Professional Documents
Culture Documents
641 X1 ABUTMENT - SH - 01, 02 & 03-sh2
641 X1 ABUTMENT - SH - 01, 02 & 03-sh2
400 A
119 CL OF ABUTMENT / BEARING 119
400
121
1 CL OF CARRIAGE WAY
20Q
T @125c/c 300
118 121
126a
3
121 DIRT WALL
C 116 C
T @125 c/c
12 Q 116a
450
125a 117 1892
117
CL OF BEARING CL OF BEARING CL OF BEARING
113
114 118
115 TOP OF ABUTMENT CAP 300
800 113
114 ABUTMENT
800 300 120
CAP
12 Q
T @125 c/c
590
125 1790
110
400 400
20Q
T150c/c
800 800
110 b
20Q
T @125c/c 116a 116
16 Q
T @150c/c
126 HEIGHT OF
112
T LINK 4 NOS. PER SQ.M.
10Q
12Q
T @125 c/c IN A STAGGERED MANNER
124 8450 2
3500
RETURN WALL 115
B 111 B
12Q
T @ 150c/c 110 113
1200 125 125 T 6L STP. @150 C/C
16Q
25 25
25
GAP GAP
GAP
1800 1800 114
PILE PILE 16 NOS. 16 Q
T
CAP CAP
300 300
800
400 C
L OF CARRIAGEWAY 400
DETAIL - 1
RETURN WALL 125 SCALE 1:30
125
124
126
116a 126 125
116a 126 4000
125 126
RETURN WALL
124
115 RETURN WALL
DIRT WALL 116a
500 500
500
CL OF ABUTMENT/PILE CAP
CL OF ABUTMENT
1200
111
LAP
LAP 112 110 110b
600 NOTES :
125 8450 125
1. ALL DIMENSIONS ARE IN MM AND LEVELS ARE IN M.
8700 UNLESS OTHERWISE NOTED.
DIST.: WEST CHAMPARAN TITLE : RCC DRAWING OF ABUTMENT DRAWN BY: RV DATE : JULY, 2023
DEVELOPMENT OF RURAL EXECUTIVE ENGINEER, SUPERSTAR DESIGNER PVT. LTD.
BRIDGE :CONSTRUCTION OF RCC BRIDGE AT PANCHAYAT ROAD AS SHOWN
ROADS/BRIDGES IN THE STATE OF RURAL WORKS DEPARTMENT, TO WARD 13 JARALPUR IN WEST CHAMPARAN DIST. DESIGNED BY: S.R. PACKAGE : CONSULTANT & ENGINEERS
BIHAR UNDER PMGSY SCHEME WORKS DIVISION PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT CHECKED BY: H.D. PATNA