F/PUR/08 ISSUE 01

QUOTATION
ACQUISITION NO: A2021-152 A
QUOTATION NO: Q2021-152 A
P.O. BOX 100001,Kasangati. DATE: 25-Oct-21
Plot 1234 ,Namirembe Hillside Road,Kitettika,Wakiso.
Tel: +256 (0) 392 175 883
Email: info@getlab.co.ug
Web: www.getlab.co.ug

GETLAB TIN: 1006958253

Address;

M/S Yerer Engineering.

Quotation for;
Seismic Investigations at Unyama Dam
QUANTITY Units Description UNIT PRICE (UGX) AMOUNT (UGX)
Mobilisation and Demobilization

Mobilisation and Demobilisation(including fuel for


1 LS 35,000,000 35,000,000
vehicle, facilitation for technicians and tooling etc)

Field Investigations (Unyama Dam)


Data acquisition
Line clearance (considering 2m width + offset
5940 metre 2,000 11,880,000
distances)
Seismic data acquistion
Line ID
1000 metre USL1 (along dam Axis) 23,000 23,000,000
1000 metre USL2 (along dam Axis) 23,000 23,000,000
1000 metre USL3 (along dam Axis) 23,000 23,000,000
600 metre USL4 (along river center) 23,000 13,800,000
400 metre USL5 (along right abutment) 23,000 9,200,000
400 metre USL 5 (along right abutment) 23,000 9,200,000
700 metre USL5 (along spillway route) 23,000 16,100,000

Topo survey for source and reciever positions

Line ID
405 Poistion USL1 (along dam Axis) 10,000 4,050,000
405 Poistion USL2 (along dam Axis) 10,000 4,050,000
405 Poistion USL3 (along dam Axis) 10,000 4,050,000
245 Poistion USL4 (along river center) 10,000 2,450,000
165 Poistion USL5 (along right abutment) 10,000 1,650,000
165 Poistion USL 5 (along right abutment) 10,000 1,650,000
285 Poistion USL5 (along spillway route) 10,000 2,850,000
Data processing & Interpretation
5100 metre 2-D Refraction data processing 15,000 76,500,000
Reporting
1 LS Preparation of Factual Report 3,500,000 3,500,000

Net Total (UGX) 264,930,000


VAT 18% 47,687,400
We recommend an advance payment of 60%, and the
Note balance 40% on submission of the final report Grand Total (UGX) 312,617,400

Amount in Words: Three Hundred Twelve Million Six Hundred Seven Thousand Four Hundred Uganda Shillings Only

Geotechnical Engineering and Technology Laboratory Ltd


Standard Chartered Bank, Speke Road Branch, Kampala, Uganda
Account Number: 0102015168800

Swift Code: SCBLUGKA

If you have any questions concerning this debit note, contact Terry on +256 704247549

THANK YOU FOR YOUR BUSINESS!


F/PUR/08 ISSUE 01

QUOTATION
ACQUISITION NO: A2021-152 B
QUOTATION NO: Q2021-152 B
P.O. BOX 100001,Kasangati. DATE: 25-Oct-21
Plot 1234 ,Namirembe Hillside Road,Kitettika,Wakiso.
Tel: +256 (0) 392 175 883
Email: info@getlab.co.ug
Web: www.getlab.co.ug

GETLAB TIN: 1006958253

Address;

M/S Yerer Engineering.

Quotation for;
Seismic Investigations at Namalu Dam
QUANTITY Units Description UNIT PRICE (UGX) AMOUNT (UGX)
Mobilisation and Demobilization

Mobilisation and Demobilisation(including fuel for


1 LS 35,000,000 35,000,000
vehicle, facilitation for technicians and tooling etc)

Field Investigations (Unyama Dam)


Data acquisition
Line clearance (considering 2m width + offset
6640 metre 2,000 13,280,000
distances)
Seismic data acquistion
Line ID
1300 metre NSL1 (along dam Axis) 23,000 29,900,000
1300 metre NSL2 (along dam Axis) 23,000 29,900,000
1300 metre NSL3 (along dam Axis) 23,000 29,900,000
600 metre NSL4 (along river center) 23,000 13,800,000
400 metre NSL5 (along right abutment) 23,000 9,200,000
400 metre NSL 5 (along right abutment) 23,000 9,200,000
500 metre NSL5 (along spillway route) 23,000 11,500,000

