Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 7

TECCENTER EST.

‫مؤسسة المركز التقني‬


For Electro-Mechanical Works ‫لألعمال الكهربائية والميكانيكية‬
info@teccenter-est.com

Al- Andalus University Project


Faculty Building
Basement
Heating Load Calculation
Sizing Summary Description
Sl. Space Space Number Heating Heating Capacity Room Supply Air Fresh Air Exhaust Air Hot Water Flow Pipe Ratio Radiator
No. Name and System Temp. Capacity Capacity Capacity Connection No. of T.Wat No. X Remarks
Length
Floor Location Watts BTU/HR ºC 0
F L/s CFM L/s CFM L/s CFM L/ s GPM mm in. Elem. Cap. Lit mm
1 Boiler Room BO-01 Bas. Radiator 23863 82089 16 61 2375 4750 0.62 8.21 15 1/2 163 351 8x1020
2 Hall HA-01 Bas. Radiator 10549 36289 20 68 1050 2100 2255 4510 0.27 3.63 15 1/2 72 155 4x900
3 Store SR-01 Bas. Radiator 1911 6574 20 68 0.05 0.66 15 1/2 13 28 1x650
4 Store SR-03 Bas. Radiator 1972 6784 20 68 0.05 0.68 15 1/2 14 31 1x700
5 Store SR-02 Bas. Radiator 2052 7059 20 68 0.05 0.71 15 1/2 14 31 1x700
6 Store SR-04 Bas. Radiator 1684 5793 20 68 0.04 0.58 15 1/2 12 26 1x600
7 Store SR-05 Bas. Radiator 1684 5793 20 68 0.04 0.58 15 1/2 12 26 1x600
8 Tech.Room TE-01 Bas. Radiator 1463 5033 20 68 0.04 0.50 15 1/2 10 22 1x500
9 Toilet WC-01 Bas. Transfer Air 3514 12089 20 68 500 1000
10 Toilet WC-02 Bas. Transfer Air 3514 12089 20 68 500 1000

Total Heating Load 52206 179592 670


TECCENTER EST. ‫مؤسسة المركز التقني‬
For Electro-Mechanical Works ‫لألعمال الكهربائية والميكانيكية‬
info@teccenter-est.com

Al- Andalus University Project


Faculty Building
Ground Floor
Heating Load Calculation
Sizing Summary Description Hot Water
Sl. Space Space Number Heating Heating Capacity Room Supply Air Fresh Air Exhaust Air Flow Pipe Ratio Radiator
No. Name and System Temp. Capacity Capacity Capacity Connection No. of T.Wat No. X Remarks
Cap.
Floor Location Watts BTU/HR ºC 0
F L/s CFM L/s CFM L/s CFM L/ s GPM mm in. Elem. Lit Length mm
1 Laboratory LA-01 GF Radiator 6046 20798 22 72 170 340 160 320 0.16 2.08 15 1/2 42 91 2X1050
2 Laboratory LA-02 GF Radiator 5031 17307 22 72 170 340 160 320 0.13 1.73 15 1/2 35 76 2X875
3 Laboratory LA-03 GF Radiator 5031 17307 22 72 170 340 160 320 0.13 1.73 15 1/2 35 76 2X875
4 Laboratory LA-04 GF Radiator 6046 20798 22 72 170 340 160 320 0.16 2.08 15 1/2 42 91 2X1050
5 Laboratory LA-05 GF Radiator 6046 20798 22 72 170 340 160 320 0.16 2.08 15 1/2 42 91 2X1050
6 Laboratory LA-06 GF Radiator 5031 17307 22 72 170 340 160 320 0.13 1.73 15 1/2 35 76 2X875
7 Laboratory LA-07 GF Radiator 5031 17307 22 72 170 340 160 320 0.13 1.73 15 1/2 35 76 2X875
8 Laboratory LA-08 GF Radiator 6655 22893 22 72 170 340 160 320 0.17 2.29 15 1/2 46 99 2X1300
9 Office OF-07 GF Radiator 2649 9113 22 72 0.07 0.91 15 1/2 19 41 1X950
10 Office OF-05 GF Radiator 2694 9267 22 72 0.07 0.93 15 1/2 19 41 1X950
11 Office OF-06 GF Radiator 2561 8810 22 72 0.07 0.88 15 1/2 18 39 1X900
12 Office OF-08 GF Radiator 2504 8614 22 72 0.07 0.86 15 1/2 18 39 1X900
13 Office OF-09 GF Radiator 2561 8810 22 72 0.07 0.88 15 1/2 18 39 1X900
14 Office OF-10 GF Radiator 3108 10692 22 72 0.08 1.07 15 1/2 22 48 1X1100
15 Store SR-10 GF Radiator 3108 10692 20 68 0.08 1.07 15 1/2 22 48 1X1100
16 Store SR-11 GF Radiator 3108 10692 20 68 0.08 1.07 15 1/2 22 48 1X1100

