Design Proposal

Ref. No: 102426

5th April 2007

Proposed Silt Trap Pond 1 & 2 for Kulim Hitech Park, Phase 3, Kedah

Conceptual Proposal using Enviromat 100 for Retention Pond

Prepared for: Prepared by:


M.E.I. Project Engineers Sdn Bhd TenCate Geosynthetic Asia Sdn. Bhd.
51-12A, Menara BHL 14 Jalan Sementa 27/91,
51, Jalan Sultan Ahmad Shah Seksyen 27, 40400
10050 Penang Shah Alam, Selangor,
Malaysia Malaysia.
Tel : +603 – 5192 8568
Tel: 04-2267793 Fax : +603 – 5192 8575
Fax:04-2265545

TenCate Geosynthetics Asia Sdn Bhd: Design Service


Copyright reserved. Unauthorized reproduction and distribution prohibited. All guidance given by TenCate Geosynthetics Asia Sdn Bhd on the
use of its industrial products for particular applications is given in good faith. It does not add to or extend any warranties contained in the
Company’s Standard Conditions of Sales. The Company (its agents or servants) accept no liability whatsoever in respect to the advice given.
Contents

Concept Proposal for TenCate - Polyfelt Geosynthetic


Clay Liner for Silt Trap Pond

1. Conceptual Design Proposal

2. Guideline Specification Geosynthetic Clay Liner (GCL)

3. Guideline Specification TenCate Miragrid GX

4. Guideline for the Installation of Enviromat Geosynthetic Clay Liner


(GCL)

5. Project Reference

Enviromat GCL Lining of Recreation Pond at Commenwealth Sport


Village Bukit Jalil, Malaysia
Enviromat GCL Lining of Waste Water Containment at Seletar
Waste Water Treatment, Singapore

6. TenCate-Polyfelt Enviromat Technical Data

7. TenCate Miragrid GX Technical Data

TenCate Geosynthetics Asia Sdn Bhd: Design Service


Copyright reserved. Unauthorized reproduction and distribution prohibited. All guidance given by TenCate Geosynthetics Asia Sdn Bhd on the use of its
industrial products for particular applications is given in good faith. It does not add to or extend any warranties contained in the Company’s Standard
Conditions of Sales. The Company (its agents or servants) accept no liability whatsoever in respect to the advice given.
1

Design Calculation

CONCEPTUAL DESIGN PROPOSAL

Geosynthetics Clay Liner ( GCL )

For

Proposed Proposed Silt Trap Pond 1 & 2 for


Kulim Hitech Park, Phase 3,
Kedah

Page 1 of 3

TenCate Geosynthetics Asia Sdn Bhd: Design Service


Copyright reserved. Unauthorized reproduction and distribution prohibited. All guidance given by TenCate Geosynthetics Asia Sdn
Bhd on the use of its industrial products for particular applications is given in good faith. It does not add to or extend any warranties
contained in the Company’s Standard Conditions of Sales. The Company (its agents or servants) accept no liability whatsoever in
respect to the advice given.
2

ATTACHMENT 1

1. DESIGN OF GEOSYNTHETIC CLAY LINER

The conceptual design proposal given below is based on Polyfelt Technical


Training Manual on Containments. Reference shall be made to this manual at all
time on the equations used.

1.1 Design Parameters


Soil cover density (assumed) = 18 kN/m3
Height of soil cover = 0.5m
Slope Inclination = 1:2.0

1.2 Design Analysis

1.2.1 Determine required peel strength of GCL

Using Technical Training Manual, From Figure B

Required Peel Strength as a function of soil covering and slope inclination,


Fv req = 10 N/10cm

1.2.2 Determine required GCL grade

Required GCL peel strength = 10 N/10cm

Select Enviromat 100, Peel Strength = 27 N/10cm;

F.S. for peel strength = 27 / 10 = 2.7; OK.

Adopt Enviromat 100 GCL for lining.