Topo survey for source and reciever positions

Line ID
525 Poistion NSL1 (along dam Axis) 10,000 5,250,000
525 Poistion NSL2 (along dam Axis) 10,000 5,250,000
525 Poistion NSL3 (along dam Axis) 10,000 5,250,000
245 Poistion NSL4 (along river center) 10,000 2,450,000
165 Poistion NSL5 (along right abutment) 10,000 1,650,000
165 Poistion NSL5 (along right abutment) 10,000 1,650,000
205 Poistion NSL5 (along spillway route) 10,000 2,050,000
Data processing & Interpretation
5800 metre 2-D Refraction data processing 15,000 87,000,000
Reporting
1 LS Preparation of Factual Report 3,500,000 3,500,000

Net Total (UGX) 295,730,000


We recommend an advance payment of 60%, and the
Note
balance 40% on submission of the final report
Grand Total (UGX) 295,730,000

Amount in Words: Three Hundred Ninety Five Million Seven Hundred Thirty Thousand Uganda Shillings Only

Geotechnical Engineering and Technology Laboratory Ltd


Standard Chartered Bank, Speke Road Branch, Kampala, Uganda
Account Number: 0102015168800

Swift Code: SCBLUGKA

If you have any questions concerning this debit note, contact Terry on +256 704247549

THANK YOU FOR YOUR BUSINESS!


QUOTATION
ACQUISITION NO: A2021- 153 A
QUOTATION NO: Q2021-153A
Plot 1234, Block 197 ,Kitetika Cell DATE: 10/25/2021
Namirembe Hillside Road, ,
Kasangati Town Council
P.O Box 9529, Kampala
Tel: +256 (0) 392 175 883
Email: info@getlab.co.ug
Web: www.getlab.co.ug

GETLAB TIN: 1006958253


Address:

M/S Yerer Engineering.

Quotation for:
Drilling at Unyama Dam

UNIT PRICE
ITEM QUANTITY UNITS DESCRIPTION AMOUNT (UGX)
(UGX)

Geological mapping of area of project components


1.0 1 LS 20,000,000 20,000,000
including geological sections as per specification
2.0. Establishment
Allow for Mobilization and demobilization of
2.1.1 1 LS 40,000,000 40,000,000
equipment, staff, PPEs, communication, etc

3.0 Drilling Works -


3.1.1 42 m Drilling to a depth of 42m in soil 185,000 7,677,500
3.1.2 42 m Drilling to a depth of 42m in Rock 350,000 14,525,000
Carrying out Standard Penetration Test at every 1.5m
3.1.3 55 No. 40,000 2,213,333
in soil
Obtaining Disturbed samples at 1.5m Interval per
3.1.4 55 No. 20,000 1,106,667
Borehole.
Obtain 3 undisturbed samples of 75-100 mm diameter
3.1.5 12 No. 80,000 960,000
per every bore hole

4.0 Construction Materials Sources


4.1.1 Fill/ Gravel Borrow Sources
4.1.2 3 No BP Identificaion and mapping every 5Km 50,000 150,000
4.1.3 9 No Test Pit excavation and profiling 200,000 1,800,000
4.1.4 9 No BP sample collection 10,000 90,000
4.1.5 Hard Rock Sources
4.1.6 2 No Quarry Identificaion and mapping every 25Km 100,000 200,000
4.1.7 2 No Equipment Establishment 5,000,000 10,000,000
4.1.8 Coring/boring and profiling
4.1.9 4 No Depths from 0 to 20m 400,000 1,600,000
4.1.10 No Depths from 20 to 35m 500,000 -
4.1.11 80 No RQD and sample collection 5,000 400,000
4.1.12 Water Sources
4.1.13 1 No Water points identificaion 10,000 -
4.1.14 3 No Collection of samples 10,000 30,000
4.1.15 Sand Source
4.1.16 4 No Identificaion of potential sand sources 100,000 400,000
4.1.17 4 No Collection of sand samples 10,000 40,000

6.0 Drilling Platforms -


6.1.1 5 No. Drilling Platforms at Drilling Locations 5,000,000 25,000,000
QUOTATION
ACQUISITION NO: A2021- 153 A
QUOTATION NO: Q2021-153A
Plot 1234, Block 197 ,Kitetika Cell DATE: 10/25/2021
Namirembe Hillside Road, ,
Kasangati Town Council
P.O Box 9529, Kampala
Tel: +256 (0) 392 175 883
Email: info@getlab.co.ug
Web: www.getlab.co.ug

GETLAB TIN: 1006958253


Address:

M/S Yerer Engineering.

Quotation for:
Drilling at Unyama Dam

UNIT PRICE
ITEM QUANTITY UNITS DESCRIPTION AMOUNT (UGX)
(UGX)

7.0 Laboratory Tests


7.1.1 Soil Laboratory Tests
7.1.2 64 No. Moisture content 12,500 804,167
7.1.3 64 No. Specific gravity 12,500 804,167
7.1.4 64 No. unit weight 25,000 1,608,333
7.1.5 64 No. Grain Size analysis 25,000 1,608,333
7.1.6 64 No. Atterberg Limits 37,500 2,412,500
7.1.7 9 No. Swell Potential 12,500 112,500
7.1.8 55 No. Dispersivity 95,000 5,256,667
7.1.9 9 No. standard proctor test 95,000 855,000
7.1.10 55 No. permeability 150,000 8,300,000
7.1.11 12 No. Oedometer 200,000 2,400,000
7.1.12 12 No. shear strength 250,000 3,000,000
7.1.13 64 No. chemical tests on soil samples 100,000 6,433,333

8.0 Rock Laboratory Tests -


8.1.1 8 No. Petrography 500,000 4,000,000
8.1.2 8 No. Specific gravity 12,500 100,000
8.1.3 8 No. unit weight 12,500 100,000
8.1.4 8 No. Porosity 50,000 400,000
8.1.5 8 No. water absorption 12,500 100,000
8.1.6 8 No. slake durability -
8.1.7 8 No. Uniaxial Compressive Strength 150,000 1,200,000
8.1.8 8 No. soundness 120,000 960,000
8.1.9 8 No. deformability/elastic modulus 120,000 960,000
8.1.10 8 No. Point load strength 120,000 960,000
-
9.0 Aggregate Laboratory Tests -
9.1.1 8 No. Specific gravity 12,500 100,000
9.1.2 8 No. Moisture content 12,500 100,000
9.1.3 8 No. Grain Size 25,000 200,000
9.1.4 8 No. Unit weight 12,500 100,000
9.1.5 8 No. Water Absorption 12,500 100,000
9.1.6 8 No. Soundness 120,000 960,000
9.1.7 8 No. Los Angeles Abrasion (LA) 47,500 380,000
9.1.8 8 No. Aggregate Impact Value 47,500 380,000
9.1.9 8 No. Aggregate Crushing Value 47,500 380,000
9.1.10 8 No. Ten percent fines value 47,500 380,000
9.1.11 8 No. Flakiness Index 12,500 100,000
9.1.12 8 No. Elongation Index 12,500 100,000
QUOTATION
ACQUISITION NO: A2021- 153 A
QUOTATION NO: Q2021-153A
Plot 1234, Block 197 ,Kitetika Cell DATE: 10/25/2021
Namirembe Hillside Road, ,
Kasangati Town Council
P.O Box 9529, Kampala
Tel: +256 (0) 392 175 883
Email: info@getlab.co.ug
Web: www.getlab.co.ug

GETLAB TIN: 1006958253


Address:

M/S Yerer Engineering.

