Professional Documents
Culture Documents
Print Renc Balok Baja
Print Renc Balok Baja
8.660 31.265
LOKASI PROYEK:
1.250
1.250
B1 30/50 B1 30/50
7
KEC. GENTENG, SURABAYA
1.005
WF 250.125.6.9
WF 300.150.6,5.9 (CASTILATED)
B1 30/50
B1 30/50
B1 30/50
B2 20/30 B2 20/30
4.220
4.405
0.400
3.400
B1 30/50 B1 30/50
KONTRAKTOR:
WF 300.150.6,5.9 (CASTILATED)
WF 300.150.6,5.9 (CASTILATED)
WF 300.150.6,5.9 (CASTILATED)
WF 300.150.6,5.9 (CASTILATED)
WF 300.150.6,5.9 (CASTILATED)
8.790
6
WF 300.150.6,5.9 (CASTILATED)
B1 30/50
B1 30/50
B1 30/50
5.990
LIFT
WF 250.125.6.9
B1 30/50 B1 30/50
B3 15/20
5 PERENCANA: TANGGAL:
UNP 100.50.6.8,5
B1 30/50
B1 30/50
20.440
11.965
2.860
B3 15/20
B1 30/50
5.975
B3 15/20 B2 20/30 B2 20/30 WF 250.125.6.9
4.570
VOID
B1 30/50
11.650
UNP 100.50.6.8,5
B1 30/50 B1 30/50
WF 250.125.6.9
WF 250.125.6.9
WF 250.125.6.9
3 CATATAN:
WF 300.150.6,5.9 (CASTILATED) 1.663
3.000
B1 30/50
B2 20/30 B2 20/30
4.220
UNP 100.50.6.8,5
4.420
7.920
WF 300.150.6,5.9 (CASTILATED)
1.420
B1 30/50 B1 30/50 WF 250.125.6.9
2
3.825
1.250
JUDUL GAMBAR:
3.570 4.500 3.605 3.750 3.750 3.977 3.973 3.875 4.023
40.000
A B C D E F G H I J K SKALA: 1: 170
C'
NO. GAMBAR: JML. LEMBAR:
STR