Page 2 of 3

TenCate Geosynthetics Asia Sdn Bhd: Design Service


Copyright reserved. Unauthorized reproduction and distribution prohibited. All guidance given by TenCate Geosynthetics Asia Sdn
Bhd on the use of its industrial products for particular applications is given in good faith. It does not add to or extend any warranties
contained in the Company’s Standard Conditions of Sales. The Company (its agents or servants) accept no liability whatsoever in
respect to the advice given.
3

100
90 Slope angle:
Slope angle: 33.7°
33.7°
80
70 26.6°
26.6°
Peel Strength [N/10 cm]

Enviromat GCL min. peel strength


60
21.8°
21.8°
50
40 18.4°
18.4°
30 14.0°
14.0°
20
10
0

0 1 2 3 4 5 6
Cover soil [m]

Figure B: Required peel strength of Enviromat in the undrained condition in


relationship to the slope angle and soil cover

Page 3 of 3

TenCate Geosynthetics Asia Sdn Bhd: Design Service


Copyright reserved. Unauthorized reproduction and distribution prohibited. All guidance given by TenCate Geosynthetics Asia Sdn
Bhd on the use of its industrial products for particular applications is given in good faith. It does not add to or extend any warranties
contained in the Company’s Standard Conditions of Sales. The Company (its agents or servants) accept no liability whatsoever in
respect to the advice given.
Boundary condition of External Stability Check using Slope-W software
Stability Analysis of Compacted Earth Bund A20

20 20

18 18

16 16

Soil 1
14 14
Backfill Material
Elevation, m

12 12 Soil Model Mohr-Coulomb


Soil 1 3m high water retention Unit Weight 18 kN/m³
10 10
Cohesion 2
8 8 Phi 26
Soil 2 Soil 2
6 6
Insitu Material
4 4 Soil Model Mohr-Coulomb
Unit Weight 18.5 kN/m³
2 2
Cohesion 5
0 0 Phi 28
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42

Distance, m

CLIENT: PROJECT TITLE: DESIGNED / DRAWN BY: Sundra DATE:


TenCate Geosynthetics Asia Sdn Bhd: Design Service TenCate Geosynthetics Asia Sdn. Bhd. M.E.I. Project Engineers Sdn Bhd April 2007
(Company No. 264232-U) 51-12A, Menara BHL Proposed Silt Trap Pond 1 & 2 for CHECKED BY: DATE:
Copyright reserved. Unauthorized reproduction and distribution prohibited. 14, Jalan Sementa 27/91, Seksyen 27, Kulim Hitech Park, Phase 3, Albert Lim April 2007
All guidance given by TenCate Geosynthetics Asia Sdn Bhd on the use of 51, Jalan Sultan Ahmad Shah
40400 Shah Alam 10050 Penang Kedah APPROVED BY: Albert Lim DATE: April 2007
its industrial products for particular applications is given in good faith. It Selangor D.E. Malaysia
does not add to or extend any warranties contained in the Company’s Malaysia SCALE:
Tel: 603 - 5192 8568 DRAWING TITLE: Not To Scale
Standard Conditions of Sales. The Company (its agents or servants) Tel: 04-2267793
Fax: 603 - 5192 8575 Fax:04-2265545 FILE NO: 102426
accept no liability whatsoever in respect to the advice given.
DRAWING NO: REVISION NO:
Boundary condition of External Stability Check using Slope-W software
Stability Analysis of Compacted Earth Bund A20

20 20

18 18

16 16

14
1.142 14
Soil 1
Backfill Material
Elevation, m

12 12 Soil Model Mohr-Coulomb


Soil 1 3m high water retention Unit Weight 18 kN/m³
10 10
Cohesion 2
8 8 Phi 26
Soil 2 Soil 2
6 6
Insitu Material
4 4 Soil Model Mohr-Coulomb
Unit Weight 18.5 kN/m³
2 2
Cohesion 5
0 0 Phi 28
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42

Distance, m

CLIENT: PROJECT TITLE: DESIGNED / DRAWN BY: Sundra DATE:


TenCate Geosynthetics Asia Sdn Bhd: Design Service TenCate Geosynthetics Asia Sdn. Bhd. M.E.I. Project Engineers Sdn Bhd April 2007
(Company No. 264232-U) 51-12A, Menara BHL Proposed Silt Trap Pond 1 & 2 for CHECKED BY: DATE:
Copyright reserved. Unauthorized reproduction and distribution prohibited. 14, Jalan Sementa 27/91, Seksyen 27, Kulim Hitech Park, Phase 3, Albert Lim April 2007
All guidance given by TenCate Geosynthetics Asia Sdn Bhd on the use of 51, Jalan Sultan Ahmad Shah
40400 Shah Alam 10050 Penang Kedah APPROVED BY: Albert Lim DATE: April 2007
its industrial products for particular applications is given in good faith. It Selangor D.E. Malaysia
does not add to or extend any warranties contained in the Company’s Malaysia SCALE:
Tel: 603 - 5192 8568 DRAWING TITLE: Not To Scale
Standard Conditions of Sales. The Company (its agents or servants) Tel: 04-2267793
Fax: 603 - 5192 8575 Fax:04-2265545 FILE NO: 102426
accept no liability whatsoever in respect to the advice given.
DRAWING NO: REVISION NO:
Boundary condition of External Stability Check using Slope-W software
Stability Analysis of Compacted Earth Bund A20

Reinforcement Details : Top – Bottom


1 Layer of TenCate Miragrid GX60/30 @ 5.0m anchorage length & 1m spacing
1 Layer of TenCate Miragrid GX60/30 @ 8.0m anchorage length & 1m spacing
1 Layer of TenCate Miragrid GX60/30 @ 10.0m anchorage length & 1m spacing

20 20

18 18

16 16

14 14 Soil 1
Backfill Material
Elevation, m

12 12
Soil Model Mohr-Coulomb
10 Soil 1 3m high water retention 10 Unit Weight 18 kN/m³
Cohesion 2
8 8
Phi 26
6 Soil 2 6 Soil 2
Insitu Material
4 4
Soil Model Mohr-Coulomb
2 2 Unit Weight 18.5 kN/m³
Cohesion 5
0 0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 Phi 28

Distance, m

CLIENT: PROJECT TITLE: DESIGNED / DRAWN BY: Sundra DATE:


TenCate Geosynthetics Asia Sdn Bhd: Design Service TenCate Geosynthetics Asia Sdn. Bhd. M.E.I. Project Engineers Sdn Bhd April 2007
(Company No. 264232-U) 51-12A, Menara BHL Proposed Silt Trap Pond 1 & 2 for CHECKED BY: DATE:
Copyright reserved. Unauthorized reproduction and distribution prohibited. 14, Jalan Sementa 27/91, Seksyen 27, Kulim Hitech Park, Phase 3, Albert Lim April 2007
All guidance given by TenCate Geosynthetics Asia Sdn Bhd on the use of 51, Jalan Sultan Ahmad Shah
40400 Shah Alam 10050 Penang Kedah APPROVED BY: Albert Lim DATE: April 2007
its industrial products for particular applications is given in good faith. It Selangor D.E. Malaysia
does not add to or extend any warranties contained in the Company’s Malaysia SCALE:
Tel: 603 - 5192 8568 DRAWING TITLE: Not To Scale
Standard Conditions of Sales. The Company (its agents or servants) Tel: 04-2267793
Fax: 603 - 5192 8575 Fax:04-2265545 FILE NO: 102426
accept no liability whatsoever in respect to the advice given.
DRAWING NO: REVISION NO:
Boundary condition of External Stability Check using Slope-W software
Stability Analysis of Compacted Earth Bund A20

Reinforcement Details : Top – Bottom


1 Layer of TenCate Miragrid GX60/30 @ 5.0m anchorage length & 1m spacing
1 Layer of TenCate Miragrid GX60/30 @ 8.0m anchorage length & 1m spacing
1 Layer of TenCate Miragrid GX60/30 @ 10.0m anchorage length & 1m spacing