Total Heating Load 67210 231202 1019


TECCENTER EST. ‫مؤسسة المركز التقني‬
For Electro-Mechanical Works ‫لألعمال الكهربائية والميكانيكية‬
info@teccenter-est.com

Al- Andalus University Project


Faculty Building
Ground Floor
Heating Load Calculation
Sizing Summary Description Hot Water
Sl. Space Space Number Heating Heating Capacity Room Supply Air Fresh Air Exhaust Air Flow Pipe Ratio Radiator
No. Name and System Temp. Capacity Capacity Capacity Connection No. of T.Wat No. X Remarks
Cap.
Floor Location Watts BTU/HR ºC 0
F L/s CFM L/s CFM L/s CFM L/ s GPM mm in. Elem. Lit Length mm
1 Corridor CO-01 GF Warm Air 7160 24630 20 68 450 900 450 900
2 Corridor CO-02 GF Warm Air 7160 24630 20 68 450 900 450 900
3 Entrance LB-01 GF Warm Air 1008 3468 20 68 50 100
4 Entrance LB-02 GF Warm Air 2221 7640 20 68 50 100
5 Hall HA-01 GF Warm Air 4075 14018 20 68 660 1320
6 Hall HA-02 GF Warm Air 4409 15167 20 68 900 1800
7 Hall HA-03 GF Radiator 9787 33667 20 68 0.26 3.37 15 1/2 67 145 4X838
8 Hall Way LB-08 GF Transfer Air 647 2226 20 68 50 100 50 100
9 Hall Way LB-09 GF Transfer Air 647 2226 20 68 50 100 50 100
10 Toilet WC-02 GF Transfer Air 1945 6691 20 68 390 780
11 Toilet WC-03 GF Transfer Air 1836 6316 20 68 315 630
12 Toilet WC-04 GF Transfer Air 1836 6316 20 68 315 630
13 Auditorium AU-01 GF Warm Air 36176 124445 22 72 5500 11000 5500 11000 5000 10000
14 Caterteria CA-01 GF Warm Air 12305 42329 22 72 1152 2304 1150 2300
15 Lecture Room LE-01 GF Radiator 5939 20430 22 72 800 1600 0.15 2.04 20 3/4 41 89 2X1025
16 Lecture Room LE-02 GF Radiator 5939 20430 22 72 800 1600 0.15 2.04 20 3/4 41 89 2X1025
17 Office OF-01 GF Radiator 2649 9113 22 72 0.07 0.91 15 1/2 19 41 1X950
18 Office OF-02 GF Radiator 2649 9113 22 72 0.07 0.91 15 1/2 19 41 1X950
19 Office OF-03 GF Radiator 1074 3695 22 72 0.03 0.37 15 1/2 8 18 1X400
20 Office OF-04 GF Radiator 1074 3695 22 72 0.03 0.37 15 1/2 8 18 1X400

Total Heating Load 109462 380244 441


TECCENTER EST. ‫مؤسسة المركز التقني‬
For Electro-Mechanical Works ‫لألعمال الكهربائية والميكانيكية‬
info@teccenter-est.com

