Project.....

Timber Door Works

BILLS OF QUANTITIES

PRELIMINARIES
Project..... Timber Door Works

BILL NO.1: PRELIMINARIES

Ref Clause Description Unit Rupiah

1. GENERAL Item

Included All Item Below:

A 1.1 Definisions

B 1.2 Brief description of the Main Works and the Contract Works

C 1.3 Completion of Works

D 1.4 Gross area

E 1.5 Access to Site

2. DOCUMENTS Item

Included All Item Below:

F 2,1 Pricing Documents

G 2,2 Discrepancies

H 2,3 Guarantees and operating instructions

I 2,4 Drawings

J 2,5 Shop drawings and co-ordination drawings

K 2,6 As-build drawings

Page : BILL 1/1 To Collection Rp. -

Preliminaries / Page 1
Project..... Timber Door Works

BILL NO.1: PRELIMINARIES

Ref Clause Description Unit Rupiah

3. CONTRACT AND PRICING OF PRELIMINARIES Item

Included All Item Below:

A 3,1 Pricing Preliminaries

B 3,2 Form of Contract

C 3,3 Fixed Price Contracts

D 3,4 Insurances

E 3,5 Performance Security

F 3,6 Date for commencement

G 3,7 Exceptionally adverse weather

H 3,8 Working hours and rates of wages

I 3,9 Works requiring Employer's site supervision

J 3.10 Currency payable

K 3,11 Contractor's acceptance of site conditions

L 3,12 Treasure trove

M 3,13 Prime cost expenditure

N 3,14 Provisional Sum expenditure

O 3,15 Omission of ProvisionalSums

P 3,16 Adjustment of Prime Cost Sums

Page : BILL 1/2 To Collection Rp. -

Preliminaries / Page 2
Project..... Timber Door Works

BILL NO.1: PRELIMINARIES

Ref Clause Description Unit Rupiah

SUBCONTRACTORS, SUPPLIERS AND OTHER


4. Item
EMPLOYED ON THE WORKS

Included All Item Below:

A 4,1 Forward contract

B 4,2 Nominated Subcontractors

C 4,3 Nominated suppliers

D 4,4 Artists, tradesmen and other contractors

E 4,5 Installation of Authorities incoming services

F 4,6 Contractor's responsibility for all Subcontractors and suppliers

G 4,7 Fix Only

H 4,8 Attendance

Nominated supply or nominated subcontract work tendered


I 4,9
by the Contractor

Page : BILL 1/3 To Collection Rp.

Preliminaries / Page 3
Project..... Timber Door Works

BILL NO.1: PRELIMINARIES

Ref Clause Description Unit Rupiah

5. ADMINISTRATION OF CONTRACT AND WORKS Item

Included All Item Below:

A 5,1 Illegal foreign workers

B 5,2 Contractor's superintendence

C 5,3 Workmen to be confined to Site

D 5,4 Trespassing and acts of nuisance

E 5,5 Publicity of the Works

F 5,6 Public relations measures

G 5,7 Resident Engineer

H 5,8 Access for the Employer to the Works

I 5,9 Access for inspection and testing

J 5.10 Welfare and Site safety

K 5,11 Visitors

L 5,12 Variations and methods of measuring and valuing

M 5,13 Payment of Preliminaries

N 5,14 Procedures for payment

O 5,15 Contract Construction programme

P 5,16 Cash flow forecasts

Q 5,17 Meetings

R 5,18 Variation Meetings

S 5,19 Progress photographs

T 5.20 Photographs of completed development project

U 5,21 Progress reports

Page : BILL 1/4 To Collection Rp. -

Preliminaries / Page 4
Project..... Timber Door Works

BILL NO.1: PRELIMINARIES

Ref Clause Description Unit Rupiah

6. SITE AND WORKS Item

Included All Item Below:

A 6,1 Setting out of the Works

B 6,2 Boundary relationship

C 6,3 Progress surveys

D 6,4 Final surveys

E 6,5 Possession of Site for the Works only

F 6,6 Restrict nuisance of dust and noise

G 6,7 Interference with traffic and adjoining properties

H 6,8 Extraordinary traffic and special loads

I 6,9 Cables/services detection

J 6.10 Maintain existing services

K 6,11 Response to interruption or disruption to existing services

L 6,12 Maintenance and protection of existing roads

M 6,13 Site control and protection of exposed excavation surfaces

N 6,14 Vector control

O 6,15 Damage and theft

P 6,16 Protecting the Works from inclement weather

Q 6,17 Site security

R 6,18 Fuel Storage

S 6,19 Industry Awards

T 6.20 Environmental Sustainability

U 6,21 Licensing Requirements

Page : BILL 1/5 To Collection Rp. -

Preliminaries / Page 5
Project..... Timber Door Works

BILL NO.1: PRELIMINARIES

Ref Clause Description Unit Rupiah

7. PLANT AND TEMPORARY WORKS Item

Included All Item Below:

A 7,1 Offices for Resident Engineer and resident Site Staff

B 7,2 Temporary access and temporary roads

C 7,3 Removal of water and temporary drainage

D 7,4 Shoring and Temporary Works

E 7,5 Signs and advertisements

F 7,6 Hoardings, fencing and gates

G 7,7 Project Name Board

H 7,8 Scaffolding and staging

I 7,9 Contractors temporary offices, stores, workshops

J 7.10 Temporary water and electrical services

K 7,11 Temporary fire protection services

L 7,12 Temporary lightning protection system

M 7,13 Temporary telephone service

N 7,14 Plant, tools and vehicles

O 7,15 Use of explosive power tools

P 7,16 Public address system

Q 7,17 Loading in excess of design load

Maintenance of Contractos Equipment and Employer's


R 7,18
Equipment

S 7,19 Submission of drawings for Temporary Works

Page : BILL 1/6 To Collection Rp. -

Preliminaries / Page 6
Project..... Timber Door Works

BILL NO.1: PRELIMINARIES

Ref Clause Description Unit Rupiah

8. COMPLETION Item

Included All Item Below:

A 8,1 Occupation Permits

B 8,2 Completion and maintenance following completion

C 8,3 Final Payment Claim

D 8,4 Removal of rubbish

E 8,5 Leave clean on Completion

9. MATERIALS AND WORKMANSHIP Item

Included All Item Below:

F 9,1 Standards and codes of practice

G 9,2 Testing of Materials

H 9,3 Materials approval

I 9,4 Samples

J 9,5 Items specified by name

K 9,6 Substitution of materials

L 9,7 Storage of materials

M 9,8 Transporting materials

N 9,9 Labour

O 9.10 Protection of completed work

P 9,11 Special protection

Q 9,12 Site mock-up

R 9.13 Prototype

Page : BILL 1/7 To Collection Rp. -

Preliminaries / Page 7
Project..... Timber Door Works

BILL NO.1: PRELIMINARIES

Ref Clause Description Unit Rupiah

OTHERS

The Contractor shall provide and allow for any other Items
not induded In the foregoing but which are required by the
Contract (In particular, the Specification, the Preliminaries
and the Trade Preambles).

A Item

B Item

C Item

D Item

E Item

Page : BILL 1/8 To Collection Rp.

Preliminaries / Page 8
Project..... Timber Door Works

BILL NO.1: PRELIMINARIES

Ref Clause Description Unit Rupiah

COLLECTION

Page BILL 1/1 Rp. -

Page No .BILL 1/2 Rp. -

Page BILL 1/3 Rp. -

Page BILL 1/4 Rp. -

Page BILL 1/5 Rp. -

Page BILL 1/6 Rp. -

Page BILL 1/7 Rp. -

Page BILL 1/8 Rp. -

BILL NO.1: PRELIMINARIES To Final Summary Rp. -

Preliminaries / Page 9

You might also like