20 20

18 18

16 16

14
1.692 14
Soil 1
Backfill Material
Elevation, m

12 12 Soil Model Mohr-Coulomb


Soil 1 3m high water retention Unit Weight 18 kN/m³
10 10
Cohesion 2
8 8 Phi 26
Soil 2 Soil 2
6 6
Insitu Material
4 4 Soil Model Mohr-Coulomb
Unit Weight 18.5 kN/m³
2 2
Cohesion 5

0 0 Phi 28
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42

Distance, m

CLIENT: PROJECT TITLE: DESIGNED / DRAWN BY: Sundra DATE:


TenCate Geosynthetics Asia Sdn Bhd: Design Service TenCate Geosynthetics Asia Sdn. Bhd. M.E.I. Project Engineers Sdn Bhd April 2007
(Company No. 264232-U) 51-12A, Menara BHL Proposed Silt Trap Pond 1 & 2 for CHECKED BY: DATE:
Copyright reserved. Unauthorized reproduction and distribution prohibited. 14, Jalan Sementa 27/91, Seksyen 27, Kulim Hitech Park, Phase 3, Albert Lim April 2007
All guidance given by TenCate Geosynthetics Asia Sdn Bhd on the use of 51, Jalan Sultan Ahmad Shah
40400 Shah Alam 10050 Penang Kedah APPROVED BY: Albert Lim DATE: April 2007
its industrial products for particular applications is given in good faith. It Selangor D.E. Malaysia
does not add to or extend any warranties contained in the Company’s Malaysia SCALE:
Tel: 603 - 5192 8568 DRAWING TITLE: Not To Scale
Standard Conditions of Sales. The Company (its agents or servants) Tel: 04-2267793
Fax: 603 - 5192 8575 Fax:04-2265545 FILE NO: 102426
accept no liability whatsoever in respect to the advice given.
DRAWING NO: REVISION NO:
Boundary condition of External Stability Check using Slope-W software
Stability Analysis of Compacted Earth Bund A25

30 30

28 28

26 26

24 3m high water retention 24

22 22 Soil 1
20 Soil 1 20 Backfill Material
Elevation, m

18 18 Soil Model Mohr-Coulomb

16 16 Unit Weight 18 kN/m³

14 14 Cohesion 2
Soil 2
12 12 Phi 26
Soil 2
10 10
Insitu Material
8 8
Soil Model Mohr-Coulomb
6 6
Unit Weight 18.5 kN/m³
4 4
Cohesion 5
2 2
Phi 28
0 0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60

Distance, m

CLIENT: PROJECT TITLE: DESIGNED / DRAWN BY: Sundra DATE:


TenCate Geosynthetics Asia Sdn Bhd: Design Service TenCate Geosynthetics Asia Sdn. Bhd. M.E.I. Project Engineers Sdn Bhd April 2007
(Company No. 264232-U) 51-12A, Menara BHL Proposed Silt Trap Pond 1 & 2 for CHECKED BY: DATE:
Copyright reserved. Unauthorized reproduction and distribution prohibited. 14, Jalan Sementa 27/91, Seksyen 27, Kulim Hitech Park, Phase 3, Albert Lim April 2007
All guidance given by TenCate Geosynthetics Asia Sdn Bhd on the use of 51, Jalan Sultan Ahmad Shah
40400 Shah Alam 10050 Penang Kedah APPROVED BY: Albert Lim DATE: April 2007
its industrial products for particular applications is given in good faith. It Selangor D.E. Malaysia
does not add to or extend any warranties contained in the Company’s Malaysia SCALE:
Tel: 603 - 5192 8568 DRAWING TITLE: Not To Scale
Standard Conditions of Sales. The Company (its agents or servants) Tel: 04-2267793
Fax: 603 - 5192 8575 Fax:04-2265545 FILE NO: 102426
accept no liability whatsoever in respect to the advice given.
DRAWING NO: REVISION NO:
Boundary condition of External Stability Check using Slope-W software
Stability Analysis of Compacted Earth Bund A25