Al- Andalus University Project


Faculty Building
First Floor
Heating Load Calculation
Sizing Summary Description Hot Water
Sl. Space Space Number Heating Heating Capacity Room Supply Air Fresh Air Exhaust Air Flow Pipe Ratio Radiator
No. Name and System Temp. Capacity Capacity Capacity Connection No. of T.Wat No. X Remarks
Cap.
Floor Location Watts BTU/HR ºC 0
F L/s CFM L/s CFM L/s CFM L/ s GPM mm in. Elem. Lit Length mm
1 Lecture Room LE-01 FF Radiator 5939 20430 22 72 1000 2000 1000 2000 0.15 2.04 20 3/4 41 89 2X1025
2 Lecture Room LE-02 FF Radiator 5939 20430 22 72 1000 2000 1000 2000 0.15 2.04 20 3/4 41 89 2X1025
3 Library LY-01 FF Warm Air 10882 37434 22 72 640 1280 640 1280
4 Office OF-09 FF Warm Air 3815 13124 22 72 60 120
5 Hall HA-02 FF Radiator 9787 33667 22 72 0.26 3.37 20 3/4 67 145 1X3350
6 Corridor CO-01 FF Radiator 4470 15377 20 68 390 780 0.12 1.54 15 1/2 31 67 1X1550
7 Corridor CO-03 FF Radiator 7160 24630 20 68 360 720 0.19 2.46 20 3/4 49 106 1X2450
8 Corridor CO-04 FF Radiator 7160 24630 20 68 0.19 2.46 20 3/4 49 106 1X2450
9 Hall HA-01 FF Radiator 1162 3997 20 68 0.03 0.40 15 1/2 8 18 1X400
10 Lobby LB-01 FF Warm Air 1738 5979 20 68
11 Corridor CO-02 FF Radiator 3616 12439 20 68 630 1260 0.09 1.24 15 1/2 25 54 1X1250
12 Entrance LB-02 FF Radiator 647 2226 20 68 0.02 0.22 15 1/2 5 11 1X250
13 Entrance LB-08 FF Radiator 569 1957 20 68 0.01 0.20 15 1/2 4 9 1X200
14 Entrance LB-09 FF Radiator 569 1957 20 68 0.01 0.20 15 1/2 4 9 1X200
15 Office OF-10 FF Radiator 695 2391 22 72 0.02 0.24 15 1/2 5 11 1X250
16 Office OF-11 FF Radiator 695 2391 22 72 0.02 0.24 15 1/2 5 11 1X250
17 Toilet WC-02 FF Transfer Air 1945 6691 390 780
18 Toilet WC-03 FF Transfer Air 1241 4269 315 630
19 Toilet WC-04 FF Transfer Air 1241 4269 315 630
20 Class Room CL-07 FF Radiator 5031 17307 22 72 170 340 160 320 0.13 1.73 15 1/2 35 76 2X875
21 Class Room CL-03 FF Radiator 5031 17307 22 72 170 340 160 320 0.13 1.73 15 1/2 35 76 2X875
22 Class Room CL-01 FF Radiator 6046 20798 22 72 170 340 160 320 0.16 2.08 20 3/4 42 91 2X1050
23 Class Room CL-02 FF Radiator 5031 17307 22 72 170 340 160 320 0.13 1.73 15 1/2 35 76 2X875
24 Class Room CL-04 FF Radiator 6046 20798 22 72 170 340 160 320 0.16 2.08 20 3/4 42 91 2X1050
25 Class Room CL-05 FF Radiator 6046 20798 22 72 170 340 160 320 0.16 2.08 20 3/4 42 91 2X1050
26 Class Room CL-06 FF Radiator 5031 17307 22 72 170 340 160 320 0.13 1.73 15 1/2 35 76 2X875
27 Class Room CL-08 FF Radiator 6046 20798 22 72 170 340 160 320 0.16 2.08 20 3/4 42 91 2X1050
28 Office OF-10 FF Radiator 1834 6309 22 72 0.05 0.63 15 1/2 13 28 1X650
29 Office OF-11 FF Radiator 1834 6309 22 72 0.05 0.63 15 1/2 13 28 1X650

