NOTES :

AFFECTION PLAN KEY PLAN

REFERENCE DRAWINGS :
CAD FILE NO SHEET NO DRAWING TITLE DATE REV

LEGENDS
SPRINKLER PIPE
WET RISER PIPE
DRAIN PIPE
1/2" RECESSED PENDENT SPRINKLER HEAD (68°C) QUICK RESPONSE(K-5.6)
1/2" CONCEALED SPRINKLER HEAD (68°C) QUICK RESPONSE(K-5.6)
1/2" UPRIGHT SPRINKLER HEAD 79°C STD. RESPONSE K-5.6
1/2" HORIZONTAL SIDEWALL SPRINKLER HEAD 79°C STD.RESPONSE K-5.6
1/2" HORIZONTAL SIDEWALL SPRINKLER HEAD Q.R. K-5.6 (68°C)
1/2" HORIZONTAL EXTENDED SIDEWALL SPRINKLER HEAD 68°C
QUICK RESPONSE K-5.6
3/4" HORIZONTAL EXTENDED SIDEWALL SPRINKLER HEAD 68°C
QUICK RESPONSE K-8
ALARM CHECK VALVE ASSEMBLY
O.S. & Y GATE VALVE
PRV PRESSURE REDUCING STATION
ZONE CONTROL VALVE ASSEMBLY c/w
BUTTERFLY VALVE,WATER FLOW SWITCH,
PRESSURE GAUGE W/VALVE & TEST & DRAIN VALVE
FIRE HOSE CABINET CONSISTING :-
1 NO. Ø25 x 30 MTR. LONG AUTOMATIC HOSE REEL
1 NO. Ø25 LOCK SHIELD VALVE
FHC 1 NO. Ø25 PRESSURE REDUCING VALVE
1 NO. Ø65 PRESSURE REDUCING LANDING VALVE
1 NO. Ø65 x 30 Mtr. LONG FIRE HOSE & NOZZLE
1 NO. 5 KG CO2 FIRE EXTINGUISHER
1 NO. 4.5 KG DRY POWDER FIRE EXTINGUISHER
5 KG CO2 FIRE EXTINGUISHER

6 KG DRY POWDER FIRE EXTINGUISHER


FB 1.2X1.2M FIRE BLANKET
150Øx4-WAY BREECHING INLET WITH CABINET
NON RETURN VALVE
AIR RELEASE VALVE
DRAIN VALVE

SRP SPRINKLER RISER PIPE CSRP CHUTE SPRINKLER PIPE

WRP WET RISER PIPE ZCV ZONE CONTROL VALVE

BIP BREECHING INLET PIPE F/A FROM ABOVE

DRP DRAIN RISER PIPE F/B FROM BELOW


NRV NON-RETURN VALVE T/A TO ABOVE
ARV AIR RELEASE VALVE T/B TO BELOW
ACV ALARM CHECK VALVE H/L HIGH LEVEL
COP CENTER OF PIPE

REVISED
03 07-02-22 AS BUILT SH A.A
02 05-05-20 REVISED AS PER LATEST ARCHITECTURE RAMIZ A.A
01 18-07-19 REVISED AS PER COMMENTS GR SHERIF
00 06-07-17 ISSUED FOR APPROVAL GR SHERIF
REV DATE DESCRIPTION DRAWN CHECKED

CLIENT NAME:

BIN DHAEN HOLDING - P.S.C

PROJECT PERSPECTIVE:

Blue color indicates 1.5m low gypsum partition


MAIN CONSULTANT:

P.O.BOX 11737 Dubai


Ph. 04-3989879 Fax. 04-3982744
Email - emirates_sas@yahoo.com

MAIN CONTRACTOR:

Asia Prime General Contracting Company


ASIA PRIME GENERAL CONTRACTING COMPANY L.L.C.
P.O. BOX: 90842 DUBAI, U.A.E. Tel: 04 2556661 Fax: 04 2556669
MEP CONTRACTOR

EGY CON
ELECTROMECHANICAL WORKS L.L.C

DUBAI - U.A.E P.O. BOX: 87262 TEL: +971 4


2612444 FAX: +971 4 2612999 info@egycon.ae

PROJECT TITLE:

THIRD FLOOR FIRE FIGHTING LAYOUT PROPOSED 3 BASEMENT+G+10+H/CLUB


SCALE1:100 COMMERCIAL/OFFICES/RESIDENTIAL
ON PLOT No. 322-301 AT AL HUDAIBA
DUBAI

AS-BUILT
SHEET CONTENT:

THIRD FLOOR
FIRE FIGHTING LAYOUT
DRAWN T.S CHECKED A.A APPROVED M.B
PLOT No.:- SCALE: 1:100 REV
322-301 SHEET: 03

PROJECT No.: DWG No.:


JOB-DBJ-19-0000-36 EGY-MEP-AB-FF-107