30 30

28
0.787 28

26 26

24 3m high water retention 24

22 22
Soil 1
20 Soil 1 20
Backfill Material
Elevation, m

18 18
Soil Model Mohr-Coulomb
16 16
Unit Weight 18 kN/m³
14 14
Cohesion 2
Soil 2
12 12 Phi 26
10 10 Soil 2
8 8 Insitu Material
6 6 Soil Model Mohr-Coulomb
4 4 Unit Weight 18.5 kN/m³

2 2 Cohesion 5

0 0 Phi 28
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60

Distance, m

CLIENT: PROJECT TITLE: DESIGNED / DRAWN BY: Sundra DATE:


TenCate Geosynthetics Asia Sdn Bhd: Design Service TenCate Geosynthetics Asia Sdn. Bhd. M.E.I. Project Engineers Sdn Bhd April 2007
(Company No. 264232-U) 51-12A, Menara BHL Proposed Silt Trap Pond 1 & 2 for CHECKED BY: DATE:
Copyright reserved. Unauthorized reproduction and distribution prohibited. 14, Jalan Sementa 27/91, Seksyen 27, Kulim Hitech Park, Phase 3, Albert Lim April 2007
All guidance given by TenCate Geosynthetics Asia Sdn Bhd on the use of 51, Jalan Sultan Ahmad Shah
40400 Shah Alam 10050 Penang Kedah APPROVED BY: Albert Lim DATE: April 2007
its industrial products for particular applications is given in good faith. It Selangor D.E. Malaysia
does not add to or extend any warranties contained in the Company’s Malaysia SCALE:
Tel: 603 - 5192 8568 DRAWING TITLE: Not To Scale
Standard Conditions of Sales. The Company (its agents or servants) Tel: 04-2267793
Fax: 603 - 5192 8575 Fax:04-2265545 FILE NO: 102426
accept no liability whatsoever in respect to the advice given.
DRAWING NO: REVISION NO:
Boundary condition of External Stability Check using Slope-W software
Stability Analysis of Compacted Earth Bund A25

Reinforcement Details : Top – Bottom


1 Layer of TenCate Miragrid GX80/30 @ 5.0m anchorage length & 1m spacing
1 Layer of TenCate Miragrid GX80/30 @ 8.0m anchorage length & 1m spacing
1 Layer of TenCate Miragrid GX80/30 @ 11.0m anchorage length & 1m spacing
1 Layer of TenCate Miragrid GX200/30 @ 18.0m anchorage length & 1m spacing

30 30

28 28

26 26
3m high water retention
24 24

22 22
Soil 1
20 Soil 1 20
Backfill Material
Elevation, m

18 18
Soil Model Mohr-Coulomb
16 16 Unit Weight 18 kN/m³
14 Soil 2 14 Cohesion 2
12 12 Phi 26
10 10 Soil 2
8 8 Insitu Material

6 6 Soil Model Mohr-Coulomb

4 4 Unit Weight 18.5 kN/m³


Cohesion 5
2 2
Phi 28
0 0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60

Distance, m

CLIENT: PROJECT TITLE: DESIGNED / DRAWN BY: Sundra DATE:


TenCate Geosynthetics Asia Sdn Bhd: Design Service TenCate Geosynthetics Asia Sdn. Bhd. M.E.I. Project Engineers Sdn Bhd April 2007
(Company No. 264232-U) 51-12A, Menara BHL Proposed Silt Trap Pond 1 & 2 for CHECKED BY: DATE:
Copyright reserved. Unauthorized reproduction and distribution prohibited. 14, Jalan Sementa 27/91, Seksyen 27, Kulim Hitech Park, Phase 3, Albert Lim April 2007
All guidance given by TenCate Geosynthetics Asia Sdn Bhd on the use of 51, Jalan Sultan Ahmad Shah
40400 Shah Alam 10050 Penang Kedah APPROVED BY: Albert Lim DATE: April 2007
its industrial products for particular applications is given in good faith. It Selangor D.E. Malaysia
does not add to or extend any warranties contained in the Company’s Malaysia SCALE:
Tel: 603 - 5192 8568 DRAWING TITLE: Not To Scale
Standard Conditions of Sales. The Company (its agents or servants) Tel: 04-2267793
Fax: 603 - 5192 8575 Fax:04-2265545 FILE NO: 102426
accept no liability whatsoever in respect to the advice given.
DRAWING NO: REVISION NO:
Boundary condition of External Stability Check using Slope-W software
Stability Analysis of Compacted Earth Bund A25

Reinforcement Details : Top – Bottom


1 Layer of TenCate Miragrid GX80/30 @ 5.0m anchorage length & 1m spacing
1 Layer of TenCate Miragrid GX80/30 @ 8.0m anchorage length & 1m spacing
1 Layer of TenCate Miragrid GX80/30 @ 11.0m anchorage length & 1m spacing
1 Layer of TenCate Miragrid GX200/30 @ 18.0m anchorage length & 1m spacing

30 30

28
1.641 28

26 26

24 3m high water retention 24

22 22
Soil 1
20 Soil 1 20
Backfill Material
Elevation, m

18 18
Soil Model Mohr-Coulomb
16 16
Unit Weight 18 kN/m³
14 14
Cohesion 2
12 Soil 2 12 Phi 26
10 10 Soil 2
8 8 Insitu Material
6 6 Soil Model Mohr-Coulomb
4 4 Unit Weight 18.5 kN/m³

2 2 Cohesion 5

0 0 Phi 28
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60

Distance, m

CLIENT: PROJECT TITLE: DESIGNED / DRAWN BY: Sundra DATE:


TenCate Geosynthetics Asia Sdn Bhd: Design Service TenCate Geosynthetics Asia Sdn. Bhd. M.E.I. Project Engineers Sdn Bhd April 2007
(Company No. 264232-U) 51-12A, Menara BHL Proposed Silt Trap Pond 1 & 2 for CHECKED BY: DATE:
Copyright reserved. Unauthorized reproduction and distribution prohibited. 14, Jalan Sementa 27/91, Seksyen 27, Kulim Hitech Park, Phase 3, Albert Lim April 2007
All guidance given by TenCate Geosynthetics Asia Sdn Bhd on the use of 51, Jalan Sultan Ahmad Shah
40400 Shah Alam 10050 Penang Kedah APPROVED BY: Albert Lim DATE: April 2007
its industrial products for particular applications is given in good faith. It Selangor D.E. Malaysia
does not add to or extend any warranties contained in the Company’s Malaysia SCALE:
Tel: 603 - 5192 8568 DRAWING TITLE: Not To Scale
Standard Conditions of Sales. The Company (its agents or servants) Tel: 04-2267793
Fax: 603 - 5192 8575 Fax:04-2265545 FILE NO: 102426
accept no liability whatsoever in respect to the advice given.
DRAWING NO: REVISION NO:
INSTALLATION PROCEDURE

See Longitudinal
Overlap Details

Direction of
Installation

End Overlap
(See Traverse Overlap Details)

Recommended Marking

CLIENT: PROJECT TITLE: DESIGNED / DRAWN BY: Sundra DATE:


