SAFETY EQUIPMENT SAFETY EQUIPMENT SAFETY EQUIPMENT

INSPECTION INSPECTION INSPECTION

ID. No. ID. No. ID. No.


DATE STATU BY DATE STATUS BY
S DATE STATUS BY
02-01-2024 OK 02-01-2024 OK
02-01-2024 OK
01-02-2024 01-02-2024
01-02-2024
01-03-2024 01-03-2024
01-03-2024
01-04-2024 01-04-2024
01-04-2024
01-05-2024 01-05-2024
01-05-2024
01-06-2024 01-06-2024
01-06-2024
01-07-2024 01-07-2024
01-07-2024
01-08-2024 01-08-2024
01-08-2024
01-09-2024 01-09-2024
01-09-2024
01-10-2024 01-10-2024
01-10-2024
01-11-2024 01-11-2024
01-11-2024
01-12-2024 01-12-2024
01-12-2024

SAFETY EQUIPMENT SAFETY EQUIPMENT


INSPECTION SAFETY EQUIPMENT
INSPECTION
INSPECTION

ID. No.
ID. No.
DATE STATUS BY ID. No.
DATE STATUS BY
02-01-2024 OK DATE STATUS BY
02-01-2024 OK
01-02-2024 02-01-2024 OK
01-02-2024
01-03-2024 01-02-2024
01-03-2024
01-04-2024 01-03-2024
01-04-2024
01-05-2024 01-04-2024
01-05-2024
01-06-2024 01-05-2024
01-06-2024
01-07-2024 01-06-2024
01-07-2024
01-08-2024 01-07-2024
01-08-2024
01-09-2024 01-08-2024
01-09-2024
01-10-2024 01-09-2024
01-10-2024
01-11-2024 01-10-2024
01-11-2024
01-12-2024 01-11-2024
01-12-2024
01-12-2024
FIRE EXTINGUISHER RECORD FIRE EXTINGUISHER RECORD

FIRE EXTINGUISHER No…………………………. FIRE EXTINGUISHER No……………………………..


MONTH 2019 SIGN MONTH 2019 SIGN
JAN JAN
FEB FEB
MAR MAR
APR APR
MAY MAY
JUN JUN
JUL JUL
AUG AUG
SEP SEP
OCT OCT
NOV NOV
DEC DEC

FIRE EXTINGUISHER RECORD FIRE EXTINGUISHER RECORD

FIRE EXTINGUISHER No……………………………. FIRE EXTINGUISHER No………………………….


MONTH 2019 SIGN MONTH 2019 SIGN
JAN JAN
FEB FEB
MAR MAR
APR APR
MAY MAY
JUN JUN
JUL JUL
AUG AUG
SEP SEP
OCT OCT
NOV NOV
DEC DEC

FIRE EXTINGUISHER RECORD FIRE EXTINGUISHER RECORD


FIRE EXTINGUISHER No…………………………….. FIRE EXTINGUISHER No……………………………..
MONTH 2019 SIGN MONTH 2019 SIGN
JAN JAN
FEB FEB
MAR MAR
APR APR
MAY MAY
JUN JUN
JUL JUL
AUG AUG
SEP SEP
OCT OCT
NOV NOV
DEC DEC
MA
TO TO
USE USE
FIRE FIRE
EXTINGUISHER EXTINGUISHER
1. PULL PIN 1. PULL PIN

2. AIM AT THE BASE OF THE FIRE 2. AIM AT THE BASE OF THE FIRE

3. SQUEEZE HANDLE 3. SQUEEZE HANDLE

4. SWEEP SIDE TO SIDE 4. SWEEP SIDE TO SIDE

TO TO

USE USE
FIRE FIRE
EXTINGUISHER EXTINGUISHER
1. PULL PIN 1. PULL PIN

2. AIM AT THE BASE OF THE FIRE 2. AIM AT THE BASE OF THE FIRE

3. SQUEEZE HANDLE 3. SQUEEZE HANDLE

4. SWEEP SIDE TO SIDE 4. SWEEP SIDE TO SIDE

TO TO

USE USE

FIRE FIRE
EXTINGUISHER EXTINGUISHER
1. PULL PIN 1. PULL PIN

2. AIM AT THE BASE OF THE FIRE 2. AIM AT THE BASE OF THE FIRE

3. SQUEEZE HANDLE 3. SQUEEZE HANDLE


4. SWEEP SIDE TO SIDE 4. SWEEP SIDE TO SIDE
PAULING MIDDLE EAST

DANGER
DANGER
DO NOT REMOVE
DEFECTIVE THIS TAG !
TO DO SO WITHOUT
AUTHORITY WILL MEAN
DISCIPLINARY ACTION
ITS HERE WITH A PURPOSE
DO NOT USE
REMARKS:
SIGNED BY:

DATE:
SEE OTHER SIDE

PAULING MIDDLE EAST

DANGER
DANGER
DO NOT REMOVE
DEFECTIVE THIS TAG !
TO DO SO WITHOUT
AUTHORITY WILL MEAN
DISCIPLINARY ACTION
ITS HERE WITH A PURPOSE
DO NOT USE
REMARKS:
SIGNED BY:

DATE:
SEE OTHER SIDE

PAULING MIDDLE EAST

DANGER
DANGER
DO NOT REMOVE
DEFECTIVE THIS TAG !
TO DO SO WITHOUT
AUTHORITY WILL MEAN
DISCIPLINARY ACTION
ITS HERE WITH A PURPOSE
DO NOT USE
REMARKS:
SIGNED BY:
DATE:
SEE OTHER SIDE
FIRE EXTINGUISHER RECORD FIRE EXTINGUISHER RECORD

FIRE EXTINGUISHER No…………………………. FIRE EXTINGUISHER No………………………….


