Professional Documents
Culture Documents
Q2021 152&153 Seismic and Drilling Works at Namalu and Unyama Dam
Q2021 152&153 Seismic and Drilling Works at Namalu and Unyama Dam
QUOTATION
ACQUISITION NO: A2021-152 A
QUOTATION NO: Q2021-152 A
P.O. BOX 100001,Kasangati. DATE: 25-Oct-21
Plot 1234 ,Namirembe Hillside Road,Kitettika,Wakiso.
Tel: +256 (0) 392 175 883
Email: info@getlab.co.ug
Web: www.getlab.co.ug
Address;
Quotation for;
Seismic Investigations at Unyama Dam
QUANTITY Units Description UNIT PRICE (UGX) AMOUNT (UGX)
Mobilisation and Demobilization
Line ID
405 Poistion USL1 (along dam Axis) 10,000 4,050,000
405 Poistion USL2 (along dam Axis) 10,000 4,050,000
405 Poistion USL3 (along dam Axis) 10,000 4,050,000
245 Poistion USL4 (along river center) 10,000 2,450,000
165 Poistion USL5 (along right abutment) 10,000 1,650,000
165 Poistion USL 5 (along right abutment) 10,000 1,650,000
285 Poistion USL5 (along spillway route) 10,000 2,850,000
Data processing & Interpretation
5100 metre 2-D Refraction data processing 15,000 76,500,000
Reporting
1 LS Preparation of Factual Report 3,500,000 3,500,000
Amount in Words: Three Hundred Twelve Million Six Hundred Seven Thousand Four Hundred Uganda Shillings Only
If you have any questions concerning this debit note, contact Terry on +256 704247549
QUOTATION
ACQUISITION NO: A2021-152 B
QUOTATION NO: Q2021-152 B
P.O. BOX 100001,Kasangati. DATE: 25-Oct-21
Plot 1234 ,Namirembe Hillside Road,Kitettika,Wakiso.
Tel: +256 (0) 392 175 883
Email: info@getlab.co.ug
Web: www.getlab.co.ug
Address;
Quotation for;
Seismic Investigations at Namalu Dam
QUANTITY Units Description UNIT PRICE (UGX) AMOUNT (UGX)
Mobilisation and Demobilization
Line ID
525 Poistion NSL1 (along dam Axis) 10,000 5,250,000
525 Poistion NSL2 (along dam Axis) 10,000 5,250,000
525 Poistion NSL3 (along dam Axis) 10,000 5,250,000
245 Poistion NSL4 (along river center) 10,000 2,450,000
165 Poistion NSL5 (along right abutment) 10,000 1,650,000
165 Poistion NSL5 (along right abutment) 10,000 1,650,000
205 Poistion NSL5 (along spillway route) 10,000 2,050,000
Data processing & Interpretation
5800 metre 2-D Refraction data processing 15,000 87,000,000
Reporting
1 LS Preparation of Factual Report 3,500,000 3,500,000
Amount in Words: Three Hundred Ninety Five Million Seven Hundred Thirty Thousand Uganda Shillings Only
If you have any questions concerning this debit note, contact Terry on +256 704247549
Quotation for:
Drilling at Unyama Dam
UNIT PRICE
ITEM QUANTITY UNITS DESCRIPTION AMOUNT (UGX)
(UGX)
Quotation for:
Drilling at Unyama Dam
UNIT PRICE
ITEM QUANTITY UNITS DESCRIPTION AMOUNT (UGX)
(UGX)
Quotation for:
Drilling at Unyama Dam
UNIT PRICE
ITEM QUANTITY UNITS DESCRIPTION AMOUNT (UGX)
(UGX)
12.0 Reporting
12.1.1 1 LS Report preparation and submission 2,000,000 2,000,000
Total 175,087,500
NOTE: We recommend an advance payment of 60%, and the balance 40% on submission of the final report Add 18% VAT 31,515,750
Amount in Words: Two Hundred Six Million Six Hundred Three Thousand Two Hundred Fifty Uganda Shillings Only
If you have any questions concerning this quotation, contact Terry on +256 789649009
Quotation for:
2.0. Establishment
Allow for Mobilization and demobilization of equipment, staff,
2.1.1 1 LS 40,000,000 40,000,000
PPEs, communication, etc
3.1.3 78 No. Carrying out Standard Penetration Test at every 1.5m in soil 40,000 3,120,000
3.1.4 78 No. Obtaining Disturbed samples at 1.5m Interval per Borehole. 20,000 1,560,000
Obtain 3 undisturbed samples of 75-100 mm diameter per every
3.1.5 15 No. 80,000 1,200,000
bore hole
Quotation for:
Quotation for:
-
9.0 Aggregate Laboratory Tests -
9.1.1 8 No. Specific gravity 12,500 100,000
9.1.2 8 No. Moisture content 12,500 100,000
9.1.3 8 No. Grain Size 25,000 200,000
9.1.4 8 No. Unit weight 12,500 100,000
9.1.5 8 No. Water Absorption 12,500 100,000
9.1.6 8 No. Soundness 120,000 960,000
9.1.7 8 No. Los Angeles Abrasion (LA) 47,500 380,000
9.1.8 8 No. Aggregate Impact Value 47,500 380,000
9.1.9 8 No. Aggregate Crushing Value 47,500 380,000
9.1.10 8 No. Ten percent fines value 47,500 380,000
9.1.11 8 No. Flakiness Index 12,500 100,000
9.1.12 8 No. Elongation Index 12,500 100,000
12.0 Reporting
12.1.1 1 LS Report preparation and submission 2,000,000 2,000,000
Total 202,502,500
NOTE: We recommend an advance payment of 60%, and the balance 40% on submission of the final report Add 18% VAT 36,450,450
Amount in Words: Two Hundred Thirty Eight Million Nine Hundred Fifty Two Thousand Nine Hundred Fifty Uganda Shillings Only
Please make payments:
Geotechnical Engineering and Technology Laboratory Ltd
Standard Chartered Bank, Speke Road Branch, Kampala, Uganda
Account Number: 0102015168800
Swift Code: SCBLUGKA
If you have any questions concerning this quotation, contact Terry on +256 789649009