORTING DEVICES ................................................................................................ 58
SECTION 16195 - ELECTRICAL IDENTIFICATION ..................................................................................... 65
SECTION 16322 – PAD MOUNTED MEDIUM-VOLTAGE TRANSFORMERS ............................................ 69
SECTION 16452 - GROUNDING .................................................................................................................. 81
SECTION 16470 –PANEL BOARDS ............................................................................................................. 89
JO/EWO
01/21/2016 BI-01382

SECTION 16475 - OVERCURRENT PROTECTIVE DEVICES .................................................................... 96


SECTION 16476 - CIRCUIT BREAKERS.................................................................................................... 102
SECTION 16503 - POLES AND STANDARDS ........................................................................................... 109
DATE

SECTION 16512 - EXTERIOR LIGHTING FIXTURES ............................................................................... 117


SECTION 16515 - INTERIOR LIGHTING FIXTURES................................................................................. 122
SECTION 16535 - EMERGENCY LIGHTING ............................................................................................. 129
NO.
REV

00

SECTION 16660 - GROUND-FAULT PROTECTION SYSTEMS ............................................................... 134


DISCIPLINE
ENGINEER SECTION 16721 - FIRE ALARM SYSTEMS ............................................................................................... 139
ANP
01/21/2016
DATE:
PROJECT
ENGINEER
LSS
01/21/2016
DATE:
CERTIFIED
YAA

01/21/2016
DATE:
CONSTRUCTION
AGENCY
YAA

01/21/2016
DATE:
OPERATIONS
ASZ

01/21/2016
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________
10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 2


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

DIVISION 16 - ELECTRICAL
YAA
ENGG CERT

SECTION 16010 - BASIC ELECTRICAL REQUIREMENTS


LSS

PART 1 - GENERAL

1.01 DESCRIPTION OF WORK

A. This Section includes general administrative and procedural requirements for


electrical installations in SAUDI ARAMCO facilities.
ISSUED FOR IFC
DESCRIPTION

1.02 QUALITY ASSURANCE

A. Codes and Standards: Comply with all applicable Codes and Standards including,
but not limited to, those listed below:

SBC 401 Saudi Building Code – Volume 4


ANSI American National Standards Institute
ASTM American Society for Testing and Materials
JO/EWO
01/21/2016 BI-01382

IEC International Electrotechnical Commission


NEMA National Electrical Manufacturers Association
NFPA National Fire Protection Association
DATE

NFPA 70 National Electrical Code (NEC)


SAES SAUDI ARAMCO Engineering Standards
SAMSS SAUDI ARAMCO Material System Specifications
NO.
REV

00

DISCIPLINE SASO Saudi Arabian Standards Organization


ENGINEER
ANP
UL Underwriter’s Laboratories
01/21/2016
DATE:
PROJECT B. For detailed list of Codes and Standards, refer to the appropriate Specification
ENGINEER
LSS
sections.
01/21/2016
DATE:
CERTIFIED
1.03 SUBMITTALS
YAA

DATE:
01/21/2016 Forward to the Company Representative for review and approval the following submittals.
CONSTRUCTION Refer also to appropriate Specification sections for other submittal requirements.
AGENCY
YAA

01/21/2016 A. General: Submit the following in accordance with Conditions of Contract and
DATE:
OPERATIONS Division 1 Specification Sections.
ASZ

01/21/2016 B. Prior to Commencing WORK: Shop drawings of proposed installations that deviate
DATE:
from the original design.
CONTROL NUMBER
VERIFICATION
EDSD

C. Prior to Final Acceptance: Record documents which shall indicate installed


conditions for:
DATE:
BY:

1. Major raceways systems, size and location, for both exterior and interior;
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

locations of control devices; distribution and branch electrical circuitry; fuse


00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

and circuit breaker size and arrangements.


(DCC) NO. _____________________
10-01382-0008-0001

SECTION 16010
1 of 4
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 3


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

2. Equipment locations (exposed and concealed), dimensioned from


YAA
ENGG CERT

prominent building lines.


LSS

3. Approved substitutions, modifications and actual equipment and materials


installed.

D. Maintenance Manuals: Submit maintenance manuals which shall include the


following information for equipment items:

1. Description of function, normal operating characteristics and limitations,


ISSUED FOR IFC
DESCRIPTION

performance curves, engineering data and tests, and complete


nomenclature and commercial numbers of replacement parts.

2. Manufacturer's printed operating procedures to include start- up, break-in,


and routine and normal operating instructions; regulation, control, stopping,
shutdown, and emergency instructions; and summer and winter operating
instructions.

3. Maintenance procedures for routine preventative maintenance and


troubleshooting; disassembly, repair, and reassembly; aligning and
JO/EWO
01/21/2016 BI-01382

adjusting instructions.
DATE

4. Servicing instructions and lubrication charts and schedules.

1.04 DELIVERY, STORAGE, AND HANDLING


NO.
REV

00

DISCIPLINE
ENGINEER Refer to the appropriate specification sections for specific requirements. Otherwise,
ANP
01/21/2016
deliver products to the WORK Site properly identified with names, model numbers, types,
DATE:
PROJECT
grades, compliance labels, and other information needed for identification.
ENGINEER
LSS
01/21/2016
PART 2 - PRODUCTS
DATE:
CERTIFIED
YAA Refer to the appropriate specification sections for specific requirements.
01/21/2016
DATE:
CONSTRUCTION
PART 3 - EXECUTION
AGENCY
YAA

01/21/2016 3.01 INSTALLATION


DATE:
OPERATIONS
ASZ
A. Electrical drawings are generally diagrammatic in nature. Except where
01/21/2016
dimensioned locations are shown on plan and coordinate the installation to
DATE:
eliminate interference with other trades.
CONTROL NUMBER
VERIFICATION

B. Provide all necessary raceway offsets, fittings, boxes and supporting materials
EDSD

required for a planned and neat installation.


DATE:
BY:

C. Where interferences occur, the Company Representative shall decide which items
APPROVAL/CERTIFICATION REQUIREMENTS,

must be relocated.
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

SECTION 16010
10-01382-0008-0001

2 of 4
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 4


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

D. Coordinate electrical systems, equipment, and materials installation with other


YAA
ENGG CERT

building components.
LSS

E. Verify all dimensions by field measurements.

F. Arrange for chases, slots, and openings in other building components during
progress of construction, to allow for electrical installations.

G. Coordinate the installation of required supporting devices and sleeves to be set in


poured-in-place concrete and other structural components, as they are
ISSUED FOR IFC
DESCRIPTION

constructed.

H. Sequence, coordinate, and integrate installations of electrical materials and


equipment for efficient flow of the WORK. Give particular attention to large
equipment requiring positioning prior to closing in the building.

I. Where mounting heights are not detailed or dimensions, install systems, materials,
and equipment to provide the maximum headroom possible.

J. Coordinate connection of electrical systems with exterior utilities and services.


JO/EWO
01/21/2016 BI-01382

Comply with requirements of other SAUDI ARAMCO Departments.


DATE

K. Install systems, materials, and equipment level and plumb, parallel and
perpendicular to other building systems and components.
NO.
REV

00

DISCIPLINE
L. Install electrical equipment to facilitate servicing, maintenance, and repair or
ENGINEER replacement of equipment components. As much as practical, connect equipment
ANP
01/21/2016
for ease of disconnecting, with minimum of interference with other installations.
DATE:
PROJECT
ENGINEER M. Install access panel where units are concealed behind finished surfaces. Access
LSS
01/21/2016
panels are specified in Division 16 Section 16050 "BASIC ELECTRICAL
DATE: MATERIALS AND METHODS."
CERTIFIED
YAA

01/21/2016 N. Install systems, materials, and equipment giving right-of-way priority to systems
DATE:
CONSTRUCTION
required to be installed at a specified slope.
AGENCY
YAA

01/21/2016 3.02 CUTTING AND PATCHING


DATE:
OPERATIONS
ASZ
A. Perform cutting, fitting, and patching of electrical equipment and materials required
01/21/2016
to:
DATE:
1. Uncover WORK to provide for installation of ill-timed WORK.
CONTROL NUMBER
VERIFICATION

2. Remove and replace defective WORK.


EDSD

DATE:

B. Remove and replace WORK not conforming to requirements of the Contract


BY:

Documents.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

C. Remove samples of installed WORK as specified for testing.


(DCC) NO. _____________________
10-01382-0008-0001

SECTION 16010
3 of 4
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 5


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

D. Upon written instructions from the Company Representative, uncover and restore
YAA
ENGG CERT

Work to provide for the Company Representative observation of concealed WORK.


LSS

E. Cut, remove and legally dispose of selected electrical equipment, components, and
materials as indicated, including, but not limited to, removal of electrical items
indicated to be removed and items made obsolete by the new WORK.

F. Protect the structure, furnishings, finishes, and adjacent materials not indicated or
scheduled to be removed.
ISSUED FOR IFC
DESCRIPTION

G. Provide and maintain temporary partitions or dust barriers adequate to prevent the
spread of dust and dirt to adjacent areas.

H. Protection of Installed WORK: During cutting and patching operations, protect


adjacent installations.

I. Patch finished surfaces and building components using new materials specified for
the original installation and experienced CONTRACTOR. CONTRACTOR's
qualifications refer to the materials and methods required for the surface and
building components being patched.
JO/EWO
01/21/2016 BI-01382
DATE

END OF SECTION
NO.
REV

00

DISCIPLINE
ENGINEER
ANP
01/21/2016
DATE:
PROJECT
ENGINEER
LSS
01/21/2016
DATE:
CERTIFIED
YAA

01/21/2016
DATE:
CONSTRUCTION
AGENCY
YAA

01/21/2016
DATE:
OPERATIONS
ASZ

01/21/2016
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

SECTION 16010
10-01382-0008-0001

4 of 4
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 6


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

DIVISION 16 - ELECTRICAL
YAA
ENGG CERT

SECTION 16050 - BASIC ELECTRICAL MATERIALS AND METHODS


LSS

PART 1 - GENERAL

1.01 DESCRIPTION OF WORK

A. This Section includes general construction materials and methods for application
with electrical installations as follows:
ISSUED FOR IFC
DESCRIPTION

1. Excavation for underground utilities and services, including underground


raceways and cables.

2. Fire-rated sealants for sealing penetrations in fire and smoke barriers, floors
and fire-rated walls.

1.02 QUALITY ASSURANCE

A. Codes and Standards: Comply with all applicable Codes and Standards including,
JO/EWO
01/21/2016 BI-01382

but not limited to, those listed below:


DATE

SBC 401 Saudi Building Code – Volume 4


ASTM American Society for Testing and Materials
CE European Conformity Certificate (For Wiring Devices
NO.
REV

00

DISCIPLINE
and Accessories)
ENGINEER
ANP
NFPA 70 National Electrical Code (NEC)
01/21/2016
UL Underwriter’s Laboratories
DATE:
PROJECT
SAUDI ARAMCO Construction Safety Manual
ENGINEER
SAUDI ARAMCO Engineering Standards (SAES)
LSS
01/21/2016
DATE:
CERTIFIED
1.03 SUBMITTALS
YAA

01/21/2016 A. General: Submit the following in accordance with Conditions of Contract and
DATE:
CONSTRUCTION Division 1 Specification Sections.
AGENCY
YAA

01/21/2016 1. Product data for each type or access doors, panels and sealants.
DATE:
OPERATIONS
ASZ 2. Schedules indicating proposed methods and sequence of operations for
01/21/2016 selective demolition prior to commencement of WORK. Include coordination
DATE:
for shut-off of electrical service, and details for dust and noise control.
CONTROL NUMBER
VERIFICATION

1.04 DELIVERY, STORAGE, AND HANDLING


EDSD

DATE:

A. Sealants:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

1. Deliver sealant materials such as duct seal and modular base conduit or
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________
10-01382-0008-0001

SECTION 16050
1 of 4
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 7


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

cable seal in original unopened containers or bundles with labels informing


YAA
ENGG CERT

about manufacturer, product name and designation, color, expiration period


for use, pot life, curing time, and mixing instructions for multi-component
LSS

materials.

2. Store and handle sealant materials in compliance with the manufacturers'


recommendations to prevent their deterioration and damage.

B. Electrical Conduits for Underground Installation:


ISSUED FOR IFC
DESCRIPTION

1. Conform to SAES-S-070 for similar methods of delivery, storage and


handling.

PART 2 - PRODUCTS

2.01 SOIL MATERIALS: All fill materials shall be subject to the approval of the Company
Representative.

A. On-Site Fill Material: All approved usable material removed from excavation shall
be used, as far as practicable, for backfill. Soil rock mixture which is free from
JO/EWO
01/21/2016 BI-01382

organic matter containing no vegetation, masses of roots, rocks or lumps over


150mm (6”)in diameter and having not more than 15% of the rocks and lumps
DATE

larger than 60mm (2-1/2” more or less), shall be considered as suitable material for
fill.
NO.
REV

00

DISCIPLINE
B. Borrow Fill: If on-site fill material is unsuitable for backfill as determined by
ENGINEER Company Representative, CONTRACTOR shall use materials from approved
ANP
01/21/2016
borrow fill.
DATE:
PROJECT
ENGINEER C. Sand envelope for underground cable and conduit installation shall be dry sand free
LSS
01/21/2016
from stones, rubble, debris, waste and other deleterious matter.
DATE:
CERTIFIED
YAA 2.02 FIRE-RESISTANT JOINT SEALANTS
01/21/2016
DATE:
CONSTRUCTION
A. Two-part, foamed-in place, silicone sealant formulated for use in through-
AGENCY
YAA
penetration fire-stopping around cables, pipes, and duct penetrations through fire-
01/21/2016 rated walls and floors. Sealants and accessories shall have fire-resistance ratings
DATE:
OPERATIONS
indicated, as established by testing identical assemblies in accordance with ASTM-
ASZ
E-814, by Underwriters’ Laboratories, Inc., or other approval equal.
01/21/2016
DATE:
2.03 FIRE-RESISTANT ACCESS DOORS AND PANELS
CONTROL NUMBER
VERIFICATION

A. Provide units from a UL-listed manufacturer.


EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

SECTION 16050
10-01382-0008-0001

2 of 4
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 8


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

PART 3 - EXECUTION
YAA
ENGG CERT

3.01 INSTALLATION OF FIRE-STOPPING SEALANTS


LSS

A. Install sealant, including forming, packing, and other accessory materials, to fill
openings, around electrical services penetrating floors and walls, to provide fire-
stops with fire-resistance ratings indicated for floor or wall assembly in which
penetration occurs. Comply with installation requirements established by
manufacturer.
ISSUED FOR IFC
DESCRIPTION

3.02 INSTALLATION OF ACCESS PANELS AND DOORS

A. Set frames accurately in position and securely attached to supports, with face
panels plumb and level in relation to adjacent finish surfaces.

B. Adjust hardware and panels after installation for proper operation.

3.03 TRENCHING FOR UNDERGROUND CABLE AND CONDUIT

A. Trenching and bedding methods shall comply with applicable provisions of


JO/EWO
01/21/2016 BI-01382

SAES-S-070.
DATE

B. Excavate trenches to the uniform width, sufficiently wide to provide ample working
room and a minimum of 150 to 230mm (6 to 9 inches) clearance on both sides of
raceways and equipment.
NO.
REV

00

DISCIPLINE
ENGINEER C. Where rock is encountered, carry excavation below required elevation and backfill
ANP
01/21/2016
with a layer of dry sand prior to installation of raceways and equipment. Provide a
DATE:
PROJECT
minimum of 150mm (6 inches) of sand cushion between rock bearing surface and
ENGINEER electrical installations.
LSS
01/21/2016
DATE: 3.04 BACKFILL
CERTIFIED
YAA

01/21/2016 A. Backfilling methods shall comply with applicable provisions of SAES-S-070.


DATE:
CONSTRUCTION
AGENCY
YAA
B. Place soil materials in layers to required sub grade elevations, using materials
01/21/2016 specified in this Section.
DATE:
OPERATIONS
ASZ
C. Backfill excavations as promptly as work permits, but not until completion of the
01/21/2016
following:
DATE:
CONTROL NUMBER
VERIFICATION

1. Inspection, testing, approval, and locations of underground utilities have


been recorded.
EDSD

DATE:

2. Removal of concrete formwork.


BY:
APPROVAL/CERTIFICATION REQUIREMENTS,

2. Removal of shoring and bracing, and backfilling of voids.


THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

SECTION 16050
10-01382-0008-0001

3 of 4
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 9


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
EDSD REV
REVISION CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________ 00
00 01/21/2016 BI-01382 ISSUED FOR IFC YAA
OF THIS DRAWING IS COVERED, FOR ALL
LSS YAA ASZ
CONTROL NUMBER

YAA

ASZ
YAA
ANP

LSS
APPROVAL/CERTIFICATION REQUIREMENTS,

AGENCY
BY:

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
01/21/2016
ENGINEER

01/21/2016
01/21/2016
DISCIPLINE

01/21/2016
CERTIFIED

01/21/2016
OPERATIONS
CONSTRUCTION
10-01382-0008-0001
(DCC) NO. _____________________ DATE:

DHAHRAN
Saudi Aramco 2616-ENG (03/99)

4.

RESIDENTIAL AREA
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL
EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6
Removal of trash and debris.

SAUDI ARABIA
DOC
END OF SECTION

EWO:
A S60
DWG.TYPE PLANT NO. INDEX
SAUDI ARABIAN OIL COMPANY

10-01382-0008
SK-P60004
DRAWING NO.
4 of 4

10
OF
148
SHT.NO.
SECTION 16050

00

EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

DIVISION 16 - ELECTRICAL
YAA
ENGG CERT

SECTION 16110 - RACEWAYS


LSS

PART 1 - GENERAL

1.01 DESCRIPTION OF WORK

A. This Section includes raceways normally used in SAUDI ARAMCO facilities for
electrical wiring. Types of raceways in this section include the following:
ISSUED FOR IFC
DESCRIPTION

1. Rigid steel conduit.

2. Electrical Metallic Tubing (EMT)

3. Flexible Metal Conduit

4. Liquid tight Flexible Metal Conduit

5. Rigid PVC conduit


JO/EWO
01/21/2016 BI-01382

1.02 QUALITY ASSURANCE


DATE

A. Codes and Standards: Comply with all applicable Codes and Standards including,
but not limited to, those listed below:
NO.
REV

00

DISCIPLINE
ENGINEER
ANP
1. SBC 401 Saudi Building Code – Volume 4
01/21/2016
DATE:
PROJECT
2. American National Standards Institute/American Society of Mechanical
ENGINEER
Engineers (ANSI/ASME)
LSS
01/21/2016
DATE:
CERTIFIED
ANSI/ASME B1.20.1 Pipe Threads, General Purpose (Inch)
YAA ANSI C80.1 Rigid Steel Conduit - Zinc Coated
01/21/2016 ANSI C80.3 Electrical Metallic Tubing - Zinc Coated
DATE:
CONSTRUCTION
AGENCY
YAA 3. Canadian Standards Association (CSA)
01/21/2016
DATE:
OPERATIONS
4. Factory Mutual Research Corporation (FM)
ASZ

01/21/2016
5. National Fire Protection Association (NFPA)
DATE:
CONTROL NUMBER
VERIFICATION

NFPA 70 National Electrical Code (NEC)


EDSD

6. National Electrical Manufacturer’s Association (NEMA)


DATE:
BY:

7. Underwriter’s Laboratories (UL)


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

SECTION 16110
10-01382-0008-0001

1 of 6
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 11


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

8. Building Industry Consulting Service International/Telecommunication


YAA
ENGG CERT

Distribution Methods Manual (BICSI/TDMM)


LSS

9. SAUDI ARAMCO Engineering Standards (SAES)

SAES-P-100 Basic Power System Design Criteria


SAES-P-104 Wiring Methods and Materials

1.03 SUBMITTALS
ISSUED FOR IFC
DESCRIPTION

A. General: Submit the following in accordance with Conditions of Contract and


Division 1 Specification Sections.

1. Product data for the following products:

a. Surface raceway and fittings.

2. Samples, 6 inches long of each type and size of surface raceway with
required finish.
JO/EWO
01/21/2016 BI-01382

3. Installation Instructions: Manufacturer's written installation instructions for


wire way and surface raceway products.
DATE

PART 2 - PRODUCTS
NO.
REV

00

DISCIPLINE
2.01 MANUFACTURERS:
ENGINEER
ANP
01/21/2016
A. Available Manufacturer: Subject to compliance with requirements, manufacturers
DATE:
PROJECT
offering products which shall be incorporated with WORK include, but not limited
ENGINEER to, the following:
LSS
01/21/2016
DATE: B. Manufacturers: Subject to compliance with requirements, provide products from
CERTIFIED
YAA the following:
01/21/2016
DATE:
CONSTRUCTION
1. Rigid Steel Conduit
AGENCY
YAA

01/21/2016 Saudi Steel Pipe (SSP)


DATE:
OPERATIONS
Allied Tube and Conduit Corporation
ASZ
Matsushita
01/21/2016
Wheatland Tube Company
DATE:
Other Approved Manufacturers
CONTROL NUMBER
VERIFICATION

2. Electrical Metallic Tubing (EMT)


EDSD

Wheatland Tube Company


DATE:

Matsushita Electric Industries


BY:

Matsushita Electric Industries


APPROVAL/CERTIFICATION REQUIREMENTS,

Alflex Corporation
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

PANASONIC
(DCC) NO. _____________________

SECTION 16110
10-01382-0008-0001

2 of 6
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 12


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

Other Approved Manufacturers


YAA
ENGG CERT

4. Liquid tight Flexible Metal Conduit


LSS

Kopex International Limited


International Metal Hose Company
Anamet Electrical Incorporated
Other Approved Manufacturers

5. Rigid PVC Conduit


ISSUED FOR IFC
DESCRIPTION

Saudi Plastic Products Company (SAPPCO)


Deco duct
Carlon Electrical Division
Cantex Incorporated
Other Approved Manufacturers

6. Conduit Bodies:

Appleton Electric Co.


JO/EWO
01/21/2016 BI-01382

Crouse-Hinds Division, Cooper Industries, Inc.


Killark Electric Mfg. Co.
DATE

O-Z/Gedney
Other Approved Manufacturers
NO.
REV

00

DISCIPLINE
2.02 STANDARDS COMPLIANCE
ENGINEER
ANP
01/21/2016
The following products shall conform to the appropriate standards and requirements:
DATE:
PROJECT
ENGINEER A. Metal Conduit and Tubing:
LSS
01/21/2016
DATE: 1. Rigid Steel Conduit: ANSI C80.1, except hot-dip galvanized (per SAES-P-
CERTIFIED
YAA 104).
01/21/2016
DATE:
CONSTRUCTION
2. Electrical Metallic Tubing (EMT): ANSI C80.3.
AGENCY
YAA

01/21/2016 3. Flexible Metal Conduit: UL1, Zinc coated Steel.


DATE:
OPERATIONS
ASZ
4. Liquid tight Flexible Metal Conduit and Fittings: UL 360 fittings shall be
01/21/2016
specifically approved for use with this raceway.
DATE:
CONTROL NUMBER
VERIFICATION

B. Nonmetallic Conduit and Ducts:


EDSD

1. Rigid Nonmetallic Conduit: Type DB-120 (minimum modulus of elasticity


DATE:

500,000 psi) per NEMA TC 6 and 8, or Type EPC-40-PVC per NEMA TC 2


BY:

for direct burial.


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

SECTION 16110
10-01382-0008-0001

3 of 6
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 13


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

C. Conduit Bodies:
YAA
ENGG CERT

1. Provide types, shapes, and sizes as required to suit individual applications


LSS

and NEC requirements. Provide matching gasketed covers secured with


corrosion-resistant screws.

2. Metallic Conduit and Tubing: Use metallic conduit bodies. Use bodies with
threaded hubs for threaded raceways.

3. EMT Installations: For Conduit 1 inch and smaller, use bodies with
ISSUED FOR IFC
DESCRIPTION

compression type EMT Connectors.

PART 3 - EXECUTION

3.01 GENERAL REQUIREMENTS

Comply with SBC 401, the National Electrical Code and SAES-P-104. General
requirements for conduit and conduit fittings shall be as follows:

A. Direct buried conduit shall be (a) threaded PVC coated rigid steel or (b) PVC
JO/EWO
01/21/2016 BI-01382

Conduit Type DB per NEMA TC 8.


DATE

B. Conduits above ground in outdoor and industrial facilities shall be threaded, rigid
steel.
NO.
REV

00

DISCIPLINE
C. Where rigid steel conduit is run entirely within a concrete slab, it may be installed
ENGINEER without a PVC coating.
ANP
01/21/2016
DATE:
PROJECT
D. Intermediate metal conduit (IMC) is prohibited.
ENGINEER
LSS
01/21/2016
E. The minimum conduit size for aboveground installation shall be 3/4 inch, except on
DATE: instrument panels, inside builldings, on prefabricated skids, and in non-industrial
CERTIFIED
YAA areas, where the minimum size conduit shall be 1/2 inch. The minimum size for
01/21/2016 underground installation shall be 1 inch, unless otherwise indicated.
DATE:
CONSTRUCTION
AGENCY
YAA
F. Conduit and threaded conduit fittings shall have tapered (NPT) threads per
01/21/2016 ANSI/ASME B1.20.1.
DATE:
OPERATIONS
ASZ
3.02 INSTALLATION
01/21/2016
DATE:
A. General: Install electrical raceways in accordance with manufacturer's written
CONTROL NUMBER
VERIFICATION

installation instructions, applicable requirements of NEC, and as follows:


EDSD

1. Complete installation of electrical raceways before starting installation of


DATE:

conductors within raceways.


BY:
APPROVAL/CERTIFICATION REQUIREMENTS,

2. Provide supports for raceways as specified elsewhere in Division 16.


THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

SECTION 16110
10-01382-0008-0001

4 of 6
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 14


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

3. Prevent foreign matter from entering raceways by using temporary closure


YAA
ENGG CERT

protection.
LSS

4 Protect stub-ups from damage where conduits rise from floor slabs.
Arrange so curved portion of bends is not visible above the finished slab.

5. Make bends and offsets so the inside diameter is not effectively reduced.
Unless otherwise indicated, keep the legs of a bend in the same plane and
the straight legs of offsets parallel.
ISSUED FOR IFC
DESCRIPTION

6. Use raceway fittings that are of types compatible with the associated
raceway and suitable for the use and location.

7. Run concealed raceways with a minimum of bends in the shortest practical


distance considering the type of building construction and obstructions
except as otherwise indicated. This does not apply to conduits in crawl
spaces.

8. Install exposed raceways parallel and perpendicular to nearby surfaces or


structural members and follow the surface contours as much as practical.
JO/EWO
01/21/2016 BI-01382

9. Run exposed, parallel, or banked raceways together. Make bends in


DATE

parallel or banked runs from the same center line so that the bends are
parallel. Factory elbows may be used in banked runs only where they can
be installed parallel. This requires that there be a change in the plane of
NO.
REV

00

DISCIPLINE
the run such as from wall to ceiling and that the raceways be of the same
ENGINEER size. In other cases provide field bends for parallel raceways.
ANP
01/21/2016
DATE:
PROJECT
10. Join raceways with fittings designed and approved for the purpose and
ENGINEER make joints tight. Make raceway terminations tight. Where terminations
LSS
01/21/2016
are subject to vibration, use bonding bushings or wedges to assure
DATE: electrical continuity. Where subject to vibration or dampness, use insulating
CERTIFIED
YAA bushings to protect conductors.
01/21/2016
DATE:
CONSTRUCTION
11. Tighten set screws of threadless fittings with suitable tool.
AGENCY
YAA

01/21/2016 12. Terminations: Where raceways are terminated with locknuts and bushings,
DATE:
OPERATIONS
align the raceway to enter squarely and install the locknuts with dished part
ASZ
against the box. Where terminations cannot be made secure with one
01/21/2016
locknut, use two locknuts, one inside and one outside the box.
DATE:
CONTROL NUMBER
VERIFICATION

13. Where terminating in threaded hubs, screw the raceway or fitting tight into
the hub so the end bears against the wire protection shoulder. Where
EDSD

chase nipples are used, align the raceway so the coupling is square to the
DATE:

box, and tighten the chase nipple so no threads are exposed.


BY:
APPROVAL/CERTIFICATION REQUIREMENTS,

14. Install pull wires in empty raceways. Use no. 14 AWG zinc-coated steel or
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

SECTION 16110
10-01382-0008-0001

5 of 6
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 15


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

monofilament plastic line having not less than 200-lb tensile strength.
YAA
ENGG CERT

Leave not less than 12 inches of slack at each end of the pull wire.
LSS

B. Field-cut conduit threads shall be coated with a zinc rich protective coating.
Threads of plugs, junction boxes and other fittings shall be lightly lubricated with a
rust preventive grease such as Crouse Hinds thread lubricant (SAMS 14-839-050)
or High Purity Goop (SAMS 26-011-087) before assembly.

3.03 ADJUSTING AND CLEANING


ISSUED FOR IFC
DESCRIPTION

Upon completion of installation of raceways, inspect interiors of raceways; clear all


blockages and remove burrs, dirt, and construction debris.

END OF SECTION
JO/EWO
01/21/2016 BI-01382
NO. DATE
REV

00

DISCIPLINE
ENGINEER
ANP
01/21/2016
DATE:
PROJECT
ENGINEER
LSS
01/21/2016
DATE:
CERTIFIED
YAA

01/21/2016
DATE:
CONSTRUCTION
AGENCY
YAA

01/21/2016
DATE:
OPERATIONS
ASZ

01/21/2016
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

SECTION 16110
10-01382-0008-0001

6 of 6
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 16


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

DIVISION 16 - ELECTRICAL
YAA
ENGG CERT

SECTION 16111 - CABLE TRAYS


LSS

PART 1 - GENERAL

1.01 DESCRIPTION OF WORK

A. This section includes aluminum cable trays.


ISSUED FOR IFC
DESCRIPTION

B. Cable tray support devices are specified here and in Section 16190 "Supporting
Devices."

1.02 QUALITY ASSURANCE

A. Codes and Standards: Comply with all applicable Codes and Standards including,
but not limited to, those listed below:

1. SBC 401 (Saudi Building Code – Volume 4)


JO/EWO
01/21/2016 BI-01382

2. American National Standards Institute/National Fire Protection Association


(ANSI/NFPA)
DATE

NFPA 70 National Electrical Code (NEC)


NO.
REV

00

DISCIPLINE
3. Factory Mutual Research Corporation (FM)
ENGINEER
ANP
01/21/2016
4. National Electrical Manufacturers Association (NEMA)
DATE:
PROJECT
ENGINEER NEMA Standard VE 1 Metallic Cable Tray Systems
LSS
01/21/2016
DATE: 5. Underwriters Laboratories (UL)
CERTIFIED
YAA

01/21/2016 6. SAUDI ARAMCO Engineering Standard (SAES)


DATE:
CONSTRUCTION
AGENCY
YAA SAES-P-104 Wiring Methods and Materials
01/21/2016
DATE:
OPERATIONS
B. Cable trays and components shall be listed and labeled by UL and comply with the
ASZ
NEMA Standards.
01/21/2016
DATE:
C. Electrical Component Standard: Components and installation shall comply with the
CONTROL NUMBER
VERIFICATION

National Electrical Code.


EDSD

D. Single-Source Responsibility: All cable tray components shall be the product of a


DATE:

single manufacturer.
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________
10-01382-0008-0001

SECTION 16111
1 of 7
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 17


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

1.03 SUBMITTALS
YAA
ENGG CERT

A. General: Submit the following in accordance with Conditions of Contract and


LSS

Division 1 Specification sections.

1. Product Data for cable tray products.

2. Factory Test Reports: Certified copies of factory test reports performed in


conformance with NEMA Standard VE 1 or NEMA FG 1 on cable trays of
types and size specified for this project.
ISSUED FOR IFC
DESCRIPTION

PART 2 - PRODUCTS

2.01 MANUFACTURERS

A. Available Manufacturer: Subject to compliance with requirements, manufacturers


offering products which shall be incorporated with WORK include, but not limited
to, the following:

B. Manufacturers: Subject to compliance with requirements, provide products from


JO/EWO
01/21/2016 BI-01382

the following:
DATE

ABAHSAIN – Cope S.A. Ltd.


B-Line Systems, Inc.
Chalfant Mfg. Co.
NO.
REV

00

DISCIPLINE
The George-Ingraham Corp.
ENGINEER GS Metals Corp.
ANP
01/21/2016
Mono-Systems, Inc.
DATE:
PROJECT
MP Husky Corp.
ENGINEER P-W Industries, Inc.
LSS
01/21/2016
Square D Co.
DATE: Saudi Electric Industries Co; Ltd. (SEICO)
CERTIFIED
YAA WESCOSA
01/21/2016 Other Approved Manufacturers
DATE:
CONSTRUCTION
AGENCY
YAA
2.02 MATERIALS
01/21/2016
DATE:
OPERATIONS
A. GENERAL REQUIREMENTS
ASZ

01/21/2016
1. Cable tray systems shall be of indicated types, sizes, and NEMA classes
DATE:
and shall be complete with manufacturer's recommended covers, barrier
CONTROL NUMBER
VERIFICATION

strips, dropouts, fittings, conduit adaptors, hold- down devices, grommets,


and blind ends as required and indicated.
EDSD

DATE:

2. Cable tray products shall have rounded edges and smooth surfaces.
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

SECTION 16111
10-01382-0008-0001

2 of 7
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 18


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

B. MATERIALS AND FINISHES


YAA
ENGG CERT

1. Aluminum Cable Trays, Fittings, and Accessories: Cable tray shall be


LSS

“copper-free” aluminum (maximum of 0.4 percent copper). Construction


and mechanical loading shall be in accordance with NEMA VE 1.

a. Aluminum cable tray shall be the ladder type.

b. Aluminum cable tray installations in outdoor locations shall utilize


ventilated, louvered, cable tray covers, secured with stainless steel
ISSUED FOR IFC
DESCRIPTION

banding, one band per 1 meter of cover length, with a minimum of


three bands per cover.

Exceptions:

1. If the cable trays contain only instrument and communication


cables, covers may be solid (unventilated).

2. Cable tray covers may be deleted at the discretion of the


facility Proponent. However, cable trays should be located
JO/EWO
01/21/2016 BI-01382

to minimize the potential for mechanical damage and


minimize the effects of sunlight on the cables. Cable
DATE

derating is also required for cables exposed to sun.

C. SUPPORTS AND CONNECTORS


NO.
REV

00

DISCIPLINE
ENGINEER
ANP
Cable tray supports and connectors, including bonding jumpers shall be as
01/21/2016
recommended by cable tray manufacturer.
DATE:
PROJECT
ENGINEER D. FASTENERS FOR SUPPORTS
LSS
01/21/2016
DATE:
CERTIFIED
Unless otherwise indicated on the drawings, fasteners to connect cable tray
YAA supports to the building structure shall be as follows:
01/21/2016
DATE:
CONSTRUCTION 1. Expansion Anchors: Carbon steel wedge or sleeve type.
AGENCY
YAA

01/21/2016 2. Toggle Bolts: All steel springhead type.


DATE:
OPERATIONS
ASZ 3. Powder-Driven Threaded Studs: Heat-treated steel, designed specifically
01/21/2016 for the intended service.
DATE:
CONTROL NUMBER
VERIFICATION

E. FIRE STOPPING
EDSD

General: Materials shall be UL listed and labeled and FM approved for fire ratings
DATE:

consistent with penetrated barriers. Materials may include but not limited to the
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________
10-01382-0008-0001

SECTION 16111
3 of 7
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 19


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

following:
YAA
ENGG CERT

1. Sleeves: Schedule 40, welded, black steel pipe sleeves. Sizes as


LSS

indicated or minimum NEC size for cable or cable group to be installed.

2. Sealing Fittings: Suitable for sealing cables in sleeves or core drilled holes.

3. Sealing Mortar: Suitable for sealing cable penetration slots/openings in fire


barriers.
ISSUED FOR IFC
DESCRIPTION

4. Sealant: One-part compound for sealing cables, sleeves, and openings in


fire barriers.

5. Two-Part Sealant: Formed-in-place sealant as specified in paragraph "Fire-


Resistant Joint Sealers" in Division 16 Section 16050, "Basic Electrical
Materials and Methods."

F. WARNING SIGNS
JO/EWO
01/21/2016 BI-01382

1. Lettering: 1-1/2-inch high, black on yellow background with legend (both in


English and Arabic)
DATE

"WARNING! NOT TO BE USED AS WALKWAY, LADDER, OR SUPPORT


FOR LADDERS OR PERSONNEL."
NO.
REV

00

DISCIPLINE 2. Materials and Fastening: Conform to Section "Electrical Identification."


ENGINEER
ANP
01/21/2016 PART 3 - EXECUTION
DATE:
PROJECT
ENGINEER
LSS
3.01 INSTALLATION OF CABLE TRAY SYSTEMS
01/21/2016
DATE:
CERTIFIED
A. Install cable trays in accordance with equipment manufacturer's written
YAA instructions. Cable trays shall be installed as a complete system. Cable tray
01/21/2016 systems shall not have mechanically discontinuous segments of cable tray runs.
DATE:
CONSTRUCTION
AGENCY
YAA B. Remove burrs and sharp edges of cable trays.
01/21/2016
DATE:
OPERATIONS
C. Support cable tray independently from the building structural components.
ASZ

01/21/2016
D. Conform to manufacturer's recommendations for selection and installation of
DATE: supports per SAES-P-104, also conform to the following:
CONTROL NUMBER
VERIFICATION

Exception: Plant structural members used as supports for conduit and other
EDSD

electrical equipment are not included in this section. Attachment hardware


DATE:

(clamps, bolts, nuts, etc.) must however comply with the requirements.
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,

1. Channel erector system components (Unistrut or similar) used to support


THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

SECTION 16111
10-01382-0008-0001

4 of 7
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 20


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

conduits, cable trays, enclosures, lighting fixtures and other electrical


YAA
ENGG CERT

equipment shall be made of steel and iron, either hot-dip galvanized


(preferably), or zinc electroplated as supplied by the manufacturer.
LSS

E. Strength of each support including fastenings to the structure shall be adequate to


carry present and future load multiplied by a safety factor of at least four or 200 lbs,
whichever is greater.

F. Support Locations: Locate supports in accordance with the recommendations of


NEMA Standard VE 1 or FG 1.
ISSUED FOR IFC
DESCRIPTION

Exception: When the following NEMA recommendations is difficult because of the


location of the plant structures and equipment, structurally equivalent of supports is
permitted with the approval of SAUDI ARAMCO Consulting Services Dept.

G. Installation of supports shall be in accordance with cable tray manufacturer's


written instructions and the recommendations of Paragraph 6.5 of NEMA Standard
VE 1.

H. Fastening Supports: Unless otherwise indicated, fasten cable tray supports


JO/EWO
01/21/2016 BI-01382

securely to the building structure as specified in Division 16 Section "Supporting


Devices."
DATE

I. Support at Connections to Equipment:


NO.
REV

00

1. Where cable trays connect to equipment, provide flanged fittings fastened


DISCIPLINE
ENGINEER to the tray and to the equipment. Support the tray separately. Do not carry
ANP
01/21/2016
the weight of the tray on the equipment enclosure.
DATE:
PROJECT
ENGINEER 2. Cables may be extended from the cable trays to equipment if:
LSS
01/21/2016
DATE: a. they are armored or metal clad and are properly supported, or
CERTIFIED
YAA

01/21/2016 b. they are installed in rigid or flexible conduit


DATE:
CONSTRUCTION
AGENCY
YAA
J. Thermal Contraction and Expansion: Install expansion connectors in cable tray
01/21/2016
runs that exceed the following length:
DATE:
OPERATIONS
ASZ
1. Aluminum Tray: 90 feet.
01/21/2016
DATE: 2. Spacings for expansion connectors shall not exceed maximums indicated in
CONTROL NUMBER

Table 6-1 of NEMA Standard VE 1.


VERIFICATION
EDSD

3. Gap Settings for expansion connectors shall be in accordance with Figure


DATE:

6-9 of NEMA Standard VE 1.