TenCate Geosynthetics Asia Sdn Bhd: Design Service TenCate Geosynthetics Asia Sdn. Bhd. M.E.I. Project Engineers Sdn Bhd April 2007
(Company No. 264232-U) 51-12A, Menara BHL Proposed Silt Trap Pond 1 & 2 for CHECKED BY: DATE:
Copyright reserved. Unauthorized reproduction and distribution prohibited. 14, Jalan Sementa 27/91, Seksyen 27, Kulim Hitech Park, Phase 3, Albert Lim April 2007
All guidance given by TenCate Geosynthetics Asia Sdn Bhd on the use of 51, Jalan Sultan Ahmad Shah
40400 Shah Alam 10050 Penang Kedah APPROVED BY: Albert Lim DATE: April 2007
its industrial products for particular applications is given in good faith. It Selangor D.E. Malaysia
does not add to or extend any warranties contained in the Company’s Malaysia SCALE:
Tel: 603 - 5192 8568 DRAWING TITLE: Not To Scale
Standard Conditions of Sales. The Company (its agents or servants) Tel: 04-2267793
Fax: 603 - 5192 8575 Fax:04-2265545 FILE NO: 102426
accept no liability whatsoever in respect to the advice given.
DRAWING NO: REVISION NO:
OVERLAP OF GCL ENVIROMAT 100

1 part benonite

undercoat
6 parts water

Undercoat

undercoat
with mix 1 : 6
marking

undercoat
150 50 topcoat
UNDER COAT 200 1 part benonite

topcoat
4 parts water

undercoat
with mix 1 : 4
marking

150 50
200 TOP COAT

CLIENT: PROJECT TITLE: DESIGNED / DRAWN BY: Sundra DATE:


TenCate Geosynthetics Asia Sdn Bhd: Design Service TenCate Geosynthetics Asia Sdn. Bhd. M.E.I. Project Engineers Sdn Bhd April 2007
(Company No. 264232-U) 51-12A, Menara BHL Proposed Silt Trap Pond 1 & 2 for CHECKED BY: DATE:
Copyright reserved. Unauthorized reproduction and distribution prohibited. 14, Jalan Sementa 27/91, Seksyen 27, Kulim Hitech Park, Phase 3, Albert Lim April 2007
All guidance given by TenCate Geosynthetics Asia Sdn Bhd on the use of 51, Jalan Sultan Ahmad Shah
40400 Shah Alam 10050 Penang Kedah APPROVED BY: Albert Lim DATE: April 2007
its industrial products for particular applications is given in good faith. It Selangor D.E. Malaysia
does not add to or extend any warranties contained in the Company’s Malaysia SCALE:
Tel: 603 - 5192 8568 DRAWING TITLE: Not To Scale
Standard Conditions of Sales. The Company (its agents or servants) Tel: 04-2267793
Fax: 603 - 5192 8575 Fax:04-2265545 FILE NO: 102426
accept no liability whatsoever in respect to the advice given.
DRAWING NO: REVISION NO:
Typical Cross Section Of Proposed Silt Trap Pond A20

Enviromat 100 (GCL) – Geosynthetic Clay Liner is formed by needle punching


bentonite between Layers of geotextiles. The unique entanglement of fiber
reinforces and gives high resistance to GCL and overcoming the natural weak
internal shear strength of bentonite.

Reinforcement Details : Top – Bottom


1 Layer of TenCate Miragrid GX60/30 @ 5.0m anchorage length & 1m spacing
1 Layer of TenCate Miragrid GX60/30 @ 8.0m anchorage length & 1m spacing
1 Layer of TenCate Miragrid GX60/30 @ 10.0m anchorage length & 1m spacing Legend:

EM-4 Erosion Control Mat


Min 300mm Thk. Soil Cover

EM-100 CLAY LINER


300mm Thk. Sand Layer
3m width at crest of embankment (To be determined)
Road
Firm Sub – Grade Soil
H.W.L (3m)

GX60/30 Well compacted earth bund


L.W.L (1m)
2H : 1V
GX60/30
2H : 1V
300mm Depth
GX60/30 26.5o 26.5o
Concrete drain 300mm thk. Aggregate drain wrap with TS50

CLIENT: PROJECT TITLE: DESIGNED / DRAWN BY: Sundra DATE:


TenCate Geosynthetics Asia Sdn Bhd: Design Service TenCate Geosynthetics Asia Sdn. Bhd. M.E.I. Project Engineers Sdn Bhd April 2007
(Company No. 264232-U) 51-12A, Menara BHL Proposed Silt Trap Pond 1 & 2 for CHECKED BY: DATE:
Copyright reserved. Unauthorized reproduction and distribution prohibited. 14, Jalan Sementa 27/91, Seksyen 27, Kulim Hitech Park, Phase 3, Albert Lim April 2007
All guidance given by TenCate Geosynthetics Asia Sdn Bhd on the use of 51, Jalan Sultan Ahmad Shah
40400 Shah Alam 10050 Penang Kedah APPROVED BY: Albert Lim DATE: April 2007
its industrial products for particular applications is given in good faith. It Selangor D.E. Malaysia
does not add to or extend any warranties contained in the Company’s Malaysia SCALE:
Tel: 603 - 5192 8568 DRAWING TITLE: Not To Scale
Standard Conditions of Sales. The Company (its agents or servants) Tel: 04-2267793
Fax: 603 - 5192 8575 Typical Cross Section Of Proposed FILE NO: 102426
accept no liability whatsoever in respect to the advice given. Fax:04-2265545
Silt Trap Pond A20
DRAWING NO: 1 REVISION NO:
Typical Cross Section Of Proposed Silt Trap Pond A25
Enviromat 100 (GCL) – Geosynthetic Clay Liner is formed by needle
punching bentonite between Layers of geotextiles.
The unique entanglement of fiber reinforces and gives high resistance to
GCL and overcoming the natural weak internal shear strength of bentonite.
Reinforcement Details : Top – Bottom
1 Layer of TenCate Miragrid GX80/30 @ 5.0m anchorage length & 1m spacing
1 Layer of TenCate Miragrid GX80/30 @ 8.0m anchorage length & 1m spacing
1 Layer of TenCate Miragrid GX80/30 @ 11.0m anchorage length & 1m spacing
Legend: 1 Layer of TenCate Miragrid GX200/30 @ 18.0m anchorage length & 1m spacing

EM-4 Erosion Control Mat


Min 300mm Thk. Soil Cover
EM-4 Erosion Control Mat
EM-100 CLAY LINER
300mm Thk. Sand Layer 3m width at crest of
embankment
Firm Sub – Grade Soil
H.W.L (3m)

Well compacted earth bund GX80/30


L.W.L (1m)
2H : 1V
2H : 1V GX80/30

300mm Depth 26.5o Stream


26.5o GX80/30
300mm thk. Aggregate drain
wrap with TS50 GX200/30

CLIENT: PROJECT TITLE: DESIGNED / DRAWN BY: Sundra DATE:


TenCate Geosynthetics Asia Sdn Bhd: Design Service TenCate Geosynthetics Asia Sdn. Bhd. M.E.I. Project Engineers Sdn Bhd April 2007
(Company No. 264232-U) 51-12A, Menara BHL Proposed Silt Trap Pond 1 & 2 for CHECKED BY: DATE:
Copyright reserved. Unauthorized reproduction and distribution prohibited. 14, Jalan Sementa 27/91, Seksyen 27, Kulim Hitech Park, Phase 3, Albert Lim April 2007
All guidance given by TenCate Geosynthetics Asia Sdn Bhd on the use of 51, Jalan Sultan Ahmad Shah
40400 Shah Alam 10050 Penang Kedah APPROVED BY: Albert Lim DATE: April 2007
its industrial products for particular applications is given in good faith. It Selangor D.E. Malaysia
does not add to or extend any warranties contained in the Company’s Malaysia SCALE:
Tel: 603 - 5192 8568 DRAWING TITLE: Not To Scale
Standard Conditions of Sales. The Company (its agents or servants) Tel: 04-2267793
Fax: 603 - 5192 8575 Typical Cross Section Of Proposed FILE NO: 102426
accept no liability whatsoever in respect to the advice given. Fax:04-2265545
Silt Trap Pond A25
DRAWING NO: REVISION NO: