Page 1
Site Overview

Equipment type : Site Model MTS9302A and ESM-4850A1 (Direct)


Site ID : KAL-KS-TJG-0879_WN0
Site Name : Sungai Pimping
Area : Kalimantan Selatan
Longitude : 115.327470
Latitude : -02.212669
Address : Sungai Pimping, Tanjung, Kabupaten Tabalong,
Kalimantan Selatan

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential


EHS Pre Work Check
 Installation Doc for PRE Installation

Pada Tahap Pre – Install, Team Leader wajib memeriksa dan meyiapkan document installasi dengan lengkap sebelum
memulai activitas installasi di SITE

 Work Permit
 HW PASS ID
 Competence Certificate [ untuk SOW Installasi ATN 910 Required Competence Certificate FA & Electrical Certificate ]
 Engineering Document [ data survey, LLD doc, etc ]

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential


EHS Pre Work Check
 Tool Checking for PRE Installation

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential


EHS Pre Work Check
 EHS Equipts for PRE Installation

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential


EHS Pre Work Check
 Personal Protective Equipment [ PPE ]

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential


Standard Installation

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential


Material Delivery Batch 1

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential


1. Overview Cabinet MTS9302A-HD10A2

Door Close Door Open

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential


2. Installation Cabinet

Bolt Fixation to Foundation

• Install the bolts with spring


washer and flat washer.
• Bolt must be tighten

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential


3. Connection Power Cable on MCB
3.1 MCB Allocation on Rectifier

15.16:
AC Input Circuit 4.5.6.7.8.9: 10.11.12.13.14:
Battrey breaker
Breaker
LLVD Circuit breaker BLVD Circuit Breaker

1 2 3 4 | 5 |6 | 7 | 8 |9 |10|11|12|13|14|15|16

Overview MCB on Rectifier

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential


3.2 Details Installation MCB on Rectifier

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential


3.3 Details Installation MCB on Rectifier

1. 63A : Phase R (AC)


2. 63A : Phase S (AC) AC Power
3. 63A : Phase T (AC)

4. 125A : Spare
5. 80A : Proposed DCDU
6. 63A : Spare LLVD
7. 63A : Spare (Non Priority Load)
8. 32A : Spare
9. 32A : Spare

10. 32A : Spare


11. 32A : Spare
BLVD
12. 16A : Proposed Transmission
(Priority Load)
13. 16A : Proposed Transmission
14. 10A : Spare

15. 125A : Battery Bank 1


16. 125A : Battery Bank 2

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential


3.4 Connection Power Cable on Rectifier
Power Connection on KWH Power Connection on KWH Power Connection on Rectifier

RST DCDU
AC Input 80A

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential


3.5 Connection Power Cable Lithium Battery to MCB

“Connection cable power battery direct to MCB”


“Connect to MCB 125A”
“( ↔ ) = +(Positive)” & “(↔) = - (Negative)”.

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential


4. Equipment in Rack Cabinet

1. Rectifier

2. BBU

3. DCDU

4. Spare 1U/3 Hole

5. Ipaso/Transmision

6. Lithium Battery

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential


5. DCDU Allocation Port

• Use 2 pair blue black power cable from DCDU 12B (1) to MCB 80A
(if no available 80A can use 125A). Make 2 lines for 2 systems.
• All power cable to DCDU must use ferrules/scoen & pressed firmly

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential


5.A DCDU Allocation Port
5.2 Overview power cable DCDU 12B and RRU

BBU EMUB

Connect to Recti_MCB80A/125A
L1800

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential


5.B RRU5502, Dual-band 1800+2100 and use EPU02D

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential


5.B RRU5502, Dual-band 1800+2100 and use EPU02D

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential


6. Route Cable
6.1 Gland layout bottom of cabinet

Must proper sealed Must proper sealed


Left Side Right Side

Details Gland Layout Bottom cabinet from Left Side : Details Gland Layout Bottom cabinet from Right Side :
• Power Cable KwH to MCB. • Power RRU
• Grounding Cable to IGB.
• Optic cable (CPRI) to RRU, Coaxial Cable IDU