BY:
APPROVAL/CERTIFICATION REQUIREMENTS,

4. The maximum spacing between expansions joints shall be based on a


THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

SECTION 16111
10-01382-0008-0001

5 of 7
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 21


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

temperature differential of 38 deg C calculated according to NEMA VE 1 or


YAA
ENGG CERT

FG 1 per SAES-P-104.
LSS

K. Direction Changes: Make changes in direction of cable tray with standard cable
tray fittings.

L. Locate cable tray above piping except as required for tray accessibility and as
otherwise indicated.

M. Firestopping: Where cable trays penetrate fire and smoke barriers including walls,
ISSUED FOR IFC
DESCRIPTION

partitions, floors, and ceilings, install fire- stopping at penetrations after cables are
installed.

N. Sleeves for Future Cables: Install capped sleeves for future cables through
firestopped cable tray penetrations of fire/smoke barriers.

O. Working Space: Install cable trays with sufficient space to permit access for
installing cables.

P. Barriers: Where trays carry conductors of different systems, such as power,


JO/EWO
01/21/2016 BI-01382

communications, and data processing, or different insulation levels, such as 600 V,


5,000 V, and 15,000 V, install barriers to separate the systems.
DATE

3.02 GROUNDING
NO.
REV

00

DISCIPLINE
Electrically ground cable trays and ensure continuous electrical conductivity of cable tray
ENGINEER system. Use tray as an equipment ground conductor for itself only, not for connected
ANP
01/21/2016
equipment.
DATE:
PROJECT
ENGINEER 3.03 WARNING SIGNS
LSS
01/21/2016
DATE: After installation of cable trays is completed, install warning signs, on or in proximity to
CERTIFIED
YAA cable trays, where easily seen by occupants of space.
01/21/2016
DATE:
CONSTRUCTION
3.04 FIELD TESTING
AGENCY
YAA

01/21/2016 A. Grounding: Test cable trays to ensure electrical continuity of bonding and
DATE:
OPERATIONS
grounding connections.
ASZ

01/21/2016
B. Anchorage: For critical requirements only and as directed by the Company
DATE:
Representative, test pull-out resistance of one of each type, size, and anchorage
CONTROL NUMBER
VERIFICATION

material for toggle bolts and powder-driven threaded studs.


EDSD

Furnish equipment, including jacks, jigs, fixtures, and calibrated indicating scales
DATE:

required for reliable testing. Obtain the Architect's approval before transmitting
BY:

loads to the structure. Test to 90 percent of rated proof-load for fastener. If


APPROVAL/CERTIFICATION REQUIREMENTS,

fastening fails test, replace fastener and retest until satisfactory results are
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

SECTION 16111
10-01382-0008-0001

6 of 7
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 22


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

achieved.
YAA
ENGG CERT

3.05 CLEANING AND FINISH REPAIR


LSS

A. Upon completion of installation of cable trays, inspect trays, fittings, and


accessories. Remove burrs, dirt, and construction debris and repair damaged
finish including chips, scratches, and abrasions.

B. PVC or Paint Finish: Repair damage with matching touch-up coating


recommended by the tray manufacturer.
ISSUED FOR IFC
DESCRIPTION

END OF SECTION
JO/EWO
01/21/2016 BI-01382
NO. DATE
REV

00

DISCIPLINE
ENGINEER
ANP
01/21/2016
DATE:
PROJECT
ENGINEER
LSS
01/21/2016
DATE:
CERTIFIED
YAA

01/21/2016
DATE:
CONSTRUCTION
AGENCY
YAA

01/21/2016
DATE:
OPERATIONS
ASZ

01/21/2016
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

SECTION 16111
10-01382-0008-0001

7 of 7
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 23


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

DIVISION 16 - ELECTRICAL
YAA
ENGG CERT

SECTION 16112 - CABLE RUNWAY


LSS

PART 1 - GENERAL

1.01 DESCRIPTION

A. This Section includes aluminum cable runway, fittings, support brackets and
hanger clip.
ISSUED FOR IFC
DESCRIPTION

1.02 QUALITY ASSURANCE

A. Codes and Standards: Comply with all applicable Codes and Standards including
but not limited to, those listed below:

SBC 401 Saudi Building Code – Volume 4


ANSI/NFPA 70 National Electrical Code
UL Underwriters Laboratories
SAES-P-104 Wiring Methods and Materials
JO/EWO
01/21/2016 BI-01382

1.03 SUBMITTALS
DATE

A. General: Submit the following in accordance with Conditions of Contract and


Division 1 Specification Sections.
NO.
REV

00

DISCIPLINE
ENGINEER
ANP
B. Product Data: For each type of cable runway, fittings and accessory item.
01/21/2016
DATE:
PROJECT
C. Installation Instructions: Manufacturer installation instructions for cable runway.
ENGINEER
LSS
01/21/2016
1.04 EXTRA MATERIALS
DATE:
CERTIFIED
YAA A. Furnish spares of the following item:
01/21/2016
DATE:
CONSTRUCTION
1. Cable runway 600 mm-width/10 ft length 6 ea.
AGENCY
YAA

01/21/2016 2. Universal splice place with complete nuts/washers/screws 10 ea.


DATE:
OPERATIONS
ASZ
3. 90 º Connector with complete nuts/washers/screws 10 ea.
01/21/2016
DATE:
4. Support Bracket with complete nuts/washers/screws 10 ea.
CONTROL NUMBER
VERIFICATION

5. Hanger clip 20 ea.


EDSD

DATE:

6. Threaded rod 3/8 inches - 10 foot length 20 ea.


BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

SECTION 16112
10-01382-0008-0001

1 of 2

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 24


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

PART 2 - PRODUCTS
YAA
ENGG CERT

2.01 MANUFACTURES
LSS

A. Subject to compliance with requirements, provide products from the following:

Square D. Co. - Al Abdul Karim Trading Est.; Tel. 834-3855, Fax 834-7308
Chatsworth Products Inc. - SESCO; Tel. 857-7738, Fax. 857-3293
Wahah Electric Company of Saudi Arabia Ltd. (WESCOSA). Tel. 857-7587, Fax:
857-1684.
ISSUED FOR IFC
DESCRIPTION

Other manufacturers

2.02 MATERIALS

A. Cable Runway: Cable runway shall be constructed of high strength, lightweight,


aluminum, in standard 600 mm (24 inches) width as specified on drawings. Cross
members shall be welded on 38 mm (1-1/2 inch) stringer and are spaced every 300
mm (12 inches) apart maximum.

B. Cable Runway Fittings: Cable runway fittings shall consist of universal splice plate
JO/EWO
01/21/2016 BI-01382

for straight runs, angle type slicing kits for either 45º or 90º vertical angle, junction
kits for making "T" connections, and auxiliary cable brackets to isolate power
DATE

cables from signal cables. Cable runway fittings shall be of the same manufacturer
as the cable runway to ensure complete compatibility. Fittings shall be made of
aluminum and when fitted shall not cause any reduction in strength of the cable
NO.
REV

00

DISCIPLINE
runway.
ENGINEER
ANP
01/21/2016
PART 3 - EXECUTION
DATE:
PROJECT
ENGINEER 3.01 INSTALLATION
LSS
01/21/2016
DATE: A. General: Install cable runway system in accordance with the layout shown on
CERTIFIED
YAA drawing. Cable runway shall be installed level and parallel to building structure on
01/21/2016 horizontal runs. Vertical runs shall be plumb. Use standard fittings for making
DATE:
CONSTRUCTION
bends. Field fabricated fittings not acceptable. Make up all splice joints tight.
AGENCY
YAA

01/21/2016 B. Cable Runway Supports: Use threaded rods and approved hangers, or wall
DATE:
OPERATIONS
brackets. Locations of supports are shown on drawings but may be slightly altered
ASZ
with the concurrence of SAUDI ARAMCO Representative, in order to avoid
01/21/2016
interference. Cable runway shall be supported at not more than 2000 mm
DATE:
intervals, as per details shown on drawing.
CONTROL NUMBER
VERIFICATION
EDSD

END OF SECTION
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

SECTION 16112
(DCC) NO. _____________________
10-01382-0008-0001

2 of 2

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 25


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

DIVISION 16 - ELECTRICAL
YAA
ENGG CERT

SECTION 16119 - UNDERGROUND DUCTS & MANHOLES


LSS

PART 1 - GENERAL

1.01 DESCRIPTION OF WORK

A. This section includes underground electrical work including the following:


ISSUED FOR IFC
DESCRIPTION

B. Related Sections: The following sections contain requirements that relate to this
Section:

1. Division 2 Section "Earthwork" for general requirements for excavation,


backfill and related items for ducts.

2. Division 3 Section "Concrete Work" for cast-in-place concrete requirements.

C. Definitions
JO/EWO
01/21/2016 BI-01382

1. Duct: The general term for electrical conduit and other raceway, either
metallic or nonmetallic, specified for use underground, embedded in earth
DATE

or concrete.

2. Duct Bank: A group of two or more ducts in a continuous run between two
NO.
REV

00

DISCIPLINE
points.
ENGINEER
ANP
01/21/2016
DATE:
PROJECT
1.02 QUALITY ASSURANCE
ENGINEER
LSS
01/21/2016
A. Codes and Standards: Comply with all applicable Codes and Standards including,
DATE: but not limited to, those listed below:
CERTIFIED
YAA

01/21/2016 1. SBC (Saudi Building Code – Volume 4)


DATE:
CONSTRUCTION
AGENCY
YAA 2. American National Standards Institute/ American Society of Mechanical
01/21/2016 Engineers (ANSI/ASME)
DATE:
OPERATIONS
ASZ
ANSI/ ASME B1.20.1 Pipe Threads, General Purpose (Inch)
01/21/2016
ANSI C80.1 Rigid Steel Conduit – Zinc Coated
DATE:
ANSI C80.3 Electrical Metallic Tubling – Zinc Coated
CONTROL NUMBER
VERIFICATION

3. Canadian Standards Association (CSA)


EDSD

DATE:

4. Factory Mutual Research Corporation (FM)


BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________
10-01382-0008-0001

SECTION 16119
1 of 7
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 26


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

5. National Fire Protection Association (NFPA)


YAA
ENGG CERT

NFPA 70 National Electrical Code (NEC)


LSS

6. National Electrical Manufacturer’s Association (NEMA)

7. Underwriter’s Laboratories (UL)

8. SAUDI ARAMCO Engineering Standards (SAES)


ISSUED FOR IFC
DESCRIPTION

SAES-P-100 Basic Power System Design Criteria


SAES-P-104 Wiring Methods and Materials
SAES-H-101 Approved Protective Coating Systems

1.03 SUBMITTALS

A. General: Submit the following in accordance with Conditions of Contract and


Division 1 Specification Sections.

B. Product data for duct bank materials, and miscellaneous components. Include:
JO/EWO
01/21/2016 BI-01382

Raceways and fittings.


DATE

Raceway supports.

C. Shop Drawings: Detail drawings of Duct Banks including reinforcing steel.


NO.
REV

00

DISCIPLINE
ENGINEER D. Coordination drawings showing duct profiles and coordination with other utilities
ANP
01/21/2016
and underground structures.
DATE:
PROJECT
ENGINEER 1.04 DELIVERY, STORAGE, AND HANDLING
LSS
01/21/2016
DATE: A. Deliver ducts to site with ends capped. Store non-metallic ducts with supports to
CERTIFIED
YAA prevent bending, warping, and deforming.
01/21/2016
DATE:
CONSTRUCTION
1.05 PROJECT CONDITIONS
AGENCY
YAA

01/21/2016 A. Subsurface conditions were investigated during the design of the project. Reports
DATE:
OPERATIONS
of these investigations are available for informational purposes only. Data in the
ASZ
reports are not intended as representations or warranties of accuracy regarding
01/21/2016
continuity of conditions (between soil borings or test kits). The Owner will assume
DATE:
no responsibility for interpretations or conclusions drawn from this material.
CONTROL NUMBER
VERIFICATION

B. Existing Utilities: Information on underground utilities and possible obstructions in


EDSD

the path of construction under this section was obtained through investigations
DATE:

during the design of the project. Reports of these investigations are available for
BY:

informational purposes only. Data in the reports are not intended as


APPROVAL/CERTIFICATION REQUIREMENTS,

representations or warranties of accuracy regarding conditions and locations. The


THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

SECTION 16119
10-01382-0008-0001

2 of 7
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 27


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

Owner will assume no responsibility of interpretations or conclusions drawn from


YAA
ENGG CERT

this information.
LSS

1.06 SEQUENCING AND SCHEDULING

A. Coordination of the Work: Coordinate layout and installation with final arrangement
of ducts/ duct bank as influenced by actual final location of other utilities in the field.
Coordinate elevations of duct/ duct bank and raceway entrances into Buildings with
final profiles of conduits as determined by coordination with other utilities and
underground obstructions. Revise locations and elevations from those indicated as
ISSUED FOR IFC
DESCRIPTION

required to suit field conditions.

1.07 EXTRA MATERIALS

A. Furnish the following extra materials matching products installed, packaged with
protective covering for storage and with identification labels clearly describing
contents.

PART 2 - PRODUCTS
JO/EWO
01/21/2016 BI-01382

2.01 MANUFACTURERS
DATE

A. Available Manufacturers: Subject to compliance with requirements, manufacturers


offering products that may be incorporated in the Work include but are not limited
to the following:
NO.
REV

00

DISCIPLINE
ENGINEER B. Manufacturers: Subject to compliance with requirements, provide products by one
ANP
01/21/2016
of the following:
DATE:
PROJECT
ENGINEER 1. Nonmetallic Ducts:
LSS
01/21/2016
DATE: Saudi Plastic Products Company (SAPPCO)
CERTIFIED
YAA Anamet, Inc.
01/21/2016 Can-Tex Industries.
DATE:
CONSTRUCTION
Carlon.
AGENCY
YAA
Decoduct
01/21/2016 Other Approved Manufacturers
DATE:
OPERATIONS
ASZ
2.01 DUCTS AND FITTINGS
01/21/2016
DATE:
A. General: Ducts and duct fittings and accessories for which listing has been
CONTROL NUMBER
VERIFICATION

obtained by one or more manufacturers shall be UL listed and labeled.


EDSD

B. General: Ducts and duct fittings and accessories for which listing has been
DATE:

obtained by one or more manufacturers shall be listed and labeled by a Nationally


BY:

Recognized Testing Laboratory (NRTL). The term "NRTL" shall be as defined in


APPROVAL/CERTIFICATION REQUIREMENTS,

OSHA Regulation 1910.7.


THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

SECTION 16119
10-01382-0008-0001

3 of 7
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 28


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

C. Galvanized Rigid Steel Conduit: ANSI C80.1.


YAA
ENGG CERT

D. Manufactured Bends: Not less than 36-inch radius.


LSS

2.03 CAST-IN-PLACE CONCRETE

A. Conform to Division 3 Section "Concrete Work" for concrete and reinforcing.

B. Aggregate for Duct Encasement: 3/8-inch maximum size.


ISSUED FOR IFC
DESCRIPTION

C. Strength: 3000 psi minimum 28-day compressive strength.

2.04 DUCT BANK ACCESSORIES

A. Duct Supports: Rigid PVC spacers selected to provide minimum duct spacings
and concrete cover depths indicated, while rigidly supporting ducts during
concreting.

2.05 RACEWAY/DUCT SEALING COMPOUND


JO/EWO
01/21/2016 BI-01382

A. Compound: Nonhardening, putty-like consistency workable at temperatures as low


as 35 deg F. Compound shall not slump at a temperature of 300 deg F and shall
DATE

readily adhere to clean surfaces of plastic ducts, metallic conduits, conduit


coatings, concrete, masonry, lead, cable sheaths, cable jackets, insulation
materials, and the common metals. Compound shall have no injurious effect on
NO.
REV

00

DISCIPLINE
worker's hands or materials.
ENGINEER
ANP
01/21/2016
PART 3 - EXECUTION
DATE:
PROJECT
ENGINEER 3.01 WIRING METHOD
LSS
01/21/2016
DATE: A. General: Install ducts for wiring runs indicated. Provide sizes as indicated.
CERTIFIED
YAA

01/21/2016 1. Single Duct Runs: PVC-coated galvanized rigid steel conduit, direct buried in
DATE:
CONSTRUCTION
earth.
AGENCY
YAA

01/21/2016 2. Duct Banks: Heavy wall plastic utilities duct type DB, encased in concrete.
DATE:
OPERATIONS
ASZ
3. Duct Banks: PVC-coated galvanized rigid steel conduit buried in earth.
01/21/2016
DATE:
3.02 EXCAVATION AND BACKFILL
CONTROL NUMBER
VERIFICATION

A. Excavation and Backfill: Conform to Division 2 Section "Earthwork," except heavy-


EDSD

duty, hydraulic-operated compaction equipment shall not be used and trenching for
DATE:

ducts shall conform to the following:


BY:
APPROVAL/CERTIFICATION REQUIREMENTS,

1. Excavation: Cut trenches neatly and uniformly, and slope uniformly to


THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

SECTION 16119
10-01382-0008-0001

4 of 7
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 29


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

required pitch.
YAA
ENGG CERT

2. For direct-buried, nonencased ducts prepare trench bottoms free from


LSS

stones, soft spots, and sharp objects. Where necessary, add a 3-inch layer
of stone-free sand or earth to trench bottom and compact to density of
adjacent undisturbed soil to provide suitable bearing for ducts. Backfill over
and around ducts on bottom of trench with stone-free sand or earth to 6
inches minimum above tops of ducts and compact by hand or pneumatic
tamper to density of adjacent undisturbed earth.
ISSUED FOR IFC
DESCRIPTION

3. For each additional layer of direct-buried ducts above bottom ducts, backfill
over and around each layer of ducts with stone-free sand or earth to 6
inches minimum above tops of ducts and compact by hand or pneumatically
to density of adjacent undisturbed earth.

4. Separation Between Direct-Buried, Nonencased Ducts: Three inches


minimum for like services, and 12 inches (300mm) minimum between
power and signal ducts.

3.03 INSTALLATION OF DUCTS


JO/EWO
01/21/2016 BI-01382

A. Curves and Bends: Use manufactured elbows for stub-ups at equipment and at
DATE

building entrances. For all other curves and bends, except as otherwise indicated,
use manufactured long sweep bends with a minimum radius of 25 ft. in both
horizontal and vertical directions.
NO.
REV

00

DISCIPLINE
ENGINEER B. Joints in ducts and fittings shall be made up watertight in accordance with
ANP
01/21/2016
manufacturer's instructions. Couplings shall be staggered so those of adjacent
DATE:
PROJECT
ducts do not lie in the same plane.
ENGINEER
LSS
01/21/2016
C. Duct Entrances to Buildings: Steel or schedule 80 PVC conduit. Transformations
DATE: from underground duct to conduit shall be made 6.5 ft. (2.0 meters) minimum,
CERTIFIED
YAA outside the building wall and shall use fittings manufactured for the purpose. Install
01/21/2016 in accordance with the following:
DATE:
CONSTRUCTION
AGENCY
YAA
1. Concrete-Encased Ducts: Install reinforcing in duct banks through
01/21/2016 disturbed earth near buildings and excavations and coordinate duct bank
DATE:
OPERATIONS
with structural design at wall so duct bank is supported at wall without
ASZ
reducing structural or watertight integrity.
01/21/2016
DATE:
D. Direct-Buried, Nonencased Duct Entering Nonwaterproofed Walls: Install a
CONTROL NUMBER
VERIFICATION

schedule 40 galvanized steel pipe sleeve for each duct. Caulk space between
conduit and sleeve with duct sealing compound on both sides for moisture-tight
EDSD

seal.
DATE:
BY:

1. Waterproof Entrances: Where ducts enter buildings through a waterproofed


APPROVAL/CERTIFICATION REQUIREMENTS,

floor or wall, a watertight entrance-sealing device shall be installed with the


THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

SECTION 16119
10-01382-0008-0001

5 of 7
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 30


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

sealing gland assembly on the inside. The device shall be securely


YAA
ENGG CERT

anchored into the masonry construction with one or more integral flanges
and the membrane waterproofing secured to the device in a permanently
LSS

watertight manner.

E. Concrete-Encased Nonmetallic Ducts: Support on plastic separators coordinated


with duct size and required duct spacing, and install in accordance with the
following:

F. Separator Installation: Space separators close enough to prevent sagging and


ISSUED FOR IFC
DESCRIPTION

deforming of ducts, and secure separators to the earth and to ducts to prevent
floating during concreting. Do not use tie wires or reinforcing steel in such a way
as to form conductive or magnetic loops around ducts or duct groups.

G. Concreting: Spade concrete carefully during pours to prevent voids under and
between conduits and at exterior surface of envelope. Do not use power-driven
agitating equipment unless specifically designed for duct bank application. Pour
each run of envelope between terminations in one continuous operation. Where
more than one pour is necessary, terminate each pour in a vertical plane and install
3/4-inch reinforcing rod dowels extending 18 inches into the concrete on each side
JO/EWO
01/21/2016 BI-01382

of the joint near the corners of the envelope.


DATE

H. Reinforcing: Reinforced duct banks where they cross disturbed earth and where
indicated. Size and arrangement of reinforcing steel as indicated.
NO.
REV

00

DISCIPLINE
I. Forms: The walls of the trench may be used to form the side walls of the duct bank
ENGINEER provided the soil is self-supporting and concrete envelope can be poured without
ANP
01/21/2016
soil inclusions. Use forms where the soil is not self-supporting.
DATE:
PROJECT
ENGINEER J. Minimum Clearances Between Ducts: Three inches between ducts and exterior
LSS
01/21/2016
envelope wall, 2 inches between ducts for like services, and 4 inches between
DATE: power and signal ducts.
CERTIFIED
YAA

01/21/2016 K. Depth: Except as otherwise indicated, top of duct bank shall be 24 inches below
DATE:
CONSTRUCTION
finished grade, minimum, in nontraffic areas, and 30 inches below finished grade,
AGENCY
YAA
minimum, in vehicular traffic areas.
01/21/2016
DATE:
OPERATIONS
L. Stub-ups: Duct stub-ups to equipment shall be galvanized rigid steel. For
ASZ
equipment mounted on outdoor concrete pads, steel conduit shall extend a
01/21/2016
minimum of 5 ft. away from edge of pad. Install insulated grounding bushings on
DATE:
the terminations. The steel conduits shall be coupled to the ducts with adapters
CONTROL NUMBER
VERIFICATION

designed for the purpose and the whole encased with 3 inches of concrete.
EDSD

M. Sealing: For ducts to be wired in this project, provide temporary closure at


DATE:

terminations. For spare ducts, seal bore of ducts at terminations. Use sealing
BY:

compound and plugs as required to withstand 15 psi minimum hydrostatic


APPROVAL/CERTIFICATION REQUIREMENTS,

pressure.
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

SECTION 16119
10-01382-0008-0001

6 of 7
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 31


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

N. Pulling Cord: Install 100-pound test nylon cord in ducts including spares.
YAA
ENGG CERT

3.07 FIELD TESTING


LSS

A. Grounding: Test manhole grounding provisions to ensure electrical continuity of


bonding and grounding connections. Make ground-resistance test at each ground
rod and submit a report of the results. Use an instrument specifically designed for
ground- resistance measurements.

B. Duct Integrity: Rod ducts with a mandrell 1/4-inch smaller in diameter than internal
ISSUED FOR IFC
DESCRIPTION

diameter of ducts. Where rodding indicates obstructions in ducts, remove the


obstructions and retest.

3.08 CLEANING AND RESTORATION

A. Clean Ducts: Clean full length of ducts with a round bristle brush with a diameter
1/2 inch greater than internal diameter of duct.

B. Restore surface features at areas disturbed by excavation and reestablish original


grades except as otherwise indicated. Where sod has been removed, replace it as
JO/EWO
01/21/2016 BI-01382

soon as possible after backfilling is completed. Restore all areas disturbed by


trenching, storing of dirt, cable laying, and other work to their original condition.
DATE

The restoration shall include a necessary topsoiling, fertilizing, liming, seeding,


sodding, sprigging, or mulching. All such work shall be performed in accordance
with Section "Landscape Work." Maintain disturbed surfaces. Restore vegetation
NO.
REV

00

DISCIPLINE
in accordance with section "Landscape Work." Restore disturbed paving as
ENGINEER indicated.
ANP
01/21/2016
DATE:
PROJECT
ENGINEER END OF SECTION
LSS
01/21/2016
DATE:
CERTIFIED
YAA

01/21/2016
DATE:
CONSTRUCTION
AGENCY
YAA

01/21/2016
DATE:
OPERATIONS
ASZ

01/21/2016
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

SECTION 16119
(DCC) NO. _____________________
10-01382-0008-0001

7 of 7

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 32


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

DIVISION 16 - ELECTRICAL
YAA
ENGG CERT

SECTION 16230 - WIRES AND CABLES


LSS

PART 1 - GENERAL

1.01 DESCRIPTION OF WORK

A. This Section includes wires, cables, and connectors for power, lighting, signal,
control and related systems rated 600 volts and less.
ISSUED FOR IFC
DESCRIPTION

B. Included in this Section is control wiring used for the interconnection of electrical
control devices, such as pushbuttons, electromechanical relays, etc., and also
microprocessor based protection relays for power distribution and motors.

C. Wiring connected on one or both sides to electronic instruments, distributed control


systems, computers, etc. (except for AC power connections) is covered.

D. This Section does not cover internal wiring of manufactured equipment approved
by SAUDI ARAMCO.
JO/EWO
01/21/2016 BI-01382

1.02 QUALITY ASSURANCE


DATE

A. Codes and Standards: Comply with all applicable Codes and Standards including,
but not limited to, those listed below:
NO.
REV

00

DISCIPLINE
ENGINEER 1. SBC 401 (Saudi Building Code – Volume 4)
ANP
01/21/2016
DATE:
PROJECT
2. American National Standards Institute (ANSI)/ National Fire Protection
ENGINEER Association (NFPA)
LSS
01/21/2016
DATE: NFPA 70 National Electrical Code (NEC)
CERTIFIED
YAA

01/21/2016 3. American Society for Testing and Materials (ASTM)


DATE:
CONSTRUCTION
AGENCY
YAA
ASTM B8 Concentric-lay-stranded Copper Conductors, Hard,
01/21/2016
Medium-hard, or Soft
DATE:
OPERATIONS
ASZ
4. Underwriters Laboratories (UL)
01/21/2016
DATE: UL 44 Rubber-Insulated Wires and Cables
CONTROL NUMBER

UL 83 Thermoplastic-Insulated Wires and Cables


VERIFICATION

UL 1277 Power and Control Tray Cables with Optional Optical


EDSD

Fiber Members
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

SECTION 16230
10-01382-0008-0001

1 of 6
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 33


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

5. National Electrical Manufacturers Association (NEMA)/Insulated Cable


YAA
ENGG CERT

Engineers Association (ICEA)


LSS

NEMA WC-5 Thermoplastic-Insulated Wire and Cable for the

6. Saudi Arabian Standards Organization (SASO)

SSA 55 PVC-Insulated Cables with Circular Copper


Conductors
ISSUED FOR IFC

7. SAUDI ARAMCO Engineering Standards (SAES)


DESCRIPTION

SAES-P-100 Basic Power System Design Criteria


SAES-P-104 Wiring Methods and Materials

PART 2 - PRODUCTS

2.01 MANUFACTURERS

A. Available Manufacturer: Subject to compliance with requirements, manufacturers


JO/EWO
01/21/2016 BI-01382

offering products which shall be incorporated with WORK include, but not limited
to, the following:
DATE

B. Manufacturers: Subject to compliance with requirements, provide products from


the following:
NO.
REV

00

DISCIPLINE 1. Wire and Cable:


ENGINEER
ANP

DATE:
01/21/2016 Riyadh Cable Company
PROJECT
ENGINEER
Saudi Cable Company
LSS Alpha Wire Company
01/21/2016 Belden Wire and Cable Company Inc.
DATE:
CERTIFIED Mitsubishi Cable Industries
YAA
Saudi Modern Co. for Cables, Ltd.
DATE:
01/21/2016 Okonite Company, Inc.
CONSTRUCTION Other Approved Manufacturers
AGENCY
YAA

DATE:
01/21/2016 2. Connectors for Wires and Cable Conductors:
OPERATIONS
ASZ Square D Company
01/21/2016 Burndy Co.
DATE:
Thomas and Betts
CONTROL NUMBER
VERIFICATION

Other Approved Manufacturers


EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________
10-01382-0008-0001

SECTION 16230
2 of 6
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 34


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

2.02 WIRES AND CABLES


YAA
ENGG CERT

A. Low voltage jacketed cables shall comply with NEC or IEC 502.
LSS

1. NEC low voltage cables shall be rated 600V, shall have a minimum
temperature rating of 90 deg C dry/75 deg C wet, and shall conform to UL
Standards according to the particular type (e.g. UL 1277, including its
vertical tray flame test, for type TC tray cables, etc.).

2. IEC 502 type cables shall be rated 600/1000V, shall have a minimum rating
ISSUED FOR IFC
DESCRIPTION

of 85 deg C, and shall meet the flame test of IEC 332-3.

B. Low voltage unjacketed insulated wires, shall comply with NEC or SSA 55.

1. NEC low voltage wires shall be rated 600V, shall have a minimum
temperature rating of 90 deg C dry/75 deg C wet, and shall conform to UL
Standards according to the particular type (e.g. UL 83 for THHN/THWN and
UL 44 for XHHW).

2. SSA 55 type low voltage wires shall be rated 450/750V, shall have a
JO/EWO
01/21/2016 BI-01382

minimum rating of 85 deg C, and shall meet the flame test of IEC 332-1.

Exception:
DATE

For wiring of equipment such as lighting fixtures, etc., that require higher
NO.
REV

00

temperature wires and cables, the above minimum temperature ratings


DISCIPLINE
ENGINEER shall be increased accordingly.
ANP
01/21/2016
DATE: C. Conductors: Power and control conductors shall be stranded copper, except solid
PROJECT
ENGINEER copper conductors 6mm square (10 AWG) and smaller may be used in non-
LSS
industrial locations. Mineral insulated cables and specialty cables (e.g. down hole
01/21/2016
DATE: pump motor cables, high temperature cables, etc.) with solid conductors are also
CERTIFIED
YAA permitted.
01/21/2016
DATE:
CONSTRUCTION
D. Conductor Stranding: Stranding shall be ASTM B8 Class B or C or IEC 228 Class
AGENCY
YAA
2, except flexible cords, portable cables and motor leads shall have finer stranding
01/21/2016
in accordance with appropriate ICEA and UL Standards or manufacturers
DATE:
recommendations.
OPERATIONS
ASZ

01/21/2016
E. Wiring Insulation for Interior Building Wiring: Unless otherwise indicated, provide
DATE: THHN/THWN insulation for all conductor sizes, except for equipment grounding
CONTROL NUMBER

conductor which may have PVC or thermoplastic insulation (green).


VERIFICATION
EDSD

F. Minimum Wire Size of Conductors: Unless otherwise indicated, minimum size of


DATE:

conductors shall be as follows:


BY:
APPROVAL/CERTIFICATION REQUIREMENTS,

Control (600V and below) 2.5mm square (14 AWG)


THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

SECTION 16230
10-01382-0008-0001

3 of 6
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 35


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

Power (600V and below) 4mm square (12 AWG)


YAA
ENGG CERT

G. Conductors of multi-conductor control cables shall be numbered or color-coded by


LSS

colors other than green or green with yellow stripes.

2.03 CONNECTIONS AND TERMINATIONS

A. Provide UL-listed factory-fabricated, solder less metal connectors of sizes,


ampacity ratings, materials, types and classes for applications and for services
indicated. Use connectors with temperature ratings equal to or greater than those
ISSUED FOR IFC
DESCRIPTION

of the wires upon which used.

B. Copper compression (crimped) type connectors shall be used for splicing and
terminating stranded conductors, except as noted below:

1. Spring pressure type twist-on connectors, and pressure set screw


connectors with insulating caps are permitted for:

a. For lighting and receptacle circuits in non-hazardous locations.


JO/EWO
01/21/2016 BI-01382

b. In non-industrial applications.

2. Use of connectors or terminals other than compression type, except solder


DATE

connectors, supplied as integral parts or components of manufactured


equipment such as molded case circuit breakers, contactors, outlets, etc., is
NO.
REV

00

permitted.
DISCIPLINE
ENGINEER
ANP
01/21/2016
C. The use of solder lugs is prohibited. Compression connectors for 230mm square
DATE: (4/0 AWG) and larger conductors shall be two hole NEMA design.
PROJECT
ENGINEER
LSS
D. All compression connectors for 10mm square (8 AWG) and larger conductors shall
01/21/2016
DATE: have a manufacturer’s reference die number and conductor size printed or
CERTIFIED
YAA stamped on the connector.
01/21/2016
DATE:
CONSTRUCTION
Exception:
AGENCY
YAA
The use of dieless compression tools is acceptable, provided that the tool is
01/21/2016
suitable for the connector, and, (for 8 AWG and larger conductor connectors), the
DATE:
tool ram embosses the tool manufacturer’s logo on the crimp.
OPERATIONS
ASZ

01/21/2016
E. Insulated ring tongue, locking fork tongue, or flanged fork tongue compression
DATE: (crimped) terminals shall be used for control wiring.
CONTROL NUMBER
VERIFICATION

Exception:
EDSD

Only ring tongue compression (crimped) terminals shall be used for current
DATE:

transformer circuits.
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

SECTION 16230
10-01382-0008-0001

4 of 6
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 36


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

2.04 WIRE MARKERS ON CONDUCTORS


YAA
ENGG CERT

Other than color-coding requirements identified elsewhere in this Specifications, conductor


LSS

identification is required when conductor numbering systems are shown on the drawings.
Wires at termination points shall be identified by the use of permanently embossed wire
markers of the heat-shrinkable or slip-on type. Wrap-around, rigid snap-on, or adhesive
type markers are not permitted.

2.05 COLOR CODING FOR PHASE IDENTIFICATION


ISSUED FOR IFC
DESCRIPTION

A. Color code secondary service, feeder, and branch circuit conductors with
factory applied color as follows:

Phase 400Wye/230 Volts


A Brown
B Black
C Grey
Neutral Blue
Ground Green-and-yellow
JO/EWO
01/21/2016 BI-01382

B. Except for ground conductor in which green is mandatory, use conductors with
black insulation or jacket and color-code with Scotch No. 35 color-coding tape or
DATE

equivalent for specified insulations and jackets not manufactured by the selected
vendor with integral colors. Color-code each conductor entering every box,
cabinet, panel board, through, and wire way. In wire ways and other locations
NO.
REV

00

DISCIPLINE
where conductors are accessible, color-code conductors every 1500mm (5 FT).
ENGINEER
ANP
01/21/2016
PART 3 - EXECUTION
DATE:
PROJECT
ENGINEER 3.01 INSTALLATION OF WIRES AND CABLES
LSS
01/21/2016
DATE: A. General: Install electrical cables, wires, and connectors in compliance with NEC.
CERTIFIED
YAA

01/21/2016 B Coordinate cable installation with other Work.


DATE:
CONSTRUCTION
AGENCY
YAA
C Pull conductors simultaneously where more than one is being installed in same
01/21/2016 raceway. Use UL listed pulling compound or lubricant, where necessary.
DATE:
OPERATIONS
ASZ
D. Use pulling means including, fish tape, cable, rope, and basket weave wire/cable
01/21/2016
grips which will not damage cables or raceways. Do not use rope hitches for
DATE:
pulling attachment to wire or cable.
CONTROL NUMBER
VERIFICATION

E. Conceal all cable in finished spaces.


EDSD

DATE:

F. Install exposed cable parallel and perpendicular to surfaces or exposed structural


BY:

members, and follow surface contours, where possible.


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

G. Keep conductor splices to minimum.


(DCC) NO. _____________________

SECTION 16230
10-01382-0008-0001

5 of 6
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 37


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

H. Install splice and tap connectors which possess equivalent or better mechanical
YAA
ENGG CERT

strength and insulation rating than conductors being spliced.


LSS

I. Use splice and tap connectors which are compatible with conductor material.

J. Provide adequate length of conductors within electrical enclosures and train the
conductors to terminal points with no excess. Bundle multiple conductors, with
conductors larger than 6mm square (10 AWG) cabled in individual circuits. Make
terminations so there is no bare conductor at the terminal.
ISSUED FOR IFC
DESCRIPTION

K. Tighten electrical connectors and terminals, including screws and bolts, in


accordance with manufacturer's published torque tightening values. Where
manufacturer's torquing requirements are not indicated, tighten connectors and
terminals to comply with tightening torques specified in UL 486A and UL 486B.

3.02 FIELD QUALITY CONTROL

A. Cables shall be 500V DC megger tested after installation and prior to placing in
service.
JO/EWO
01/21/2016 BI-01382

B. Prior to energizing, test wires and cables for electrical continuity and for short-
circuits.
DATE

C. Subsequent to wire and cable hook-ups, energize circuits and demonstrate proper
functioning. Correct malfunctioning units, and retest to demonstrate compliance.
NO.
REV

00

DISCIPLINE
ENGINEER C. Correct the deficiencies found at no cost to SAUDI ARAMCO.
ANP
01/21/2016
DATE:
PROJECT
D. Low voltage (600, 450/750, or 600/1000 V rated) cables, including splices to
ENGINEER existing cables, shall be 1000 V DC megger tested after installation and prior to
LSS
01/21/2016
placing in service per SAES-P-104, Section 13.1
DATE:
CERTIFIED
YAA

01/21/2016 END OF SECTION


DATE:
CONSTRUCTION
AGENCY
YAA

01/21/2016
DATE:
OPERATIONS
ASZ

01/21/2016
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

SECTION 16230
10-01382-0008-0001

6 of 6
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 38


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

DIVISION 16 - ELECTRICAL
YAA
ENGG CERT

SECTION 16124 - MEDIUM VOLTAGE CABLES


LSS

PART 1 - GENERAL

1.01 DESCRIPTION OF WORK

A. This section includes conductor cables and splices, terminations, and accessories
for 13,200 V underground electrical distribution systems.
ISSUED FOR IFC
DESCRIPTION

B. Related Sections: The following Division 16 Sections contain requirements that


relate to this Section:

1. 16320 "Medium Voltage Transformer Liquid Filled" for cable termination


provisions.

2. 16344 "Medium Voltage Switchgear" for cable termination provisions.

1.02 QUALITY ASSURANCE


JO/EWO
01/21/2016 BI-01382

A. Codes and Standards: Comply with all applicable Codes and Standards including,
DATE

but not limited to, those listed below:

SBC 401 Saudi Building Code – Volume 4


NO.
REV

00

DISCIPLINE
SAES-P-104 Wiring Methods and Materials
ENGINEER
ANP
15-SAMSS-502 Medium Voltage Power Cable 5KV through 35KV
01/21/2016
DATE:
PROJECT
B. Installer Qualifications: Splices and terminations on cables rated 1000V shall be
ENGINEER
made by personnel certified in accordance with SAUDI ARAMCO General
LSS
01/21/2016
Instruction 2.705.
DATE:
CERTIFIED
YAA C. Field Testing Organization Qualifications: To qualify for acceptance, an
01/21/2016 independent testing organization must demonstrate, based on evaluation of
DATE:
CONSTRUCTION organization-submitted criteria conforming to ASTM E 699, that it has the
AGENCY
YAA experience and capability to conduct satisfactorily the testing indicated.
01/21/2016
DATE:
OPERATIONS
D. Cable Testing after Installation: Conform to the requirements of SAES-P-104.
ASZ

01/21/2016 1.03 SUBMITTALS


DATE:
CONTROL NUMBER
VERIFICATION

A. General: Submit the following in accordance with Conditions of Contract and


Division 1 Specification Sections.
EDSD

DATE:

1. Product Data on cables and cable accessories including descriptions and


BY:

detailed specifications.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

2. Shop Drawings of splices and terminations.


(DCC) NO. _____________________
10-01382-0008-0001

SECTION 16124
1 of 7
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 39


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

3. Installer Certificates signed by CONTRACTOR that installers of cable


YAA
ENGG CERT

splices and terminations meet the experience qualifications specified under


Quality Assurance.
LSS

4. Field Test Reports: Conform to the requirements of SAES-P-104.

1.04 DELIVERY, STORAGE, AND HANDLING

A. Reels shall be made of steel, lagged with wood, and shall be marked with a
durable label securely attached to a flange of the reel and plainly stating Buyer’s
ISSUED FOR IFC
DESCRIPTION

Purchase Order number, shipping length of cable on reel, number, type and size of
conductors, cable configuration, and voltage rating. Cable ends shall be sealed
and capped.