MONTH 2021 2022 MONTH 2021 2022
JAN JAN
FEB FEB
MAR MAR
APR APR
MAY MAY
JUN JUN
JUL JUL
AUG AUG
SEP SEP
OCT OCT
NOV NOV
DEC DEC

FIRE EXTINGUISHER RECORD FIRE EXTINGUISHER RECORD

FIRE EXTINGUISHER No…………………………. FIRE EXTINGUISHER No………………………….


MONTH 2021 2022 MONTH 2021 2022
JAN JAN
FEB FEB
MAR MAR
APR APR
MAY MAY
JUN JUN
JUL JUL
AUG AUG
SEP SEP
OCT OCT
NOV NOV
DEC DEC

FIRE EXTINGUISHER RECORD FIRE EXTINGUISHER RECORD

FIRE EXTINGUISHER No…………………………. FIRE EXTINGUISHER No………………………….


MONTH 2021 2022 MONTH 2021 2022
JAN JAN
FEB FEB
MAR MAR
APR APR
MAY MAY
JUN JUN
JUL JUL
AUG AUG
SEP SEP
OCT OCT
NOV NOV
DEC DEC
LADDER INSPECTION LADDER INSPECTION

ID. No. ID. No.


DATE BY DATE BY DATE BY DATE BY
4/5/2023 HSE 4/5/2023 HSE
5/2/2023 HSE 5/2/2023 HSE
6/5/2023 HSE 6/5/2023 HSE
7/5/2023 HSE 7/5/2023 HSE

LADDER INSPECTION LADDER INSPECTION

ID. No. ID. No.


DATE BY DATE BY DATE BY DATE BY
4/5/2023 HSE 4/5/2023 HSE
5/2/2023 HSE 5/2/2023 HSE
6/5/2023 HSE 6/5/2023 HSE
7/5/2023 HSE 7/5/2023 HSE
SAFETY EQUIPMENT SAFETY EQUIPMENT
INSPECTION INSPECTION

ID. No. ID. No.


DATE BY DATE BY DATE BY DATE BY
6/2/2023 HSE (MAHFOOZ) 6/2/2023 HSE (MAHFOOZ)

7/1/2023 HSE (MAHFOOZ) 7/1/2023 HSE (MAHFOOZ)

8/2/2023 HSE (MAHFOOZ) 8/2/2023 HSE (MAHFOOZ)

9/4/2023 HSE (MAHFOOZ) 9/4/2023 HSE (MAHFOOZ)

10/4/2023 HSE (MAHFOOZ) 10/4/2023 HSE (MAHFOOZ)

11/4/2023 HSE (MAHFOOZ) 11/4/2023 HSE (MAHFOOZ)

SAFETY EQUIPMENT SAFETY EQUIPMENT


INSPECTION INSPECTION

ID. No. ID. No.


DATE BY DATE BY DATE BY DATE BY
6/2/2023 HSE (MAHFOOZ) 6/2/2023 HSE (MAHFOOZ)

7/1/2023 HSE (MAHFOOZ) 7/1/2023 HSE (MAHFOOZ)

8/2/2023 HSE (MAHFOOZ) 8/2/2023 HSE (MAHFOOZ)

9/4/2023 HSE (MAHFOOZ) 9/4/2023 HSE (MAHFOOZ)

10/4/2023 HSE (MAHFOOZ) 10/4/2023 HSE (MAHFOOZ)

11/4/2023 HSE (MAHFOOZ) 11/4/2023 HSE (MAHFOOZ)


LADDER LADDER
INSPECTION INSPECTION

ID. No. ID. No.


DATE STATUS BY DATE STATUS BY

LADDER LADDER
INSPECTION INSPECTION

ID. No. ID. No.


DATE STATUS BY DATE STATUS BY
PAULING MIDDLE EAST PAULING MIDDLE EA

DANGER DANGE
DO NOT
USE THIS DO NOT REMO
LADDER THIS TA
REMARKS:
REPAIRS REQUIRED
SEE OTHER SIDE

BROKEN
DISPOSE OFF PROPERLY
SIGNED BY:

DATE: SEE OTHER SID

PAULING MIDDLE EAST PAULING MIDDLE E

DDAANNGG DANGE
EERR
DO NOT REMO
DO NOT THIS TA
USE THIS REMARKS:

LADDER
REPAIRS REQUIRED
SEE OTHER SIDE

BROKEN
SEE OTHER SID
DISPOSE OFF PROPERLY
ST+G1

VE
G!

AST

VE
G!