Quotation for:
Drilling at Unyama Dam

UNIT PRICE
ITEM QUANTITY UNITS DESCRIPTION AMOUNT (UGX)
(UGX)

10.0 Sand Laboratory Tests -


10.1.1 4 No Particle Size Distribution 25,000 100,000
10.1.2 4 No Organic Impurities 85,000 340,000
10.1.3 4 No Sodium Sulphate Soundness 87,500 350,000

11.0 Water Laboratory Tests -


11.1.1 3 No pH-value 20,000 60,000
11.1.2 3 No Chloride & Sulphate Content 130,000 390,000

12.0 Reporting
12.1.1 1 LS Report preparation and submission 2,000,000 2,000,000

Total 175,087,500

NOTE: We recommend an advance payment of 60%, and the balance 40% on submission of the final report Add 18% VAT 31,515,750

Grand Total 206,603,250

Amount in Words: Two Hundred Six Million Six Hundred Three Thousand Two Hundred Fifty Uganda Shillings Only

Please make payments:

Geotechnical Engineering and Technology Laboratory Ltd

Standard Chartered Bank, Speke Road Branch, Kampala, Uganda

Account Number: 0102015168800

Swift Code: SCBLUGKA

If you have any questions concerning this quotation, contact Terry on +256 789649009

THANK YOU FOR YOUR BUSINESS!


QUOTATION
ACQUISITION NO: A2021-153 B
QUOTATION NO: Q2021-153 B
Plot 1234, Block 197 ,Kitetika Cell DATE: 10/25/2021
Namirembe Hillside Road, ,
Kasangati Town Council
P.O Box 9529, Kampala
Tel: +256 (0) 392 175 883
Email: info@getlab.co.ug
Web: www.getlab.co.ug

GETLAB TIN: 1006958253


Address:

M/S Yerer Engineering.

Quotation for:

Drilling at Namalu Dam

ITEM QUANTITY UNITS DESCRIPTION UNIT PRICE (UGX) AMOUNT (UGX)

Geological mapping of area of project components including


1.0 1 LS 20,000,000 20,000,000
geological sections as per specification

2.0. Establishment
Allow for Mobilization and demobilization of equipment, staff,
2.1.1 1 LS 40,000,000 40,000,000
PPEs, communication, etc

3.0 Drilling Works -


3.1.1 59 m Drilling to a depth of 42m in soil 185,000 10,822,500
3.1.2 59 m Drilling to a depth of 42m in Rock 350,000 20,475,000

3.1.3 78 No. Carrying out Standard Penetration Test at every 1.5m in soil 40,000 3,120,000

3.1.4 78 No. Obtaining Disturbed samples at 1.5m Interval per Borehole. 20,000 1,560,000
Obtain 3 undisturbed samples of 75-100 mm diameter per every
3.1.5 15 No. 80,000 1,200,000
bore hole

4.0 Construction Materials Sources


4.1.1 Fill/ Gravel Borrow Sources
4.1.2 3 No BP Identificaion and mapping every 5Km 50,000 150,000
4.1.3 9 No Test Pit excavation and profiling 200,000 1,800,000
4.1.4 9 No BP sample collection 10,000 90,000
4.1.5 Hard Rock Sources
4.1.6 2 No Quarry Identificaion and mapping every 25Km 100,000 200,000
4.1.7 2 No Equipment Establishment 5,000,000 10,000,000
4.1.8 Coring/boring and profiling
4.1.9 4 No Depths from 0 to 20m 400,000 1,600,000
4.1.10 No Depths from 20 to 35m 500,000 -
4.1.11 80 No RQD and sample collection 5,000 400,000
4.1.12 Water Sources
4.1.13 1 No Water points identificaion 10,000 -
4.1.14 3 No Collection of samples 10,000 30,000
QUOTATION
ACQUISITION NO: A2021-153 B
QUOTATION NO: Q2021-153 B
Plot 1234, Block 197 ,Kitetika Cell DATE: 10/25/2021
Namirembe Hillside Road, ,
Kasangati Town Council
P.O Box 9529, Kampala
Tel: +256 (0) 392 175 883
Email: info@getlab.co.ug
Web: www.getlab.co.ug

GETLAB TIN: 1006958253


Address:

M/S Yerer Engineering.

Quotation for:

Drilling at Namalu Dam

ITEM QUANTITY UNITS DESCRIPTION UNIT PRICE (UGX) AMOUNT (UGX)

4.1.15 Sand Source


4.1.16 4 No Identificaion of potential sand sources 100,000 400,000
4.1.17 4 No Collection of sand samples 10,000 40,000

6.0 Drilling Platforms -


6.1.1 5 No. Drilling Platforms at Drilling Locations 6,000,000 30,000,000

7.0 Laboratory Tests


7.1.1 Soil Laboratory Tests
7.1.2 87 No. Moisture content 12,500 1,087,500
7.1.3 87 No. Specific gravity 12,500 1,087,500
7.1.4 87 No. unit weight 25,000 2,175,000
7.1.5 87 No. Grain Size analysis 25,000 2,175,000
7.1.6 87 No. Atterberg Limits 37,500 3,262,500
7.1.7 9 No. Swell Potential 12,500 112,500
7.1.8 78 No. Dispersivity 95,000 7,410,000
7.1.9 9 No. standard proctor test 95,000 855,000
7.1.10 78 No. permeability 150,000 11,700,000
7.1.11 15 No. Oedometer 200,000 3,000,000
7.1.12 15 No. shear strength 250,000 3,750,000
7.1.13 87 No. chemical tests on soil samples 100,000 8,700,000

8.0 Rock Laboratory Tests -


8.1.1 8 No. Petrography 500,000 4,000,000
8.1.2 8 No. Specific gravity 12,500 100,000
8.1.3 8 No. unit weight 12,500 100,000
8.1.4 8 No. Porosity 50,000 400,000
8.1.5 8 No. water absorption 12,500 100,000
8.1.6 8 No. slake durability -
8.1.7 8 No. Uniaxial Compressive Strength 150,000 1,200,000
8.1.8 8 No. soundness 120,000 960,000
8.1.9 8 No. deformability/elastic modulus 120,000 960,000
8.1.10 8 No. Point load strength 120,000 960,000
QUOTATION
ACQUISITION NO: A2021-153 B
QUOTATION NO: Q2021-153 B
Plot 1234, Block 197 ,Kitetika Cell DATE: 10/25/2021
Namirembe Hillside Road, ,
Kasangati Town Council
P.O Box 9529, Kampala
Tel: +256 (0) 392 175 883
Email: info@getlab.co.ug
Web: www.getlab.co.ug

GETLAB TIN: 1006958253


Address:

M/S Yerer Engineering.

Quotation for:

Drilling at Namalu Dam

ITEM QUANTITY UNITS DESCRIPTION UNIT PRICE (UGX) AMOUNT (UGX)

-
9.0 Aggregate Laboratory Tests -
9.1.1 8 No. Specific gravity 12,500 100,000
9.1.2 8 No. Moisture content 12,500 100,000
9.1.3 8 No. Grain Size 25,000 200,000
9.1.4 8 No. Unit weight 12,500 100,000
9.1.5 8 No. Water Absorption 12,500 100,000
9.1.6 8 No. Soundness 120,000 960,000
9.1.7 8 No. Los Angeles Abrasion (LA) 47,500 380,000
9.1.8 8 No. Aggregate Impact Value 47,500 380,000
9.1.9 8 No. Aggregate Crushing Value 47,500 380,000
9.1.10 8 No. Ten percent fines value 47,500 380,000
9.1.11 8 No. Flakiness Index 12,500 100,000
9.1.12 8 No. Elongation Index 12,500 100,000

10.0 Sand Laboratory Tests -


10.1.1 4 No Particle Size Distribution 25,000 100,000
10.1.2 4 No Organic Impurities 85,000 340,000
10.1.3 4 No Sodium Sulphate Soundness 87,500 350,000

11.0 Water Laboratory Tests -


11.1.1 3 No pH-value 20,000 60,000
11.1.2 3 No Chloride & Sulphate Content 130,000 390,000

12.0 Reporting
12.1.1 1 LS Report preparation and submission 2,000,000 2,000,000

Total 202,502,500
NOTE: We recommend an advance payment of 60%, and the balance 40% on submission of the final report Add 18% VAT 36,450,450

Grand Total 238,952,950

Amount in Words: Two Hundred Thirty Eight Million Nine Hundred Fifty Two Thousand Nine Hundred Fifty Uganda Shillings Only
Please make payments:
Geotechnical Engineering and Technology Laboratory Ltd
Standard Chartered Bank, Speke Road Branch, Kampala, Uganda
Account Number: 0102015168800
Swift Code: SCBLUGKA
If you have any questions concerning this quotation, contact Terry on +256 789649009