B. Store cables on reels on elevated platforms in a clean, dry location.

C. Cable reels shall be covered, or turned on their sides, when not in use for long
periods to prevent UV damage.

1.05 WARRANTY
JO/EWO
01/21/2016 BI-01382

A. Special Project Warranty: Submit a written warranty, mutually executed by


DATE

manufacturer and the principal installer, agreeing to repair or replace medium


voltage cables, splices, and terminations that fail in materials or workmanship
within the special project warranty period specified below. This warranty shall be in
NO.
REV

00

DISCIPLINE
addition to, and not a limitation of, other rights and remedies SAUDI ARAMCO may
ENGINEER have against the CONTRACTOR under the Contract Documents.
ANP
01/21/2016
DATE:
PROJECT
B. Special Project Warranty Period: 2 years beginning on the date of Substantial
ENGINEER Completion.
LSS
01/21/2016
DATE: PART 2 - PRODUCTS
CERTIFIED
YAA

01/21/2016 2.01 MANUFACTURERS


DATE:
CONSTRUCTION
AGENCY
YAA
A. Available Manufacturer: Subject to compliance with requirements, manufacturers
01/21/2016
offering products which shall be incorporated with WORK include, but not limited
DATE:
to, the following:
OPERATIONS
ASZ

01/21/2016
B. Manufacturers: Subject to compliance with requirements, provide products by the
DATE: following:
CONTROL NUMBER
VERIFICATION

1. Cable
EDSD

DATE:

Riyadh Cable Company


BY:

American Insulated Wire Corporation


APPROVAL/CERTIFICATION REQUIREMENTS,

Carol Cable Co., Inc.


THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

General Cable Co.


(DCC) NO. _____________________

SECTION 16124
10-01382-0008-0001

2 of 7
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 40


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

The Okonite Co.


YAA
ENGG CERT

Saudi Cable Company


Saudi Modern Co. for Cables, Ltd.
LSS

Other Approved Manufacturers

2. Cable Splicing and Terminating Products and Accessories

Electrical Products Division 3M.


Engineered Products Co.
G&W Electric Co.
ISSUED FOR IFC
DESCRIPTION

M.P. Husky Corp.


Raychem Corp.
Or Other Approved Manufacturers

2.02 MEDIUM VOLTAGE CABLE

A. General: Cable shall be the types and sizes as indicated on the drawings and shall
conform to 15-SAMSS-502.

B. If not indicated on the drawings, cable shall be cross-linked-polyethylene (XLPE)


JO/EWO
01/21/2016 BI-01382

insulated, conforming to IEC 502 or AEIC (CS5 or CS6). Substitution of IEC cable
with AEIC cable, if IEC cable is specified, and vice versa, is prohibited.
DATE

C. Conductors: Conductors shall conform to one of the following:


NO.
REV

00

DISCIPLINE
1. IEC 502 Class 2 annealed copper, plain or metal coated
ENGINEER
ANP
01/21/2016
2. AEIC Class B annealed copper, plain or metal coated
DATE:
PROJECT
ENGINEER D. Conductor Screen: Extruded semi conductive compound, or a layer of extruded
LSS
01/21/2016
semi-conducting compound over a semi-conducting tape.
DATE:
CERTIFIED
YAA E. Insulation Screen (Non-metallic part): Layer of extruded semi-conducting
01/21/2016 compound. Semi-conducting coatings (paints) are not allowed. The extruded
DATE:
CONSTRUCTION
compound shall be removable (strippable).
AGENCY
YAA

01/21/2016 F. Insulation Screen (Metallic part): Copper shielding tape, helically applied over the
DATE:
OPERATIONS
semicon-shielded, insulated conductor.
ASZ

01/21/2016
G. Concentric Neutral Conductor: If concentric neutral conductor is specified, it shall
DATE:
take the place of the copper shielding tape. It shall consist of copper wires with the
CONTROL NUMBER
VERIFICATION

specified cross-section, and shall be plain or metal coated as specified.


EDSD

H. Ground Conductors: If specified, ground conductors shall be provided in the


DATE:

interstices of the cable and shall conform to one of the following:


BY:
APPROVAL/CERTIFICATION REQUIREMENTS,

1. IEC 502. Class 2 stranded copper ground conductor


THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

SECTION 16124
10-01382-0008-0001

3 of 7
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 41


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

2. AEIC Class B stranded copper ground conductor


YAA
ENGG CERT

I. Metallic Armor or Metallic Cover: If specified, metallic armor or cover shall conform
LSS

to one of the following:

1. IEC 502 Metallic armor shall be galvanized steel double tape armor,
or galvanized steel wire armor

2. AEIC Metallic cover shall be corrugated impervious aluminum


sheath, or galvanized steel interlocked tape. The cable shall
ISSUED FOR IFC
DESCRIPTION

be type MC (metal clad).

J. All cables shall have a continuous overall outer PVC jacket, suitable for 90 ºC
maximum rated conductor temperature.

K. Cables shall be suitable for direct burial and for installation in duct banks and cable
trays.

L. Cable Voltage Rating for 13.2KV Electrical Distribution System :


JO/EWO
01/21/2016 BI-01382

1. IEC 502 Buyer’s System Voltage Nominal/Class: 13.2KV/15KV


DATE

Rated Phase to Ground Voltage/Phase to Phase Voltage for


which the Cable is Designed: 12/20KV Highest System
Voltage for which the Cable May Be Used: 20KV
NO.
REV

00

DISCIPLINE
ENGINEER 2. AEIC Buyer’s System Voltage Nominal/Class: 13.2/15KV
ANP
01/21/2016
DATE:
PROJECT
Rated Voltage: 15KV
ENGINEER
LSS
01/21/2016
Insulation Thickness: Corresponding to 133 percent
DATE: insulation level in accordance with the referenced standard.
CERTIFIED
YAA

01/21/2016 M. Circuit Identification: Each phase of multi-conductor cables shall be permanently


DATE:
CONSTRUCTION
identified.
AGENCY
YAA

01/21/2016 2.03 SPLICING AND TERMINATING PRODUCTS


DATE:
OPERATIONS
ASZ
A. General: Comply with the following standards:
01/21/2016
DATE:
1. IEEE 400: Guide for making High-Direct-Voltage Tests on Power Cable
CONTROL NUMBER
VERIFICATION

Systems in the Field.


EDSD

2. IEEE 404: Standard for Power Cable Joints.


DATE:
BY:

3. UL 486A: Wire connectors for use with copper conductors.


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

B. Types: Compatible with the cable materials.


(DCC) NO. _____________________

SECTION 16124
10-01382-0008-0001

4 of 7
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 42


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

C. Connectors: Compression type as recommended by cable or splicing kit


YAA
ENGG CERT

manufacturer for the application.


LSS

D. Splicing shall be made with standard splicing kits and shall be one of the following
types:

1. Combination tape and cold shrink rubber sleeve kit with re-jacketing by cast
epoxy resin encasement or other waterproof, abrasion resistant material.

2. Heat shrink splice kit of uniform cross section polymeric construction with
ISSUED FOR IFC
DESCRIPTION

outer heat shrink jacket.

E. Separable Insulated Connectors: Modular system, complying with IEEE Standard


386, "Separable Insulated Connectors for Power Distribution Systems above
600V." System shall consist of disconnecting, single pole, cable terminators and
matching stationary, plug-in, dead-front terminals. System components shall be
designed for the system voltage and for sealing against moisture and shall conform
to the following:

1. Cable Terminations at Transformers: Elbow type terminators that mate with


JO/EWO
01/21/2016 BI-01382

bushing terminals in the equipment.


DATE

2. Load Break Cable Terminators: Elbow type units, make/break and with
continuous current rating as indicated. Each terminator shall be
coordinated with insulation diameter and conductor size and material of
NO.
REV

00

DISCIPLINE
cable being terminated. Terminator body shall have capacitively coupled
ENGINEER test point.
ANP
01/21/2016
DATE:
PROJECT
PART 3 - EXECUTION
ENGINEER
LSS
01/21/2016
3.01 EXAMINATION
DATE:
CERTIFIED
YAA A. Examine raceways, cable racks and other cable installation locations for
01/21/2016 cleanliness of raceways, minimum bending radii of cables, and conditions affecting
DATE:
CONSTRUCTION
performance of cable. Pull a mandrell through raceways to check for suitable
AGENCY
YAA
conditions. Do not proceed with cable installation until unsatisfactory conditions
01/21/2016 have been corrected.
DATE:
OPERATIONS
ASZ
3.02 INSTALLATION OF CABLES
01/21/2016
DATE:
A. General: Install cable accessory items in accordance with manufacturer's written
CONTROL NUMBER
VERIFICATION

instructions and as indicated. Comply with the requirements of SAES-P-104.


EDSD

B. Pull conductors simultaneously where more than one cable is indicated in same
DATE:

raceway. Use UL-listed and manufacturer approved pulling compound or lubricant


BY:

where necessary. Do not exceed manufacturer's recommended maximum pulling


APPROVAL/CERTIFICATION REQUIREMENTS,

tensions and sidewall pressure values.


THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

SECTION 16124
10-01382-0008-0001

5 of 7
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 43


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

C. Use pulling means including, fish tape, cable, rope, and basket weave wire/cable
YAA
ENGG CERT

grips that will not damage cables or raceways. Do not use rope hitches for pulling
attachment to cable.
LSS

D. Separation distances between conductors, pipelines, low voltage cables, control


and communication cables shall in conformance with SAES-P-104 and
SAES-T-standards.

3.04 INSTALLATION OF SPLICES


ISSUED FOR IFC
DESCRIPTION

A. Splicing of conductors shall be kept to a minimum. The maximum number of field


splices permitted in any one circuit for new installations is the number made
necessary by the use of standard size reels with full length cables, plus one extra
splice. In case of accidental damage of the cable during installation, additional
splices are permitted with the concurrence of the cable Proponent.

B. Install splices using standard kit. Conform to kit manufacturer's written instructions.

C. Installation of Terminations
JO/EWO
01/21/2016 BI-01382

1. Install terminations at ends of conductors and seal multiconductor cable


ends with standard kits. Conform to manufacturer's written instructions.
Comply with classes of terminations indicated.
DATE

2. Tighten electrical connectors and terminals in accordance with


NO.
REV

00

manufacturer's published torgue tightening values. Where manufacturer's


DISCIPLINE
ENGINEER torquing requirements are not indicated, tighten connectors and terminals to
ANP
01/21/2016
comply with tightening torques specified in UL 486A and UL 486B.
DATE:
PROJECT
ENGINEER 3.05 GROUNDING
LSS
A. Ground shields of shielded cable at terminations, splices, and separable insulated
01/21/2016
DATE: connectors. Ground metal bodies of terminators, splices, cable and separable
CERTIFIED
YAA insulated connector fittings, and hardware in accordance with manufacturer's
01/21/2016
written instructions.
DATE:
CONSTRUCTION
AGENCY
YAA
3.06 FIELD QUALITY CONTROL
01/21/2016
DATE:
A. General: Comply with applicable standards of the International Electrical Testing
OPERATIONS
ASZ
Association (INETA) including standard ATS, "Acceptance Testing Specifications
01/21/2016
for Electrical Power Distribution Equipment and system."
DATE:
CONTROL NUMBER

B. Preparation: Perform the following preparations in advance of independent tests:


VERIFICATION
EDSD

1. Test cables insulation resistance.


DATE:
BY:

2. Test circuits continuity.


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

SECTION 16124
10-01382-0008-0001

6 of 7
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 44


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

3. Furnish a set of Contract documents and manufacturer's recommendations


YAA
ENGG CERT

to test organization.
LSS

4. Make power available at test locations.

C. Schedule tests and notify the Company Representative at least ten (10) working
days in advance of schedule for test commencement.

D. Test procedure shall conform to the following:


ISSUED FOR IFC
DESCRIPTION

1. Independent Testing Organization: Arrange and pay for the services of an


Independent electrical testing organization to perform tests on medium
voltage cable.

2. Test Objectives: To assure cable installation is operational within industry


and manufacturer’s tolerances, is installed in accordance with Contract
Documents, and is suitable for energizing.

3. Procedures: Comply with the INETA Standard and IEEE 400. Upon
satisfactory completion of tests, attach a label to tested components.
JO/EWO
01/21/2016 BI-01382

E. Tests shall include all cable testing requirements of SAES-P-104.


DATE

F. Reports: The testing organization shall maintain a written record of observations


and tests, report defective materials and workmanship, and retest corrected
NO.
REV

00

DISCIPLINE
defective items. Testing organization shall submit written reports to the Company
ENGINEER Representative and CONTRACTOR.
ANP
01/21/2016
DATE:
PROJECT
ENGINEER END OF SECTION
LSS
01/21/2016
DATE:
CERTIFIED
YAA

01/21/2016
DATE:
CONSTRUCTION
AGENCY
YAA

01/21/2016
DATE:
OPERATIONS
ASZ

01/21/2016
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________
10-01382-0008-0001

SECTION 16124
7 of 7
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 45


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

DIVISION 16 - ELECTRICAL
YAA
ENGG CERT

SECTION 16135 - CABINETS, BOXES, AND FITTINGS


LSS

PART 1 - GENERAL

1.01 DESCRIPTION OF WORK

A. This Section includes cabinets, boxes, and fittings for electrical installations and
certain types of electrical fittings not covered in other sections. Types of products
ISSUED FOR IFC
DESCRIPTION

specified in this Section include:

Outlet and device boxes


Pull and junction boxes.
Cabinets.
Hinged door enclosures.

B Conduit-body-type electrical enclosures and wiring fittings are specified in Division


16 Section "Raceways."
JO/EWO
01/21/2016 BI-01382

1.02 QUALITY ASSURANCE


DATE

A. Codes and Standards: Comply with all applicable Codes and Standards including
but not limited to, those listed below
NO.
REV

00

DISCIPLINE
SBC 401 Saudi Building Code – Volume 4
ENGINEER
ANP
BS 4662 Boxes for Flush Mounting of Electrical Accessories –
01/21/2016 Requirements, Test Methods and Dimensions
DATE:
PROJECT
NFPA 70 National Electrical Code (NEC)
ENGINEER
NEMA National Electrical Manufacturers Association
LSS
01/21/2016
NEMA 250 Enclosures for Electrical Equipment (1000 Volts Maximum)
DATE:
CERTIFIED
NEMA ICS 6 Enclosures for Industrial Control and Systems
YAA UL Underwriters Laboratories
01/21/2016 SAES-P-104 Wiring Methods and Materials
DATE:
CONSTRUCTION SAES-P-100 Basic Power System Design Criteria
AGENCY
YAA

01/21/2016 1.03 SUBMITTALS


DATE:
OPERATIONS
ASZ
A. General: Submit the following in accordance with Conditions of Contract and
01/21/2016 Division 1 Specification Sections:
DATE:
CONTROL NUMBER
VERIFICATION

1. Product data for cabinets and enclosures with classification higher than
NEMA 1.
EDSD

DATE:

2. Shop drawings for enclosures and cabinets that are to be shop fabricated,
BY:

(nonstock items). For shop fabricated junction and pull boxes, show
APPROVAL/CERTIFICATION REQUIREMENTS,

accurately scaled views and spatial relationships to adjacent equipment.


THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

SECTION 16135
10-01382-0008-0001

1 of 5
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 46


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

Show box types, dimensions, and finishes.


YAA
ENGG CERT

PART 2 - PRODUCTS
LSS

2.01 MANUFACTURERS

A. Available Manufacturers: Subject to compliance with requirements, manufacturers


offering products that may be incorporated in the Work include, but are not limited
to, the following:
ISSUED FOR IFC
DESCRIPTION

B. Manufacturers: Subject to compliance with requirements, provide products by the


following:

1. Outlet and Device Box

Appleton Electric Company steel city


MK by Honeywell
Alfanar Co.
Thomas & Belts
Raco
JO/EWO
01/21/2016 BI-01382

Other Approved Manufacturers.


DATE

2. Boxes and Fittings for Hazardous Locations:

Adalet-PLM
NO.
REV

00

DISCIPLINE
Cooper Industries, Inc.
ENGINEER Killark Electric Mfg. Co.
ANP
01/21/2016
OZ/ Gedney
DATE:
PROJECT
Robroy Industries, Inc.
ENGINEER Spring City Electrical Mfg. Co.
LSS
01/21/2016
Woodhead Industries, Inc.
DATE: Other Approved Manufacturers
CERTIFIED
YAA

01/21/2016 3. Cabinets:
DATE:
CONSTRUCTION
AGENCY
YAA
Electric Panelboard, Inc.
01/21/2016 Erickson Electrical Equipment Co.
DATE:
OPERATIONS
Spring City Electrical Mfg. Co.
ASZ
Square D Co.
01/21/2016
Alfanar Co.
DATE:
Other Approved Manufacturers
CONTROL NUMBER
VERIFICATION

PART 3 - EXECUTION
EDSD

DATE:

3.01 INSTALLATION, GENERAL


BY:
APPROVAL/CERTIFICATION REQUIREMENTS,

A. Locations: Install items where indicated and where required to suit NEC, SAES-P-
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

100, SAES-P-104 requirements and installation conditions.


(DCC) NO. _____________________

SECTION 16135
10-01382-0008-0001

2 of 5
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 47


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

B. Cap unused knockout holes where blanks have been removed and plug unused
YAA
ENGG CERT

conduit hubs.
LSS

C. Support and fasten items securely in accordance with Division 16 Section 16190
"Supporting Devices."
D. Sizes shall be adequate to meet NEC volume requirements, but in no case smaller
than sizes indicated.

E. Remove sharp edges where they may come in contact with wiring or personnel.
ISSUED FOR IFC
DESCRIPTION

3.02 APPLICATIONS

Comply with the provisions of the NEC, and in addition, comply with the following:

A. In outdoor plant areas, within the perimeter of process units, equipment and
terminal enclosures shall be either one of the following:

1. NEMA Type 4X
2. IEC 529 Type IP65 or better
JO/EWO
01/21/2016 BI-01382

B. In outdoor plant areas, outside the perimeter of process units, equipment and other
industrial areas, equipment and terminal enclosures shall be either one of the
following:
DATE

1. NEMA Type 3 or 4
NO.
REV

00

2. IEC 529 Type IP54 or better


DISCIPLINE
ENGINEER
ANP
01/21/2016
C. In outdoor plant and other industrial areas located in severe corrosive
DATE: environments (severe corrosive locations are enumerated under Section 16110
PROJECT
ENGINEER “Raceways”), equipment and terminal enclosures shall be either one of the
LSS
following:
01/21/2016
DATE:
CERTIFIED
YAA 1. NEMA Type 4X (galvanized and/or painted or coated carbon steel sheet metal
01/21/2016 enclosures are not permitted.
DATE:
CONSTRUCTION
AGENCY
YAA
2. IEC 529 Type IP65 or better, manufactured of stainless steel (Type 304 or
01/21/2016
better, or copper free cast aluminum or plastic including fiberglass).
DATE:
OPERATIONS
ASZ
D. Enclosures that are rated (a) NEMA Type 3, 4 or 4X, or (b) IEC 529 Type IP54, or
01/21/2016
better, shall have Type 300 Series stainless steel hardware, except aluminum
DATE: enclosures may have aluminum or aluminum alloy hinges.
CONTROL NUMBER
VERIFICATION

E. Enclosures and junction boxes having an internal volume exceeding 2000 cubic
EDSD

centimeters (122 cubic inches) shall be provided with Type 300 Series stainless
DATE:

steel breather and drain fittings.


BY:
APPROVAL/CERTIFICATION REQUIREMENTS,

F. In hazardous (classified) locations, enclosures that are required to be approved for


THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

SECTION 16135
10-01382-0008-0001

3 of 5
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 48


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

Class I locations by NEC Article 501, shall meet the hazardous area equipment
YAA
ENGG CERT

application requirements of SAES-P-100 and SAES-P-104.


LSS

3.03 INSTALLATION OF OUTLET BOXES

A. Locations in Special Finish Materials: For outlet boxes for receptacles and
switches mounted in desks or furniture cabinets or in glazed tile, concrete block,
marble, brick, stone or wood walls, use rectangular shaped boxes with square
corners and straight sides. Install such boxes without plaster rings. Saw cut all
recesses for outlet boxes in exposed masonry walls.
ISSUED FOR IFC
DESCRIPTION

B. Gasketed Boxes: At the following locations use cast metal, threaded hub type
boxes with gasketed weatherproof covers:

1. Exterior locations.
2. Where surface mounted on unfinished walls, columns or pilasters. (Cover
gaskets may be omitted in dry locations).
3. Where exposed to moisture laden atmosphere.
4. At food preparation equipment within four ft. of steam connections.
5. Where indicated.
JO/EWO
01/21/2016 BI-01382

C. Mounting: Mount outlet boxes for switches with the long axis vertical or as
indicated. Mount boxes for receptacles either vertically or horizontally but
DATE

consistently either way. Locate box covers or device plates so they will not span
different types of building finishes either vertically or horizontally. Locate boxes for
NO.
REV

00

switches near doors on the side opposite the hinges and close to door trim, even
DISCIPLINE
ENGINEER though electrical floor plans may show them on hinge side.
ANP
01/21/2016
DATE: D. Ceiling Outlets: Where wiring is concealed, use minimum of 86 x 86mm x 41mm
PROJECT
ENGINEER deep boxes for 1-gang outlets; and 86 x 146mm x 41mm deep for 2-gang outlets,
LSS
in accordance of BS 5733 , unless otherwise indicated.
01/21/2016
DATE:
CERTIFIED E. Cover Plates for Surface Boxes: Use plates sized to box front without overlap.
YAA

01/21/2016
DATE: F. Protect outlet boxes to prevent entrance of plaster, and debris. Thoroughly clean
CONSTRUCTION
AGENCY foreign material from boxes before conductors are installed.
YAA

01/21/2016
DATE: 3.04 INSTALLATION OF PULL AND JUNCTION BOXES
OPERATIONS
ASZ
A. Box Selection: For boxes in main feeder conduit runs, use sizes not smaller than
01/21/2016
DATE: 8-inches square by 4-inches deep. Do not exceed 6 entering and 6 leaving
CONTROL NUMBER

raceways in a single box. Quantities of conductors (including equipment grounding


VERIFICATION

conductors) in pull or junction box shall not exceed the following:


EDSD

Size of Maximum no. of


DATE:
BY:

Largest Conductors Conductors in


in Box Box
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

SECTION 16135
10-01382-0008-0001

4 of 5

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 49


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

No. 4/0 AWG 30


YAA
ENGG CERT

250 MCM 20
LSS

B. Cable Supports: Install clamps, grids, or devices to which cables may be secured.
Arrange cables so they may be readily identified. Support cable at least every 30-
inches inside boxes.
C. Mount pull boxes in inaccessible ceilings with the covers flush with the finished
ceiling.

D. Size: Provide pull and junction boxes for telephone, signal, and other systems at
ISSUED FOR IFC
DESCRIPTION

least 50 percent larger than would be required by Article 370 of NEC, or as


indicated. Locate boxes strategically and provide shapes to permit easy pulling of
future wires or cables of types normal for such systems.

3.05 INSTALLATION OF CABINETS AND HINGED DOOR ENCLOSURES

A. Mount with fronts straight and plumb.

B. Install with tops 78-inches above floor.


JO/EWO
01/21/2016 BI-01382

C. Set cabinets in finished spaces flush with walls, unless indicated shown otherwise.
DATE

3.06 GROUNDING

A. Electrically ground metallic cabinets, boxes, and enclosures. Where wiring to item
NO.
REV

00

DISCIPLINE
includes a grounding conductor, provide a grounding terminal in the interior of the
ENGINEER cabinet, box or enclosure.
ANP
01/21/2016
DATE: 3.07 CLEANING AND FINISH REPAIR
PROJECT
ENGINEER
LSS
A. Upon completion of installation, inspect components. Remove burrs, dirt, and
01/21/2016
DATE: construction debris and repair damaged finish including chips, scratches, abrasions
CERTIFIED
YAA and weld marks.
01/21/2016
DATE:
B. Galvanized Finish: Repair damage using a zinc-rich paint recommended by the
CONSTRUCTION
AGENCY
YAA
tray manufacturer.
01/21/2016
DATE: C. Painted Finish: Repair damage using matching corrosion inhibiting touch-up
OPERATIONS
coating.
ASZ

01/21/2016
DATE:
CONTROL NUMBER

END OF SECTION
VERIFICATION
EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

SECTION 16135
10-01382-0008-0001

5 of 5

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 50


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

DIVISION 16 - ELECTRICAL
YAA
ENGG CERT

SECTION 16143 - WIRING DEVICES


LSS

PART 1 - GENERAL

1.01 DESCRIPTION OF WORK

A. This Section includes the following:


ISSUED FOR IFC
DESCRIPTION

Socket Outlets
Socket Outlets Incorporating Residual-Current Devices
Switches

1.02 QUALITY ASSURANCE

A. Codes and Standards: Comply with all applicable Codes and Standards including
but not limited to, those listed below:

SAUDI ARAMCO Engineering Standards


JO/EWO
01/21/2016 BI-01382

SBC 401 Saudi Building Code – Volume 4


BS EN 60320-1 Appliance Couplers for Household and Similar General
DATE

Purposes: General Requirements


BS EN 60529 Degrees of Protection Provided by Enclosures (IP Codes)
BS EN 60669-1 Switches for Household and Similar Fixed Electrical
NO.
REV

00

DISCIPLINE
Installations: General Requirements (BS 3676-1)
ENGINEER
ANP
BS EN 60669-2-1 Switches for Household and Similar Fixed Electrical
01/21/2016 Installations: Particular Requirements - Electronic Switches
DATE:
PROJECT
BS 1363-2 Specification for 13 A Switched Socket-Outlets
ENGINEER
LSS
01/21/2016
BS 4662 Boxes for Flush Mounting of Electrical Accessories -
DATE:
CERTIFIED
Requirements, Test Methods and Dimensions
YAA BS 5733 Specification for General Requirements for Electrical
01/21/2016 Accessories
DATE:
CONSTRUCTION BS 7288 Specification for Socket Outlets Incorporating Residual
AGENCY
YAA Current Devices
01/21/2016
DATE:
OPERATIONS
B. BS and IEC Compliance: Provide wiring devices which comply with applicable BS
ASZ and IEC Standards.
01/21/2016
DATE:
1.03 SUBMITTALS
CONTROL NUMBER
VERIFICATION

A. General: Submit the following in accordance with Conditions of Contract and


EDSD

Division 1 Specifications Sections.


DATE:
BY:

1. Product data for each type of wiring devices and coverplates.


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

2. Samples.
(DCC) NO. _____________________
10-01382-0008-0001

SECTION 16143
1 of 4
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 51


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

PART 2 - PRODUCTS
YAA
ENGG CERT

2.01 MANUFACTURERS
LSS

Available Manufacturers: Subject to compliance with requirements, manufacturers offering


products which may be incorporated in the Work include, but are not limited to, the
following:

MK by Honeywell
Legrand Co.
ISSUED FOR IFC
DESCRIPTION

Schneider Electric Co
Other Approved Manufacturers

2.02 WIRING DEVICES

A. General: Provide wiring devices, in types, characteristics, grades, colors, and


electrical ratings for applications indicated in accordance with British and IEC
Standards. Provide white color devices and wall plates, except as otherwise
indicated.
JO/EWO
01/21/2016 BI-01382

B. Receptacles:
DATE

1. General Receptacles: Unless otherwise indicated, provide single and


duplex, 13-ampere, 250-volt, 2-pole, 3-wire, grounding type, flush-mounted
switched receptacles complying with BS 1363-2 Standard. Provide single
NO.
REV

00

DISCIPLINE
units designed for installation in 72mm x 72mm x 47mm deep; and duplex
ENGINEER unit designed for installation in 72mm x 132mm x 47mm deep outlet boxes
ANP
01/21/2016
without adapter, grounding type, complying with BS 4662 Standard.
DATE:
PROJECT
ENGINEER 2. Receptacles Equipped with Residual Current Devices (RCD): Provide
LSS
01/21/2016
single and duplex, 13-ampere, 250-volt, 2-pole, 3-wire, grounding type,
DATE: flush-mounted switched receptacles equipped with RCD, with passive
CERTIFIED
YAA control ciruit and complying with BS 7288 Standard in areas required by
01/21/2016 NFPA-70. Provide single units designed for installation in 72mm x 72mm x
DATE:
CONSTRUCTION
47mm deep; and duplex units designed for installation in 72mm x 132mm x
AGENCY
YAA
47mm deep outlet boxes, without adapter, grounding type, complying with
01/21/2016 BS 4662 Standard.
DATE:
OPERATIONS
ASZ
3. Weatherproof Receptacles Equipped with Residual Current Devices (RCD):
01/21/2016
Provide weatherproof duplex, 13-ampere, 250-volt, 2-pole, 3-wire,
DATE:
grounding type, flush-mounted switched receptacles equipped with RCD,
CONTROL NUMBER
VERIFICATION

with passive control circuit and complying with BS 7288 and BS EN 60529
Standards for outdoor areas. Provide units complete with rear-entry back
EDSD

boxes.
DATE:
BY:

C. Double-Pole Switches: Provide 20-ampere, flush-mounted, double-pole switches


APPROVAL/CERTIFICATION REQUIREMENTS,

with neon indicators, one gang, 250-volt; 35-ampere, flush-mounted, double-pole


THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

SECTION 16143
10-01382-0008-0001

2 of 4
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 52


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

switches with neon indicators, one gang, 250-volt; and 50-ampere, flush-mounted,
YAA
ENGG CERT

double- pole switches with neon indicators, 250-volt, one-gang, complying with BS
EN 60669-1 Standards. Provide units designed for installation in 72mm x 72mm x
LSS

47mm deep outlet boxes without adapter, grounding type, complying with BS 4662
Standard; and with engraved faceplates indicating equipment controlled.

D. Cable Outlets: Provide 45-ampere, flush-mounted, cable outlets with terminal


blocks complying with BS 5733 Standards. Provide units designed for installation
in 72mm x 72mm x 47mm deep outlet boxes without adapter, grounding type,
complying with BS 4662 Standard.
ISSUED FOR IFC
DESCRIPTION

E. Switches and Bushbuttons:

1. Indoor Plateswitches: Unless otherwise indicated, provide quiet-type, 20-


ampere, 250-volt, 1 pole, heavy duty, one-gang, two-gang and three-gang,
one-way, two-way or intermediate AC switches complying with BS EN
60669-1 Standard. Provide units designed for installation in 72mm x 72mm
x 47 mm deep mounting boxes without adapter, grounding type, complying
with BS 4662 Standard.
2. Weatherproof Outdoor Switches: Unless otherwise indicated, provide
JO/EWO
01/21/2016 BI-01382

weatherproof, quiet-type, 20-ampere, 250-volt, 1 pole, heavy duty, one-


gang, one-way AC switches complying with BS EN 60529 and BS EN
DATE

60669-1 Standards for outdoor areas. Provide units complete with rear-
entry back boxes.
NO.
REV

00

DISCIPLINE
F. LED Dimmers: Unless otherwise indicated, provide 240-volt, 70-watt, LED
ENGINEER intelligent dimmers complying with BS EN 60669-2-1 Standard. Provide units
ANP
01/21/2016
designed for installation in 72mm x 72mm x 47 mm deep mounting boxes without
DATE:
PROJECT
adapter, grounding type, complying with BS 4662 Standard.
ENGINEER G. Wall Plates: Single and combination, of types, sizes, and with ganging and cutouts
LSS
01/21/2016
as indicated. Provide stainless steel plates for areas subject to hard usage or open
DATE: to the public.
CERTIFIED
YAA H. Door Chime: Provide Sleek and simple decorative design chime to fit selected
01/21/2016 décor, Mounted vertically or horizontally, fully adjustable volume, multi tone
DATE:
CONSTRUCTION
selection, powered by transformer, illuminated by LED indicators, Compatible with
AGENCY
YAA
most bell pushes, with standard normally open contacts, 1Ph, 230V, 60Hz.
01/21/2016
DATE:
OPERATIONS
PART 3 - EXECUTION
ASZ

01/21/2016
3.01 INSTALLATION OF WIRING DEVICES AND ACCESSORIES
DATE:
A. Install wiring devices and accessories as indicated, in accordance with
CONTROL NUMBER
VERIFICATION

manufacturer's written instructions, applicable requirements of NEC and in


accordance with recognized industry practices to fulfill project requirements.
EDSD

DATE:

B. Coordinate with other work, including painting, electrical boxes and wiring
BY:

installations, as necessary to interface installation of wiring devices with other


APPROVAL/CERTIFICATION REQUIREMENTS,

Work.
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

SECTION 16143
10-01382-0008-0001

3 of 4
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 53


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

C. Install wiring devices only in electrical boxes which are clean; free from excess
YAA
ENGG CERT

building materials, dirt, and debris.


D. Install wiring devices after wiring work is completed.
LSS

E. Install wall plates after painting work is completed.

E. Tighten connectors and terminals, in accordance with equipment manufacturer's


published torque tightening values for wiring devices. Where manufacturer's
torquing requirements are not indicated, tighten connectors and terminals to
comply with tightening torques specified in UL Standard 486A. Use properly
ISSUED FOR IFC
DESCRIPTION

scaled torque indicating hand tool.


F. Wiring devices at mechanical rooms, Work room and garage area shall be with
metal clad faceplats.

3.02 PROTECTION

A. Protect installed components from damage.

B. Replace damaged items prior to final acceptance.


JO/EWO
01/21/2016 BI-01382

3.03 FIELD QUALITY CONTROL

A. Prior to energizing circuits, test wiring for electrical continuity, and for short-circuits.
DATE

Ensure proper polarity of connections is maintained.


NO.
REV

00

B. Subsequent to energizing, test wiring devices and demonstrate compliance with


DISCIPLINE
ENGINEER requirements, operating each operable device at least six times.
ANP
01/21/2016
DATE: C. Test RCD-equipped receptacle operation with both local and remote fault
PROJECT
ENGINEER simulations in accordance with manufacturer recommendations.
LSS
01/21/2016
DATE:
CERTIFIED
YAA END OF SECTION
01/21/2016
DATE:
CONSTRUCTION
AGENCY
YAA

01/21/2016
DATE:
OPERATIONS
ASZ

01/21/2016
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________
10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 54


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16143
YAA
ENGG CERT

4 of 4
DIVISION 16 - ELECTRICAL
LSS

SECTION 16170 - CIRCUITS AND MOTOR DISCONNECTS

PART 1 - GENERAL

1.01 DESCRIPTION OF WORK


ISSUED FOR IFC
DESCRIPTION

A. This Section includes circuit and motor disconnects (otherwise known as enclosed
switches, disconnects, disconnect switches or safety switches).

1.02 QUALITY ASSURANCE

A. Code and Standards: Comply with all applicable Codes and Standards including,
but not limited to, those listed below:

1. SAUDI ARAMCO Engineering Standards (SAES)


JO/EWO
01/21/2016 BI-01382

SAES-P-100 Basic Power Design Criteria


SAES-P-104 Wiring Methods and Materials
DATE

2. SBC 401 Saudi Building Code – Volume 4


NO.
REV

00

3. Electrical Component Standards: Provide components complying with


DISCIPLINE
ENGINEER ANSI/NFPA 70 "National Electrical Code" and which are listed and labeled
ANP
by UL. Comply with UL Standard 98 and NEMA Standard KS 1.
01/21/2016
DATE:
PROJECT
ENGINEER 1.03 SUBMITTALS
LSS
01/21/2016
DATE: A. General: Submit the following in accordance with Conditions of Contract and
CERTIFIED
YAA Division 1 Specifications Sections.
01/21/2016
DATE:
CONSTRUCTION
1. Product data for each type of product specified.
AGENCY
YAA

01/21/2016
2. Maintenance data for circuit and motor disconnects, for inclusion in
DATE: Operation and Maintenance Manual specified in Division 16 Section 16010
OPERATIONS
"Basic Electrical Requirements"
ASZ

01/21/2016
DATE: PART 2 - PRODUCTS
CONTROL NUMBER
VERIFICATION

2.01 MANUFACTURERS
EDSD

DATE:

A. Available Manufacturers: Subject to compliance with requirements, manufacturers


BY:

offering products which shall be incorporated in the work include, but are not
APPROVAL/CERTIFICATION REQUIREMENTS,

limited to, the following:


THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________
10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 55


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16170
YAA
ENGG CERT

1 of 3
B. Manufacturers: Subject to compliance with requirements, provide products by the
following:
LSS

Crouse-Hinds Co.
Cutler-Hammer Inc.
General Electric Co.
Square D Company.
Westinghouse Electric Corp.
ISSUED FOR IFC
DESCRIPTION

Other Approved Manufacturers

2.02 CIRCUIT AND MOTOR DISCONNECT SWITCHES

A. General: Provide circuit and motor disconnect switches in types, sizes, duties,
features, ratings, and enclosures as indicated. For motor and motor starter
disconnects, provide units with horsepower ratings suitable to the loads.

B. Non-Fusible Disconnects: Heavy duty switches of classes and current ratings as


indicated.
JO/EWO
01/21/2016 BI-01382

C. Switches for Classified (Hazardous) Locations: Heavy duty switches, with UL


labels and listings for hazardous location classifications in which installed.
DATE

2.03 ACCESSORIES
NO.
REV

00

DISCIPLINE
ENGINEER A. Electrical Interlocks: Provide number and arrangement of interlock contacts in
ANP
switches as indicated.
01/21/2016
DATE:
PROJECT
ENGINEER PART 3 - EXECUTION
LSS
01/21/2016
DATE: 3.01 INSTALLATION
CERTIFIED
YAA

01/21/2016
General: Follow switch manufacturers' printed installation instructions. Comply with the
DATE:
provisions of SBC 401, the NEC, SAES-P-100 and SAES-P-104 requirements and
CONSTRUCTION
AGENCY
YAA
installation conditions. In addition, comply with the following:
01/21/2016
DATE: A. In outdoor plant areas, within the perimeter of process units, equipment and
OPERATIONS
terminal enclosures shall be either one of the following:
ASZ

01/21/2016
DATE: 1. NEMA Type 4X
CONTROL NUMBER

2. IEC 529 Type IP65 or better


VERIFICATION
EDSD

B. In outdoor plant areas, outside the perimeter of process units, and other industrial
DATE:

areas, equipment and terminal enclosures shall be either one of the following
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,

1. NEMA Type 4X
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

2. IEC 529 Type IP65 or better


(DCC) NO. _____________________
10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 56


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16170
YAA
ENGG CERT

2 of 3
C. In outdoor plant and other industrial areas located in severe corrosive
environments (severe corrosive locations are enumerated under Section 16110
LSS

“Raceways”), equipment and terminal enclosures shall be either one of the


following:

1. NEMA Type 4X (galvanized and/ or painted or coated carbon steel sheet


metal enclosures are not permitted).
ISSUED FOR IFC
DESCRIPTION

2. IEC 529 Type IP65 or better, manufactured of stainless steel (Type 304 or
better), or copper free cast aluminum or plastic (including fiberglass).

D. Enclosures that are rated (a) NEMA Type 3, 4 or 4X, or (b) IEC 529 Type IP54, or
better, shall have Type 300 Series stainless steel hardware, except aluminum
enclosures may have aluminum or aluminum alloy hinges.

E. Enclosures and junction boxes having an internal volume exceeding 2000 cubic
centimeters (122 cubic inches) shall be provided with Type 300 Series stainless
steel breather and drain fittings.
JO/EWO
01/21/2016 BI-01382

F. In hazardous (classified) locations, enclosures that are required to be approved for


Class I locations by NEC Article 501, shall meet the hazardous area equipment
DATE

application requirements of SAES-P-100 and SAES-P-104.


NO.
REV

00

3.02 FIELD QUALITY CONTROL


DISCIPLINE
ENGINEER
ANP
A. Testing: Subsequent to completion of installation of electrical disconnect switches,
01/21/2016
DATE: energize circuits and demonstrate capability and compliance with requirements.
PROJECT
ENGINEER Except as otherwise indicated, do not test switches by operating them under load.
LSS
However, demonstrate switch operation through six opening/closing cycles with
01/21/2016
DATE: circuit unloaded. Open each switch enclosure for inspection of interior, mechanical
CERTIFIED
YAA and electrical connections, fuse installation, and for verification of type and rating of
01/21/2016
fuses installed. Correct deficiencies then retest to demonstrate compliance.
DATE:
Remove and replace defective units with new units and retest.
CONSTRUCTION
AGENCY
YAA

01/21/2016
DATE: END OF SECTION
OPERATIONS
ASZ

01/21/2016
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________
10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 57


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16170
YAA
ENGG CERT

3 of 3
DIVISION 16 - ELECTRICAL
LSS

SECTION 16190 - SUPPORTING DEVICES

PART 1 - GENERAL

1.01 DESCRIPTION OF WORK


ISSUED FOR IFC
DESCRIPTION

This Section includes secure support from the building structure for electrical items by
means of hangers, supports, anchors, sleeves, inserts, seals, and associated fastenings.