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential


6. Route Cable
6.2 Gland layout middle of cabinet

1 3
4

6
7
5 Right Side
Left Side

Details Gland Layout Bottom cabinet from Left Side : Details Gland Layout Bottom cabinet from Right Side :
5. Power Cable from KwH to MCB Rectifier 1. LAN for EMU, Ethernet Cable RTN 310/320/380.
6. Grounding Cabinet & Grounding Module. 2. Battery Cable
7. Optic cable CPRI. 3. Grounding Module, Power EMU, Power RTN 310/320/380
4. Power RRU

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential


6. Route Cable
6.3 Grounding Cable Installation to all equipment
Grounding Bar 1 inside cabinet

Grounding Bar/EGB

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential


6. Route Cable
6.4 Spare Optic Cable

Perhatian :
Spare Cable Optic diletakan di tray Horizontal
Di belakang cabinet, tumpuk per sistem, di susun
Dengan rapih, dan diberi label Ring Warna sesuai
Sistem.

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential


7. Sensor Alarm in Cabinet
Overview temperature sensor alarm & Smoke sensor alarm
Smoke Sensor

Temperature sensor cabinet

Temperature Battery sensor

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential


8. Battery Installation
8.1 Battery Module Type & Model

Preview Installing an ESM

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential


8. Battery Installation
8.2 Overview Battery installation & connection battery power cable
Installation Rack Battery

Battery Rack

1
Grounding

ESM Communication cables connection to SMU_port CAN


(+) Power cable
Build-out resistor connect to the COM_OUT Port of the last ESM
(-) Power cable

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential


8. Battery Installation
8.4 Measurement test parameters for Battery

Voltage measurement at battery polarization (+) and (-)

Voltage measurement Voltage measurement


At SMU-02S

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential


9. BBU Installation

UBBP UMPT UPEU

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential


10. Laying Cable on Cable Tray to cabinet

Laying Optic
&
Laying Power RRU

Posisi
spare
Optic
di tray
belakang
kabinet

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential


Antenna Installation

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential


11. Antenna Installation & RRU Installation on Tower
11.1 Overview antenna sector on tower leg
Sec 1 Sec 2 Sec 3

PERHATIAN :
• Antenna RF harap di install pada mounting yang sudah di sediakan.
• Pastikan kedudukan mounting lengan atas dan lengan bawah agar terhubung dengan baik ke Main Leg Tower.
• Seluruh Baut pada bracket mounting agar di install dengan kencang, Baut mounting terdiri dari 2 pcs Locknut,
1pcs plain washer, dan 1 pcs main washer.

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential


11. Antenna Installation & RRU Installation on Tower
11.2 Overview RRU Installation
Sec 1 Sec 2 Sec 3

PERHATIAN :
• Prioritas-1, Installasi/penempatan RRU Pada Boom Mounting atau “”Back to back with antenna RF”.
• Prioritas-2, Installasi/penempatan RRU pada main leg tower (sisi dalam).
• Prioritas-3, Installasi/penempatan RRU pada Tray Vertical (Property XL), baik self tower maupun tower sharing (TP).

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential


11. Antenna Installation & RRU Installation on Tower
11.3 Installation CPRI & Power Optic CPRI at RRU
Sec 1 Sec 2 Sec 3

PERHATIAN :
• Instalasi konektor atau koneksi kabel power dan Optic agar terhubung dengan baik pada port-nya masing-masing.
• Panjang potongan kabel power pada core wire dan stripping cable, agar mengikuti standard yang di minta.
• Label power dan optic CPRI di RRU (Label cincin,label papan) agar di install, skema ring label agar mengikuti frequency system.

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential


11. Antenna Installation & RRU Installation on Tower
11.4 Implementation

Use Scoen

CABLE COAT
Should be Stripped

PERHATIAN :
• Pastikan Koneksi kabel power RRU menggunakan Scoen lug.
• Pastikan Grounding serabut kabel Power RRU mengenai Stripped RRU.

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential


11. Antenna Installation & RRU Installation on Tower
11.5 Stripping cable Power RRU

PERHATIAN :
• Stripping cable mengikuti standard ukuran (gbr di atas).
• Exposed core wire cable di buat jarak 1.5 mm.
• Koneksi Power RRU wajib diproteksi menggunakan scoen

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential


11. Antenna Installation & RRU Installation on Tower
11.6 Installation grounding RRU at nearest BUSBAR
BUSBAR
Sec 1 Sec 2 Sec 3

PERHATIAN :
• Koneksi scoen cable ground pada RRU dan Busbar harus di install dengan kencang.
• Pada koneksi scoen cable harap di proteksi menggunakan heatshrink.
• Label Grounding di install disesuaikan dengan type Frequency and Sektorisasinya.

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential


11. Antenna Installation & RRU Installation on Tower
11.7 Installation Label at RRU
Sec 1 Sec 2 Sec 3

PERHATIAN :
• Label RRU harus diinstall pada pintu RRU.
• Penulisan (informasi) pada label harus jelas, Informasi sesuaikan dengan sektorisasinya, dan type Frequency system.
• Bahan Label terbuat dari paper glossy, label di tapping 1-2 layer menggunakan Isolasi Transparan setelah sudah di tempel pada Modul RRU

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential


11. Antenna Installation & RRU Installation on Tower
11.8 Jumper Installation at RRU and Antenna

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential


11. Antenna Installation & RRU Installation on Tower
11.9 Antenna height measurement
Sec 1 Sec 2 Sec 3

PERHATIAN :
• Ketinggian pemasangan Antenna mengacu ke konfigurasi data yang di minta, dan mengacu ke data Colo Apps untuk Tower Sharing (di Luar XL).
• Pengukuran ketinggian Antenna harap dilakukan dengan benar dan akurat, ketentetuan pengukuran ketinggian Antenna :
- Pengambilan titik + 0.00 di ambil dari BASE PLATE TOWER (Berlaku untuk TP : Protelindo, ISAT).
- Pengambilan titik + 0.00 di ambil dari PERMUKAAN TANAH (Berlaku Untuk TP : TBG, IBS, STP, EBJ, XL, MITRATEL, Dsb).
- Elevasi ketinggian antenna berada pada titik “Center Line” Antenna → center Line = Panjang (L) antenna : 2.

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential


11. Antenna Installation & RRU Installation on Tower
11.10 Azimuth Antenna
Sec 1 Sec 2 Sec 3

PERHATIAN :
• Instalasi Azimuth agar mengikuti Data Azimuth pada configurasi Data atau RFD (Engineering Parameter).
• Pengukuran Azimuth harap dilakukan dengan benar dan Akurat, pastikan Jarak Alar Compas (Suuntho) di ambil sekitar 15cm-20cm
di sisi atas/permukaan Antenna RF.

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential


11. Antenna Installation & RRU Installation on Tower
11.11 Mechanical Tilt Antenna
Sec 1 Sec 2 Sec 3

PERHATIAN :
• Mechanical Tilt Antenna agar mengikuti Data Tilting pada Configurasi Data atau DFD (Engineering Parameter).
• Pengukuran Antenna Tilt dilakukan dengan benar dan akurat, pastikan Gelembung air Raksa di posis tengan Tabung.

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential


12. Installation Earthing kit of Power RRU

PERHATIAN :
• Earthing Kit Pada kabel Power RRU Agar di install dengan baik, Koneksi earthing kit agar di beri Water proofing dan ties hitam di sisi atas-bawah.
• Label Earthing kit agar di install, Label ring dan label papan agar di install mengikuti type Frequency system.
• Label Ring di install sekitar 2-3 cm dari Waterproofing earthing kit, dan label papan di install 2-3 cm koneksi ke Busbar

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential


13. Routing Cable at Tray Horizontal and Tray vertical space

Cable clamp terinstall


(tiap 50cm-100cm)

PERHATIAN :
• Earthing Kit Pada kabel Power RRU Agar di install dengan baik, Koneksi earthing kit agar di beri Water proofing dan ties hitam di sisi atas-bawah.
• Label Earthing kit agar di install, Label ring dan label papan agar di install mengikuti type Frequency system.
• Label Ring di install sekitar 2-3 cm dari Waterproofing earthing kit, dan label papan di install 2-3 cm koneksi ke Busbar

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential


QUALITY IS
RESPONSIBILITY OF ALL
BUSINESS ENTITY !
“Think Safe, Work Safe, Home Safe”
Thank You
www.huawei.com

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 45

You might also like