PANJANG 10647

PEKERJAAN JALAN

Beton K-350 13308.75 m3 1,900,000 25,286,625,000


Besi Tulangan 1552688 Kg 20,000 31,053,750,000
Bekisting 5323.5 m2 175,000 931,612,500
Pekerjaan Persiapan 1 LS 75,000,000 75,000,000

PEKERJAAN PONDASI BATU BELAH

Pekerjaan Galian 811.68 m3 90,000 73,051,200


Urugan Kembali 270.56 m3 150,000 40,584,000
Urugan Pasir 202.92 m3 320,000 64,934,400
Pas. Batu Belah 2435.04 m3 875,000 2,130,660,000
Pekerjaan beton 500 m3 4,250,000 2,125,000,000
Pekerjaan Persiapan 1 Ls 125,000,000 125,000,000
1 7 1.041667
7.291667 29.16667