1.02 QUALITY ASSURANCE

A. Codes and Standards: Comply with all applicable Codes and Standards including
but not limited to, those listed below:

1. Electrical Component Standard: Components and installation shall comply


JO/EWO
01/21/2016 BI-01382

with SBC 401 (Saudi Building Code Volume 4) and ANSI/NFPA 70


"National Electrical Code," with the SBC 401 requirements prevailing over
the NFPA 70 provisions.
DATE

Electrical components shall be listed and labeled by UL, ETL, CSA, BS or


NO.
REV

00

other approved, nationally recognized testing and listing agency that


DISCIPLINE
ENGINEER provides third-party certification follow-up services.
ANP
01/21/2016
DATE: 2. SAUDI ARAMCO Engineering Standards (SAES)
PROJECT
ENGINEER
LSS
SAES-P-104 Wiring Methods and Materials
01/21/2016
DATE:
CERTIFIED
YAA 1.03 SUBMITTALS
01/21/2016
DATE:
CONSTRUCTION
A. General: Submit the following in accordance with Conditions of Contract and
AGENCY
YAA
Division 1 Specification Sections.
01/21/2016
DATE: 1. Product data for each type of product specified.
OPERATIONS
ASZ

01/21/2016
2. Hanger and support schedule showing manufacturer's figure number, size,
DATE: spacing, features, and application for each required type of hanger, support,
CONTROL NUMBER

sleeve, seal, and fastener to be used.


VERIFICATION
EDSD

3. Shop drawings indicating details of fabricated products and materials.


DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________
10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 58


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16190
YAA
ENGG CERT

1 of 7
PART 2 - PRODUCTS
LSS

2.01 MANUFACTURERS

A. Available Manufacturers: Subject to compliance with requirements, manufacturers


offering products which may be incorporated in the Work include, but are not
limited to, the following:
ISSUED FOR IFC
DESCRIPTION

B. Manufacturers: Subject to compliance with requirements, provide products by the


following:

1. Slotted Metal Angle and U-Channel Systems:


ABAHSAIN-COPE S.A. LTD.
Allied Tube & Conduit
American Electric
B-Line Systems, Inc.
GS Metals Corp.
Unistrut Diversified Products
JO/EWO
01/21/2016 BI-01382

Other Approved Manufacturers

2. Conduit Sealing Bushings:


DATE

Cooper Industries, Inc.


NO.
REV

00

GS Metals Corp.
DISCIPLINE
ENGINEER Killark Electric Mfg. Co.
ANP
O-Z/Gedney
01/21/2016
DATE: Raco, Inc.
PROJECT
ENGINEER Red Seal Electric Corp.
LSS
Spring City Electrical Mfg. Co.
01/21/2016
DATE: Thomas & Betts Corp.
CERTIFIED
YAA Other Approved Manufacturers
01/21/2016
DATE:
2.02 COATINGS AND MATERIALS FOR SUPPORTING DEVICES
CONSTRUCTION
AGENCY
YAA

01/21/2016
A. Conform to manufacturer's recommendations for selection and installation of
DATE: supports. Per SAES-P-104, also conform to the following:
OPERATIONS
ASZ
Exception: Plant structural members used as supports for conduit and other
DATE:
01/21/2016
electrical equipment are not included in this section. Attachment hardware
(clamps, bolts, nuts, etc) must however comply to the requirements.
CONTROL NUMBER
VERIFICATION
EDSD

1. Channel erector system components (Unistrut or similar) used to support


conduits, cable trays, enclosures, lighting fixtures and other electrical
DATE:

equipment shall be made of steel and iron, either hot-dip galvanized


BY:

(preferably), or zinc electroplated as supplied by the manufacturer.


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

2. For purposes of this section, severe corrosive environments include:


(DCC) NO. _____________________
10-01382-0008-0001

a. Outdoor offshore locations


B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 59


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16190
YAA
ENGG CERT

2 of 7
b. Outdoor onshore locations within one kilometer from the shoreline of
the Arabian Gulf, all of the Rastanura Refinery and Terminal, and
LSS

within three kilometers from shoreline of the Red Sea.

2.03 MANUFACTURED SUPPORTING DEVICES

A. Raceway Supports: Provide as indicated on the drawings or as per requirements


of SBC 401 and the NEC. Supports include clevis hangers, riser clamps, conduit
ISSUED FOR IFC
DESCRIPTION

straps, threaded C-clamps with retainers, ceiling trapeze hangers, wall brackets,
and spring steel clamps.

B. Fasteners: Types, materials, and construction features as follows:

1. Expansion Anchors: Carbon steel wedge or sleeve type, zinc coated


(indoor and outdoor use), or stainless steel (corrosive locations).

2. Toggle Bolts: All steel springhead type (indoor use only).


JO/EWO
01/21/2016 BI-01382

3. Powder-Driven Threaded Studs: Heat-treated steel, designed specifically


for the intended service.
DATE

C. Conduit Sealing Bushings: Factory-fabricated watertight conduit sealing bushing


assemblies suitable for sealing around conduit, or tubing passing through concrete
NO.
REV

00

floors and walls. Construct seals with steel sleeve, malleable iron body, neoprene
DISCIPLINE
ENGINEER sealing grommets or rings, metal pressure rings, pressure clamps, and cap screws.
ANP
01/21/2016
DATE: D. Cable Supports for Vertical Conduit: Factory-fabricated assembly consisting of
PROJECT
ENGINEER threaded body and insulating wedging plug for nonarmored electrical cables in riser
LSS
conduits. Provide plugs with number and size of conductor gripping holes as
01/21/2016
DATE: required to suit individual risers. Construct body of malleable-iron casting with hot-
CERTIFIED
YAA dip galvanized finish.
01/21/2016
DATE:
E. U-Channel Systems: 16-gage steel channels unless indicated otherwise. Provide
CONSTRUCTION
AGENCY
YAA
fittings and accessories that mate and match with U-channel and are of the same
01/21/2016
manufacture.
DATE:
OPERATIONS
2.04 FABRICATED SUPPORTING DEVICES
ASZ

01/21/2016
DATE: A. General: Shop- or field-fabricated supports or manufactured supports assembled
CONTROL NUMBER

from U-channel components. Conform to the requirements of Paragraph 2.02


VERIFICATION

regarding coatings and materials.


EDSD

DATE:

B. Steel Brackets: Fabricated of angles, channels, and other standard structural


BY:

shapes. Connect with welds and machine bolts to form rigid supports. Conform to
APPROVAL/CERTIFICATION REQUIREMENTS,

the requirements of Paragraph 2.02 regarding coatings and materials.


THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________
10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 60


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16190
YAA
ENGG CERT

3 of 7
C. Pipe Sleeves: Provide pipe sleeves (normally two sizes larger than conduit/pipe
passing through) of one of the following:
LSS

1. Sheet Metal: Fabricate from galvanized sheet metal; round tube closed
with snaplock joint, welded spiral seams, or welded longitudinal joint.

Fabricate sleeves from the following gage metal for sleeve diameter noted:
ISSUED FOR IFC
DESCRIPTION

3-inch and smaller: 20-gage.


4-inch to 6-inch: 16-gage.
over 6-inch: 14-gage.

2. Steel Pipe: Fabricate from Schedule 40 galvanized steel pipe.

3. Plastic Pipe: Fabricate from Schedule 80 PVC plastic pipe.

PART 3 - EXECUTION
JO/EWO
01/21/2016 BI-01382

3.01 INSTALLATION

A. Install supporting devices to fasten electric components securely and permanently


DATE

in accordance with NEC requirements.


NO.
REV

00

B. Coordinate with the building structural system and with other electrical installation.
DISCIPLINE
ENGINEER
ANP
C. Conform to manufacturer's recommendations for selection and installation of
01/21/2016
DATE: supports, in addition to the requirements specified in this Section.
PROJECT
ENGINEER
LSS
D. Strength of each support shall be adequate to carry present and future load
01/21/2016
DATE: multiplied by a safety factor of at least four. Where this determination results in a
CERTIFIED
YAA safety allowance of less than 200 lbs, provide additional strength until there is a
01/21/2016
minimum of 200 lbs safety allowance in the strength of each support.
DATE:
CONSTRUCTION
AGENCY
YAA
E. Install individual and multiple (trapeze) raceway hangers and riser clamps as
01/21/2016
necessary to support raceways. Provide U- bolts, clamps, attachments, and other
DATE: hardware necessary for hanger assembly and for securing hanger rods and
OPERATIONS
conduits.
ASZ

01/21/2016
DATE: F. Support parallel runs of horizontal raceways together on trapeze-type hangers.
CONTROL NUMBER
VERIFICATION

G. Support individual horizontal raceways by separate pipe hangers. Spring steel


EDSD

fasteners may be used in lieu of hangers only for 1-1/2-inch and smaller raceways
DATE:

serving lighting and receptacle branch circuits above suspended ceilings only. For
BY:

hanger rods with spring steel fasteners, use 1/4-inch-diameter or larger threaded
APPROVAL/CERTIFICATION REQUIREMENTS,

steel. Use spring steel fasteners that are specifically designed for supporting
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

single conduits or tubing.


(DCC) NO. _____________________
10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 61


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16190
YAA
ENGG CERT

4 of 7
H. Space supports for raceways in accordance with the following Table. Space
supports for raceway types not covered by the above in accordance with SBC 401
LSS

and the NEC.

SPACING FOR RACEWAY SUPPORTS

Raceway No. of Maximum Spacing


Size Coductors of Supports (Feet)
ISSUED FOR IFC
DESCRIPTION

(Inches) in. Run Location RSC EMT RNC


*
HORIZONTAL RUNS
½, 3/4 1 or 2 Flat ceiling or wall where it 5 5 3
is difficult to provide
supports except at interval
fixed by the building
construction.
½, 3/4 3 or more Any location 7 7 -
JO/EWO
01/21/2016 BI-01382

½-1 3 or more Any location 7 7 -


1 & larger 1 or 2 Flat ceiling or wall where it 6 6 -
is difficult to provide
DATE

supports except at intervals


fixed by the building
construction.
NO.
REV

00

DISCIPLINE 1 & larger 3 or more Any location 10 10 -


ENGINEER
ANP Any Concealed 10 10 -
01/21/2016
DATE:
PROJECT
ENGINEER
VERTICAL RUNS
LSS ½, 3/4 Exposed 7 7 -
01/21/2016
DATE: 1, 1-1/4 Exposed 8 8 -
CERTIFIED 1-1/2 and Exposed 10 10 -
YAA

01/21/2016
larger
DATE:
Up to 2 Shaftway 14 10 -
CONSTRUCTION
AGENCY
YAA
2-1/2 Shaftway 16 10 -
01/21/2016
3 & larger Shaftway 20 10 -
DATE:
OPERATIONS
Any Concealed 10 10 -
ASZ

01/21/2016 * Maximum spacings for RSC above apply to straight runs only. Otherwise the
DATE:
maximums for EMT apply.
CONTROL NUMBER
VERIFICATION

Abbreviations: EMT - Electrical metallic tubing.


EDSD

RSC - Rigid steel conduit.


DATE:

RNC - Rigid nonmetallic conduit.


BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

I. Support exposed and concealed raceway within 1 foot of an unsupported box and
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

access fittings. In horizontal runs, support at the box and access fittings may be
(DCC) NO. _____________________
10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 62


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16190
YAA
ENGG CERT

5 of 7
omitted where box or access fittings are independently supported and raceway
terminals are not made with chase nipples or threadless box connectors.
LSS

J. In vertical runs, arrange support so the load produced by the weight of the raceway
and the enclosed conductors is carried entirely by the conduit supports with no
weight load on raceway terminals.

K. Vertical Conductor Supports: Install simultaneously with installation of conductors.


ISSUED FOR IFC
DESCRIPTION

L. Miscellaneous Supports: Support miscellaneous electrical components as required


to produce the same structural safety factors as specified for raceway supports.
Install metal channel racks for mounting cabinets, panelboards, disconnects,
control enclosures, pull boxes, junction boxes, transformers, and other devices.

M. In open overhead spaces, cast boxes threaded to raceways need not be supported
separately except where used for fixture support. Support sheet metal boxes
directly from the building structure or by bar hangers. Where bar hangers are
used, attach the bar to raceways on opposite sides of the box and support the
JO/EWO
01/21/2016 BI-01382

raceway with an approved type of fastener not more than 24 inches from the box.

N. Sleeves: Install in concrete slabs and walls and all other fire- rated floors and walls
DATE

for raceways and cable installations. For sleeves through fire-rated wall or floor
construction, apply UL- listed firestopping sealant in gaps between sleeves and
NO.
REV

00

enclosed conduits and cables in accordance with "Fire Resistant Joint Sealers"
DISCIPLINE
ENGINEER requirement of Division 16 Section 16050.
ANP
01/21/2016
DATE: O. Conduit Seals: Install seals for conduit penetrations of slabs on grade and exterior
PROJECT
ENGINEER walls below grade and where indicated. Tighten sleeve seal screws until sealing
LSS
grommets have expanded to form watertight seal.
01/21/2016
DATE:
CERTIFIED
YAA P. Fastening: Unless otherwise indicated, fasten electrical items and their supporting
01/21/2016
hardware securely to the building structure, including but not limited to conduits,
DATE:
raceways, cables, cable trays, busways, cabinets, panelboards, transformers,
CONSTRUCTION
AGENCY
YAA
boxes, disconnect switches, and control components in accordance with the
01/21/2016
following:
DATE:
OPERATIONS
1. Fasten by means of wood screws or screw-type nails on wood, toggle bolts
ASZ
on hollow masonry units, concrete inserts or expansion bolts on concrete or
01/21/2016
DATE: solid masonry, and machine screws, welded threaded studs, or spring-
CONTROL NUMBER

tension clamps on steel. Threaded studs driven by a powder charge and


VERIFICATION

provided with lock washers and nuts may be used instead of expansion
EDSD

bolts and machine or wood screws.


DATE:
BY:

2. Do not weld conduit, pipe straps, or items other than threaded studs to steel
APPROVAL/CERTIFICATION REQUIREMENTS,

structures.
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

3. In partitions of light steel construction, use sheet metal screws.


10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 63


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16190
YAA
ENGG CERT

6 of 7
Q. Holes cut to depth of more than 1-1/2 inches in reinforced concrete beams or to
depth of more than 3/4 inch in concrete shall not cut the main reinforcing bars. Fill
LSS

holes that are not used.

R. Ensure that the load applied to any fastener does not exceed 25 percent of the
proof test load. Use vibration- and shock- resistant fasteners for attachments to
concrete slabs.
3.02 TESTS:
ISSUED FOR IFC
DESCRIPTION

When directed by Company Representative to provide testing of fasteners, comply with


the following:

A. Test pull-out resistance of one of each type, size, and anchorage material for the
following fastener types:

1. Expansion anchors.

2. Toggle bolts.
JO/EWO
01/21/2016 BI-01382

3. Powder-driven threaded studs.


DATE

B. Provide all jacks, jigs, fixtures, and calibrated indicating scales required for reliable
testing.
NO.
REV

00

DISCIPLINE
ENGINEER C. Obtain the Structural Engineer's approval before transmitting loads to the structure.
ANP
01/21/2016
DATE: D. Test to 90 percent of rated proof load for fastener. If fastening fails test, revise all
PROJECT
ENGINEER similar fastener installations and retest until satisfactory results are achieved.
LSS
01/21/2016
DATE:
CERTIFIED
YAA END OF SECTION
01/21/2016
DATE:
CONSTRUCTION
AGENCY
YAA

01/21/2016
DATE:
OPERATIONS
ASZ

01/21/2016
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________
10-01382-0008-0001

SECTION 16190

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 64


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

7 of 7
YAA
ENGG CERT

DIVISION 16 - ELECTRICAL
LSS

SECTION 16195 - ELECTRICAL IDENTIFICATION

PART 1 - GENERAL

1.01 DESCRIPTION OF WORK

This Section includes identification of electrical materials, equipment, and installations. It


ISSUED FOR IFC
DESCRIPTION

includes requirements for electrical identification components including but not limited to
the following:

A. Identification labeling for raceways, cables, and conductors.

B. Equipment labels and signs.

C. Buried Electrical Line Warnings.

D. Warning and Caution Signs.


JO/EWO
01/21/2016 BI-01382

1.02 QUALITY ASSURANCE


DATE

A. Codes and Standards: Comply with all applicable Codes and Standards including
but not limited to, those listed below:
NO.
REV

00

DISCIPLINE
ENGINEER 1. Electrical Component Standard: Components and installation shall comply
ANP
01/21/2016
with SBC 401 (Saudi Building Code Volume 4) and ANSI/NFPA 70
DATE:
PROJECT
"National Electrical Code," with the SBC 401 requirements prevailing over
ENGINEER the NFPA 70 provisions.
LSS
01/21/2016
DATE: 2. ANSI Compliance: Comply with requirements of ANSI Standard A13.1,
CERTIFIED
YAA "Scheme for the Identification of Piping Systems," with regard to type and
01/21/2016 size of lettering for raceway and cable labels.
DATE:
CONSTRUCTION
AGENCY
YAA
1.03 SUBMITTALS
01/21/2016
DATE:
OPERATIONS
A. General: Submit the following in accordance with Conditions of Contract and
ASZ
Division 1 Specification Sections:
01/21/2016
DATE:
1. Product Data for each type of product specified.
CONTROL NUMBER
VERIFICATION

PART 2 - PRODUCTS
EDSD

DATE:

2.01 MANUFACTURERS
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,

A. Available Manufacturers: Subject to compliance with requirements, manufacturers


THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

offering products that may be incorporated in the Work include, but are not limited
(DCC) NO. _____________________
10-01382-0008-0001

SECTION 16195
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 65


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

1 of 4
YAA
ENGG CERT

to, the following:


LSS

B. Manufacturers: Subject to compliance with requirements, provide products by the


following:

Ideal Industries, Inc.


National Band and Tag Co.
Panduit Corp.
ISSUED FOR IFC

Seton Name Plate Co.


DESCRIPTION

Standard Signs, Inc.


W.H. Brady Co.
Thomas & Betts
Weidmuller Incorporated
Other Approved Manufacturers

2.02 ELECTRICAL IDENTIFICATION PRODUCTS

A. Colored Adhesive Marking Tape for Raceways of Certain Systems: Self adhesive
JO/EWO
01/21/2016 BI-01382

vinyl tape not less than 3 mils thick by 1 inch to 2 inches in width.

B. Pretensioned Flexible Wraparound Colored Plastic Sleeves for Raceway


DATE

Identification: Flexible acrylic bands sized to suit the raceway diameter and
arranged to stay in place by pre-tensioned gripping action when coiled around the
NO.
REV

00

raceway.
DISCIPLINE
ENGINEER
ANP
C. Underground Line Marking Tape: Permanent, bright-colored, continuous
01/21/2016
DATE: printed, plastic tape compounded for direct-burial service not less than 6 inches
PROJECT
ENGINEER wide by 4 mils thick. Printed legend indicative of general type of underground line
LSS below.
01/21/2016
DATE:
CERTIFIED D. Wire/Cable Designation Markers: Permanently embossed wire markers of the
YAA

01/21/2016
heat-shrinkable or slip-on type. Wrap-around, rigid snap-on, or adhesive type
DATE: markers are not permitted.
CONSTRUCTION
AGENCY
YAA
E. Engraved, Plastic-Laminated Labels, Signs, and Instruction Plates: Engraving
01/21/2016
DATE: stock melamine plastic laminate, 1/16-inch minimum thick for signs up to 20 square
OPERATIONS
inches, or 8 inches in length; 1/8-inch thick for larger sizes. Engraved legend in
ASZ
white letters on black face and punched for mechanical fasteners.
01/21/2016
DATE:
CONTROL NUMBER

F. Baked-Enamel Warning and Caution Signs for Interior Use: Preprinted aluminum
VERIFICATION

signs, punched for fasteners, with colors, legend, and size appropriate to the
EDSD

location.
DATE:
BY:

G. Exterior Metal-Backed Butyrate Warning and Caution Signs: Weather-resistant,


nonfading, preprinted cellulose acetate butyrate signs with 20-gage, galvanized
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

steel backing, with colors, legend, and size appropriate to the location. Provide 1/4
(DCC) NO. _____________________

inch grommets in corners for mounting.


10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 66


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16195
YAA
ENGG CERT

2 of 4
H. Fasteners for Plastic-Laminated and Metal Signs: Self-tapping stainless steel
screws or number 10/32 stainless steel machine screws with nuts and flat and lock
LSS

washers.

I. Cable Ties: Fungus-inert, self-extinguishing, one-piece, self-locking nylon cable


ties, 0.18-inch minimum width, 50-lb minimum tensile strength, and suitable for a
temperature range from minus 50 deg F to 350 deg F. Provide ties in specified
colors when used for color coding.
ISSUED FOR IFC
DESCRIPTION

PART 3 - EXECUTION

3.01 INSTALLATION

A. Lettering and Graphics: Coordinate names, abbreviations, colors, and other


designations used in electrical identification work with corresponding designations
specified or indicated. Install numbers, lettering, and colors as approved in
submittals and as required by code.
JO/EWO
01/21/2016 BI-01382

B. Install identification devices in accordance with manufacturer's written instructions


and requirements of NEC.
DATE

C. Sequence of Work: Where identification is to be applied to surfaces that require


finish, install identification after completion of finish work.
NO.
REV

00

DISCIPLINE
ENGINEER D. Conductor Color Coding:
ANP
01/21/2016
DATE: 1. Provide color coding for secondary service, feeder, and branch circuit
PROJECT
ENGINEER conductors throughout the project secondary electrical system as follows:
LSS
01/21/2016
DATE: Phase 400y/230 Volts
CERTIFIED
YAA

01/21/2016 A Brown
DATE:
CONSTRUCTION
B Black
AGENCY
YAA
C Gray
01/21/2016
Neutral Blue
DATE:
OPERATIONS
Ground Green-and-yellow
ASZ

01/21/2016
2. For specified insulations and jackets not manufactured by the selected
DATE:
vendor with integral colors, use conductors with black insulation or jacket
CONTROL NUMBER
VERIFICATION

and color-code with Scotch No. 35 color-coding tape or equivalent. Color-


code each conductor entering every box, cabinet, panelboard, through, and
EDSD

wire way. In wire ways and other locations where conductors are
DATE:

accessible, color-code conductors every 1500mm (5 FT).


BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

3. The following field-applied color-coding methods may be used in lieu of


00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

factory-coded wire for sizes larger than No. 10 AWG.


(DCC) NO. _____________________
10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 67


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16195
YAA
ENGG CERT

3 of 4
a. Apply colored, pressure-sensitive plastic tape in half- lapped turns
for a distance of 6 inches from terminal points and in boxes where
LSS

splices or taps are made. Apply the last two laps of tape with no
tension to prevent possible unwinding. Use 1-inch-wide tape in
colors as specified. Do not obliterate cable identification markings
by taping. Tape locations may be adjusted slightly to prevent such
obliteration.
b. In lieu of pressure-sensitive tape, colored cable ties may be used for
ISSUED FOR IFC
DESCRIPTION

color identification. Apply three ties of specified color to each wire at


each terminal or splice point starting 3 inches from the terminal
spaced 3 inches apart. Apply with a special tool or pliers, tighten for
snug fit, and cut off excess length.

4. For control and communications/signal wiring, use color coding or


wire/cable markers at terminations and at intermediate locations where
conductors appear in wiring boxes, troughs, and control cabinets. Use
consistent letter/number conductor designations throughout on wire/cable
markers.
JO/EWO
01/21/2016 BI-01382

END OF SECTION
NO. DATE
REV

00

DISCIPLINE
ENGINEER
ANP
01/21/2016
DATE:
PROJECT
ENGINEER
LSS
01/21/2016
DATE:
CERTIFIED
YAA

01/21/2016
DATE:
CONSTRUCTION
AGENCY
YAA

01/21/2016
DATE:
OPERATIONS
ASZ

01/21/2016
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________
10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 68


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16195
YAA
ENGG CERT

4 of 4
DIVISION 16 - ELECTRICAL
LSS

SECTION 16322 – PAD MOUNTED MEDIUM-VOLTAGE TRANSFORMERS

PART 1 - GENERAL

1.01 DESCRIPTION OF WORK


ISSUED FOR IFC
DESCRIPTION

A. This section includes distribution and power transformers with medium-voltage


primaries. Types of transformers specified in this section include the following:

Dry-Type Secondary Substation Type.


Pad-Mounted Type.
Liquid-Filled Secondary Substation Type.

B. Related Sections: The following Division 16 Sections contain requirements that


relate to this Section:
JO/EWO
01/21/2016 BI-01382

1. "Medium-Voltage Cable" for cable terminations to be made at transformers.


DATE

2. "Secondary Unit Substations" for transformers installed as integral


components of unit substations.
NO.
REV

00

3. "Transformers" for general purpose transformers with no windings over 600


DISCIPLINE
ENGINEER V.
ANP
01/21/2016
DATE:
4. "Electrical Identification" for signs associated with transformer installations.
PROJECT
ENGINEER
LSS
1.02 QUALITY ASSURANCE
01/21/2016
DATE:
CERTIFIED
YAA A. Installer Qualifications: Engage an experienced Installer of medium-voltage
01/21/2016 electrical distribution equipment to perform the installation specified in this section.
DATE:
CONSTRUCTION
Refer to Division 1 Section "Definitions and Standards" for definition of experienced
AGENCY
YAA
Installer. Submit certified evidence of such qualifications to the Architect.
01/21/2016
DATE:
B. Manufacturer Qualifications: Member firm of NEMA who is regularly engaged in
OPERATIONS
ASZ
manufacturing transformers that comply with the requirements of these
01/21/2016
Specifications and that have been used on at least five projects of similar size and
DATE: scope as this Project.
CONTROL NUMBER
VERIFICATION

C. Field Testing Organization Qualifications: To qualify for acceptance, an


EDSD

independent testing organization must demonstrate, based on evaluation of


DATE:

organization-submitted criteria conforming to ASTM E 699, that it has the


BY:

experience and capability to conduct satisfactorily the testing indicated.


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

D. Electrical Component Standard: Components and installation shall comply with


(DCC) NO. _____________________

SBC 401 (Saudi Building Code Volume 4) and ANSI/NFPA 70 "National Electrical
10-01382-0008-0001

Code," with the SBC 401 requirements prevailing over the NFPA 70 provisions.
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 69


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16322
YAA
ENGG CERT

1 of 12
E. ANSI/IEEE Compliance: Comply with applicable requirements of ANSI/IEEE
Standards including C2, "National Electrical Safety Code."
LSS

1.03 SUBMITTALS

A. General: Submit the following in accordance with Conditions of Contract and


Division 1 Specification Sections.
ISSUED FOR IFC
DESCRIPTION

B. Product data for each product specified.

C. Shop drawings for each transformer, including dimensional plans, sections, and
elevations showing minimum clearances, installed devices, and materials lists.

D. Wiring diagrams from manufacturer differentiating between manufacturer-installed


and field-installed wiring.

E. Product certificates signed by manufacturer of transformers certifying that their


products comply with the specified requirements.
JO/EWO
01/21/2016 BI-01382

F. Installer certificates signed by the Contractor certifying that Installers comply with
the requirements specified under "Quality Assurance" below.
DATE

G. Product Test Reports: Certified copies of manufacturer's design and routine


NO.
REV

00

factory tests required by the referenced standards.


DISCIPLINE
ENGINEER
ANP
PART 2 - PRODUCTS
01/21/2016
DATE:
PROJECT
ENGINEER 2.01 MANUFACTURERS
LSS
01/21/2016
DATE: A. Available Manufacturers: Subject to compliance with requirements, manufacturers
CERTIFIED
YAA offering products that may be incorporated in the Work include but are not limited
01/21/2016
to the following:
DATE:
CONSTRUCTION
AGENCY
YAA
B. Manufacturers: Subject to compliance with requirements, provide products by the
01/21/2016
following:
DATE:
OPERATIONS
A.B Chance Co.
ASZ
Balteau Standard, Inc.
01/21/2016
DATE: Federal Pacific Transformer Co.
CONTROL NUMBER

General Electric Co.


VERIFICATION

Hevi-Duty Electric.
EDSD

International Transformer Corp.


DATE:

Line Power Mfg. Corp.


BY:

Master Electronic Controls.


APPROVAL/CERTIFICATION REQUIREMENTS,

Matra Electric, Inc.


THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Pauwels Transformers, Inc.


(DCC) NO. _____________________

Rapid Power Technologies, Inc.


10-01382-0008-0001

Romac Supply Co.


B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 70


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16322
YAA
ENGG CERT

2 of 12
RTE Components.
Shape Magnetronics, Inc.
LSS

Siemens Energy & Automation, Inc.


Square D Co.
R.E. Uptegraff Mfg. Co.
Westinghouse Electric Corp.

2.02 TRANSFORMERS, GENERAL


ISSUED FOR IFC
DESCRIPTION

A. Medium-Voltage Transformers: Factory assembled and tested, general purpose,


air cooled, dry type or liquid filled as indicated, and having characteristics and
capacities as indicated.

B. Windings: 2-winding type, designed for operation with high- voltage windings
connected to a 3-phase, 3-wire, 60 Hz, grounded neutral system.

C. Sound Level: Sound level of transformers for this project shall be minimum of 3 dB
less than NEMA TR 1 standard sound levels for transformer type and size
JO/EWO
01/21/2016 BI-01382

indicated when factory tested in accordance with applicable ANSI standard.


Audible sound-level tests shall be added to routine factory tests performed on
transformers for this project. (Note: NEMA Standard TR1 is available from NEMA
DATE

for reference with regard to sound levels even though it has been rescinded as an
overall transformer standard).
NO.
REV

00

DISCIPLINE
ENGINEER D. Unusual Service Conditions: Provide transformers designed for the following
ANP
conditions:
01/21/2016
DATE:
PROJECT
ENGINEER 1. Forced-air-cooled transformers shall comply with the following
LSS
requirements:
01/21/2016
DATE:
CERTIFIED
YAA 2. Forced-air-cooling equipment shall consist of cooling fans, temperature
01/21/2016
sensing devices, and controls complete with housing, mounting devices,
DATE:
conduit, and wiring. Operation of cooling fans shall be automatically and
CONSTRUCTION
AGENCY
YAA
sequentially controlled by temperature sensing devices. A manually
01/21/2016
operable switch shall be connected in parallel with the automatic control
DATE: contacts. Controls shall be enclosed in a cabinet located on the side of the
OPERATIONS
transformer 60 inches or less above the base.
ASZ

01/21/2016
DATE: 3. Cooling Fans: Propeller type, with aluminum blades and TEFC motors,
CONTROL NUMBER

direct drive. Motor circuits shall be individually fused or thermally protected.


VERIFICATION

Fans shall have OSHA fan guards.


EDSD

DATE:

4. Fan Control: Thermally-operated winding temperature control devices.


BY:
APPROVAL/CERTIFICATION REQUIREMENTS,

E. Provisions for Future Forced-Air Cooling: Include the following provisions where
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

future forced-air cooling is required:


(DCC) NO. _____________________
10-01382-0008-0001

1. Top-Liquid Temperature Sensing on Liquid-Filled Transformers: Thermally


B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 71


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16322
YAA
ENGG CERT

3 of 12
operated control device with thermal element mounted in a well, and
provisions for mounting the control cabinet, the conduit, and the fans.
LSS

2. Winding Temperature Sensing on Liquid-Filled Transformers: Thermally


operated winding temperature control device with thermal element mounted
in a well, a heating coil, and provisions for mounting the control cabinet,
conduit, and fans.
ISSUED FOR IFC

3. Winding Temperature Sensing on Dry-Type Transformers: Insulated wells


DESCRIPTION

in all three coils for the future installation of sensors directly in the air ducts
of each coil to monitor coil temperature, and provisions for future mounting
of cooling fans, control cabinet, and conduit.

F. Windings: Copper or Aluminum.

2.03 DRY TYPE TRANSFORMERS

A. General: Comply with NEMA Standard ST 20, "Dry-Type Transformers for General
JO/EWO
01/21/2016 BI-01382

Applications" and ANSI/IEEE Standard C.57.12.01, "General Requirements for


Dry-Type Distribution and Power Transformers." Transformers shall have the
following features and ratings:
DATE

1. Enclosures:
NO.
REV

00

DISCIPLINE
ENGINEER a. Indoor, ventilated.
ANP
b. Outdoor, ventilated.
01/21/2016
DATE: c. Totally enclosed, nonventilated.
PROJECT
ENGINEER
LSS 2. Cooling System:
01/21/2016
DATE:
CERTIFIED
YAA
a. ANSI/IEEE Standard C57.12.01, Class AA.
b. ANSI/IEEE Standard C57.12.01, Class AA/FA.
01/21/2016
DATE: c. Equipped for future forced-air cooling; Class AA/FFA.
CONSTRUCTION
AGENCY
YAA
3. Insulation Class: 220 deg C.
01/21/2016
DATE:
OPERATIONS
4. Insulation Temperature Rise:
ASZ

01/21/2016
DATE: a. 80 deg C maximum rise above 40 deg C.
CONTROL NUMBER

b. 115 deg C maximum rise above 40 deg C.


VERIFICATION

c. 150 deg C maximum rise above 40 deg C.


EDSD

5. Basic Impulse Insulation Level:


DATE:
BY:

a. 60 kV
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

b. 75 kV.
(DCC) NO. _____________________

c. 95 kV
10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 72


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16322
YAA
ENGG CERT

4 of 12
d. 100 kV.
LSS

6. Full-Capacity Voltage Taps:

a. Four nominal 2.5 percent taps, two above and two below rated high
voltage.
b. Four nominal 2.5 percent taps, below rated high voltage.
ISSUED FOR IFC
DESCRIPTION

7. Impedance: 6.5 percent.

B. Accessories: Provide the following accessory items:

1. Surge Arresters: Low-flash-over type, factory installed and connected to


high-voltage terminals, complying with NEMA Standard LA 1.

2. Surge Arresters: Low-voltage type, factory installed and connected to low-


voltage terminals, complying with NEMA Standard LA 1.
JO/EWO
01/21/2016 BI-01382

3. High-Voltage Terminal Compartment: Full-height steel compartment where


indicated.
DATE

4. Low-Voltage Terminal Compartment: Full-height steel compartment where


indicated.
NO.
REV

00

DISCIPLINE
ENGINEER 5. High-Temperature Alarm: Sensor at transformer with local audible and
ANP
visual alarm and contacts for remote alarm.
01/21/2016
DATE:
PROJECT
ENGINEER 2.04 PAD-MOUNTED TRANSFORMERS
LSS
01/21/2016
DATE: A. General: Comply with ANSI/IEEE C57.12.22 and with the following features and
CERTIFIED
YAA ratings:
01/21/2016
DATE:
B. General: Comply with ANSI/IEEE C57.12.26 and with the following features and
CONSTRUCTION
AGENCY
YAA
ratings:
01/21/2016
DATE: 1. Insulating Liquid: Mineral oil, conforming to ASTM D-3487 "Specifications
OPERATIONS
for Mineral Insulating Oil Used in Electrical Apparatus," Type II, tested in
ASZ
accordance with ASTM D-117 "Guide to Test Methods and Specifications
01/21/2016
DATE: for Electrical Insulating Oils of Petroleum Origin."
CONTROL NUMBER
VERIFICATION

2. Insulating Liquid: High-molecular-weight, mineral-oil-based less flammable


EDSD

transformer liquid application, listed and labeled by a Nationally Recognized


DATE:

Testing Laboratory (NRTL) for installation and location of same type as


BY:

required for this project.


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

3. Insulating Liquid: Silicone insulating liquid, UL listed as a "Less


(DCC) NO. _____________________

Flammable" transformer insulating liquid. Liquid shall have the ability to


10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 73


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16322
YAA
ENGG CERT

5 of 12
extinguish small arcing and shall have a minimum fire point of 330 deg C, a
maximum convective heat release of 350 BTU/cu. ft. when tested in
LSS

accordance with ASTM standards, and a minimum dielectric strength of 35


kV.

4. Insulation Temperature Rise: 65 deg C.

5. Basic Impulse Insulation Level: 60 kV, 75 kV, 95 kV and 110 kV.


ISSUED FOR IFC
DESCRIPTION

B. Full-Capacity Voltage Taps: Four nominal 2.5 percent taps, two above and two
below rated high voltage, with externally operable tap changer for deenergized
use, with position indicator.

C. High Voltage Terminals: Arranged for radial feed, with 3-phase, 2-position, gang-
operated load-break switch, oil immersed in transformer tank, with hook-stick-
operated handle in the primary compartment.

D. High-Voltage Terminals: Arranged for loop feed with 3-phase, 4- position, gang-
JO/EWO
01/21/2016 BI-01382

operated load-break switch, oil immersed in transformer tank, with hook-stick-


operated handle in the primary compartment.
DATE

E. Primary Fuses: Current limiting type in dry-fuse holder wells, mechanically


interlocked with oil switch to prevent disconnect under load.
NO.
REV

00

DISCIPLINE
ENGINEER F. Surge Arresters: Comply with NEMA Standard LA 1, Distribution Class, supported
ANP
from tank wall within high-voltage compartment, one for each primary phase.
01/21/2016
DATE:
PROJECT
ENGINEER G. Separable Insulated Connectors: Insulated bushing, parking stand, feed-through
LSS
bushing, and dead-front elbow-type lightning arrester for each high-voltage
01/21/2016
DATE: terminal. Provide three portable insulated bushings for parking-energized load-
CERTIFIED
YAA break connectors on parking stands.
01/21/2016
DATE:
H. Secondary Feeder Breaker: Molded case type, mounted in secondary
CONSTRUCTION
AGENCY
YAA
compartment; frame, trip, and interrupting ratings as indicated; complying with UL
01/21/2016
Standard 489, "Molded Case Circuit Breakers and Circuit Breaker Enclosures."
DATE:
OPERATIONS
I. Accessories: Provide the following accessories:
ASZ

01/21/2016
DATE: 1. One-inch drain valve with sampling device.
CONTROL NUMBER
VERIFICATION

2. Dial-type thermometer.
EDSD

DATE:

3. Liquid level gage.


BY:
APPROVAL/CERTIFICATION REQUIREMENTS,

4. Pressure-vacuum gage.
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

5. Pressure relief device, self-sealing with indicator.


10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 74


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16322
YAA
ENGG CERT

6 of 12
6. Mounting provision for low-voltage current transformers and potential
transformers.
LSS

7. Busway opening in low-voltage compartment.

8. Alarm contacts for above gages.

9. KWH meter.
ISSUED FOR IFC
DESCRIPTION

10. Key interlock on HV compartment door.

2.05 LIQUID-FILLED SUBSTATION TRANSFORMERS

A. General: Conform to ANSI/IEEE Standard C57.12.00, "General Requirements For


Liquid-Immersed, Distribution, Power, and Regulating Transformers" and
C57.12.13, "Conformance Requirements for Liquid Filled Transformers Used in
Unit Installation Including Unit Substations" and the following requirements:
JO/EWO
01/21/2016 BI-01382

1. Insulating Liquid: Mineral oil conforming to ASTM D-3487 "Specifications


for Mineral Insulating Oil Used in Electrical Apparatus," Type II, tested in
accordance with ASTM D-117 "Guide to Test Methods and Specifications
DATE

for Electrical Insulating Oils of Petroleum Origin."


NO.
REV

00

2. Insulating Liquid: High-molecular-weight, mineral-oil-based, less flammable


DISCIPLINE
ENGINEER transformer liquid application, UL listed and labeled for installation and
ANP
location of same type as required for this project.
01/21/2016
DATE:
PROJECT
ENGINEER 3. Insulating Liquid: Silicone insulating liquid, UL listed as a "Less
LSS
Flammable" transformer insulating liquid. Liquid shall have the ability to
01/21/2016
DATE: extinguish small arcing and shall have a minimum fire point of 330 deg C, a
CERTIFIED
YAA maximum convective heat release of 350 BTU/cu. ft. when tested in
01/21/2016
accordance with ASTM standards, and a minimum dielectric strength of 35
DATE:
kV.
CONSTRUCTION
AGENCY
YAA

01/21/2016
4. Insulation Temperature Rise: 65 deg C.
DATE:
OPERATIONS
5. Basic Impulse Insulation Level: 60 kV, 75 kV, 95 kV and 110 kV.
ASZ

01/21/2016
DATE: B. Full-Capacity Voltage Taps: Four nominal 2.5 percent taps, two above and two
CONTROL NUMBER

below rated high voltage, with externally operable tap changer for deenergized use
VERIFICATION

and with position indicator and padlock hasp.


