01-09-24 Revised Cost Estimate
01-09-24 Revised Cost Estimate
Sub-Total 51,270.00
Sub-Total 0.00
Sub-Total 0.00
Sub-Total 0.00
E. Shower Enclosure
12mm Thk. Tempered Clear Glass with Swing Door lot 0.00 0.00
1200mm(W)x1800mm (H)
Sub-Total 0.00
F. Carpentry Works
Bedroom Closet 1.00 lot 25,240.80 25,240.80
Bed Frame 1.00 lot 22,682.40 22,682.40
Kitchen Cabinet 1.00 lot 24,570.00 24,570.00
Nook 1.00 lot 15,381.60 15,381.60
TV Wall Overhead Cabinet, Ledges, and Suspended Table 1.00 lot 18,902.52 18,902.52
Balcony Ledge Counter 1.00 lot 0.00 0.00
*Consumables 1.00 lot 11,088.00 11,088.00
*Cabinet Handle (By Owner)
Sub-Total 117,865.32
G. Painting Works
Walls - Semi Gloss Finished sqm. 0.00 0.00
Ceiling - Flat Finished sqm. 0.00 0.00
TV Wall and Headboard Wall - Light Gray Finished
Sub-Total 0.00
H. Electrical Works 1.00 lot 8,400.00 8,400.00
Supply and Installation of Conduit and Electrical Wires
Relocation and Installation of Lighting Fixtures and Devices
Sub-Total 8,400.00
T&B Floor and Wall Tiles (Installation Only) 20.76 sqm. 800.00 16,608.00
Waterproofing - By Owner
Consumables: By Owner sqm. 0.00 0.00
*Tile Adhesive
*Tile Grout
*Cutting and Grinding Disc
Sub-Total 28,724.80
Terms of Payment:
40% Downpayment
60% Progress Billing