PROJECT :PROPOSED TWO (02) STOREY WITH ROOF DECK RESIDENTIAL BUILDING

LOCATION : UNIT 231 RECOLETOS STREET, URDANETA VILLAGE, BRGY. URDANETA


, MAKATI CITY
OWNER : ONE CATUCBAC TECHNOLOGIES CORP./ LEVI VILLA

BILL OF MATERIALS

DESCRIPTION QUANTITY/ UNIT PRICE TOTAL AMOUNT


MECHANICAL WORKS: UNIT

I. CASSETE MOUNTED SPLIT TYPE


AIR- CONDITIONING UNIT
CARRIER ALPHA BRAND 15.00 units 25,000.00 375,000.00
DUCTED TYPE DIRECT EXPANSION
INDOOR TYPE UNIT
15 SETS-1 HP
II. CASSETE MOUNTED SPLIT TYPE
AIR- CONDITIONING UNIT
CARRIER ALPHA BRAND 1.00 units 400,000.00 400,000.00
DUCTED TYPE DIRECT EXPANSION
OUTDOOR TYPE UNIT
1 SET-10 HP
II. CEILING TYPE VENTILATION EXAHAUST FAN 11.00 sets 5,500.00 60,500.00
OMNI CEILING MOUNT EXHAUST FAN XYC-200
26WATTS, 48dB NOISE LEVEL
FITTINGS 1.00 lot 5,000.00 5,000.00
SOLVENT CEMENT 4.00 cans 250.00 1,000.00
STEEL BRACKET BRACE 1.00 lot 25,000.00 25,000.00
III. SUPPLY & LABOR INSTALLATION 1.00 lot 10,000.00 250,000.00

TOTAL PROJECT COST ₱ 1,116,500.00

PROFESSIONAL MECHANICAL ENGINEER


PRC NO:
PTR NO.
DATE ISSUED:
ISSUED AT:
TIN NO:
TAN NO:
PROJECT : PROPOSED THREE (3) STOREY RESIDENTIAL BUILDING
LOCATION :LOT 9-A, BLK. 212, SAMPAGUITA ST., PEMBO, MAKATI CITY
OWNER :CATALINA M. BARTOCILLO

SUMMARY OF COST ESTIMATES

I. EARTHWORKS — 92,400.00

II. CONCRETE WORKS — 858,000.00

III. MASONRY WORKS — 160,030.00

IV. DOORS & WINDOWS — 91,700.00

V. PLUMBING & SANITARY WORKS — 62,885.00

VI. ROOFING/STEEL WORKS — 150,000.00

VII. PAINTING WORKS — 128,000.00

VIII. TILEWORKS — 97,350.00

IX. ELECTRICAL WORKS — 150,000.00

Sub Total 1,790,365.00


Labor 716,146.00

TOTAL 2,506,511.00

PREPARED BY

CIVIL ENGINEER

PRC NO.
PTR NO.
ISSUED AT:
ISSUED ON:
TIN.