EDSD

DATE:

C. Cooling System:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,

1. ANSI/IEEE Standard C57.12.00, Class OA.


THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

2. ANSI/IEEE Standard C57.12.00, Class 0A/FA.


10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 75


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16322
YAA
ENGG CERT

7 of 12
3. Equipped for future forced-air cooling; Class OA/FFA.
LSS

D. Bushing Mounting Arrangement:

1. Top-mounted high-voltage bushings.

2. High- and low-voltage bushings mounted on opposite sides of transformer.


ISSUED FOR IFC
DESCRIPTION

E. Impedance: 6.5 percent.

F. Accessories: The following accessory items are required:

1. Lightning Arresters: Distribution type, factory installed, and connected to


high-voltage terminals, with rating as indicated.

2. Surge Arresters: Low-voltage type, complying with NEMA Standard LA 1,


factory installed and connected to low-voltage terminals.
JO/EWO
01/21/2016 BI-01382

3. High-Voltage Terminal Compartment: Full-height steel compartment for


side-mounted bushings.
DATE

4. Low-Voltage Terminal Compartment: Full-height steel compartment where


indicated.
NO.
REV

00

DISCIPLINE
ENGINEER 5. Drain Valve: 1-inch drain valve with sampling device.
ANP
01/21/2016
DATE: 6. Dial-type thermometer.
PROJECT
ENGINEER
LSS
7. Liquid level gage.
01/21/2016
DATE:
CERTIFIED
YAA 8. Pressure-vacuum gage.
01/21/2016
DATE:
9. Pressure relief device: Self-sealing, with indicator.
CONSTRUCTION
AGENCY
YAA

01/21/2016
10. Low-voltage busway connection.
DATE:
OPERATIONS
11. Alarm contacts for above gages.
ASZ

01/21/2016
DATE: 12. Grounding and bonding components complying with UL Standard 467,
CONTROL NUMBER

"Grounding and Bonding Equipment."


VERIFICATION
EDSD

PART 3 - EXECUTION
DATE:
BY:

3.01 INSTALLATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

A. General: Install transformers and accessories in accordance with manufacturer's


(DCC) NO. _____________________

written installation instructions.


10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 76


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16322
YAA
ENGG CERT

8 of 12
B. Identify transformers in accordance with Division 16 Section "Electrical
Identification."
LSS

C. Tighten electrical connectors and terminals in accordance with manufacturer's


published torque-tightening values. Where manufacturer's torque valves are not
indicated, use those specified in UL 486A and UL 486B.

3.02 EQUIPMENT BASES


ISSUED FOR IFC
DESCRIPTION

A. Construct concrete equipment pads as follows:

1. Coordinate size of equipment bases with actual unit sizes provided.


Construct base 4 inches larger in both directions than the overall
dimensions of the supported unit.

2. Form concrete pads with steel channels conforming to ASTM A 36, size
and location as indicated. Miter and weld corner and provide cross bracing.
Anchor or key to floor slab.
JO/EWO
01/21/2016 BI-01382

3. Form concrete pads with framing lumber with form release compounds.
Chamfer top edge and corners of pad.
DATE

4. Install reinforcing bars, tied to frame, and place anchor bolts and sleeves to
NO.
REV

00

facilitate securing units.


DISCIPLINE
ENGINEER
ANP
5. Place concrete and allow to cure before installation of units. Use Portland
01/21/2016
DATE: Cement conforming to ASTM C 150, 4,000 psi compressive strength, and
PROJECT
ENGINEER normal weight aggregate.
LSS
01/21/2016
DATE: 6. Clean exposed steel form in accordance with SSPC Surface Preparation
CERTIFIED
YAA Specifications SP 2 or SP 3 and apply two coats of rust-preventative metal
01/21/2016
primer.
DATE:
CONSTRUCTION
AGENCY
YAA
3.03 GROUNDING
01/21/2016
DATE: A. Ground transformers and tighten connections to comply with tightening torques
OPERATIONS
specified in UL Standard 486A.
ASZ

01/21/2016
DATE: B. Ground substation type transformers to ground bus to provide a maximum of 10-
CONTROL NUMBER

ohm ground resistance at transformer location.


VERIFICATION
EDSD

C. Use exothermic welded grounding connections for wire-to-wire and wire-to-rod


DATE:

grounding connections. Make exothermic welds in accordance with the


BY:

manufacturer's written recommendations. Welds that puff up or show convex


APPROVAL/CERTIFICATION REQUIREMENTS,

surfaces are not acceptable. No mechanical connectors are required at exothermic


THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

weldments.
(DCC) NO. _____________________
10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 77


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16322
YAA
ENGG CERT

9 of 12
3.04 FIELD QUALITY CONTROL
LSS

A. Manufacturer's Field Services: Arrange and pay for the services of a factory-
authorized service representative to supervise the field assembly and connection of
components and the pretesting and adjustment of transformer, components, and
accessories.

B. Pretesting: Upon completing installation of the system, perform the following


ISSUED FOR IFC
DESCRIPTION

preparations for tests:

1. Make insulation resistance tests for transformers.

2. Make continuity test for windings and remote alarm circuits.

3. Furnish a set of Contract Drawings to test organization.

4. Provide manufacturer's installation and testing instructions to test


organization.
JO/EWO
01/21/2016 BI-01382

C. Tests: Conform to InterNational Electrical Testing Association (INETA) Standard


ATS, "Acceptance Testing Specifications for Electrical Power Distribution
DATE

Equipment and Systems," ANSI/IEEE standard C57.90 and the following:


NO.
REV

00

1. Independent Testing Organization: Arrange and pay for the services of an


DISCIPLINE
ENGINEER independent electrical testing organization in accordance with the
ANP
requirements of Division 1 Section "Quality Control Services" to perform
01/21/2016
DATE: tests on medium-voltage transformer installation.
PROJECT
ENGINEER
LSS
2. Test Objectives: To assure transformer installation is operational within
01/21/2016
DATE: industry and manufacturer's tolerances, is installed in accordance with
CERTIFIED
YAA Contract Documents, and is suitable for energizing.
01/21/2016
DATE:
3. Procedures: Upon satisfactory completion of tests, attach a label to tested
CONSTRUCTION
AGENCY
YAA
components.
01/21/2016
DATE: 4. Schedule tests and notify Architect at least one week in advance of
OPERATIONS
schedule and of test commencement.
ASZ

01/21/2016
DATE: 5. Reports: The testing organization shall maintain a written report of
CONTROL NUMBER

observations and tests. Report defective materials and workmanship and


VERIFICATION

retest corrected defective items.


EDSD

DATE:

6. Testing organization shall submit written test reports to the Architect and
BY:

Contractor.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

7. Testing shall include a turns ratio test at each tap setting, winding
(DCC) NO. _____________________

resistance tests, and individual excitation current test on each phase. In


10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 78


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16322
YAA
ENGG CERT

10 of 12
addition, for liquid-filled transformers, insulating liquid shall be sampled and
tested.
LSS

D. Test Failures: Correct deficiencies identified by tests and make ready for retest.
Verify that the total system meets the specified requirements.

3.05 ADJUSTING AND CLEANING


ISSUED FOR IFC
DESCRIPTION

A. Upon completion of installation, inspect interiors and exteriors of accessible


components. Remove paint splatters and other spots, dirt, and construction debris.
Touch up scratches and mars of finish to match original finish.

B. Adjust transformer taps to provide optimum voltage conditions at utilization


equipment.

3.06 PROTECTION

A. Provide final protection and maintain conditions in a manner that ensures


JO/EWO
01/21/2016 BI-01382

protection of transformers from damage or deterioration until Substantial


Completion.
DATE

3.07 DEMONSTRATION
NO.
REV

00

A. Training: Arrange and pay for the services of a factory- authorized service
DISCIPLINE
ENGINEER representatives to demonstrate transformers and accessories and training of
ANP
Owner's staff.
01/21/2016
DATE:
PROJECT
ENGINEER B. Training: Train Owner's staff in operation and maintenance for at least one day.
LSS
Include both classroom training and hands-on equipment operation and
01/21/2016
DATE: maintenance procedures. Training shall include:
CERTIFIED
YAA

01/21/2016
1. Safety precautions.
DATE:
CONSTRUCTION
AGENCY
YAA
2. Features and construction of project transformers and accessories.
01/21/2016
DATE: 3. Routine inspection and test procedures.
OPERATIONS
ASZ
4. Routine cleaning.
01/21/2016
DATE:
CONTROL NUMBER

5. Features and operation and maintenance of integral disconnect and


VERIFICATION

protective devices.
EDSD

DATE:

6. Interpretation of readings of indicating and alarm devices.


BY:
APPROVAL/CERTIFICATION REQUIREMENTS,

7. Fuse selection.
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

8. Protective relay setting considerations.


10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 79


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16322
YAA
ENGG CERT

11 of 12
9. Features, operation, and maintenance of separable insulated connector
system.
LSS

10. Tap changing procedures.

C. Schedule training with Owner and Architect with at least seven days' advance
notice.
ISSUED FOR IFC
DESCRIPTION

END OF SECTION
JO/EWO
01/21/2016 BI-01382
NO. DATE
REV

00

DISCIPLINE
ENGINEER
ANP
01/21/2016
DATE:
PROJECT
ENGINEER
LSS
01/21/2016
DATE:
CERTIFIED
YAA

01/21/2016
DATE:
CONSTRUCTION
AGENCY
YAA

01/21/2016
DATE:
OPERATIONS
ASZ

01/21/2016
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________
10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 80


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16322
YAA
ENGG CERT

12 of 12
DIVISION 16 - ELECTRICAL
LSS

SECTION 16452 - GROUNDING

PART 1 - GENERAL

1.01 DESCRIPTION OF WORK


ISSUED FOR IFC
DESCRIPTION

A. This Section includes solid grounding of electrical systems and equipment in


facilities, which may include, but not limited to:

1. Control buildings.
2. Outdoor Industrial Areas and Process Plant Areas.

B. Communications System grounding shall be in accordance with the SAES-T series


Standards.

C. Grounding of Process control instrumentation and process control systems shall be


JO/EWO
01/21/2016 BI-01382

in accordance with SAES-J-902 “Electrical system for Instrumentation.


DATE

1.02 QUALITY ASSURANCE

A. Applicable Codes and Standards: Comply with all applicable Codes and
NO.
REV

00

Standards including but not limited to, those listed below:


DISCIPLINE
ENGINEER
ANP
01/21/2016
SBC 401 Saudi Building Code – Volume 4
DATE: NFPA 70 National Electrical Code (NEC)
PROJECT
ENGINEER SAES-P-104 Wiring Methods and Materials
LSS
SAES-P-111 Grounding
01/21/2016
DATE: UL Underwriters Laboratories
CERTIFIED
YAA UL 467 Grounding and Bonding Equipment
01/21/2016
DATE:
CONSTRUCTION
B. Listing and Labeling: Provide products specified in this Section that are listed and
AGENCY
YAA
labeled. The terms "listed" and "labeled" shall be defined as they are in the NEC,
01/21/2016
Article 100.
DATE:
OPERATIONS
ASZ
C. Electrical Component Standard: Components and installation shall comply with
01/21/2016
SBC 401 and the NEC, with the SBC 401 requirements prevailing over the NEC
DATE: rovisios, in addition to the requirements specified herein.
CONTROL NUMBER
VERIFICATION

D. Field-Testing Organization Qualifications: To qualify for acceptance, the


EDSD

independent testing organization must demonstrate, based on evaluation of


DATE:

organization-submitted criteria conforming to ASTM E 699, that it has the


BY:

experience and capability to conduct satisfactorily the testing indicated.


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________
10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 81


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16452
YAA
ENGG CERT

1 of 8
1.03 SUBMITTALS
LSS

A. General: Submit the following in accordance with Conditions of Contract and


Division 1 Specification Sections.

B. Product data for ground rods, connectors and connection materials, and grounding
fittings.
ISSUED FOR IFC
DESCRIPTION

C. Field-testing organization certificate, signed by the Contractor, certifying that the


organization performing field tests complies with the requirements specified in
Quality Assurance above.

D. Report of field tests and observations certified by the testing organization.

PART 2 - PRODUCTS

2.01 MANUFACTURERS
JO/EWO
01/21/2016 BI-01382

Available Manufacturers: Subject to compliance with requirements, manufacturers


offering products that may be incorporated in the Work include, but are not limited to,
the following:
DATE

A.B. Chance Co.


NO.
REV

00

Erico Products, Inc.


DISCIPLINE
ENGINEER GB Electrical, Inc.
ANP
General Machine Products Co., Inc.
01/21/2016
DATE: Kearney-National.
PROJECT
ENGINEER O-Z/Gedney Co.
LSS
Raco, Inc.
01/21/2016
DATE: Thomas & Betts Corp.
CERTIFIED
YAA Thermoweld Products
01/21/2016
Other Approved Manufacturers
DATE:
CONSTRUCTION
AGENCY 2.02 GROUNDING AND BONDING PRODUCTS
YAA

01/21/2016
DATE: Products: Of types indicated and of sizes and ratings to comply with SBC 401 and the
OPERATIONS
NEC. Where types, sizes, ratings, and quantities indicated are in excess of NEC
ASZ
requirements, the more stringent requirements and the greater size, rating, and quantity
01/21/2016
DATE: indications govern.
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________
10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 82


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16452
YAA
ENGG CERT

2 of 8
2.03 WIRE AND CABLE CONDUCTORS
LSS

Comply with SAES-P-111 and as indicated below:

A. Conductor Materials:

1. Conductors shall be soft drawn copper and shall conform to the following
applicable standards:
ISSUED FOR IFC
DESCRIPTION

a. Solid Conductors: ASTM B-3.


b. Assembly of Stranded Conductors: ASTM B-8.
c. Tinned Conductors: ASTM B-33.

2. Conductors larger than 35mm square (#2 AWG) shall be stranded.

B. Conductors shall be insulated and PVC-jacketed with green or green with yellow
stripes, unless indicated otherwise.
JO/EWO
01/21/2016 BI-01382

2.04 CONNECTOR PRODUCTS

A. General: UL-listed and labeled as grounding connectors for the materials used.
DATE

B. Pressure Connectors: High-conductivity-plated units.


NO.
REV

00

DISCIPLINE
ENGINEER C. Bolted Clamps: Heavy-duty units listed for the application.
ANP
01/21/2016
DATE: D. Exothermic Welded Connections: Provided in kit form and selected for the specific
PROJECT
ENGINEER types, sizes, and combinations of conductors and other items to be connected.
LSS
01/21/2016
DATE: 2.05 GROUNDING ELECTRODES
CERTIFIED
YAA
A. Ground Rods: Comply with the following:
01/21/2016
DATE:
CONSTRUCTION
AGENCY 1. Shall be copper, copper-jacketed steel (“Copperweld” or equivalent) or
YAA
galvanized steel. Copper-clad or jacketed steel rod shall be steel with high-
01/21/2016
DATE: strength steel core and electrolytic-grade copper outer sheath, molten
OPERATIONS
welded to core and shall meet the requirements of UL467.
ASZ

DATE:
01/21/2016
2. Minimum Size:
CONTROL NUMBER
VERIFICATION

a. Copper or copper-clad: 16mm (5/8 inch) diameter by 2.44m (8 ft)


EDSD

long.
b. Galvanized steel: 19mm (3/4inch) diameter by 2.44m (8 ft) long.
DATE:
BY:

B. Reinforcing steel bar of building shall not be used as a grounding electrode.


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Structural steel of a building may be used as a grounding electrode in accordance


with the NEC provided it is continuous and effectively grounded by connecting at
(DCC) NO. _____________________
10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 83


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16452
YAA
ENGG CERT

3 of 8
least every other structural steel column on the perimeter of the building to a
LSS

concrete-encased electrode or a ground ring installed per the NEC and SAES-P-
111. If a concrete-encased electrode is used, the conductor must be bare copper.

C. Grid or Loop Conductors: Insulated copper conductors.

PART 3 - EXECUTION
ISSUED FOR IFC
DESCRIPTION

3.01 APPLICATION

A. Equipment Grounding Conductor for Feeder and Branch Circuits: Install separate
insulated equipment grounding conductors with circuit conductors as indicated.

Comply with SBC 401 for sizes and quantities of equipment grounding conductors,
except where larger sizes or more conductors are indicated.

1. Conduit, cable tray, shall not be relied on as the equipment grounding


conductor. A bare or insulated copper conductor shall be installed in the
JO/EWO
01/21/2016 BI-01382

same conduit, cable tray, cable, or cord or shall otherwise accompany the
power conductors.
DATE

2. In accordance with the NEC, an equipment grounding conductor is not


required between the neutral point of a transformer and a service
NO.
REV

00

disconnecting means. The grounded circuit conductor (neutral) required by


DISCIPLINE
ENGINEER the NEC is sufficient.
ANP
01/21/2016
DATE: 3. Aluminum cable trays containing only circuits operated at, or below, 50V to
PROJECT
ENGINEER ground may be used as equipment grounding conductors provided the NEC
LSS requirements for such use are met. On other aluminum cable trays, a
01/21/2016
DATE: common equipment grounding conductor external to the cables in the tray
CERTIFIED
YAA
may be used under the following conditions:
01/21/2016
DATE: a. This common conductor shall be sized in accordance with NEC
CONSTRUCTION
AGENCY Table 250-95 for the largest power conductor in the tray, with a
YAA
minimum size of 16mm square (#6 AWG).
01/21/2016
DATE: b. Connections shall be made between this common grounding
OPERATIONS
conductor and other grounding conductors for intersecting or branch
ASZ
trays, and to extend the equipment grounding conductor beyond the
01/21/2016
DATE: tray.
CONTROL NUMBER

c. This common conductor (or the largest individual grounding


VERIFICATION

conductor, if more than one are installed) shall be bonded to each


EDSD

section of the cable tray system with a connector approved for a


copper to aluminum connection.
DATE:
BY:

B. Supplementary Grounding: In addition to the equipment grounding conductors run


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

with the power conductors as required by the NEC, supplementary grounding per
NEC 250-91 as required by SAES-P-111 shall be provided in outdoor plant areas,
(DCC) NO. _____________________
10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 84


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16452
YAA
ENGG CERT

4 of 8
process plant areas and in substations. Refer to SAES-P-111 Paragraph 7.2 for
the requirements.
LSS

The following equipment shall be connected to the supplementary grounding


electrodes:

1. Structural steel supports for process equipment and piping and structural
steel columns for buildings.
ISSUED FOR IFC
DESCRIPTION

2. Frames of equipment (motors, generators and transformers) operating at


480V or greater.

3. When not bolted to grounded structural steel: metallic enclosures for


panelboards, circuit breakers, switches, fuses, motor controllers,
switchgear, switchracks, motor control centers, and motors and
transformers not covered above.

C. Underground Conductors for Ground Grid:


JO/EWO
01/21/2016 BI-01382

1. Buried conductors used for grids and/or interconnection of ground rods


shall be 120mm square (4/0 AWG) minimum. Burial depth shall be 460mm
DATE

minimum.
NO.
REV

00

2. Grounding connections to grounding grids or grounding electrodes shall be


DISCIPLINE
ENGINEER 70mm square (2/0 AWG) or 25mm square (#4 AWG) minimum as indicated
ANP
in plan.
01/21/2016
DATE:
PROJECT
ENGINEER 3. Grounding conductors extending through concrete or asphalt shall be run in
LSS PVC conduit (preferred) or PVC coated rigid steel conduit.
01/21/2016
DATE:
CERTIFIED D. In areas of severe corrosion (as defined in SAES-P-104), exposed ground system
YAA

01/21/2016
conductors shall be insulated or covered.
DATE:
CONSTRUCTION
AGENCY E. Grounding conductors which do not accompany associated power conductors in
YAA
the same conduit shall not be installed in metallic conduit except where PVC is not
01/21/2016
DATE: suitable and it is necessary to protect the conductor against mechanical damage.
OPERATIONS
Grounding conductors installed in metallic conduit and which do not accompany
ASZ
associated power conductors shall be bonded to both ends of the conduit.
01/21/2016
DATE:
CONTROL NUMBER

F. Signal and Communications: Unless required otherwise by other Standards,


VERIFICATION

telephone, alarm, and communication systems, shall be provided with a 25 mm


EDSD

square (#4 AWG) minimum green insulated copper conductor in raceway from the
grounding electrode system to each terminal cabinet or central equipment location.
DATE:
BY:

3.02 INSTALLATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

A. General: Ground electrical systems and equipment in accordance with SBC 401,
(DCC) NO. _____________________
10-01382-0008-0001

NEC and SAES-P-111 requirements.

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 85


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16452
YAA
ENGG CERT

5 of 8
B. Electrical Room Ground Bus: Size, location, and arrangement as indicated. Space
1 inch from wall and support from wall 6 inches above finished floor, except as
LSS

otherwise indicated.

C. Ground Rods: Locate a minimum of one-rod length from each other and buried at
least 460mm below grade. Connect ground conductors to ground rods by means
of exothermic welds, brazing, or approved compression grounding connectors
(Burndy “Hyground” system or equivalent). Make these connections without
ISSUED FOR IFC
DESCRIPTION

damaging the copper coating or exposing the steel. Drive rods until tops are
150mm (6 inches) below finished floor or final grade except as otherwise indicated.

D. Braided-Type Bonding Jumpers: Use for flexible bonding and grounding


connections.

E. Route grounding conductors along the shortest and straightest paths possible
without obstructing access or placing conductors where they may be subjected to
strain, impact, or damage, except as indicated.
JO/EWO
01/21/2016 BI-01382

F. Test Wells/Ground Test Stations: Locate as indicated, and fabricate in accordance


with details indicated.
DATE

G. Ground the shields and armor of power cable at both ends. Maintain continuity of
splice by bonding across the splice. On long runs of single core cables where
NO.
REV

00

circulating currents are a problem, ground one end of the cable shield. Install a
DISCIPLINE
ENGINEER cable protection device on the open end.
ANP
01/21/2016
DATE: H. Ground metallic raceway conduit at both end points. Grounding with locknuts
PROJECT
ENGINEER alone is not acceptable. Conduit grounding may be accomplished by:
LSS
01/21/2016
DATE: 1. Externally installing approved grounding clamps and conductors. For PVC-
CERTIFIED
YAA
coated conduits, do not scrape the coating to install grounding clamps. Use
other methods explained below.
01/21/2016
DATE:
CONSTRUCTION
AGENCY 2. Using grounded enclosures having integral threaded bushings or using a
YAA
conduit hub (such as Myers hub) which is approved for grounding
01/21/2016
DATE: purposes.
OPERATIONS
ASZ
3. Using an approved grounding bushing.
01/21/2016
DATE:
I Bond metallic cable trays at both end points and a minimum of every 25 meters to
CONTROL NUMBER
VERIFICATION

the local ground grid or ground electrode or to structural steel which is bonded to
EDSD

the local ground grid or ground electrode.


DATE:
BY:

J. Ground busses of motor control centers shall have two connections to the main
ground electrode.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

K. Raised computer floors shall be grounded by bonding a minimum of two pedestals


(DCC) NO. _____________________
10-01382-0008-0001

at opposite corners to the nearest grounding electrode.

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 86


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16452
YAA
ENGG CERT

6 of 8
3.03 CONNECTIONS
LSS

A. General: Make connections in such a manner as to minimize possibility of galvanic


action or electrolysis. Select connectors, connection hardware, conductors, and
connection methods so metals in direct contact will be galvanically compatible.

B. Make connections with clean bare metal at points of contact.


ISSUED FOR IFC
DESCRIPTION

C. Exothermic Welded Connections: Use for connections to structural steel and for
underground connections to ground rods except those at ground test stations.
Comply with manufacturer's written recommendations. Welds that are puffed up or
that show convex surfaces indicating improper cleaning are not acceptable.

D. Terminate insulated equipment grounding conductors for feeders and branch


circuits with pressure-type grounding lugs. Where metallic raceways terminate at
metallic housings without mechanical and electrical connection to the housing,
terminate each conduit with a grounding bushing. Connect grounding bushings
with a bare grounding conductor to the ground bus in the housing. Bond
JO/EWO
01/21/2016 BI-01382

electrically non-continuous conduits at both entrances and exits with grounding


bushings and bare grounding conductors.
DATE

E. Tighten grounding and bonding connectors and terminals, including screws and
bolts, in accordance with manufacturer's published torque tightening values for
NO.
REV

00

connectors and bolts. Where manufacturer's torquing requirements are not


DISCIPLINE
ENGINEER indicated, tighten connections to comply with torque tightening values specified in
ANP
UL 486A and UL 486B.
01/21/2016
DATE:
PROJECT
ENGINEER F. Connections at Ground Test Stations: Use compression-type connectors on
LSS conductors and make bolted- and clamped-type connections between conductors
01/21/2016
DATE: and ground rods.
CERTIFIED
YAA

01/21/2016
G. Compression-Type Connections: Use hydraulic compression tools to provide the
DATE: correct circumferential pressure for compression connectors. Use tools and dies
CONSTRUCTION
AGENCY recommended by the manufacturer of the connectors. Provide embossing die
YAA
code or other standard method to make a visible indication that a connector has
01/21/2016
DATE: been adequately compressed on the ground conductor.
OPERATIONS
ASZ
H. Moisture Protection: Where insulated ground conductors are connected to ground
01/21/2016
DATE: rods or ground buses, insulate the entire area of the connection and seal against
CONTROL NUMBER

moisture penetration of the insulation and cable.


VERIFICATION

3.04 FIELD QUALITY CONTROL


EDSD

A. Independent Testing Organization: Arrange and pay for the services of a qualified
DATE:
BY:

independent electrical testing organization to perform tests described below.


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

B. Tests: Subject the completed grounding system to a megger test at each location
(DCC) NO. _____________________
10-01382-0008-0001

SECTION 16452
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 87


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

7 of 8
YAA
ENGG CERT

where a maximum ground resistance level is specified, at service disconnect


LSS

enclosure ground terminal, and at ground test stations. Measure ground resistance
without the soil being moistened by any means other than natural precipitation or
natural drainage or seepage and without chemical treatment or other artificial
means of reducing natural ground resistance. Perform tests by the 2- point method
in accordance with Section 9.03 of IEEE 81, "Guide for Measuring Earth
Resistivity, Ground Impedance and Earth Surface Potentials of a Grounding
System."
ISSUED FOR IFC
DESCRIPTION

C. Ground/resistance maximum values shall be as follows:

Equipment rated 500 kVA and less: 10 Ohms


Pad-mounted equipment: 5 Ohms

D. Deficiencies: Where ground resistances exceed specified values, and if directed,


modify the grounding system to reduce resistance values. Where measures are
directed that exceed those indicated the provisions of the Contract, covering
changes will apply.
JO/EWO
01/21/2016 BI-01382

E. Report: Prepare test reports, certified by the testing organization, of the ground
DATE

resistance at each test location. Include observations of weather and other


phenomena that may affect test results. Describe measures taken to improve test
results.
NO.
REV

00

DISCIPLINE
ENGINEER 3.05 CLEANING AND ADJUSTING
ANP
01/21/2016
DATE: A. Restore surface features at areas disturbed by excavation and re-establish original
PROJECT
ENGINEER grades except as otherwise indicated.
LSS
01/21/2016
DATE: B. Where sod has been removed, replace it as soon as possible after backfilling is
CERTIFIED
YAA completed. Restore areas disturbed by trenching, storing of dirt, cable laying, and
01/21/2016 other Work to their original condition.
DATE:
CONSTRUCTION
AGENCY
YAA
C. Include necessary topsoiling, fertilizing, liming, seeding, sodding, sprigging, or
01/21/2016
mulching. Restore disturbed paving as indicated.
DATE:
OPERATIONS
ASZ

01/21/2016
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:

END OF SECTION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________
10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 88


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16452
YAA
ENGG CERT

8 of 8
DIVISION 16 - ELECTRICAL
LSS

SECTION 16470 –PANEL BOARDS

PART 1 - GENERAL

1.01 DESCRIPTION OF WORK


ISSUED FOR IFC
DESCRIPTION

A. This Section includes lighting and power circuit breaker type panelboards and
associated auxiliary equipment rated 600V or less.

1.02 QUALITY ASSURANCE

A. Applicable Codes and Standards: Conform to the Codes and Standards listed, but
not limited to:

1. Provide products that are listed and labeled by UL, NEMA, or other
internationally recognized testing laboratory.
JO/EWO
01/21/2016 BI-01382

2. Electrical Component Standard: Components and installation which shall


DATE

comply with SBC 401 (Saudi Building Code Volume 4) and ANSI/NFPA 70
"National Electrical Code," with the SBC 401 requirements prevailing over
the NFPA 70 provisions.
NO.
REV

00

DISCIPLINE
ENGINEER 3. NEMA Standard: Comply with NEMA PB1, “Panelboards.”
ANP
01/21/2016
DATE:
4. UL Standards: Comply with UL 61, “Panelboards,” and UL 50, “Cabinets
PROJECT
ENGINEER and Boxes.”
LSS
01/21/2016
DATE: 1.03 SUBMITTALS
CERTIFIED
YAA

01/21/2016 A. General: Submit the following in accordance with Conditions of Contract and
DATE:
CONSTRUCTION
Division 1 Specification Sections.
AGENCY
YAA

01/21/2016
1. Product data for each type panelboard, accessory item, and component
DATE:
specified.
OPERATIONS
ASZ

01/21/2016
2. Shop drawings from manufacturers of panelboards including dimensioned
DATE: plans, sections, and elevations. Show tabulations of installed devices,
CONTROL NUMBER

major features, and voltage rating. Include the following:


VERIFICATION
EDSD

a. Enclosure type with details for types other than NEMA Type 1.
DATE:

b. Bus configuration and current ratings.


BY:

c. Short-circuit current rating of panelboard.


APPROVAL/CERTIFICATION REQUIREMENTS,

d. Features, characteristics, ratings, and factory settings of individual


THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

protective devices and auxiliary components.


(DCC) NO. _____________________
10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 89


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16470
YAA
ENGG CERT

1 of 7
4. Qualification data for field-testing organization certificates, signed by the
Contractor, certifying that the organization complies with the requirements
LSS

specified in Quality Assurance below. Include list of completed projects


with project names, addresses, and names of Architect and Owner plus
basic organization qualifications data.

5. Report of field tests and observations certified by the testing organization.


ISSUED FOR IFC

6. Panel schedules for installation in panelboards. Submit final versions after


DESCRIPTION

load balancing.

7. Maintenance data for panelboard components, for inclusion in Operating


and Maintenance Manual specified in Division 1 and in Division 16 Section
"Basic Electrical Requirements." Include instructions for testing circuit
breakers.

1.04 EXTRA MATERIALS


JO/EWO
01/21/2016 BI-01382

A. Keys: Furnish six spares of each type for panelboard cabinet locks.

B. Touch-up Paint for surface-mounted panelboards: One half-pint container.


DATE

PART 2 - PRODUCTS
NO.
REV

00

DISCIPLINE 2.01 MANUFACTURERS


ENGINEER
ANP

DATE:
01/21/2016 A. Available Manufacturers: Subject to compliance with requirements, manufacturers
PROJECT offering products that may be incorporated in the Work include, but are not limited
ENGINEER
LSS
to, the following:
01/21/2016
DATE:
CERTIFIED B. Manufacturers: Subject to compliance with requirements, provide products by the
YAA following:
01/21/2016
DATE:
CONSTRUCTION 1. ABB Power Distribution, Inc.
AGENCY
YAA 2. Asco Electrical Products Co., Inc.
01/21/2016 3. Challenger Electrical Equipment Corp. Crouse-Hinds Distribution
DATE:
OPERATIONS
Equipment.
ASZ 4. General Electric Co.
01/21/2016 5. Square D Co.
DATE:
6. Westinghouse Electric Corp.
CONTROL NUMBER
VERIFICATION

2.02 PANELBOARDS, GENERAL REQUIREMENTS


EDSD

DATE:

A. Overcurrent Protective Devices (OCPDs): Provide type, rating, and features as


BY:

indicated. Comply with Division 16 Section "Overcurrent Protective Devices," with


APPROVAL/CERTIFICATION REQUIREMENTS,

OCPDs adapted to panelboard installation. Tandem circuit breakers shall not be


THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

used. Multiple breakers shall have common trip.


(DCC) NO. _____________________
10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 90


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16470
YAA
ENGG CERT

2 of 7
B. Enclosures: Cabinets, flush or surface mounted as indicted. NEMA Type 1
enclosure, except where the following enclosure requirements are indicated.
LSS

1. NEMA 7: Hazardous Locations: Div.1 Group c & D.

C. Front: Secured to box with concealed trim clamps except as indicated. Front for
surface-mounted panels shall be same dimensions as box. Fronts for flush panels
shall overlap box except as otherwise specified.
ISSUED FOR IFC
DESCRIPTION

D. Directory Frame: Metal, mounted inside each panel door.

E. Bus: Hard drawn copper of 98 percent conductivity.

F. Main and Neutral Lugs: Compression type.

G. Equipment Ground Bus: Adequate for feeder and branch-circuit equipment ground
conductors. Bonded to box.
JO/EWO
01/21/2016 BI-01382

H. Service Equipment Approval: Listed for use as service equipment for panelboards
having main service disconnect.
DATE

I. Provision for Future Devices: Equip with mounting brackets, bus connections, and
necessary appurtenances, for the OCPD ampere ratings indicated for future
NO.
REV

00

installation of devices.
DISCIPLINE
ENGINEER
ANP
J. Special Features: Provide the following features for panelboards as indicated.
01/21/2016
DATE:
PROJECT
ENGINEER 1. Isolated Equipment Ground Bus: Adequate for branch-circuit equipment
LSS ground conductors; insulated from box.
01/21/2016
DATE:
CERTIFIED 2. Hinged Front Cover: Entire front trim hinged to box with standard door
YAA

01/21/2016
within hinged trim cover.
DATE:
CONSTRUCTION
AGENCY 3. Skirt For Surface-Mounted Panels: Same gage and finish as panel front
YAA
with flanges for attachment to panel, wall, and floor.
01/21/2016
DATE:
OPERATIONS
4. Extra Gutter Space: Dimensions and arrangement as indicated.
ASZ

01/21/2016
DATE: 5. Gutter Barrier: Arranged to isolate section of gutter as indicated.
CONTROL NUMBER
VERIFICATION

6. Column-Type Panelboard Configuration: Narrow cabinet extended as wire


EDSD

way to overhead junction box equipped with ground and neutral terminal
buses.
DATE:
BY:

7. Subfeed: OCPD or lug provision as indicated.


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

K. Feed-Through Lugs: Sized to accommodate feeders indicated.


10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 91


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16470
YAA
ENGG CERT

3 of 7
2.03 LIGHTING AND APPLIANCE BRANCH CIRCUIT PANELBOARDS
LSS

A. Doors: In panel front, with concealed hinges. Secure with flush catch and tumbler
lock, all keyed alike.

2.04 DISTRIBUTION PANELBOARDS

A. Doors: In panel front, omit single panelboard door in cabinet front for fusible switch
ISSUED FOR IFC

panelboards except as indicated. Secure with vault-type with tumbler lock, all keyed
DESCRIPTION

alike.

B. Branch-Circuit Breakers: Where OCPDs are indicated to be circuit breakers, use bolt-
on breakers except circuit breakers 225-ampere frame size and greater may be plug-in
type where individual positive locking device requires mechanical release for removal.

2.05 IDENTIFICATION

A. General: Refer to Division 16 Section "Electrical Identification" for labeling


JO/EWO
01/21/2016 BI-01382

materials.

B. Panelboard Nameplates: Engraved laminated plastic or metal nameplate for each


DATE

panelboard mounted with epoxy or industrial cement or industrial adhesive.


NO.
REV

00

PART 3 - EXECUTION
DISCIPLINE
ENGINEER
ANP
3.01 INSTALLATION
01/21/2016
DATE:
PROJECT
ENGINEER A. General: Install panelboards and accessory items in accordance with NEMA PB
LSS 1.1, "General Instructions for Proper Installation, Operation and Maintenance of
01/21/2016
DATE: Panelboards Rated 600 Volts or Less" and manufacturers' written installation
CERTIFIED
YAA
instructions.
01/21/2016
DATE: B. Ground Fault Protection: Install panelboard ground fault circuit interrupter devices
CONSTRUCTION
AGENCY in accordance with installation guidelines of NEMA 289, "Application Guide for
YAA
Ground Fault Circuit Interrupters."
01/21/2016
DATE:
OPERATIONS
C. Mounting Heights: Top of trim 6'-2" above finished floor, except as indicated.
ASZ

01/21/2016
DATE: D. Mounting: Plumb and rigid without distortion of box. Mount flush panels uniformly
CONTROL NUMBER

flush with wall finish.


VERIFICATION
EDSD

E. Circuit Directory: Typed and reflective of final circuit changes required to balance
DATE:

panel loads. Obtain approval before installing.


BY:
APPROVAL/CERTIFICATION REQUIREMENTS,

F. Install filler plates in unused spaces.


THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

G. Provision for Future Circuits at Flush Panelboards: Stub four 1- inch empty
10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 92


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16470
YAA
ENGG CERT

4 of 7
conduits from panel into accessible ceiling space or space designated to be ceiling
space in future. Stub four 1-inch empty conduits into raised floor space or below
LSS

slab other than slabs on grade.

H. Auxiliary Gutter: Install where a panel is tapped to a riser at an intermediate


location.

I. Wiring in Panel Gutters: Train conductors neatly in groups, bundle, and wrap with
ISSUED FOR IFC
DESCRIPTION

wire ties after completion of load balancing.

3.02 IDENTIFICATION

A. Identify field-installed wiring and components and provide warning signs in


accordance with Division 16 Section "Electrical Identification."

3.03 GROUNDING

A. Connections: Make equipment grounding connections for panelboards as


JO/EWO
01/21/2016 BI-01382

indicated.

B. Provide ground continuity to main electrical ground bus indicated.


DATE

3.04 CONNECTIONS
NO.
REV

00

DISCIPLINE
ENGINEER A. Tighten electrical connectors and terminals, including grounding connections, in
ANP
accordance with manufacturer's published torque- tightening values. Where
01/21/2016
DATE: manufacturer's torque values are not indicated, use those specified in UL 486A and
PROJECT
ENGINEER UL 486B.
LSS
01/21/2016
DATE: 3.05 FIELD QUALITY CONTROL
CERTIFIED
YAA

01/21/2016
A. Independent Testing Organization: Arrange and pay for the services of an
DATE:
independent electrical testing organization in to perform tests on low-voltage power
CONSTRUCTION
AGENCY
YAA
panelboards and accessories.
01/21/2016
DATE: B. Pretesting: Upon completing installation of the system, perform the following
OPERATIONS
preparations for independent tests:
ASZ

01/21/2016
DATE: 1. Make insulation resistance tests of panelboard buses, components, and
CONTROL NUMBER

connecting supply, feeder, and control circuits.


VERIFICATION
EDSD

2. Make continuity tests of circuits.


DATE:
BY:

3. Provide set of Contract Documents to test organization. Include full


APPROVAL/CERTIFICATION REQUIREMENTS,

updating on final system configuration and parameters where they


THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

supplement or differ from those indicated in original Contract Documents.


(DCC) NO. _____________________
10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 93


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16470
YAA
ENGG CERT

5 of 7
C. Quality Control Program: Conform to the following:
LSS

D. Procedures: Make field tests and inspections and prepare panelboard for
satisfactory operation in accordance with manufacturer's recommendations and
these specifications.

1. Schedule tests with at least one week in advance and notify SA


Representative.
ISSUED FOR IFC
DESCRIPTION

2. Reports by Testing Organization: Submit written report of the results of


tests and observations. Report defective materials and workmanship and
unsatisfactory test results. Include records of repairs and adjustments
made.

3. Labeling: Upon satisfactory completion of tests and related effort, apply a


label to tested components indicating results of tests and inspections,
responsible organization and person, and date.
JO/EWO
01/21/2016 BI-01382

4. Protective Device Ratings and Settings: Verify indicated ratings and


settings to be appropriate for final system configuration and parameters.
Where discrepancies are found, recommend final protective device ratings
DATE

and settings. Use accepted ratings or settings to make the final system
adjustments.
NO.
REV

00

DISCIPLINE
ENGINEER E. Visual and Mechanical Inspection: Include the following inspections and related
ANP
work:
01/21/2016
DATE:
PROJECT
ENGINEER 1. Inspect for defects and physical damage, labeling, and nameplate
LSS compliance with requirements of up-to-date drawings and panelboard
01/21/2016
DATE: schedules.
CERTIFIED
YAA

01/21/2016
2. Exercise and perform of operational tests of all mechanical components
DATE: and other operable devices in accordance with manufacturer's instruction
CONSTRUCTION
AGENCY manual.
YAA

01/21/2016
DATE: 3. Check panelboard mounting, area clearances, and alignment and fit of
OPERATIONS
components.
ASZ

01/21/2016
DATE: 4. Check tightness of bolted electrical connections with calibrated torque
CONTROL NUMBER

wrench. Refer to manufacturer's instructions for proper torque values.


VERIFICATION
EDSD

5. Perform visual and mechanical inspection and related work for over current
protective devices as specified in Division 16 Section "Overcurrent
DATE:
BY:

Protective Devices."
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

F. Electrical tests: Include the following items performed in accordance with


(DCC) NO. _____________________

manufacturer's instruction:
10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 94


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16470
YAA
ENGG CERT

6 of 7
1. Insulation resistance test of buses and portions of control wiring that
disconnected from solid-state devices. Insulation resistance less than 100
LSS

megohms is not acceptable.

2. Ground resistance test on system and equipment ground connections.

3. Test main and subfeed over current protective devices in accordance with
Section "Overcurrent Protective Devices."
ISSUED FOR IFC
DESCRIPTION

G. Retest: Correct deficiencies identified by tests and observations and provide


retesting of panelboards by testing organization. Verify by the system tests that the
total assembly meets specified requirements.

3.06 CLEANING

A. Upon completion of installation, inspect interior and exterior of panelboards.


Remove paint splatters and other spots, dirt, and debris. Touch up scratches and
mars of finish to match original finish.
JO/EWO
01/21/2016 BI-01382

3.07 COMMISSIONING
DATE

A. Balancing Loads: After Substantial Completion, but not more than two months
after Final Acceptance, conduct load-balancing measurements and circuit changes
NO.
REV

00

as follows:
DISCIPLINE
ENGINEER
ANP
1. Perform measurements during period of normal working load as advised by
01/21/2016
DATE: the SAUDI ARAMCO Representative.
PROJECT
ENGINEER
LSS
2. Perform load-balancing circuit changes outside the normal
01/21/2016
DATE: occupancy/working schedule of the facility. Make special arrangements
CERTIFIED
YAA with SAUDI ARAMCO Representative to avoid disrupting critical 24-hour
01/21/2016
services such as FAX machines and on-line data processing, computing,
DATE:
transmitting, and receiving equipment.
CONSTRUCTION
AGENCY
YAA

01/21/2016
3. Recheck loads after circuit changes during normal load period. Record all
DATE: load readings before and after changes and submit test records.
OPERATIONS
ASZ
4. Tolerance: Difference between phase loads exceeding 20 percent at any
01/21/2016
DATE: one panelboard is not acceptable. Rebalance and recheck as required to
CONTROL NUMBER

meet this minimum requirement.


VERIFICATION
EDSD

DATE:

END OF SECTION
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________
10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 95


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16470
YAA
ENGG CERT

7 of 7
DIVISION 16 - ELECTRICAL
LSS

SECTION 16475 - OVERCURRENT PROTECTIVE DEVICES

PART 1 - GENERAL

1.01 DESCRIPTION OF WORK


ISSUED FOR IFC
DESCRIPTION

A. This Section includes over current protective devices (OCPDs) rated 600V and
below and switching devices commonly used with them.

B. Panelboards: Application, installation, and other related requirements for over


current protective device installations in distribution equipment are specified in
other Division 16 sections.

1.02 QUALITY ASSURANCE

A. Electrical Component Standard: Components and installation shall comply with


JO/EWO
01/21/2016 BI-01382

SBC 401 (Saudi Building Code Volume 4) and ANSI/NFPA 70 "National Electrical
Code," with the SBC 401 requirements prevailing over the NFPA 70 provisions.
DATE

B. Listing and Labeling: Provide products specified in this Section that are listed and
labeled.
NO.
REV

00

DISCIPLINE
ENGINEER 1. The terms "listed" and "labeled" shall be defined as they are in the National
ANP
01/21/2016
Electrical Code, Article 100.
DATE:
PROJECT
ENGINEER C. Listing and Labeling Agency Qualifications: A "Nationally Recognized Testing
LSS
Laboratory" (NRTL) as defined in OSHA Regulation 1910.7.
01/21/2016
DATE:
CERTIFIED
YAA D. Single-Source Responsibility: Obtain similar OCPDs from a single manufacturer.
01/21/2016
DATE:
CONSTRUCTION
1.03 SUBMITTALS
AGENCY
YAA

01/21/2016
A. General: Submit the following in accordance with Conditions of Contract and
DATE:
Division 1 Specification Sections.
OPERATIONS
ASZ

01/21/2016
B. Product data for fuses, fusible switches, circuit breakers, and OCPD accessories
DATE: specified in this Section, including descriptive data and time-current curves for all
CONTROL NUMBER

protective devices and let- through current curves for those with current limiting
VERIFICATION

characteristics. Include coordination charts and tables and related data.


EDSD

DATE:

1.04 EXTRA MATERIALS


BY:
APPROVAL/CERTIFICATION REQUIREMENTS,

A. Maintenance Stock Fuses: For types and ratings required, furnish spare fuses,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

amounting to one unit for every 5 installed units, but not less than one set of 3 of
(DCC) NO. _____________________

each kind.
10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 96


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16475
YAA
ENGG CERT

1 of 6
PART 2 - PRODUCTS
LSS

2.01 MANUFACTURERS

A. Available Manufacturers: Subject to compliance with requirements, manufacturers


offering products that may be incorporated in the Work include, but are not limited
to, the following:
ISSUED FOR IFC
DESCRIPTION

B. Manufacturers: Subject to compliance with requirements, provide products by the


following:

1. Molded-Case Circuit Breakers:

ABB Power Distribution, Inc.


Crouse-Hinds Distribution Equipment.
General Electric Co.
General Switch Corp.
Square D Co.
JO/EWO
01/21/2016 BI-01382

Westinghouse Electric Corp.

2.02 OVERCURRENT PROTECTIVE DEVICES (OCPDs), GENERAL


DATE

A. General: Provide OCPDs in indicated types, as integral components of


NO.
REV

00

panelboards, and also as individually enclosed and mounted single units.


DISCIPLINE
ENGINEER
ANP
B. Enclosures: NEMA 250 "Enclosures for Electrical Equipment (1,000 Volts
01/21/2016
DATE: Maximum)."
PROJECT
ENGINEER
LSS
2.03 MOLDED-CASE CIRCUIT BREAKERS
01/21/2016
DATE:
CERTIFIED
YAA A. General: UL 489, "Molded Case Circuit Breakers and Circuit Breaker Enclosures,"
01/21/2016
and NEMA AB 1, "Molded Case Circuit Breakers."
DATE:
CONSTRUCTION
AGENCY
YAA
B. Construction: Bolt-in type, except breakers in load-center-type panelboards and
01/21/2016
breakers 225-ampere frame size and larger may be plug-in type if held in place by
DATE: positive locking device requiring mechanical release for removal.
OPERATIONS
ASZ
C. Characteristics: Indicated frame size, trip rating, number of poles, and a short-
01/21/2016
DATE: circuit interrupting capacity rating of 10,000 amperes symmetrical, unless a greater
CONTROL NUMBER

rating is indicated.
VERIFICATION
EDSD

D. Tripping Device: Quick-make, quick-break toggle mechanism with inverse-time


DATE:

delay and instantaneous over current trip protection for each pole.
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,

E. Adjustable Instantaneous Trip Devices: Factory adjusted to low- trip-setting current


THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

values.
(DCC) NO. _____________________
10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 97


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16475
YAA
ENGG CERT

2 of 6
F. Enclosure Panelboard Mounting: Suitable for panel mounting in panelboards
where indicated.
LSS

G. Enclosure for motor control center mounting: Provide individual mounting where
indicated.

H. Enclosure for Independent Mounting: NEMA Type 1 enclosure, except as


otherwise indicated or required to suit environment where located.
ISSUED FOR IFC
DESCRIPTION

I. Circuit Breakers with Solid-State Trip Devices: Provide indicated circuit breakers
with solid-state trip devices having the following features:

1. Ambient Compensation: Trip device insensitive to temperature changes


between minus 20 deg C and plus 55 deg C.

2. Adjustability: Breaker ratings and trip settings shall be changeable by


operation of controls on front panel of breaker, by change of plug-in
element without removing breaker from mounting, or by a combination of
JO/EWO
01/21/2016 BI-01382

the two methods.

3. Ground-Fault Tripping: Adjustable for pick-up and time-delay values.


DATE

Provide for indicated units.


NO.
REV

00

PART 3 - EXECUTION
DISCIPLINE
ENGINEER
ANP
3.01 INSTALLATION
01/21/2016
DATE:
PROJECT
ENGINEER A. Independently Mounted OCPDs: Locate as indicated and install in accordance
LSS
with manufacturer's written installation instructions.
01/21/2016
DATE:
CERTIFIED
YAA B. OCPDs in distribution equipment shall be factory installed.
01/21/2016
DATE:
3.02 IDENTIFICATION
CONSTRUCTION
AGENCY
YAA

01/21/2016
Identify components in accordance with Division 16 Section "Electrical Identification."
DATE: 3.03 CONTROL WIRING INSTALLATION
OPERATIONS
ASZ
A. Install wiring between OCPDs and control/indication devices as specified in
01/21/2016
DATE: Division 16 Section "Wires and Cables" for hard wired connections.
CONTROL NUMBER
VERIFICATION

3.04 CONNECTIONS
EDSD

DATE:

A. Check connectors, terminals, bus joints, and mountings for tightness. Tighten field-
BY:

connected connectors and terminals, including screws and bolts, in accordance


APPROVAL/CERTIFICATION REQUIREMENTS,

with equipment manufacturer's published torque tightening values. Where


THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

manufacturer's torquing requirements are not indicated, tighten connectors and


(DCC) NO. _____________________
10-01382-0008-0001

SECTION 16475
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 98


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

3 of 6
YAA
ENGG CERT

terminals to comply with tightening torques specified in UL 486A and UL 486B.


LSS

3.05 GROUNDING

A. Provide equipment grounding connections for individually mounted OCPD units as


indicated and as required by NEC. Tighten connectors to comply with tightening
torques specified in UL Standard 486A to assure permanent and effective
grounding.
ISSUED FOR IFC
DESCRIPTION

3.06 FIELD QUALITY CONTROL

A. Independent Testing Organization: Arrange and pay for the services of an


independent electrical testing organization to perform tests and observations on
OCPDs.

B. Reports: Prepare written reports certified by Testing Organization on tests and


observations. Report defective materials and workmanship and unsatisfactory test
results. Include complete records of repairs and adjustments made.
JO/EWO
01/21/2016 BI-01382

C. Labeling: Upon satisfactory completion of tests and related effort, apply a label to
tested components indicating test results, date, and responsible organization and
DATE

person.
NO.
REV

00

D. Schedule visual and mechanical inspections and electrical tests with at least one
DISCIPLINE
ENGINEER
week's advance notification.
ANP
01/21/2016
DATE: E. Pretesting: Upon completing installation of the system, perform the following
PROJECT
ENGINEER preparations for independent tests:
LSS
01/21/2016
DATE: 1. Make insulation resistance tests of OCPD buses, components, and
CERTIFIED
YAA
connecting supply, feeder, and control circuits.
01/21/2016
DATE: 2. Make continuity tests of circuits.
CONSTRUCTION
AGENCY
YAA
3. Provide set of Contract Documents to test personnel. Include full updating
01/21/2016
DATE: on final system configuration and parameters where they supplement or
OPERATIONS
differ from those indicated in original Contract Documents.
ASZ

01/21/2016
DATE: 4. Provide manufacturer's instructions for installation and testing of OCPDs to
CONTROL NUMBER

test personnel.
VERIFICATION
EDSD

F. Visual and mechanical inspection: Include the following inspections and related
work.
DATE:
BY:

G. Overcurrent-Protective-Device Ratings and Settings: Verify indicated ratings and


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

settings to be appropriate for final system arrangement and parameters. Where


(DCC) NO. _____________________

discrepancies are found, test organization shall recommend final protective device
10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 99


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16475
YAA
ENGG CERT

4 of 6
ratings and settings. Use accepted revised ratings or settings to make the final
system adjustments.
LSS

1. Inspect for defects and physical damage, NRTL labeling, and nameplate
compliance with current single line diagram.

2. Exercise and perform operational tests of all mechanical components and


other operable devices in accordance with manufacturer's instruction
ISSUED FOR IFC
DESCRIPTION

manual.

3. Check tightness of electrical connections of OCPDs with calibrated torque


wrench. Refer to manufacturer's instructions for proper torque values.

4. Clean OCPDs using manufacturer's approved methods and materials.

5. Verify installation of proper fuse types and ratings in fusible OCPDs.

H. Electrical Tests: Include the following items performed in accordance with


JO/EWO
01/21/2016 BI-01382

manufacturer's instructions:

1. Insulation resistance test of OCPD conducting parts. Insulation resistance


DATE

less than 100 megohms is not acceptable.


NO.
REV

00

2. Contact resistance test or measurement of millivolt drop across contacts of


DISCIPLINE
ENGINEER drawout circuit breakers at rated current. Compare contact resistance or
ANP
millivolt drop values of adjacent poles and of similar breakers. Deviations of
01/21/2016
DATE: more than 50 percent are not acceptable.
PROJECT
ENGINEER
LSS 3. Insulation resistance test of molded-case circuit breakers over 600- ampere
01/21/2016
DATE: frame size at 1000 V d.c. for one minute from pole to pole and from each
CERTIFIED pole to ground with breaker closed and across open contacts of each
YAA

01/21/2016
phase. Insulation resistance less than 100 megohms is not acceptable.
DATE:
CONSTRUCTION
AGENCY 4. Use primary current injection to check performance characteristics of trip
YAA
units of insulated-case circuit breakers and molded-case breakers over
01/21/2016
DATE: 600-ampere frame size. Trip characteristics not falling within
OPERATIONS
manufacturer’s published time-current characteristic tolerance bands when
ASZ
adjusted to approved parameters are not acceptable. Perform the following
01/21/2016
DATE: tests:
CONTROL NUMBER
VERIFICATION

a. Determine minimum pickup current acceptable per manufacturer’s


EDSD

instructions.
b. Determine long – time delay at 300 percent pickup current.
DATE:
BY:

c. Determine short-time-pickup current and corresponding delay time.


d. Determine ground-fault current pickup and corresponding delay
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

time.
(DCC) NO. _____________________

e. Determine instantaneous pickup current value.


10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 100


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16475
YAA
ENGG CERT

5 of 6
5. Verify trip unit reset characteristics for insulated-case circuit breakers.
LSS

6. Make adjustments for final settings of adjustable-trip devices.

7. Activate auxiliary protective devices such as ground fault or under voltage


relays, to verify operation of shunt-trip devices.

8. Check stored-energy charging motors for proper operation of motor,


ISSUED FOR IFC
DESCRIPTION

mechanism, and limit switches.

9. Check operation of electrically operated OCPDs in accordance with


manufacturer’s instructions.

10. Check key and other interlock and safety devices for operation and
sequence. Make closing attempts on locked-open and opening attempts on
locked-closed devices including moveable barriers and shutters.

I. Retest: Correct deficiencies identified by tests and observations and provide


JO/EWO
01/21/2016 BI-01382

retesting of OCPDs by testing organization. Verify by the system tests that


specified requirements are met.
DATE

3.07 CLEANING
NO.
REV

00

Upon completion of installation, inspect OCPDs. Remove paint splatters and other spots,
DISCIPLINE
ENGINEER dirt, and debris. Touch up scratches and mars of finish to match original finish.
ANP
01/21/2016
DATE: 3.08 DEMONSTRATION
PROJECT
ENGINEER
LSS
A. Training: Arrange and pay for the services of factory-authorized service
01/21/2016
DATE: representatives to demonstrate OCPDs and train Owner's maintenance personnel.
CERTIFIED
YAA

01/21/2016
B. Conduct a minimum of one half day of training in operation and maintenance as
DATE:
specified under "Instructions to Owner Employees" in the "Project Closeout"
CONSTRUCTION
AGENCY
YAA
Section of these specifications. Include both classroom training and hands-on
01/21/2016
equipment operation and maintenance procedures.
DATE:
OPERATIONS
C. Schedule training with at least seven days' advance notification.
ASZ

01/21/2016
DATE:
CONTROL NUMBER

END OF SECTION
VERIFICATION
EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________
10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 101


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16475
YAA
ENGG CERT

6 of 6
DIVISION 16 - ELECTRICAL
LSS

SECTION 16476 - CIRCUIT BREAKERS

PART 1 - GENERAL

1.01 DESCRIPTION OF WORK


ISSUED FOR IFC
DESCRIPTION

A. Extent of circuit-breaker (CB) work is indicated by drawings and schedules.

B. Types of circuit breakers in this section include the following:

1. Low-voltage power.
2. Current-limiting.
3. Molded-case.
4. Solid-state trip.
5. Insulated case.
JO/EWO
01/21/2016 BI-01382

C. Refer to other Division-16 sections for wires/cables and connector work required in
conjunction with CB protective devices; not work of this section.
DATE

1.02 QUALITY ASSURANCE


NO.
REV

00

A. Codes and Standards: Comply with all applicable Codes and Standards including,
DISCIPLINE
ENGINEER but not limited to, those listed below:
ANP
01/21/2016
DATE:
1. Electrical Code Compliance: Comply with SBC 401 (Saudi Building Code
PROJECT
ENGINEER Volume 4), and the NEC, with the SBC 401 requirements prevailing over
LSS
the NEC provisions, as applicable to construction and installation of circuit
01/21/2016
DATE: breakers.
CERTIFIED
YAA

01/21/2016 2. UL Compliance: Comply with applicable requirements of UL 486A, 489 and


DATE:
CONSTRUCTION
1066 which apply to construction and installation of circuit breakers.
AGENCY
YAA

01/21/2016
3. NEMA Compliance: Comply with applicable requirements of NEMA
DATE:
Standard Publication No.'s AB 1, 2 and 3, SG 3 and 250.
OPERATIONS
ASZ

01/21/2016
4. ANSI/IEEE Compliance: Comply with applicable requirements of
DATE: ANSI/IEEE C37.13, C97.1 pertaining to low-voltage AC power circuit
CONTROL NUMBER

breakers.
VERIFICATION
EDSD

5. FS Compliance: Comply with Federal Specification W-C-375B/GEN


DATE:

pertaining to molded-case circuit breakers.


BY:
APPROVAL/CERTIFICATION REQUIREMENTS,

B. Manufacturer's Qualifications: Firms regularly engaged in manufacture of circuit


THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

breakers of types, ratings, and capacities required, whose products have been in
(DCC) NO. _____________________

satisfactory use in similar service for not less than 5 years.


10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 102


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16476
YAA
ENGG CERT

1 of 7
C. Installer's Qualifications: Firm with at least 3 years of successful installation
experience on projects utilizing circuit- breaker devices similar to those required for
LSS

this project.

1.03 SUBMITTALS

A. Product Data: Submit manufacturer's product data and installation instructions for
circuit breakers.
ISSUED FOR IFC
DESCRIPTION

B. Wiring Diagrams: Submit wiring diagrams for circuit breakers and accessories
showing connections to electrical power feeders and associated equipment.
Differentiate between portions of wiring which are manufacturer-installed and
portions which are field- installed.

C. Certification: Submit certified test data which indicates current-interrupting ratings


for each circuit breaker.

1.04 PRODUCT DELIVERY, STORAGE AND HANDLING:


JO/EWO
01/21/2016 BI-01382

A. Deliver circuit breakers and components in factory-fabricated type containers or


wrappings, which properly protect devices from damage.
DATE

B. Store circuit breakers in original packaging and protect from weather and
NO.
REV

00

construction traffic. Wherever possible, store indoors; where necessary to store


DISCIPLINE
ENGINEER outdoors, store above grade and enclose with watertight wrapping.
ANP
01/21/2016
DATE: C. Handle circuit breakers carefully to prevent physical damage to CBs and
PROJECT
ENGINEER components. Do not install damaged CBs; remove from site and replace damaged
LSS
devices with new.
01/21/2016
DATE:
CERTIFIED
YAA PART 2 - PRODUCTS
01/21/2016
DATE:
2.01 MANUFACTURERS:
CONSTRUCTION
AGENCY
YAA

01/21/2016
A. Available Manufacturers: Subject to compliance with requirements, manufacturers
DATE: offering circuit-breaker products which may be incorporated in the work include, but
OPERATIONS
are not limited to, the following:
ASZ

01/21/2016
DATE: 1. Manufacturers: Subject to compliance with requirements, provide circuit-
CONTROL NUMBER

breaker devices of one of the following (for each type and rating of circuit
VERIFICATION

breaker):
EDSD

DATE:

Adalet-PLM Div; Scott Fetzer Co.


BY:

Airpax Corporation.
APPROVAL/CERTIFICATION REQUIREMENTS,

Appleton Electric Div; Emerson Electric Co.


THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Bryant Electric Co.


(DCC) NO. _____________________

Challenger Electrical Equipment Corp.


10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 103


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16476
YAA
ENGG CERT

2 of 7
Crouse-Hinds Div; Cooper Industries Co.
Cutler-Hammer Div; Eaton Corp.
LSS

General Electric Co.


Heinemann Electric Co.
Killark Electric Mfg Co.
Klockner-Moeller Co.
McGraw-Edison Power Sys Div; Cooper Industries Co.
I-T-E Electrical Products Div; Siemens-Allis Inc.
ISSUED FOR IFC
DESCRIPTION

Square D Company.
Westinghouse Electric Corp.

2.02 CIRCUIT BREAKERS:

A. General: Except as otherwise indicated, provide circuit breakers and ancillary


components, of types, sizes, ratings and electrical characteristic indicated, which
comply with manufacturer's standard design, materials, components, and
construction in accordance with published product information, and as required for
a complete installation.
JO/EWO
01/21/2016 BI-01382

B. Air Circuit Breakers: Provide factory-assembled, electronically operated, low-


voltage air circuit breakers, 600 VAC 50/60 Hz, 3- phase, 3-wire, back connected,
DATE

envelope size rating 800 amperes; frame size rating of 800, 100 percent equipment
rated, continuous current rating of 400 amperes, 50,000 RMS symmetrical
NO.
REV

00

amperes interrupting capacity rating; and with 24-volts closing relays for operating
DISCIPLINE
ENGINEER breakers. Provide bolted type stationary-mounted breaker elements with NEMA
ANP
Type 3R raintight enclosures. Construct with ground-fault protection devices as
01/21/2016
DATE: integral part of breakers, with delay of 0.21 seconds at 225 amperes. Construct
PROJECT
ENGINEER breaker with solid-state over current trip devices; and equip circuit breakers with
LSS
solid-state controls and programming units possessing the following operating
01/21/2016
DATE: features:
CERTIFIED
YAA

01/21/2016
1. Adjustable current setting.
DATE:
CONSTRUCTION
AGENCY
YAA
2. Adjustable long-time pickup and delay.
01/21/2016
DATE: 3. Adjustable short-time pickup and delay.
OPERATIONS
ASZ
4. Adjustable instantaneous pickup.
01/21/2016
DATE:
CONTROL NUMBER

5. Adjustable ground fault pickup.


VERIFICATION
EDSD

6. Overload and short circuit trip indicators.


DATE:
BY:

7. Local and remote target indication.


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

C. Circuit Breaker Accessories: Provide the following air circuit breaker accessories:
(DCC) NO. _____________________
10-01382-0008-0001

1. Shunt trip.
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 104


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16476
YAA
ENGG CERT

3 of 7
2. Undervoltage release.
LSS

3. Bell alarm with lockout.

4. Auxiliary contacts.

5. Enclosure-mounted interlock.
ISSUED FOR IFC
DESCRIPTION

C. Current-Limiting Circuit Breakers: Provide molded-case current- limiting circuit


breakers rated 250 amperes, 480-volts, 60 Hz, 2- poles, with interrupting ratings of
100,000 RMS, or less, symmetrical amperes. Select breakers with common trip,
and thermal-magnetic circuitry with independently operating limiter elements in
series with each pole which automatically resets after circuit interruptions. Provide
limiters with let-through current range of 110-125 amperes. Construct with over
center, trip-free toggle-type mechanism with quick-make, quick-break action and
positive handle indication. Provide current-limiting breakers with permanent trip
units containing individual thermal and magnetic trip elements in each pole.
JO/EWO
01/21/2016 BI-01382

Calibrate trip elements for 40 deg C ambient temperature. Select circuit breakers
with mechanical screw type lugs for use with copper conductors.
DATE

D. Molded-Case Circuit Breakers: Provide factory-assembled, molded- case circuit


breakers of frame sizes indicated; rated 1600 amperes, 600-volts, 60 Hz, 3-poles
NO.
REV

00

with 75,000 RMS symmetrical interrupting ratings. Provide breakers with


DISCIPLINE
ENGINEER
permanent thermal and instantaneous magnetic trips in each pole, and with fault-
ANP current limiting protection, ampere ratings as indicated. Construct with over center,
01/21/2016
DATE: trip-free, toggle-type operating mechanisms with quick-make, quick-break action
PROJECT
ENGINEER and positive handle trip indication. Provide push-to-trip button on enclosure cover
LSS for mechanically tripping circuit breakers. Construct breakers for mounting and
01/21/2016
DATE: operating in any physical position and operating in an ambient temperature of 40
CERTIFIED
YAA
deg C. Provide breakers with mechanical screw type removable connector lugs,
AL/CU rated, and with NEMA Type 1 general purpose enclosures.
01/21/2016
DATE:
CONSTRUCTION
AGENCY E. Internal Breaker Accessories:
YAA

01/21/2016
DATE: 1. Shunt trip.
OPERATIONS
ASZ
2. Auxiliary contacts.
01/21/2016
DATE:
CONTROL NUMBER

3. Alarm switch.
VERIFICATION
EDSD

4. Undervoltage trip.
DATE:
BY:

F. Solid-State Trip Circuit Breakers: Provide solid-state trip circuit breakers rated 800
amperes, 480-volts, 60 Hz, 3-poles, with 100,000 RMS symmetrical ampere
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

interrupting ratings. Construct breakers with ampere setting adjustment knobs for
(DCC) NO. _____________________

changing current carrying capability of units, and with ground- fault protection
10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 105


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16476
YAA
ENGG CERT

4 of 7
components with external neutral current transformer (CT). Provide electronic
components for timing and monitoring internal currents and for initiating automatic
LSS

tripping action. Construct with trip-free mechanisms, and with positive handle
indication. Provide push-to-trip button on cover for mechanical tripping circuit
breakers. Construct breakers for mounting in any physical position and operating
in an ambient temperature of 40 deg C. Select breakers with mechanical screw
type removable connectors, AL/CU rated, and with NEMA Type 1 general purpose
enclosures.
ISSUED FOR IFC
DESCRIPTION

G. Insulated Case Circuit Breakers: Provide factory-assembled, electronically


operated, insulated case circuit breakers, 600 VAC, 50/60 Hz, 3-phase, 3-wire,
back connected, envelope size rating 3000 amperes, frame size rating of 2500
amperes, 100 percent equipment rated, continuous current rating 1600 amperes,
65,000 RMS symmetrical amperes interrupting capacity rating. Provide draw-out
breaker elements with NEMA Type 1 general purpose enclosures. Construct with
ground-fault protection sensors as integral part of breakers, with delay 0.21
seconds at 400 amperes. Equip circuit breakers with solid-state controls and
programming units possessing the following operating features:
JO/EWO
01/21/2016 BI-01382

1. Adjustable current, long time delay.


DATE

2. Adjustable intermediate delay.


NO.
REV

00

3. Ground-fault pickup and delay.


DISCIPLINE
ENGINEER
ANP
4. Adjustable instantaneous pickup.
01/21/2016
DATE:
PROJECT
ENGINEER 5. Short time pickup and delay.
LSS
01/21/2016
DATE: 6. Overload, short-circuit and ground-fault target indicators.
CERTIFIED
YAA

01/21/2016
7. Local and remote target indication.
DATE:
CONSTRUCTION
AGENCY
YAA
H. Circuit Breaker Accessories: Provide the following insulated case circuit-breaker
01/21/2016
accessories.
DATE:
OPERATIONS
1. Shunt trip.
ASZ

01/21/2016
DATE: 2. Undervoltage release.
CONTROL NUMBER
VERIFICATION

3. Bell alarm with lockout.


EDSD

DATE:

4. Auxiliary contacts.
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,

5. Enclosure-mounted interlock.
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________
10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 106


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16476
YAA
ENGG CERT

5 of 7
PART 3 - EXECUTION
LSS

3.01 EXAMINATION

Examine areas and conditions under which circuit breakers are to be installed and notify
Contractor in writing of conditions detrimental to proper completion of the Work. Do not
proceed with the Work until unsatisfactory conditions have been corrected in a manner
acceptable to the Installer.
ISSUED FOR IFC
DESCRIPTION

3.02 INSTALLATION OF CIRCUIT BREAKERS

A. Install circuit breakers and accessories as indicated, in accordance with


manufacturer's written instructions and with recognized industry practices to ensure
that protective devices comply with requirements. Comply with requirements of
NEC, and applicable portions of NECA's "Standard of Installation" pertaining to
installation of circuit breakers and general wiring practices.

B. Coordinate with other work, including electrical wiring work, as necessary to


JO/EWO
01/21/2016 BI-01382

interface installation of circuit breaker work with other work.

C. Fasten circuit breakers without causing mechanical stresses, twisting or


DATE

misalignment being exerted by clamps, supports, or cabling.


NO.
REV

00

D. Set field-adjustable circuit breakers for trip settings as indicated, subsequent to


DISCIPLINE
ENGINEER installation of units.
ANP
01/21/2016
DATE: E. Tighten electrical connectors and terminals, including screws and bolts, in
PROJECT
ENGINEER accordance with equipment manufacturer's published torque tightening values for
LSS
equipment connectors. Where manufacturer's torquing requirements are not
01/21/2016
DATE: indicated, tighten connectors and terminals to comply with tightening torques
CERTIFIED
YAA specified in UL Standard 486A.
01/21/2016
DATE:
3.03 ADJUST AND CLEAN
CONSTRUCTION
AGENCY
YAA

01/21/2016
Inspect circuit-breaker operating mechanisms for malfunctioning and, where necessary,
DATE: clean and adjust units for free mechanical movement.
OPERATIONS
ASZ
3.04 GROUNDING
01/21/2016
DATE:
CONTROL NUMBER

Provide equipment grounding connections for circuit breakers as indicated. Tighten


VERIFICATION

connectors to comply with tightening torques specified in UL Std 486A to assure


EDSD

permanent and effective grounding.


DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________
10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 107


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16476
YAA
ENGG CERT

6 of 7
3.05 FIELD QUALITY CONTROL
LSS

Upon completion of installation and after circuitry has been energized, demonstrate
capability and compliance of system with requirements. Where possible, correct
malfunctioning units at site, then retest to demonstrate compliance; otherwise, remove and
replace with new units, and proceed with retesting. Testing and retesting at no cost to
Owner.
ISSUED FOR IFC
DESCRIPTION

END OF SECTION
JO/EWO
01/21/2016 BI-01382
NO. DATE
REV

00

DISCIPLINE
ENGINEER
ANP
01/21/2016
DATE:
PROJECT
ENGINEER
LSS
01/21/2016
DATE:
CERTIFIED
YAA

01/21/2016
DATE:
CONSTRUCTION
AGENCY
YAA

01/21/2016
DATE:
OPERATIONS
ASZ

01/21/2016
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________
10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 108


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16476
YAA
ENGG CERT

7 of 7
DIVISION 16 - ELECTRICAL
LSS

SECTION 16503 - POLES AND STANDARDS

PART 1 - GENERAL

1.01 DESCRIPTION OF WORK


ISSUED FOR IFC
DESCRIPTION

A. Extent, location, and details of electrical poles and standards work are indicated on
drawings and in schedules.

B. Applications of lighting poles and standards specified in this section include the
following:

1. Automobile parking lots.

2. Vehicular storage areas.


JO/EWO
01/21/2016 BI-01382

3. Promenades/plazas.
DATE

4. Parks.

5. Pedestrian walkways.
NO.
REV

00

DISCIPLINE
ENGINEER 6. Building entrances.
ANP
01/21/2016
DATE: C. Excavation and backfilling for poles, standards, and foundations are specified in
PROJECT
ENGINEER Division 2.
LSS
01/21/2016
DATE: D. Concrete for embedding poles, and for pole foundations and footings is specified in
CERTIFIED
YAA Division 3.
01/21/2016
DATE:
CONSTRUCTION
E. Wire/cables, raceways, and electrical boxes and fittings which are required in
AGENCY
YAA
connection with electrical poles and standards are specified in Division-16 Basic
01/21/2016
Materials and Methods sections, "Wires and Cables," "Raceways," and "Electrical
DATE:
Boxes and Fittings." Transformers are specified in another Division 16 section.
OPERATIONS
ASZ

01/21/2016
Refer to other Division-16 sections for cables/wires, raceways, transformers, and
DATE: electrical boxes and fittings work which are required in connection with electrical
CONTROL NUMBER

poles and standards.


VERIFICATION
EDSD

F. Exterior lighting fixtures (luminaries) and brackets which are required in connection
DATE:

with electrical poles and standards are specified in another Division-16 section,
BY:

"Exterior Lighting Fixtures."


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________
10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 109


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16503
YAA
ENGG CERT

1 of 8
1.02 QUALITY ASSURANCE
LSS

A. Manufacturer's Qualifications: Firms regularly engaged in manufacture of electrical


poles and standards of types and sizes required, whose products have been in
satisfactory use in similar service for not less than 5 years.

B. Installer's Qualifications: Firm with at least 3 years of successful installation


experience with projects utilizing electrical pole and standard work similar to that
ISSUED FOR IFC
DESCRIPTION

required for this project.

C. Codes and Standards:

1. Electrical Code Compliance: Comply with applicable requirements of SBC


401 (Saudi Building Code Volume 4) and the NEC Articles 220 and 250, as
applicable to installation, and construction of electrical poles and standards,
with SBC 401 requirements prevailing over the NEC provisions.

2. UL Compliance: Comply with UL standards, including UL 486A and B,


JO/EWO
01/21/2016 BI-01382

pertaining to electrical poles and standards. Provide lighting components


and fittings which are UL-listed and labeled.
DATE

3. ANSI/ASTM Compliance: Comply with applicable requirements of ANSI C


2, "National Electrical Safety Code," and O 5.1, "Specifications and
NO.
REV

00

Dimensions for Wood Poles," pertaining to construction and installation of


DISCIPLINE
ENGINEER lighting poles and standards.
ANP
01/21/2016
DATE: 4. FS Compliance: Comply with FS TT-W-571 I and J pertaining to wood
PROJECT
ENGINEER preservation treating practices.
LSS
01/21/2016
DATE: 5. AWPA Compliance: Comply with provisions of applicable American Wood-
CERTIFIED
YAA Preservers Association standards pertaining to preservative treatment of
01/21/2016
wood poles and standards.
DATE:
CONSTRUCTION
AGENCY
YAA
6. AASHTO Compliance: Comply with applicable requirements of American
01/21/2016
Association of State Highway and Transportation Officials Standard LTS-1;
DATE: "Standard Specifications for Structural Supports for Highway Signs,
OPERATIONS
Luminaries and Traffic Signals."
ASZ

01/21/2016
DATE: 7. NEMA Compliance: Comply with NEMA Stds Pub/No's. LE 2 and TT 1
CONTROL NUMBER

pertaining to electrical pole and standard units, materials, and installation.


VERIFICATION
EDSD

8. IES Compliance: Comply with applicable requirements of IES RP-8


DATE:

"Roadway Lighting," and RP-20, "Parking Facilities Lighting."


BY:
APPROVAL/CERTIFICATION REQUIREMENTS,

9. REA Compliance: Comply with applicable requirements of Rural


THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Electrification Administration (REA) guide specifications for installation of


(DCC) NO. _____________________

steel pole structures.


10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 110


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16503
YAA
ENGG CERT

2 of 8
1.03 SUBMITTALS
LSS

A. Product Data: Submit manufacturer's data on electrical poles, standards and


hardware; include certified dimension drawings for fabricated poles, standards and
mast arms, if any.

B. Shop Drawings: Submit shop drawings of electrical poles and standards, including
mast arms and wire/cable connections which are custom work.
ISSUED FOR IFC
DESCRIPTION

C. Wiring Diagrams: Submit wiring diagrams for electrical poles and standards
showing connections to electrical power panel feeders, switches, dimmers, and
controllers. Differentiate between portions of electrical wiring which are
manufacturer-installed and portions which are field-installed.

D. Samples: Submit one complete unit and component for each type of electrical pole
and standard specified.

1.04 PRODUCT DELIVERY, STORAGE AND HANDLING


JO/EWO
01/21/2016 BI-01382

A. Deliver electrical pole and standard products, and fittings in factory-fabricated


containers or wrappings, which properly protect products from damage.
DATE

B. Store electrical pole and standard products, and fittings in original cartons in well-
NO.
REV

00

ventilated space protected from moisture, construction traffic and debris.


DISCIPLINE
ENGINEER
ANP
C. Handle electrical pole and standard products carefully to prevent breakage, denting
01/21/2016
DATE: and scoring finish. Wrap finished laminated wood standards and mast arms
PROJECT
ENGINEER individually, in heavy-duty moisture-resistant paper for protection in transit. Do not
LSS
install damaged units or components; replace with new.
01/21/2016
DATE:
CERTIFIED
YAA 1.05 SEQUENCING AND SCHEDULING
01/21/2016
DATE:
A. Coordinate with other electrical work including wires/cables, electrical boxes and
CONSTRUCTION
AGENCY
YAA
fittings, and raceways, to properly interface installation of electrical pole and
01/21/2016
standard work with other work.
DATE:
OPERATIONS
B. Sequence electrical pole and standard installation work with other work to minimize
ASZ
possibility of damage and soiling during remainder of construction period.
01/21/2016
DATE:
CONTROL NUMBER

PART 2 - PRODUCTS
VERIFICATION
EDSD

2.01 MANUFACTURERS
DATE:
BY:

A. Available Manufacturers: Subject to compliance with requirements, manufacturers


APPROVAL/CERTIFICATION REQUIREMENTS,

offering electrical poles and standards which may be incorporated in the work
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

include, but are not limited to, the following:


(DCC) NO. _____________________
10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 111


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16503
YAA
ENGG CERT

3 of 8
B. Manufacturers: Subject to compliance with requirements, provide products of one
of the following (for each type of pole or standard).
LSS

1. Standards

Appleton Electric Co.


General Electric Co.
Kirlin Company.
ISSUED FOR IFC

Koppers Company.
DESCRIPTION

Lexington Standard Corp.


Lighting Div; Harvey Hubbell, Inc.
Spring City Electrical Mfg Co.
Sternberg Lanterns Inc.
Union Metal Mfg Co.
Westinghouse Electric Corp.

2. Metal Poles
JO/EWO
01/21/2016 BI-01382

Anchor Metals, Inc.


A.B. Chance Co.
Lehigh Structural Steel Co.
DATE

Lithonia Lighting Div; National Services Industries, Inc.


Marathon Steel Co.
NO.
REV

Meyer Industries Div; ITT Corp.


00

DISCIPLINE Millerbernd Mfg Co.


ENGINEER
ANP Union Metal Mfg Co.
DATE:
01/21/2016 Valmont Industries, Inc.
PROJECT
ENGINEER
LSS
3. Fiberglass Poles
01/21/2016
DATE:
CERTIFIED Electronics and Fiberglass Div; Shakespeare Co.
YAA

DATE:
01/21/2016 4. Reinforced Concrete Poles
CONSTRUCTION
AGENCY
YAA Ameron Pole Products Co.
01/21/2016 Centrecon, Inc.
DATE:
OPERATIONS
Dura-Stress Inc. Raymond International Inc.
ASZ Union Metal Mfg Co.
01/21/2016 Utility Vault Co.
DATE:
CONTROL NUMBER
VERIFICATION

5. Pole Hardware
EDSD

A.B. Chance Co.


DATE:

Dixie Electrical Mfg Co.


BY:

Stanley G. Flagg and Co., Inc.


APPROVAL/CERTIFICATION REQUIREMENTS,

Hercules, Inc.
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Joslyn Mfg and Supply Co.


(DCC) NO. _____________________
10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 112


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16503
YAA
ENGG CERT

4 of 8
Lithonia Lighting Div; National Services Industries, Inc.
McGraw-Edison Co.
LSS

Preform Line Products Co.


Reliable Electric Co.
Utilities Service Co.

2.02 ELECTRICAL POLES AND STANDARDS


ISSUED FOR IFC
DESCRIPTION

A. Laminated Wood Lighting Standards: Provide laminated wood, raceway-type,


lighting standards, of types, sizes, materials and finishes indicated, pressure-treat
with pentachlorophenol preservative; design to sustain wind velocities of up to 100
MPH; equip with hand access hole above and cable entrance hole below ground
level, locate as indicated or, if not indicated, at manufacturer's standard locations to
facilitate wiring, with matching plate to cover above-ground access hole. Provide
standards with solid wood mast arms, where indicated.

B. Utility-Type Wood Lighting Poles: Provide utility-type tapered solid wood lighting
poles, with single crossarms, of sizes and type materials indicated; pressure-treat
JO/EWO
01/21/2016 BI-01382

with creosote solution preservative.

C. Wood Pole Accessories: Where indicated, provide wood pole accessories


DATE

including guy-wires, anchors, and eye bolts, of types recommended by wood pole
manufacturer, of sizes and materials needed to fulfill loading erection application
NO.
REV

00

requirements.
DISCIPLINE
ENGINEER
ANP
D. Prestressed Concrete Lighting Standards: Provide prestressed concrete, raceway-
01/21/2016
DATE: type, lighting poles and standards, of sizes and types indicated, comprised of
PROJECT
ENGINEER shafts and brackets, and construct with the following construction features:
LSS
01/21/2016
DATE: 1. Configuration: Embedded type base and reinforcing sleeve with hand and
CERTIFIED
YAA cable entrance holes where indicated.
01/21/2016
DATE:
2. Configuration: Anchor base type with hand hole and cover where indicated.
CONSTRUCTION
AGENCY
YAA

01/21/2016
3. Configuration: Transformer base type with access door and cover.
DATE:
OPERATIONS
E. Prestressed Concrete Lighting Standard Accessories: Provide accessories for
ASZ
prestressed concrete lighting standards, including anchor bolts, as recommended
01/21/2016
DATE: by lighting standard manufacturer, of sizes and materials needed to fulfill loading
CONTROL NUMBER

and erection application requirements.


VERIFICATION
EDSD

F. Metal Lighting Standards: Provide metal, raceway-type, lighting poles and


DATE:

standards, of sizes and types indicated, comprised of shafts and tenon joints.
BY:

Equip with grounding connections readily accessible from handhole or transformer


APPROVAL/CERTIFICATION REQUIREMENTS,

base access doors; and construct of the following materials and additional
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________
10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 113


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16503
YAA
ENGG CERT

5 of 8
construction features:
LSS

1. Material: Stainless steel.

2. Material: Galvanized steel.

3. Material: Spun aluminum.


ISSUED FOR IFC

4. Material: Extruded aluminum.


DESCRIPTION

5. Material: Bronze.

6. Material: Cast iron.

7. Material: Special weathering-type steel.

8. Configuration: Embedded type base and reinforcing sleeve with hand and
cable entrance holes where indicated.
JO/EWO
01/21/2016 BI-01382

9. Configuration: Anchor base type with hand hole and cover where indicated.
DATE

10. Configuration: Transformer base type with access door and cover.
NO.
REV

00

G. Metal Lighting Standard Accessories: Provide accessories for metal lighting


DISCIPLINE
ENGINEER standards, including anchor bolts, as recommended by lighting standard
ANP
manufacturer, of sizes and materials needed to meet erection and loading
01/21/2016
DATE: application requirements.
PROJECT
ENGINEER
LSS H. Metal Poles: Provide galvanized steel, tapered tubular seamless shaft poles, of
01/21/2016
DATE: sizes and types indicated, with 1/4" bearing plates and ground sleeves for direct
CERTIFIED
YAA
embedment. Provide removable step bolts 3/4" diameter and 6" long with threaded
steel lugs welded to pole beginning 12" above finish grade. Space step bolts at 15"
01/21/2016
DATE: intervals on alternative sides of pole continuing to the top. Provide pole with
CONSTRUCTION
AGENCY adequately sized reinforced handhole complete with matching cover and located
YAA
on climbing side of pole, 18" above grade level. Weld 1/2" grounding nut on shaft
01/21/2016
DATE: with accessibility from handhole. Design poles to withstand loads developed by
OPERATIONS
100 MPH wind pressure, as adjusted for height above ground level, structural
ASZ
shapes and cable/wire loading. Construct poles whose total length is greater than
01/21/2016
DATE: 40 feet in two sections for shipping purposes.
CONTROL NUMBER
VERIFICATION

I. Metal Pole Accessories: Provide accessories for metal poles, including crossarms,
EDSD

bolts, lifting eyes, and nuts as recommended by pole manufacturer, of sizes and
materials needed to meet erection and loading application requirements.
DATE:
BY:

J. Reinforced Concrete Poles: Provide reinforced raceway-type concrete poles of


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

sizes and types indicated. Design poles to withstand loads developed by 100 MPH
(DCC) NO. _____________________

wind pressure, as adjusted for height above ground level, structural shapes and
10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 114


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16503
YAA
ENGG CERT

6 of 8
cable/wire loading. Centrifugally spin concrete to attain 28-day strength of 7000
psi. Fasten galvanized steel base plates to pole by using both the prestressing
LSS

and reinforcing steel to transfer load on pole to anchor bolts. Embed base plate in
concrete and cast as integral part of pole. Provide adequately sized cable
entrance holes and handholes, where indicated, and with matching plate to cover
above-ground access hole.

K. Reinforced Concrete Pole Accessories: Provide accessories for reinforced


ISSUED FOR IFC
DESCRIPTION

concrete poles, including anchor bolts and nuts, crossarms, climbing rungs, and
pole tops as recommended by pole manufacturer, of sizes and materials needed to
meet erection and loading application requirements.

PART 3 - EXECUTION

3.01 EXAMINATION

Examine areas and conditions under which pole and standard equipment and components
are to be installed, and substrate which will support equipment. Notify Contractor in
JO/EWO
01/21/2016 BI-01382

writing of conditions detrimental to proper completion of the Work. Do not proceed with
the Work until unsatisfactory conditions have been corrected in a manner acceptable to
the Installer.
DATE

3.02 INSTALLATION OF ROADWAY AND PARKING AREA LIGHTING


NO.
REV

00

DISCIPLINE
ENGINEER A. Install pole and standard units and products as indicated, in accordance with
ANP
manufacturer's written instructions, applicable requirements of SBC 401, the NEC,
01/21/2016
DATE: NESC and NEMA Standards, and with recognized Industry practices to ensure that
PROJECT
ENGINEER roadway and parking area lighting equipment fulfill requirements.
LSS
01/21/2016
DATE: B. Utilize belt slings or rope (not chain or cable) to protect finishes when raising and
CERTIFIED
YAA setting finished poles and standards.
01/21/2016
DATE:
C. Where poles and standards are indicated to be embedded in soil, set to depth
CONSTRUCTION
AGENCY
YAA
required for adequate structural support, but not less than minimum 5'-6" below
01/21/2016
finish grade.
DATE:
OPERATIONS
D. Set poles and standards plumb. Support adequately during backfilling, or when
ASZ
anchoring them to the foundations.
01/21/2016
DATE:
CONTROL NUMBER

E. Provide sufficient space encompassing hand access and cable entrance holes for
VERIFICATION

installation of underground cabling where indicated.


EDSD

DATE:

F. Fasten electrical lighting fixtures and brackets securely to indicated structural


BY:

supports, including poles/standards; and ensure that installed fixtures are plumb
APPROVAL/CERTIFICATION REQUIREMENTS,

and level.
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

G. Tighten connectors and terminals, including screws and bolts, in accordance with
10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 115


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16503
YAA
ENGG CERT

7 of 8
equipment manufacturer's published torque tightening values for equipment
connectors. Where manufacturer's torquing requirements are not indicated, tighten
LSS

connectors and terminals to comply with tightening torques specified in UL


Standards 486A and B, and the National Electrical Code.

3.03 GROUNDING

Provide equipment grounding connections for poles and standard as indicated. Tighten
ISSUED FOR IFC
DESCRIPTION

connections to comply with tightening torques specified in UL 486A to assure permanent


and effective grounding.

END OF SECTION
JO/EWO
01/21/2016 BI-01382
NO. DATE
REV

00

DISCIPLINE
ENGINEER
ANP
01/21/2016
DATE:
PROJECT
ENGINEER
LSS
01/21/2016
DATE:
CERTIFIED
YAA

01/21/2016
DATE:
CONSTRUCTION
AGENCY
YAA

01/21/2016
DATE:
OPERATIONS
ASZ

01/21/2016
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________
10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 116


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16503
YAA
ENGG CERT

8 of 8
DIVISION 16 - ELECTRICAL
LSS

SECTION 16512 - EXTERIOR LIGHTING FIXTURES

PART 1 - GENERAL

1.01 DESCRIPTION OF WORK


ISSUED FOR IFC
DESCRIPTION

A. Extent of exterior lighting fixture work is indicated by drawings and schedules.

B. Types of exterior lighting fixtures in this section include the following:

C. High-intensity-discharge (HID)

1. High pressure sodium.

2. Metal Halide
JO/EWO
01/21/2016 BI-01382

3. LED
DATE

D. Applications of exterior lighting fixtures required for this project include the
following:
NO.
REV

00

DISCIPLINE
ENGINEER 1. Outdoor flood lighting
ANP
01/21/2016
DATE: 2. Outdoor Alley Lighting
PROJECT
ENGINEER
LSS 3. Landscape Pollard Lights
01/21/2016
DATE:
CERTIFIED
YAA
1.02 QUALITY ASSURANCE
01/21/2016
DATE:
A. Manufacturer's Qualifications: Firms regularly engaged in manufacture of exterior
CONSTRUCTION
AGENCY building lighting fixtures of types and ratings required, whose products have been
YAA

01/21/2016
in satisfactory use in similar service for not less than 5 years.
DATE:
OPERATIONS
B. Installer's Qualifications: Firm with at least 3 years of successful installation
ASZ
experience on projects with exterior lighting fixture work similar to that required for
01/21/2016
DATE: project.
CONTROL NUMBER
VERIFICATION

C. Codes and Standards:


EDSD

DATE:

1. Electrical Code Compliance: Comply with applicable requirements of SBC


BY:

401 (Saudi Building Code Volume 4) and NEC Articles 225, 250, 410, and
APPROVAL/CERTIFICATION REQUIREMENTS,

501 as applicable to installation, and construction of exterior building


THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

lighting fixtures, with SBC 401 requirements prevailing over the NEC
(DCC) NO. _____________________

provisions.
10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 117


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16512
YAA
ENGG CERT

1 of 5
2. NEMA Compliance: Comply with applicable requirements of NEMA Stds
Pub/No. LE 2 pertaining lighting equipment.
LSS

3. IES Compliance: Comply with IES RP-8, 19, 20 and PB-15 pertaining to
exterior, parking, and roadway lighting practices and fixtures.

4. UL Compliance: Comply with requirements of UL standards, including Stds


486A and B, pertaining to exterior lighting fixtures. Provide exterior lighting
ISSUED FOR IFC
DESCRIPTION

fixtures and components which are UL-listed and labeled.

5. NFPA Compliance: Comply with applicable requirements of NFPA 78,


"Lightning Protection Code," pertaining to installation of exterior lighting
fixtures.

1.03 SUBMITTALS

A. Product Data: Submit manufacturer's product data and installation instructions on


each type exterior building lighting fixture and component.
JO/EWO
01/21/2016 BI-01382

B. Shop Drawings: Submit fixture shop drawings in booklet form with separate sheet
for each fixture, assembled in "luminaire type" alphabetical or numerical order, with
DATE

proposed fixture and accessories clearly indicated on each sheet.


NO.
REV

00

C. Wiring Diagrams: Submit wiring diagrams for exterior lighting fixtures showing
DISCIPLINE
ENGINEER connections to electrical power panels, switches, dimmers, controllers, and
ANP
feeders. Differentiate between portions of wiring which are manufacturer-installed
01/21/2016
DATE: and portions which are field-installed.
PROJECT
ENGINEER
LSS
D. Samples: Submit one complete operating unit for each type of exterior lighting
01/21/2016
DATE: fixture specified.
CERTIFIED
YAA

01/21/2016
E. Illumination Data: Provide isofootcandle (isolux) plot diagram of footcandles on
DATE:
horizontal pavement surface which shows composite values of luminance projected
CONSTRUCTION
AGENCY
YAA
from the arrangement of light sources from indicated fixture locations and heights.
01/21/2016
Show on the graphic plots the locations, spacings and heights of luminaries.
DATE:
OPERATIONS
1.04 DELIVERY, STORAGE, AND HANDLING
ASZ

01/21/2016
DATE: A. Deliver exterior lighting fixtures in factory-fabricated containers or wrappings, which
CONTROL NUMBER

properly protect fixtures from construction debris and physical damage.


VERIFICATION
EDSD

B. Store exterior lighting fixtures in original wrappings in a clean dry place. Protect
from weather, dirt, fumes, water, construction debris, and damage.
DATE:
BY:

C. Handle exterior lighting fixtures carefully to prevent damage, breaking, and scoring.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Do not install damaged fixtures or components; remove units from site and replace
(DCC) NO. _____________________

with new.
10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 118


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16512
YAA
ENGG CERT

2 of 5
1.05 SEQUENCING AND SCHEDULING
LSS

A. Coordinate with other electrical work including wires/cables, electrical boxes and
fittings, and raceways, to properly interface installation of exterior lighting fixtures
with other work.

B. Sequence exterior lighting installation with other work to reduce possibility of


damage and soiling of fixtures during remainder of construction period.
ISSUED FOR IFC
DESCRIPTION

1.06 MAINTENANCE

A. Maintenance Data: Submit maintenance data and parts list for each exterior
lighting fixture and accessory; including "trouble- shooting" maintenance guide.
Include that data, product data, and shop drawings in a maintenance manual; in
accordance with requirements of Division 1.

B. Extra Stock:
JO/EWO
01/21/2016 BI-01382

Furnish stock or replacement lamps amounting to 15 percent (but not less than one
lamp in each case) of each type and size lamp used in each type fixture. Deliver
replacement stock as directed to SAUDI ARAMCO storage space, and obtain
DATE

receipt.
NO.
REV

00

PART 2 - PRODUCTS
DISCIPLINE
ENGINEER
ANP
2.01 MANUFACTURERS
01/21/2016
DATE:
PROJECT
ENGINEER A. Available Manufacturers: Subject to compliance with requirements, manufacturers
LSS
offering products which may be incorporated in the work include, but are not limited
01/21/2016
DATE: to, the following:
CERTIFIED
YAA

01/21/2016
B. Manufacturers: Subject to compliance with requirements, provide products of one
DATE:
of the following (for each type of exterior lighting fixture).
CONSTRUCTION
AGENCY
YAA
1. Exterior Lighting Fixtures:
01/21/2016
DATE:
OPERATIONS
Appleton Electric Co.
ASZ
Crouse-Hinds Lighting Products Div; Cooper Industries Inc.
01/21/2016
DATE: Devoe Lighting Corp.
CONTROL NUMBER

Dual-Lite Mfg Inc.


VERIFICATION

Emerson Electric Co.


EDSD

General Electric Co.


GTE Sylvania, Inc.
DATE:
BY:

Lithonia Lighting Div; National Services Industries, Inc.


Saudi Lighting Co.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Philips Lighting Co.


(DCC) NO. _____________________

National Lighting Co.


10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 119


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16512
YAA
ENGG CERT

3 of 5
2. High-Intensity Ballasts:
LSS

General Electric Co.


McGraw-Edison Co.
Sola Electric Div; General Signal Corp.
U.S. Lighting Products Inc.
Saudi Lighting Co.
ISSUED FOR IFC
DESCRIPTION

2.02 EXTERIOR LIGHTING FIXTURES

A. General: Provide lighting fixtures, of sizes, types and ratings indicated; complete
with, but not limited to, housings, energy efficient ballasts, starters and wiring.

B. Wiring: Provide electrical wiring within fixtures which are suitable for connection to
branch circuit wiring as follows:

1. NEC Type AF for 230-volts, minimum No. 18 AWG.


JO/EWO
01/21/2016 BI-01382

C. High-Intensity-Discharge Lamp Ballasts: Provide HID lamp ballasts, capable of


operating lamp types and ratings indicated; reactor type, high power-factor, core
and coil assembly encapsulated in non-melt resin; install capacitor outside ballast
DATE

encapsulation for easy field replacement.


NO.
REV

00

D. Lamps:
DISCIPLINE
ENGINEER
ANP
1. Provide high pressure sodium lamps in wattages indicated.
01/21/2016
DATE:
PROJECT
ENGINEER 2. Provide metal halide lamps in wattages indicated.
LSS
01/21/2016
DATE: PART 3 - EXECUTION
CERTIFIED
YAA

01/21/2016
3.01 EXAMINATION
DATE:
CONSTRUCTION
AGENCY A. Examine areas and conditions under which lighting fixtures are to be installed, and
YAA
substrate which will support lighting fixtures. Notify CONTRACTOR in writing of
01/21/2016
DATE: conditions detrimental to proper completion of the Work. Do not proceed with the
OPERATIONS
Work until unsatisfactory conditions have been corrected in a manner acceptable to
ASZ
Installer.
01/21/2016
DATE:
CONTROL NUMBER

3.02 INSTALLATION OF EXTERIOR LIGHTING FIXTURES


VERIFICATION
EDSD

A. Install exterior lighting fixtures at locations and heights as indicated, in accordance


with fixture manufacturer's written instructions, applicable requirements of SBC 401
DATE:
BY:

and the NEC, NECA's "Standard of Installation", NEMA standards, and with
recognized Industry practices to ensure that lighting fixtures fulfill requirements.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

B. Tighten connectors and terminals, including screws and bolts, in accordance with
10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 120


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16512
YAA
ENGG CERT

4 of 5
equipment manufacturer's published torque tightening values for equipment
LSS

connectors. Where manufacturer's torquing requirements are not indicated, tighten


connectors and terminals to comply with tightening torques specified in UL
Standards 486A and B, and the National Electrical Code.

C. Fasten electrical lighting fixtures and brackets securely to indicated structural


supports, including poles/standards; and ensure that installed fixtures are plum and
level.
ISSUED FOR IFC
DESCRIPTION

3.03 GROUNDING

A. Provide equipment grounding connections for exterior lighting fixtures as indicated.


Tighten connections to comply with tightening torques specified in UL Standard
486A to assure permanent and effective grounds.

3.04 FIELD QUALITY CONTROL

A. Replace defective and burned out lamps for a period of one year following the Date
JO/EWO
01/21/2016 BI-01382

of Substantial Completion.

B. At the Date of Substantial Completion, replace lamps in exterior lighting fixtures


DATE

which are observed to be noticeably dimmed after Contractor's use and testing, as
judged by the Company Representative.
NO.
REV

00

DISCIPLINE
ENGINEER C. Refer to Division-1 sections for the replacement/restoration of lamps in exterior
ANP
lighting fixtures, where used for temporary lighting prior to Date of Substantial
01/21/2016
DATE: Completion.
PROJECT
ENGINEER
LSS 3.05 ADJUSTING AND CLEANING
01/21/2016
DATE:
CERTIFIED A. Aim adjustable lighting fixtures and lamps in night test of system. Verify that
YAA

01/21/2016
measured illuminance values comply with isolux plot diagram values.
DATE:
CONSTRUCTION
AGENCY B. Clean lighting fixtures of dirt and debris upon completion of installation.
YAA

01/21/2016
DATE: C. Protect installed fixtures from damage during construction period.
OPERATIONS
ASZ
3.06 DEMONSTRATION
01/21/2016
DATE:
CONTROL NUMBER

A. Upon completion of installation of exterior lighting fixtures, and associated electrical


VERIFICATION

supply circuitry, apply electrical energy to circuitry to demonstrate capability and


EDSD

compliance with requirements. Where possible, correct malfunctioning units at site,


then retest to demonstrate compliance; otherwise, remove and replace with new units,
DATE:
BY:

and proceed with retesting.


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

END OF SECTION
10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 121


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16512
YAA
ENGG CERT

5 of 5
DIVISION 16 - ELECTRICAL
LSS

SECTION 16515 - INTERIOR LIGHTING FIXTURES

PART 1 - GENERAL

1.01 DESCRIPTION OF WORK


ISSUED FOR IFC
DESCRIPTION

A. Extent, location, and details of interior lighting fixture work are indicated on
drawings and in schedules.

B. Types of interior lighting fixtures in this section include the following:

1. High-intensity-discharge (HID)

2. High-Pressure Sodium.

3. Meal Halide Lamps


JO/EWO
01/21/2016 BI-01382

4. Fluorescent.
DATE

5. Incandescent.
NO.
REV

00

6. LED
DISCIPLINE
ENGINEER
ANP
01/21/2016
1.02 QUALITY ASSURANCE
DATE:
PROJECT
ENGINEER A. Manufacturer's Qualifications: Firms regularly engaged in manufacture of interior
LSS
lighting fixtures of sizes, types and ratings required, whose products have been in
01/21/2016
DATE: satisfactory use in similar service for not less than 5 years.
CERTIFIED
YAA

01/21/2016 B. Installer's Qualifications: Firms with at least 3 years of successful installation


DATE:
CONSTRUCTION
experience on projects with interior lighting fixture work similar to that required for
AGENCY
YAA
this project.
01/21/2016
DATE:
C. Codes and Standards:
OPERATIONS
ASZ

01/21/2016
1. Electrical Code Compliance: Comply with applicable requirements of SBC
DATE: 401 (Saudi Building Code Volume 4) and NEC Articles 220, 410, and 510
CONTROL NUMBER

as applicable to installation, and construction of interior building lighting


VERIFICATION

fixtures, with the requirements of SBC 401 prevailing over the NEC
EDSD

provisions.
DATE:
BY:

2. NEMA Compliance: Comply with applicable requirements of NEMA Stds


APPROVAL/CERTIFICATION REQUIREMENTS,

Pub/No.'s LE 1 and LE 2 pertaining to lighting equipment.


THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

3. IES Compliance: Comply with IESNA Lighting Handbook regarding


10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 122


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16515
YAA
ENGG CERT

1 of 7
selection of illuminance values for interior and exterior residential lighting;
IES RP-1 pertaining to office lighting practices, and RP-15 regarding
LSS

selection of illuminance values for interior office lighting.

4. UL Compliance: Comply with UL standards, including UL 486A and B,


pertaining to interior lighting fixtures. Provide interior lighting fixtures and
components which are UL-listed and labeled.
ISSUED FOR IFC
DESCRIPTION

5. CBM Labels: Provide fluorescent lamp ballasts which comply with Certified
Ballast Manufacturers Association standards and carry the CBM label.

1.03 SUBMITTALS

A. Product Data: Submit manufacturer's product data and installation instructions on


each type interior building lighting fixture and component.

B. Shop Drawings: Submit layout drawings of interior lighting fixtures and their spatial
relationship to each other. In addition, submit fixture shop drawings in booklet form
JO/EWO
01/21/2016 BI-01382

with separate sheet for each fixture, assembled in "luminaire type" alphabetical or
numerical order, with proposed fixture and accessories clearly indicated on each
sheet. Submit details indicating compatibility with ceiling grid system.
DATE

C. Wiring Diagrams: Submit wiring diagrams for interior lighting fixtures showing
NO.
REV

00

connections to electrical power panels, switches, dimmers, controllers, and


DISCIPLINE
ENGINEER feeders. Differentiate between portions of wiring which are manufacturer-installed
ANP
and portions which are field-installed.
01/21/2016
DATE:
PROJECT
ENGINEER D. Samples: Submit one complete operating unit for each type of interior light fixture
LSS
specified.
01/21/2016
DATE:
CERTIFIED
YAA E. Maintenance Data: Submit maintenance data and parts list for each interior
01/21/2016
lighting fixture and accessory; including "trouble- shooting" maintenance guide.
DATE:
Include that data, product data, and shop drawings in maintenance manual; in
CONSTRUCTION
AGENCY
YAA
accordance with requirements of Division 1.
01/21/2016
DATE: 1.04 DELIVERY, STORAGE AND HANDLING
OPERATIONS
ASZ
A. Deliver interior lighting fixtures in factory-fabricated containers or wrappings, which
01/21/2016
DATE: properly protect fixtures from damage. Store interior lighting fixtures in original
CONTROL NUMBER

packaging. Store inside well-ventilated area protected from weather, moisture,


VERIFICATION

soiling, extreme temperatures, humidity, laid flat and blocked off ground.
EDSD

DATE:

B. Handle interior lighting fixtures carefully to prevent damage, breaking, and scoring
BY:

of finishes. Do not install damaged units or components; replace with new.


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________
10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 123


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16515
YAA
ENGG CERT

2 of 7
1.05 SEQUENCING AND SCHEDULING
LSS

A. Coordinate with other work including wires/cables, electrical boxes and fittings, and
raceways, to properly interface installation of interior lighting fixtures with other
Work.

B. Sequence interior lighting installation with other Work to minimize possibility of


damage and soiling during remainder of construction.
ISSUED FOR IFC
DESCRIPTION

PART 2 - PRODUCTS

2.01 MANUFACTURERS

A. Available Manufacturers: Subject to compliance with requirements, manufacturers


offering products which may be incorporated in the work include, but are not limited
to, the following:

B. Manufacturers: Subject to compliance with requirements, provide products of one


JO/EWO
01/21/2016 BI-01382

of the following (for each type of interior lighting fixture):

Benjamin Div; Thomas Industries Inc.


DATE

Columbia Lighting, Inc.


Crescent Lighting Div; Keene Corp.
NO.
REV

00

Day-Brite Lighting Div; Emerson Electric Co.


DISCIPLINE Dual-Lite Mfg. Inc.
ENGINEER
ANP General Electric Co.
DATE:
01/21/2016 GTE Products Corp.
PROJECT
ENGINEER
Guth Lighting Div; General Signal Corp.
LSS Halo Lighting Div; McGraw-Edison Co.
DATE:
01/21/2016 Halophane Div; Johns-Manville Sales Corp.
CERTIFIED Lightolier Inc.
YAA
Lithonia Lighting Div; National Service Industries Inc.
01/21/2016
DATE: Wide-Light Corp.
CONSTRUCTION
AGENCY
Saudi Lighting Co.
YAA Philips
DATE:
01/21/2016
Hubbell Lighting Inc.
OPERATIONS National Lighting Company
ASZ

DATE:
01/21/2016 2.02 FIXTURES
CONTROL NUMBER
VERIFICATION

A. General: Provide lighting fixtures, of sizes, types and ratings indicated; complete
EDSD

with, but not limited to, housings, energy- efficient lamps, lamp holders, reflectors,
energy efficient ballasts, starters and wiring. Ship fixtures factory-assembled, with
DATE:
BY:

parts required for a complete installation. Design fixtures with concealed hinges
and catches, with metal parts grounded as common unit, and so constructed as to
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

dampen ballast generated noise.


(DCC) NO. _____________________
10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 124


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16515
YAA
ENGG CERT

3 of 7
B. Wiring: Provide electrical wiring within fixture suitable for connecting to branch
circuit wiring as follows:
LSS

NEC Type AF for 230 volt, minimum No. 18 AWG.

C. Fluorescent-Lamp Ballasts: Provide low-energy fluorescent lamp ballasts, capable


of operating lamp types indicated; with high power factor, rapid-start, and low-noise
features; Type 1; Class P; sound-rated A.
ISSUED FOR IFC
DESCRIPTION

D. High-Intensity-Discharge Lamp Ballasts: Provide HID lamp ballasts, capable of


operating lamp types with ratings indicated; reactor type, high power-factor, core
and coil assembly encapsulated in non-melt resin; install capacitor outside ballast
encapsulation for easy field replacement.

E. High-Intensity-Discharge-Lamp Ballasts: Provide HID lamp ballasts, of ratings,


types and makes as recommended by lamp manufacturer, which properly mates
and matches lamps to electrical supply by providing appropriate voltages and
impedances for which lamps are designed. Design ballast to operate lamp within
JO/EWO
01/21/2016 BI-01382

the lamp's power trapezoid requirements.

F. Lamps:
DATE

1. Provide fluorescent lamps of energy saving cool white, types as indicated.


NO.
REV

00

DISCIPLINE 2. Provide high pressure sodium lamp in wattages indicated.


ENGINEER
ANP

DATE:
01/21/2016 3. Provide Metal halide lamp in wattages indicated.
PROJECT
ENGINEER
LSS 4. Provide LED lamp in wattages indicated.
01/21/2016
DATE:
CERTIFIED G. Interior Lighting Fixture Types:
YAA

01/21/2016
DATE: General: Various fixture types required are indicated below. Fixtures must comply
CONSTRUCTION
AGENCY
with minimum requirements as stated herein. Review architectural drawings and
YAA specifications to verify ceiling types, modules, suspension systems appropriate to
DATE:
01/21/2016
installation.
OPERATIONS
ASZ 1. Fluorescent Fixture:
01/21/2016
DATE:
a. Recessed Mounted: 600 x 600 mm and 600 x 2300 mm fully
CONTROL NUMBER
VERIFICATION

recessed white fluorescent fixture with injection molded, virgin


EDSD

acrylic, pre-treated CRS sheet steel painted stove enamelled in


white, deep parabolic shaped semi-specular aluminum sheet louver
DATE:
BY:

for use with four-18watt and four-36 watt respectively energy saving,
cool white lamps for operation on 230 volts, and proper trim for
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

installations in suspended acoustic tile ceilings.


b. Surface Wall Mounted: 212 x 1230 mm surface-mounted, semi-
(DCC) NO. _____________________
10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 125


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16515
YAA
ENGG CERT

4 of 7
direct type fixtures with pre-treated CRS sheet steel painted stove
enamelled in white with overall efficiency of not less than 70% of
LSS

bare-lamp lumens, shielding assembly of molded virgin acrylic


panels in combination with not less than 20-gage durable etched
and lacquered steel louvers, for operation on 230-volts, with 2
energy-saving Type F instant-start 40 watt, Type T-8/CW slimline
fluorescent lamps as indicated; wire with not less than No. 16 Type
AF fixture wire.
ISSUED FOR IFC
DESCRIPTION

c. Recessed mounted downlight: Down light indoor lighting fixture with


lamp installed vertically, symmetrical dome shaped specular
aluminum reflector for surface, semi-recessed and wall mounting,
housing of cylindrical body made of spun aluminum pre-treated,
painted and stove enameled in white color for surface mounted,
semi-recessed and wall mounting. With recessing frame made of
spun aluminum for semi-recessed fixture and wall bracket for wall
mounted fixture and a bracket for semi-recessed fixture made of
formed galvanized steel sheet pre-treated, painted and stove
enamelled in white color. For use with 1-18 watt fluorescent lamp
JO/EWO
01/21/2016 BI-01382

for operation on 230 volts power supply.

PART 3 - EXECUTION
DATE

3.01 EXAMINATION
NO.
REV

00

DISCIPLINE
ENGINEER A. Examine areas and conditions under which lighting fixtures are to be installed, and
ANP
substrate for supporting lighting fixtures. Notify Saudi Aramco Representative in
01/21/2016
DATE: writing of conditions detrimental to proper completion of the work. Do not proceed
PROJECT
ENGINEER with work until unsatisfactory conditions have been corrected in manner acceptable
LSS
to Installer.
01/21/2016
DATE:
CERTIFIED
YAA 3.02 INSTALLATION OF INTERIOR LIGHTING FIXTURES
01/21/2016
DATE:
A. Install interior lighting fixtures at locations and heights as indicated, in accordance
CONSTRUCTION
AGENCY
YAA
with fixture manufacturer's written instructions, applicable requirements of NEC,
01/21/2016
NECA's "Standard of Installation", NEMA standards, and with recognized industry
DATE: practices to ensure that lighting fixtures fulfill requirements.
OPERATIONS
ASZ
B. Provide fixtures and/or fixture outlet boxes with hangers to properly support fixture
01/21/2016
DATE: weight. Submit design of hangers, method of fastening, other than indicated or
CONTROL NUMBER

specified herein, for review by Architect.


VERIFICATION
EDSD

C. Install flush mounted fixtures to eliminate light leakage between fixture frame and
finished surface.
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

D. Provide plaster frames for recessed fixtures installed in other than suspended grid
type acoustical ceiling systems. Brace frames temporarily to prevent distortion
(DCC) NO. _____________________
10-01382-0008-0001

during handling.

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 126


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16515
YAA
ENGG CERT

5 of 7
E. For air supply type fixtures, retain side slot closures in place for adjustment by
Balancing Contractor.
LSS

F. Fasten fixtures securely to indicated structural supports; and ensure that pendant
fixtures are plumb and level. Provide individually mounted pendant fixtures longer
than 2 feet with twin stem hangers. Provide stem hanger with ball aligners and
provisions for minimum 1" vertical adjustment. Mount continuous rows of fixtures
with an additional stem hanger greater than number of fixtures in the row.
ISSUED FOR IFC
DESCRIPTION

G. Tighten connectors and terminals, including screws and bolts, in accordance with
equipment manufacturer's published torque tightening values for equipment
connectors. Where manufacturer's torquing requirements are not indicated, tighten
connectors and terminals to comply with tightening torques specified in UL
Standards 486A and B, and the National Electrical Code.

H. Support surface mounted fixtures greater than 2 feet in length at a point in addition
to the outlet box fixture stud.
JO/EWO
01/21/2016 BI-01382

3.03 FIELD QUALITY CONTROL

A. Replace defective and burned out lamps for a period of one year following the Date
DATE

of Substantial Completion.
NO.
REV

00

B. At Date of Substantial Completion, replace lamps in interior lighting fixtures which


DISCIPLINE
ENGINEER are observed to be noticeably dimmed after Contractor's use and testing, as judged
ANP
by Architect.
01/21/2016
DATE:
PROJECT
ENGINEER Refer to Division-1 sections for the replacement/restoration of lamps in interior
LSS
lighting fixtures, where used for temporary lighting prior to Date of Substantial
01/21/2016
DATE: Completion.
CERTIFIED
YAA

01/21/2016
C. Furnish stock or replacement lamps amounting to 15%, but not less than 4 lamps
DATE:
in each case, of each type and size lamp used in each type fixture. Deliver
CONSTRUCTION
AGENCY
YAA
replacement stock as directed to Owner's storage space.
01/21/2016
DATE: 3.04 ADJUSTING AND CLEANING
OPERATIONS
ASZ
A. Clean interior lighting fixtures of dirt and construction debris upon completion of
01/21/2016
DATE: installation. Clean fingerprints and smudges from lenses.
CONTROL NUMBER
VERIFICATION

B. Protect installed fixtures from damage during remainder of construction period.


EDSD

3.05 GROUNDING
DATE:
BY:

A. Provide equipment grounding connections for interior lighting fixtures as indicated.


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Tighten connections to comply with tightening torques specified in UL Standard


(DCC) NO. _____________________

486A to assure permanent and effective grounds.


10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 127


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16515
YAA
ENGG CERT

6 of 7
3.06 DEMONSTRATION
LSS

A. Upon completion of installation of interior lighting fixtures, and after building


circuitry has been energized, apply electrical energy to demonstrate capability and
compliance with requirements. Where possible, correct malfunctioning units at
site, then retest to demonstrate compliance; otherwise, remove and replace with
new units, and proceed with retesting.
ISSUED FOR IFC
DESCRIPTION

END OF SECTION
JO/EWO
01/21/2016 BI-01382
NO. DATE
REV

00

DISCIPLINE
ENGINEER
ANP
01/21/2016
DATE:
PROJECT
ENGINEER
LSS
01/21/2016
DATE:
CERTIFIED
YAA

01/21/2016
DATE:
CONSTRUCTION
AGENCY
YAA

01/21/2016
DATE:
OPERATIONS
ASZ

01/21/2016
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________
10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 128


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16515
YAA
ENGG CERT

7 of 7
DIVISION 16 - ELECTRICAL
LSS

SECTION 16535 - EMERGENCY LIGHTING

PART 1 - GENERAL

1.01 DESCRIPTION OF WORK


ISSUED FOR IFC
DESCRIPTION

A. This Section includes emergency light sets, exit fixtures with integral emergency
battery backup, and emergency fluorescent fixture power supplies with integral
battery backup.

B. Related Sections: The following Section contain requirements that relate to this
Section:

Division 16 Section "Interior Lighting Fixtures" for regular fixtures that may be
connected to emergency circuits to provide emergency lighting.
JO/EWO
01/21/2016 BI-01382

1.02 QUALITY ASSURANCE


DATE

A. Electrical Component Standard: Components and installation shall comply with


SBC 401 (Saudi Building Code Volume 4) and NFPA 70 "National Electrical Code,"
with the requirements of SBC 401 prevailing over the NEC provisions.
NO.
REV

00

DISCIPLINE
ENGINEER B. UL Compliance: Emergency lighting fixtures shall be UL listed and labeled.
ANP
01/21/2016
DATE: C. NFPA Compliance: Comply with applicable requirements of NFPA 99, "Health
PROJECT
ENGINEER Care Facilities" and NFPA 101, "Life Safety Code."
LSS
01/21/2016
DATE: D. Local Code Compliance: Comply with applicable local codes and regulations for
CERTIFIED
YAA emergency lighting and exit signage including, but not limited to, colors and letter
01/21/2016 heights for exit signs.
DATE:
CONSTRUCTION
AGENCY
YAA
1.03 SUBMITTALS
01/21/2016
DATE:
A. Product data for each type of emergency lighting unit specified. Assemble in
OPERATIONS
ASZ
booklet form with separate sheet for each fixture, arranged in unit "type,"
01/21/2016
alphabetical, or numerical order, with proposed fixture and accessories clearly
DATE: indicated on each sheet.
CONTROL NUMBER
VERIFICATION

B. Samples of specific individual products for approval where indicated.


EDSD

DATE:

C. Maintenance data for units specified, for inclusion in Operating and Maintenance
BY:

Manual specified in Division 1 and in Division 16 Section "Basic Electrical


APPROVAL/CERTIFICATION REQUIREMENTS,

Requirements." Submit complete manual material concurrently with system


THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

submittal and updated final versions of manuals with closeout procedures specified
(DCC) NO. _____________________

in Division 1 Section "Project Closeout."


10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 129


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16535
YAA
ENGG CERT

1 of 5
D. Installation instructions written by manufacturers for all specified products.
LSS

1.04 DELIVERY, STORAGE, AND HANDLING

A. Deliver products in factory containers. Store in clean, dry space in original


container. Protect products from fumes and construction traffic.

1.05 EXTRA MATERIALS


ISSUED FOR IFC
DESCRIPTION

A. Furnish stock of replacement lamps amounting to 15 percent (but not less than one
lamp in each case) of each type and size lamp used in each type unit.

PART 2 - PRODUCTS

2.01 MANUFACTURERS

A. Available Manufacturers: Subject to compliance with requirements, manufacturers


offering products that may be incorporated in the Work include but are not limited
JO/EWO
01/21/2016 BI-01382

to the following:

B. Manufacturers: Subject to compliance with requirements, provide products by the


DATE

following:
NO.
REV

00

1. Chloride Systems
DISCIPLINE
ENGINEER
ANP
Cooper Industries, Inc.
01/21/2016
DATE: Dual-Lite, Inc.
PROJECT
ENGINEER Holophane Lighting
LSS
Hubbell, Inc. Legion Lighting Co., Inc.
01/21/2016
DATE: Lithonia Lighting
CERTIFIED
YAA Thomas Industries, Inc.
01/21/2016
Saudi Lighting Co.
DATE:
Philips
CONSTRUCTION
AGENCY
YAA
National Lighting Company
01/21/2016
DATE: 2.02 EMERGENCY LIGHT SET, EXIT SIGN
OPERATIONS
ASZ
A. Self-contained, a.c. battery-illuminated exit sign unit, universal mounting with
01/21/2016
DATE: downlight.
CONTROL NUMBER
VERIFICATION

1. Lamps: Manufacturer's standard, furnished with unit.


EDSD

DATE:

Style, shape, trim, material, finish, and arrangement of housing as


BY:

indicated.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

2. Faceplate: High-impact, UL 94 V-O rated, plastic with snap- out arrows and
(DCC) NO. _____________________

color of letters as indicated.


10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 130


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16535
YAA
ENGG CERT

2 of 5
3. Mounting provisions shall suit individual installation conditions. Battery:
LSS

Sealed, maintenance-free, lead-acid type, with 10- year nominal life.

4. Charger: Minimum 2-rate, fully automatic, solid-state type, with sealed


transfer relay.

5. Finish: Matte white for exposed parts, or as indicated.


ISSUED FOR IFC
DESCRIPTION

6. Operation: Sign is illuminated by a.c.-powered lamps under normal


conditions. Relay turns emergency lamps on automatically when supply
circuit voltage drops to 80 percent of nominal or below. Lamps operate for
duration of outage, up to 1.5 hours. Lamps automatically disconnect from
battery when voltage approaches deep-discharge value. When normal
voltage is restored, a.c.-powered lamps are relighted and d.c. lamps are
switched off. Battery is automatically recharged within 16 hours and
maintained on trickle charge.
JO/EWO
01/21/2016 BI-01382

2.03 EMERGENCY FLUORESCENT POWER SUPPLY

A. Internal Type: For designated fluorescent fixtures, provided under Division 16


DATE

Section "Lighting Fixtures," provide internal self-contained, modular, battery-


inverter unit, factory mounted within the fixture body.
NO.
REV

00

DISCIPLINE
ENGINEER 1. Arrange unit with test switch and LED indicator light, visible and accessible
ANP
without opening fixture or entering ceiling space.
01/21/2016
DATE:
PROJECT
ENGINEER 2. Battery: Sealed, maintenance-free, nickel-cadmium type, with normal 10-
LSS year life, minimum.
01/21/2016
DATE:
CERTIFIED 3. Charger: Fully automatic, solid-state, constant-current type.
YAA

01/21/2016
DATE: 4. Operation: Relay turns two lamps on automatically when supply circuit
CONSTRUCTION
AGENCY voltage drops to 80 percent of nominal or below. Lamps operate for
YAA
duration of outage, up to 1.5 hours. When normal voltage is restored,
01/21/2016
DATE: battery is automatically recharged.
OPERATIONS
ASZ
B. External Type: For designated fluorescent fixtures, provided under Division 16
01/21/2016
DATE: Section "Lighting Fixtures," provide external self-contained, modular, battery-
CONTROL NUMBER

inverter unit.
VERIFICATION
EDSD

1. Arrange unit with test switch and LED indicator light, visible and accessible
without entering ceiling space.
DATE:
BY:

2. Battery: Sealed, maintenance-free, nickel-cadmium type, with normal 10-


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

year life, minimum.


(DCC) NO. _____________________
10-01382-0008-0001

3. Charger: Fully automatic, solid-state, constant-current type.


B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 131


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16535
YAA
ENGG CERT

3 of 5
4. Operation: Relay turns two lamps of associate fixture on automatically
when supply circuit voltage drops to 80 percent of nominal or below.
LSS

Lamps operate for duration of outage, up to 1.5 hours. When normal


voltage is restored, battery is automatically recharged.

PART 3 - EXECUTION

3.01 INSTALLATION
ISSUED FOR IFC
DESCRIPTION

A. Setting and Securing: Set units plumb, square, and level with ceiling and walls and
secure in accordance with manufacturer's written instructions and approved shop
drawings. Conform to the requirements of NFPA 70.

B. Mounting heights specified or indicated are to bottom of fixture for suspended or


ceiling-mounted fixtures and to center of fixture for wall-mounted fixtures.

C. Support: Recessed and semirecessed fixtures may be supported from suspended


ceiling support system if the ceiling system support rods or wires are installed at a
JO/EWO
01/21/2016 BI-01382

minimum of four rods or wires per fixture and located not more than 6 inches from
fixture corners. For fixtures smaller than the ceiling grid, install a minimum of four
rods or wires per fixture and locate at corner of the ceiling grid in which the fixture
DATE

is located. Do not support fixtures by ceiling acoustical panels. Where fixtures


smaller than the ceiling grid are indicated to be centered in the acoustical panel,
NO.
REV

00

support fixtures independently with at least two 3/4-inch metal channels spanning
DISCIPLINE
ENGINEER and secured to the ceiling tees. Rods or wires for Section "Acoustical Treatment."
ANP
Install support clips for recessed fixtures, securely fastened to ceiling grid
01/21/2016
DATE: members, at or near each fixture corner.
PROJECT
ENGINEER
LSS D. Lamping and Connection: Lamp units in accordance with manufacturer's
01/21/2016
DATE: instructions. Make external wiring connections required for proper functioning.
CERTIFIED
YAA

01/21/2016
E. Coordinate with other electrical installations as appropriate for proper installation of
DATE: emergency lighting fixtures.
CONSTRUCTION
AGENCY
YAA
3.02 ADJUSTING AND CLEANING
01/21/2016
DATE:
OPERATIONS A. Clean emergency units light set upon completion of installation.
ASZ

DATE:
01/21/2016
B. Adjust aimable fixtures to provide light intensities in egress paths.
CONTROL NUMBER
VERIFICATION

3.03 GROUNDING
EDSD

A. Ground non-current-carrying parts of equipment. Where the copper grounding


DATE:
BY:

conductor is connected to a metal other than copper, provide specially treated or


lined connectors suitable for this purpose.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

B. Tighten grounding connections to comply with tightening torques specified in UL


(DCC) NO. _____________________
10-01382-0008-0001

Standard 486A.

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 132


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16535
YAA
ENGG CERT

4 of 5
3.04 FIELD QUALITY CONTROL
LSS

A. Tests: After emergency lighting units have been installed and building circuits have
been energized with normal power source, apply and interrupt electrical energy to
demonstrate proper operation. Remove and replace malfunctioning units with new
units and proceed with retesting. Give the Company Representative advance
notice of dates and times for all field tests. Provide instruments as required to
make positive observation of test results. Include the following in tests:
ISSUED FOR IFC
DESCRIPTION

1. Duration of supply.

2. Low battery voltage shutdown.

3. Normal transfer to battery source and retransfer to normal.

4. Low supply voltage transfer.

B. Insulation Resistance Test: Perform as specified in Division 16 Section "Wires and


JO/EWO
01/21/2016 BI-01382

Cables" both before and after connection of fixtures and equipment.

C. Electrical Continuity Tests: Perform as specified in Division 16 Section "Wires and


DATE

Cables."
NO.
REV

D. Lamp Replacement: Prior to tests, install new lamps in emergency lighting units.
00

DISCIPLINE After testing, place malfunctioning lamps.


ENGINEER
ANP
01/21/2016
DATE:
PROJECT
ENGINEER
LSS
01/21/2016 END OF SECTION
DATE:
CERTIFIED
YAA

01/21/2016
DATE:
CONSTRUCTION
AGENCY
YAA

01/21/2016
DATE:
OPERATIONS
ASZ

01/21/2016
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________
10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 133


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16535
YAA
ENGG CERT

5 of 5
DIVISION 16 - ELECTRICAL
LSS

SECTION 16660 - GROUND-FAULT PROTECTION SYSTEMS

PART 1 - GENERAL

1.01 DESCRIPTION OF WORK


ISSUED FOR IFC
DESCRIPTION

A. Extent of ground-fault protection work is indicated by drawings and schedules, and


by requirements of this section.

B. Applications of ground-fault protection units required for project include the


following:

Single service disconnect.


Feeder and branch circuits.

1.03 SUBMITTALS
JO/EWO
01/21/2016 BI-01382

A. Product Data: Submit manufacturer's data on ground-fault protection devices and


DATE

associated components including, but not limited to, types, sizes, basic ampere
ratings, and control voltages.
NO.
REV

00

B. Shop Drawings: Submit layout drawings of installed ground-fault protection


DISCIPLINE
ENGINEER devices and accessories including sensors, current monitors, and test panels.
ANP
01/21/2016
DATE:
C. Wiring Diagrams: Submit ground-fault protection systems wiring diagrams
PROJECT
ENGINEER showing, but not limited to, splices, connectors, and interconnections to equipment.
LSS
Include routing and special relationships to adjacent electrical power and signal
01/21/2016
DATE: wiring.
CERTIFIED
YAA

01/21/2016 1.02 QUALITY ASSURANCE:


DATE:
CONSTRUCTION
AGENCY
YAA
A. Codes and Standards: Comply with all applicable codes and standards including,
01/21/2016
but not limited to, those listed below:
DATE:
OPERATIONS
ASZ
1. UL Compliance: Comply with applicable requirements of Standard 486A,
01/21/2016
"Wire Connectors and Soldering Lugs for Use with Copper Conductors",
DATE: and Std 1053, "Ground-Fault Sensing and Relaying Equipment." Provide
CONTROL NUMBER

ground-fault protection systems and components which are UL-listed and


VERIFICATION

labeled.
EDSD

DATE:

2. IEEE Compliance: Comply with applicable recommended practice of IEEE


BY:

Standards 142, 241 and 242 pertaining to ground-fault protection devices.


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________
10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 134


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16660
YAA
ENGG CERT

1 of 5
3. NEMA Compliance: Comply with NEMA Stds Pub No.'s PB 2.2 and AB 1,
pertaining to construction and installation of ground- fault protection devices
LSS

and molded-case circuit-breakers.

4. Electrical Code Compliance: Comply with applicable requirements of SBC


401 (Saudi Building Code Volume 4) and NFPA 70 (National Electrical
Code), pertaining to construction and installation of ground-fault protection
devices, with the requirements of SBC 401 prevailing over the NEC
ISSUED FOR IFC
DESCRIPTION

provisions.

B. Manufacturer's Qualifications: Firms regularly engaged in manufacture of ground-


fault protection units of types, ratings and characteristics required, whose products
have been in satisfactory use in similar service for not less than 3 years.

C. Installer's Qualifications: Firm with at least 3 years of successful installation


experience on projects utilizing ground- fault protection work similar to that required
for this project.
JO/EWO
01/21/2016 BI-01382

1.04 PRODUCT DELIVERY, STORAGE AND HANDLING:

A. Deliver ground-fault protection units properly packaged in factory-fabricated


DATE

containers.
NO.
REV

00

B. Store ground-fault protection units indoors in clean, dry space. Retain units, until
DISCIPLINE
ENGINEER installed, in original cartons and protect from dirt, weather, construction debris and
ANP
traffic.
01/21/2016
DATE:
PROJECT
ENGINEER C. Handle ground-fault protection units properly to avoid abrasing, cracking, and
LSS
breaking.
01/21/2016
DATE:
CERTIFIED
YAA PART 2 - PRODUCTS
01/21/2016
DATE:
2.01 MANUFACTURERS:
CONSTRUCTION
AGENCY
YAA

01/21/2016
A. Available Manufacturers: Subject to compliance with requirements, manufacturers
DATE: offering ground-fault protection units which may be incorporated in the work
OPERATIONS
include, but are not limited to, the following:
ASZ

01/21/2016
DATE: 1. Manufacturers: Subject to compliance with requirements, provide ground-
CONTROL NUMBER

fault protection units of one of the following (for each type of unit):
VERIFICATION
EDSD

Allen-Bradley Co.
DATE:

Brown Boveri Electric Inc. Federal Pacific Electric Co.


BY:

General Electric Co.


APPROVAL/CERTIFICATION REQUIREMENTS,

Gould Inc.
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Square D Co.
(DCC) NO. _____________________

Westinghouse Electric Corp.


10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 135


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16660
YAA
ENGG CERT

2 of 5
2.02 GROUND-FAULT PROTECTION SYSTEMS AND DEVICES:
LSS

A. General: Except as otherwise indicated, provide ground-fault protection systems,


including devices and components, of types, sizes, characteristics, and ratings
indicated, which comply with manufacturer's standard materials, design and
construction in accordance with published product information, and as required for
complete installation. Where types, sizes, or ratings are not indicated, comply with
NEC, UL and established industry standards for applications indicated.
ISSUED FOR IFC
DESCRIPTION

B. Circuit Interrupters/Circuit Breakers: Provide 1" wide module bolt-on panelboard


circuit breakers, with integral ground-fault circuit interrupters, UL-rated Class A,
Group 1; 20-amperes ratings, 2-pole construction, 230/400-volts, 60 Hz, 10,000
AIC. Provide units with solid-state ground-fault sensing and signaling, with 5
milliamperes ground-fault sensitivity trip level, with accuracy of plus or minus 1
milliampere. Equip with PUSH-TO-TEST capability. Provide modules which mate
and match panelboards in which they are located.

C. Ground-Fault Protection Systems:


JO/EWO
01/21/2016 BI-01382

1. General: Provide ground-fault protection systems for grounded electrical


systems, 600-Volts, 60Hz, comprised of current monitor, shunt trip relaying
DATE

equipment, including solid-state relays, and static ground-fault current


sensors of sufficient size to encircle phase conductors and neutral
NO.
REV

conductor of circuit to be monitored. Select GFP systems with monitor


00

DISCIPLINE panels, and low-voltage power circuit-breakers; select units which function
ENGINEER
ANP properly in conjunction with other elements of GFP system. Provide
DATE:
01/21/2016 ground-fault current sensitivity and time- current response characteristics as
PROJECT indicated. Construct system components and devices with the following
ENGINEER
LSS
features:
01/21/2016
DATE:
CERTIFIED D. Current Sensors: Provide zero-sequence current sensors with rectangular
YAA windows for feeder and branch devices and ground return sensors for main service
DATE:
01/21/2016 device; inputs compatible to relay. Construct sensor of split-core construction which
CONSTRUCTION can be opened to expedite its installation or removal without disturbing the
AGENCY
YAA electrical conductors being encompassed. Provide test windings in sensor for
01/21/2016 testing the operation of ground-fault protection unit including sensor pick-up, relay
DATE:
OPERATIONS
and circuit protection devices.
ASZ

01/21/2016 E. Ground-Fault Relay: Provide solid-state ground-fault signaling relay with silicon
DATE:
controlled rectifier (SCR) output, to be used with electric or shunt trip, which
CONTROL NUMBER
VERIFICATION

requires no external source of electrical power, drawing its energy to operate


ground-fault protection system directly from output of current sensor. Select relays
EDSD

capable of sensing ground currents which causes the interruptor to open after
DATE:

current reaches a magnitude value for time period indicated. Provide relay with
BY:

adjustable pick-up current sensitivity range from 10 mA to 200 mA for ground-fault


APPROVAL/CERTIFICATION REQUIREMENTS,

currents from 100 to 2300 amperes, with calibrated dial to show pick-up point
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

settings. Provide factory-set time delay which is adjustable from instantaneous to


(DCC) NO. _____________________

15-seconds and which also prevents tampering with setting after installation.
10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 136


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16660
YAA
ENGG CERT

3 of 5
F. Circuit Breakers: Provide molded-case circuit breakers of sizes and ratings
indicated. Construct with thermal and magnetic elements for conventional overload
LSS

and fault-current protection; and with ground-fault trip mechanism capable of being
activated by ground-fault relay which causes opening of circuit when ground-fault
occurs of the magnitude indicated.

G. Monitor Panels: Provide monitor panels with ground-fault indicators, control power
indicators and TEST and RESET buttons, and with control circuitry capable of
ISSUED FOR IFC
DESCRIPTION

providing means for testing system with, or without interruption of service.


Construct ground-fault system which can not be left in an INACTIVE, or OFF state.

PART 3 - EXECUTION

3.01 EXAMINATION

Examine areas and conditions under which ground-fault protection systems and devices
are to be installed, and notify Contractor in writing of conditions detrimental to proper
completion of work. Do not proceed with work until unsatisfactory conditions have been
JO/EWO
01/21/2016 BI-01382

corrected in a manner acceptable to Installer.


DATE

3.02 INSTALLATION OF GROUND-FAULT PROTECTION DEVICES


NO.
REV

00

A. Install ground-fault protection devices as indicated, in accordance with


DISCIPLINE
ENGINEER manufacturer's written instructions and with recognized industry practices to ensure
ANP
that ground-fault protection devices comply with requirements. Comply with
01/21/2016
DATE: applicable requirements of NEC and NEMA standards for installation of ground-
PROJECT
ENGINEER fault protection devices to ensure that devices fulfill requirements.
LSS
01/21/2016
DATE: B. Coordinate with other electrical work, including electrical wiring work, as
CERTIFIED
YAA appropriate to properly interface installation of ground-fault protection devices with
01/21/2016
other work.
DATE:
CONSTRUCTION
AGENCY
YAA
C. Install ground-fault protection devices complying with electrical winding polarities
01/21/2016
indicated.
DATE:
OPERATIONS
D. Fasten ground-fault sensing devices without mechanical stresses, twisting, or
ASZ
misalignment being exerted by clamps, supports, bus bars or cables.
01/21/2016
DATE:
CONTROL NUMBER

E. Install ground-fault sensing windows symmetrically encircling power conductor bus


VERIFICATION

bars or cables. Maintain clearances between conductors and ground-fault sensor


EDSD

body as recommended by device manufacturer.


DATE:
BY:

3.03 GROUNDING
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Provide grounding connections for ground-fault systems and units as indicated. Tighten
(DCC) NO. _____________________

connectors and terminals, including screws and bolts, in accordance with equipment
10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 137


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16660
YAA
ENGG CERT

4 of 5
manufacturer's published torque tightening values for equipment connectors. Where
manufacturer's torquing requirements are not indicated, tighten connectors and terminals
LSS

to comply with tightening torques specified in UL Standard 486A.

3.04 ADJUSTING

Set field-adjustable GFP devices for pickup and time sensitivity ranges as indicated by
shunt circuit and overcurrent study, subsequent to installation of devices.
ISSUED FOR IFC
DESCRIPTION

3.05 FIELD QUALITY CONTROL

Upon completion of installation of ground-fault protection devices and after electrical


circuitry has been energized, demonstrate capability, and compliance with requirements.
Where possible, correct malfunctioning units at site, then retest to demonstrate
compliance; otherwise, remove and replace with new units, and proceed with retesting.

END OF SECTION
JO/EWO
01/21/2016 BI-01382
NO. DATE
REV

00

DISCIPLINE
ENGINEER
ANP
01/21/2016
DATE:
PROJECT
ENGINEER
LSS
01/21/2016
DATE:
CERTIFIED
YAA

01/21/2016
DATE:
CONSTRUCTION
AGENCY
YAA

01/21/2016
DATE:
OPERATIONS
ASZ

01/21/2016
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________
10-01382-0008-0001

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 138


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

SECTION 16660
YAA
ENGG CERT

5 of 5
DIVISION 16 - ELECTRICAL
LSS

SECTION 16721 - FIRE ALARM SYSTEMS

PART 1 - GENERAL

1.01 DESCRIPTION OF WORK


ISSUED FOR IFC
DESCRIPTION

A. Extent of fire alarm systems work is indicated by drawings, schedules, and riser
diagrams.

B. The National Fire Alarm Code NFPA 72 shall be followed to establish the
requirement for buildings. Local Fire Alarm Panels (LFAP) shall be installed in all
buildings such as to which in-building addressable smoke detectors, heat sensors
and manual call points are installed and connected.

Fire detection /monitoring devices such as manual-call points shall be connected to


the dedicated LFAPs located in the relevant building through dedicated junction
JO/EWO
01/21/2016 BI-01382

boxes.
DATE

To maintain the integrity of the Fire Alarm System design all LFAPs shall be of the
indicating and audible type to ensure that a status of each field device loop is
available locally.
NO.
REV

00

DISCIPLINE
ENGINEER C. Provide system suitable for type occupancy as defined by local Building Code and
ANP
01/21/2016
as approved by local Fire Marshal.
DATE:
PROJECT
ENGINEER D. Fire protection where required shall be provided by passive fire protection methods
LSS
such as physical isolation or fire insulation.
01/21/2016
DATE:
CERTIFIED
YAA Mitigating actions against Fire events such as the operation of fire suppression or
01/21/2016 closure of air dampers are safety actions subject to Safety Review by Company.
DATE:
CONSTRUCTION
AGENCY
YAA
1.01.1 SCOPE
01/21/2016
DATE:
The Scope of Supply shall include all the necessary hardware, software, manufacture,
OPERATIONS
ASZ
assembly and testing to meet the requirements of the Fire Detection System (FDS) as
01/21/2016
specified in this document and on the requisition but not limited to the following:
DATE:
CONTROL NUMBER

Hardware and Software


VERIFICATION

• Fire Detectors
EDSD

• Smoke Detectors
DATE:

• Fire Panels
BY:

• Special Tools
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

• Commissioning Spares
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________
10-01382-0008-0001

SECTION 16721
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 139


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

1 of 10
YAA
ENGG CERT

Testing
LSS

Site Supervision

Documentation and Certificates

To facilitate material control at site, the Vendor shall package the fire alarm panel and
components (detectors, horns etc;) associated with each building to allow easier control at
site.
ISSUED FOR IFC
DESCRIPTION

CONTRACTOR shall furnish the following information to FDS Vendor:


• A floor plan which indicates the use of all rooms
• Locations of alarm-initiating and notification appliances
• Alarm control and trouble signalling equipment.
• Annunciation
• Power connection
• Battery calculations
• Conductor type and sizes
JO/EWO
01/21/2016 BI-01382

• Voltage drop calculations


• Manufacturers, model numbers and listing information for each material
• Details of ceiling height and construction
DATE

• The interface of fire safety control functions


• Complete sequence of operations detailing all inputs and outputs
NO.
REV

00

• Provide details regarding system performance and integrity in accordance with


DISCIPLINE
ENGINEER
Chapter 6.5, NFPA 72. this should also include the details pertaining to: Class Type
ANP (A) and style for SLC, and Class Type (A) and style type for NACs.
01/21/2016
DATE:
PROJECT
ENGINEER 1.02 QUALITY ASSURANCE:
LSS

DATE:
01/21/2016
A. Manufacturer's Qualifications: Firms regularly engaged in manufacture of fire
CERTIFIED alarm systems, of types, sizes, and electrical characteristics required, and whose
YAA
products have been in satisfactory use in similar service for not less than 5 years.
01/21/2016
DATE:
CONSTRUCTION
AGENCY B. Installer's Qualifications: Factory trained technicians qualified with at least 5 years
YAA
of successful installation experience on projects with fire alarm systems installation
01/21/2016
DATE: work similar to that required for this project.
OPERATIONS
ASZ
C. Contractor shall be responsible for detailing the basis of quantifying the types,
01/21/2016
DATE: quantities and locations of all fire devices for approval by Company.
CONTROL NUMBER
VERIFICATION

Firm with factory authorized service organization and spare parts stock.
EDSD

D. Codes and Standards


DATE:
BY:

1. NEC Compliance: Comply with applicable requirements of NEC standards


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

pertaining to fire alarm systems.


(DCC) NO. _____________________
10-01382-0008-0001

SECTION 16721

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 140


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

2 of 10
YAA
ENGG CERT

2. UL Compliance and Labeling: Comply with provisions of UL safety


standards pertaining to fire alarm systems; and provide products and
LSS

components which are UL-listed and labeled.

3. FM Compliance: Provide fire alarm systems and accessories which are


FM-approved.

1.03 SUBMITTALS
ISSUED FOR IFC
DESCRIPTION

A. Product Data: Submit manufacturer's technical product data, including


specifications and installation instructions, for each type of fire alarm system
equipment. Include standard or typical riser and wiring diagrams, and operation
and maintenance instructions for inclusion in maintenance manuals.

B. Shop Drawings: Provide shop drawings showing equipment/device locations and


connecting wiring of entire fire alarm system. Include wiring and riser diagrams.

C. Maintenance Data: Submit maintenance data and parts lists for each type of fire
alarm equipment installed, including furnished specialties and accessories. Include
JO/EWO
01/21/2016 BI-01382

this data, product data, and shop drawings in maintenance manual; in accordance
with requirements of Division 1.
DATE

D. Fire layout drawings detailing fire zones, alarm zones and all fire devices shall be
provided by Contractor for approval by Company.
NO.
REV

00

DISCIPLINE
ENGINEER 1.04 DELIVERY, STORAGE, AND HANDLING
ANP
01/21/2016
DATE: A. Handle fire alarm equipment carefully to prevent damage, breaking, and scoring.
PROJECT
ENGINEER Do not install damaged equipment or components; replace with new.
LSS
01/21/2016
DATE: B. Store fire alarm equipment in clean, dry place. Protect from weather, dirt, fumes,
CERTIFIED
YAA water, construction debris, and physical damage.
01/21/2016
DATE:
CONSTRUCTION
PART 2 - PRODUCTS
AGENCY
YAA

01/21/2016
2.01 ACCEPTABLE MANUFACTURERS
DATE:
OPERATIONS
ASZ
A. Available Manufacturers: Subject to compliance with requirements, manufacturers
01/21/2016
offering fire alarm systems which may be incorporated in the work include, but are
DATE: not limited to, the following:
CONTROL NUMBER
VERIFICATION

B. Manufacturers: Subject to compliance with requirements, provide fire alarm


EDSD

systems of one of the following (for each type of product):


DATE:
BY:

Tyco
Notifier
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

GE Security
(DCC) NO. _____________________
10-01382-0008-0001

SECTION 16721

B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 141


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

3 of 10
YAA
ENGG CERT

EST
Honeywell
Detronics
LSS

Protecto-Wire
Simplex Grinnell
Hochiki

2.02 FIRE ALARM AND DETECTION SYSTEMS

A. SYSTEM REQUIREMENTS
ISSUED FOR IFC
DESCRIPTION

1. Standards

In addition, the Vendor shall be fully responsible for ensuring that any fire or
smoke devices offered shall meet national and local standards in addition to
the international standards and the documents referenced herein. The
Vendor shall have all appropriate documentation in place as a pre-requisite
requirement.
JO/EWO
01/21/2016 BI-01382

National and local standards at the site location may take precedence over
the International codes and the COMPANY standards. It shall be the
Vendors responsibility to confirm all these standards and requirements are
DATE

met and provide the necessary documentation to obtain certification for the
system approval.
NO.
REV

00

DISCIPLINE This is in addition to the international certification that shall be provided with
ENGINEER
ANP the equipment before procurement and installation of the devices.
01/21/2016
DATE:
PROJECT 2. Fire Detection and Alarm Systems
ENGINEER
LSS
01/21/2016 Fire detection system consisting of smoke detector, carbon monoxide alarm, horn
DATE:
CERTIFIED and strobe lights.
YAA

DATE:
01/21/2016 3. Fire Detection Audible Alarms
CONSTRUCTION
AGENCY
YAA The smoke alarm and carbon monoxide (CO) shall receive primary power
DATE:
01/21/2016 from the building 230VAC power and a secondary power supply from an
OPERATIONS individual 9VDC battery inside each smoke alarm unit.
ASZ

DATE:
01/21/2016 All fire alarm tones and patterns shall be distinct and recognisable from all
other audible alarms. This shall be engineered by CONTRACTOR and be
CONTROL NUMBER
VERIFICATION

subject to review and approval by the COMPANY. Process unit and site
EDSD

wide alarms shall also be distinguishable from the site evacuation alarm
tone and pattern.
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________
10-01382-0008-0001

SECTION 16721
4 of 10
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 142


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

4. Automatic Actuation
YAA
ENGG CERT

Automatic actuation on fire detection may be applied to the following and is


LSS

subject to the approval by the COMPANY:

• Actuation of alarm sounders upon detection of fire


• Actuation of Sprinkler System through Flow Switch

5. Manual Initiation
ISSUED FOR IFC
DESCRIPTION

The following may be manually initiated:

• Actuation of fire alarm and flow switch

B. Design system for alarm sounding continuously on each building zone in alarm
only and will activate the Sprinkler System through Flow Switch.

C. System Wiring and Supervision:


JO/EWO

1. Provide Class A initiating and alarm circuits with electrical supervision for
01/21/2016 BI-01382

shorts and open conditions.


DATE

2. Power Supplies: Provide system for operation on 230 VAC power supply.
Arrange control system for operation of primary power supply and trouble
power supply to operate from opposite legs of three wire system.
NO.
REV

00

DISCIPLINE
ENGINEER
ANP
3. Provide battery back-up as secondary power supply. Design battery back-
01/21/2016 up to take over supply to system within 30 seconds of loss of primary
DATE:
PROJECT system to 85% voltage. Provide battery system capable of operation of
ENGINEER
LSS
system for 24-hours under normal conditions and then for five minutes
01/21/2016 under alarm conditions.
DATE:
CERTIFIED
YAA D. Remote Station Systems
01/21/2016
DATE:
CONSTRUCTION E. Control of auxiliary services:
AGENCY
YAA

01/21/2016 1. Fan shut down relays.


DATE:
OPERATIONS
ASZ F. Equip and wire system so that by energizing fire alarm audible signaling devices
01/21/2016 will also activate the following:
DATE:
CONTROL NUMBER
VERIFICATION

1. Exterior flashing red lights.


EDSD

2. Interior Flashing Strobelights


DATE:
BY:

G. Wiring System Materials: Provide basic wiring materials which comply with
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE

Division-16 Basic Electrical Materials and Methods sections, "Raceways" and


00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________
10-01382-0008-0001

SECTION 16721
5 of 10
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 143


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

"Electrical Boxes and Fittings"; types to be selected by Installer.


YAA
ENGG CERT

1. Provide wire and cable in accordance with requirements of manufacturer.


LSS

2. Provide conductor sizes AWG #14, or larger, with maximum 19 strands


copper conductor, 7 strands for sizes AWG #16 and #18.

3. Provide multiconductor cables for wire sizes smaller than AWG #16.

4. Provide conductors which are listed and approved for fire alarm usage.
ISSUED FOR IFC
DESCRIPTION

H. Control Panels: Provide fire alarm control panel enclosures for housing devices
and circuits necessary to perform required functions, and to service as test points,
and trouble-signal points.

I. Design devices to be modular, plug-in.

1. Provide control panel for operation on 230-volts AC supply and for 24-volts
DC system operation with battery stand-by power source.
JO/EWO
01/21/2016 BI-01382

2. Equip control panel for number of initiating zones indicated. Provide tone
generator, with redundant unit, supervised, producing the sound pattern
DATE

recommended by NFPA 72A, Appendix A, paragraph A-2-5.5.

J. Alarm Lights: Provide manufacturer's standard construction alarm lights with the
NO.
REV

00

DISCIPLINE
following features:
ENGINEER
ANP
01/21/2016
1. Red lens, plain or lettered white "FIRE".
DATE:
PROJECT
ENGINEER 2. White lens, plain or lettered red "FIRE".
LSS
01/21/2016
DATE: 3. 24-volt DC incandescent.
CERTIFIED
YAA

01/21/2016 4. 24-volt DC xenon flasher


DATE:
CONSTRUCTION
AGENCY
YAA
K. Sirens: Provide manufacturer’s standard construction fire alarm sirens with the
01/21/2016 following features:
DATE:
OPERATIONS
ASZ
1. Motor driven
01/21/2016
DATE:
2. Alternating current
CONTROL NUMBER
VERIFICATION

3. Direct current
EDSD

DATE:

L. Junction Boxes and Floor Terminal Panels: Provide fire alarm junction boxes and
BY:

floor terminal panels painted red enamel. Provide each box with suitable number
APPROVAL/CERTIFICATION REQUIREMENTS,

of terminals and of proper size to hold wiring, both for immediate floor and floors
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

SECTION 16721
10-01382-0008-0001

6 of 10
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 144


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

above.
YAA
ENGG CERT

M. Fire Alarm Sign: Provide 8” x 8” sign, “FIRE ALARM BOX”, over each fire alsrm
LSS

pull station mounted perpendicular to wall, red with 2-1/2” high white letters.

N. Test Chart Instructions: Provide fire alarm system test instructions chart mounted in
lexan enclosed frame assembly on control cabinet hinged door.

O. Door Holders: Provide manufacturer’s standard construction magnetic door holder


ISSUED FOR IFC

with the following features:


DESCRIPTION

1. 24-volts AC or DC

2. Single door

3. Flush mounted

P. Fire Detection Equipment:

All equipment supplied shall meet the requirements of this specification using
JO/EWO
01/21/2016 BI-01382

equipment listed by UL and FM, suitable for Fire Detection application. To ensure
consistency throughout the Project, the selection of all fire detection equipment
DATE

shall be subject to the approval of the Company.

All Fire Alarm System equipments shall be given the requirement in SAES-M-100 for
NO.
REV

00

DISCIPLINE
UL Listing or FM Approval for fire alarm equipment approved for the application
ENGINEER
ANP
specified all components of the Fire Alarm System shall carry a full 1 year warranty
01/21/2016
for any manufacturing defect.
DATE:
PROJECT
ENGINEER
All initiating and signalling devices shall be approved for use with fire alarm control
LSS
01/21/2016
panel unless specifically instructed otherwise by this Specification or unless the
DATE:
CERTIFIED
type of device required is not made by the fire alarm control panel manufacturer. All
YAA controls and annunciation lights shall be identified with a permanent label.
01/21/2016
DATE:
CONSTRUCTION The systems shall be designed to meet the Project operational requirements and
AGENCY
YAA arranged to comply with the plant protection philosophy.
01/21/2016
DATE:
OPERATIONS
All equipment provided under this Project shall be capable of expansion to meet
ASZ the future requirements without requiring changes to equipment provided under
01/21/2016 this specification.
DATE:
CONTROL NUMBER
VERIFICATION

The Fire equipment supplied shall not be affected in any way by the use of
Standard commercial UHF and VHF band, handheld, telecommunications
EDSD

equipment operating with a normal output power of 5 Watts. These transmitters will
DATE:

be used within close proximity of the detectors that are installed within the building.
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________
10-01382-0008-0001

SECTION 16721
7 of 10
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 145


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

Q. Fire Detection Implementation Schedule:


YAA
ENGG CERT

Fire Detection Alarming shall be implemented and commissioned in advance of


LSS

any other process or non-process plant. This shall allow:

• occupation of a manned control building


• monitoring of control & electrical equipment installation
• detection of fire in the field during commissioning

Environmental Conditions:
ISSUED FOR IFC
DESCRIPTION

All equipment is to be supplied suitable for installation and operation in accordance


with the environmental conditions specified in Basic Engineering Design Data and
SAES-A-112.

Although some equipment shall be supplied and installed for use in an indoor, air-
conditioned environment they shall include protection against traces of sand and
dust.

Conflicts and Deviations:


JO/EWO
01/21/2016 BI-01382

If any inconsistency or conflict exists between this specification and other


DATE

COMPANY documents, industry standards or drawings, this must be brought to the


attention of the COMPANY in writing. COMPANY shall resolve the
inconsistency/conflict in writing. Deviations from the standards as listed in the
NO.
REV

00

DISCIPLINE
Appendix shall not be permitted unless approved by the COMPANY.
ENGINEER
ANP
01/21/2016 PART 3 - EXECUTION
DATE:
PROJECT
ENGINEER
3.01 EXAMINATION
LSS
01/21/2016
DATE:
CERTIFIED
A. Examine areas and conditions under which fire alarm systems are to be installed.
YAA Do not proceed with work until unsatisfactory conditions have been corrected in
01/21/2016 manner acceptable to Installer.
DATE:
CONSTRUCTION
AGENCY
YAA 3.02 INSTALLATION OF BASIC IDENTIFICATION
01/21/2016
DATE:
OPERATIONS A. Install electrical identification in accordance with Division-16 Basic Electrical
ASZ Materials and Methods section "Electrical Identification."
01/21/2016
DATE:
3.03 INSTALLATION OF BASIC WIRING SYSTEM MATERIALS
CONTROL NUMBER
VERIFICATION

A. Install wiring, raceways, and electrical boxes and fittings in accordance with
EDSD

Division-16 Basic Electrical Materials and Methods sections, "Raceways", "Wires


DATE:

and Cables", and "Electrical Boxes and Fittings" for wiring of non-power limited
BY:

circuits.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________
10-01382-0008-0001

SECTION 16721
8 of 10
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 146


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

B. Install wiring of power-limited circuits in raceways or exposed on walls or ceilings


YAA
ENGG CERT

where properly protected. Use conduit for runs through floors or in shaftways to
height of 7' above floor. Provide cables in plenum spaces in metallic raceways or
LSS

with cable jackets approved for use in plenum spaces.


C. Install wires and cable without splices. Make connections at terminal strips in
cabinets or at equipment terminals. Make soldered splices in electronic circuits in
control cabinets.

3.04 INSTALLATION OF FIRE ALARM SYSTEMS


ISSUED FOR IFC
DESCRIPTION

A. Install fire alarm system as indicated, in accordance with equipment manufacturer's


written instructions and complying with applicable portions of NEC and NECA's
"Standard of Installation."

B. Wiring: Wiring of fire alarm system is work of this section, but is not specifically
detailed on drawings.
1. Complete wiring in accordance with manufacturer's requirements. Color
code wiring and install per manufacturer's point-to-point wiring diagram.
Determine exact number of wires for each fire area zone from number and
types of devices installed. Connect each device with sufficient wiring to
JO/EWO
01/21/2016 BI-01382

complete its intended operation.


2. Where there are a number of power requiring devices such as smoke
DATE

detectors, fan relays, door holders and smoke damper operators installed in
a circuit, group in numbers so power required does not exceed 80% of
manufacturer's power supply rating. Provide extra wiring, or extra power
NO.
REV

00

DISCIPLINE
supplies required to fulfill that requirement. In addition, provide extra or
ENGINEER larger size wiring to alleviate voltage drops which makes device operate
ANP
01/21/2016
beyond voltage limits for which it was designed. Determine above with
DATE:
PROJECT
manufacturer's representative while equipment is being installed.
ENGINEER
LSS
01/21/2016
3.05 FIELD QUALITY CONTROL
DATE:
CERTIFIED
YAA A. Connection and Supervision: Make connections to panel under manufacturer's
01/21/2016 supervision.
DATE:
CONSTRUCTION
B. Where work consists of additions or extensions to existing system, prior to starting
AGENCY
YAA
work, establish that system is in proper working order. If condition exists which
01/21/2016 prevents normal operation of specified additions and extensions, bring this fact to
DATE:
OPERATIONS
Company Representative attention prior to doing work affecting existing system.
ASZ
Where work is done without such notification, it is assumed that connections have
01/21/2016
been made to a working system, and performance requirements and guarantee will
DATE:
apply to entire system.
CONTROL NUMBER
VERIFICATION

C. System Test and Approval: Submit shop drawings for function and operation only,
EDSD

pre-approved by authority having local jurisdiction.


DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

SECTION 16721
10-01382-0008-0001

9 of 10
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 147


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

ASZ
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
YAA

1. Prior to final acceptance of system, manufacturer of system shall, in


YAA
ENGG CERT

presence of Contractor, Company Representative, test each sensing or


detection and alarm device.
LSS

2. Submit copy of test results in duplicate after signed by Company


Representative and local Fire Protection Authority. Mount copy of
inspection record in lexan enclosed frame assembly on control panel.

END OF SECTION
ISSUED FOR IFC
DESCRIPTION
JO/EWO
01/21/2016 BI-01382
NO. DATE
REV

00

DISCIPLINE
ENGINEER
ANP
01/21/2016
DATE:
PROJECT
ENGINEER
LSS
01/21/2016
DATE:
CERTIFIED
YAA

01/21/2016
DATE:
CONSTRUCTION
AGENCY
YAA

01/21/2016
DATE:
OPERATIONS
ASZ

01/21/2016
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
REVISION CERTIFICATE
00
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

SECTION 16721
10-01382-0008-0001

10 of 10
B CONSTRUCTION SPECIFICATIONS - ELECTRICAL DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

EXPAND DHAHRAN RESIDENTIAL COMMUNITY –DD PKG 6 DOC 148


S60 A SK-P60004
RESIDENTIAL AREA OF 00
DHAHRAN SAUDI ARABIA EWO: 10-01382-0008 148
EDSD/2616-0399.doc