Total Heating Load 117246 403326 1449


TECCENTER EST. ‫مؤسسة المركز التقني‬
For Electro-Mechanical Works ‫لألعمال الكهربائية والميكانيكية‬
info@teccenter-est.com

Al- Andalus University Project


Faculty Building
First Floor
Heating Load Calculation
Sizing Summary Description Hot Water
Sl. Space Space Number Heating Heating Capacity Room Supply Air Fresh Air Exhaust Air Flow Pipe Ratio Radiator
No. Name and System Temp. Capacity Capacity Capacity Connection No. of T.Wat No. X Remarks
Cap.
Floor Location Watts BTU/HR ºC 0
F L/s CFM L/s CFM L/s CFM L/ s GPM mm in. Elem. Lit Length mm
1 Office OF-05 FF Radiator 3331 11459 22 72 0.09 1.15 15 1/2 23 50 1X1150
2 Office OF-03 FF Radiator 2459 8459 22 72 0.06 0.85 15 1/2 17 37 1X850
3 Office OF-16 FF Radiator 3427 11789 22 72 0.09 1.18 15 1/2 24 52 1X1200
4 Office OF-17 FF Radiator 3427 11789 22 72 0.09 1.18 15 1/2 24 52 1X1200
5 Office OF-04 FF Radiator 2459 8459 22 72 0.06 0.85 15 1/2 17 37 1X850
6 Office OF-06 FF Radiator 1883 6478 22 72 0.05 0.65 15 1/2 13 28 1X650
7 Office OF-07 FF Radiator 1883 6478 22 72 0.05 0.65 15 1/2 13 28 1X650
8 Office OF-12 FF Radiator 3563 12257 22 72 0.09 1.23 15 1/2 25 54 1X1250
9 Office OF-15 FF Radiator 3282 11290 22 72 0.09 1.13 15 1/2 23 50 1X1150
10 Office OF-01 FF Radiator 3331 11459 22 72 0.09 1.15 15 1/2 23 50 1X1150
11 Office OF-02 FF Radiator 2459 8459 22 72 0.06 0.85 15 1/2 17 37 1X850
12 Office OF-13 FF Radiator 3427 11789 22 72 0.09 1.18 15 1/2 24 52 1X1200
13 Office OF-14 FF Radiator 3427 11789 22 72 0.09 1.18 15 1/2 24 52 1X1200
14 Store SR-10 FF Radiator 3958 13616 22 72 0.10 1.36 15 1/2 27 59 1X1350
15 Store SR-11 FF Radiator 3841 13213 22 72 0.10 1.32 15 1/2 27 59 1X1350

Total Heating Load 46157 158780 697


TECCENTER EST. ‫مؤسسة المركز التقني‬
For Electro-Mechanical Works ‫لألعمال الكهربائية والميكانيكية‬
info@teccenter-est.com

Al- Andalus University Project


Faculty Building
Second Floor
Heating Load Calculation
Sizing Summary Description Hot Water
Sl. Space Space Number Heating Heating Capacity Room Supply Air Fresh Air Exhaust Air Flow Pipe Ratio Radiator
No. Name and System Temp. Capacity Capacity Capacity Connection No. of T.Wat No. X Remarks
Length
Floor Location Watts BTU/HR ºC 0
F L/s CFM L/s CFM L/s CFM L/ s GPM mm in. Elem. Cap. Lit mm
1 Office OF-10 SF Radiator 1109 3815 22 72 0.03 0.38 15 1/2 8 18 1X400
2 Corridor CO-01 SF Radiator 11605 39921 20 68 0.30 3.99 15 1/2 79 170 2X1975
3 Corridor CO-02 SF Warm Air 11371 39116 20 68 630 1260
4 Corridor CO-04 SF Warm Air 10521 36192 20 68 375 750
5 Office OF-11 SF Radiator 1109 3815 22 72 0.03 0.38 15 1/2 8 18 1X400
6 Corridor CO-03 SF Warm Air 10521 36192 20 68 375 750
7 Entrance LB-05 SF Warm Air 931 3203 20 68 50 100
8 Entrance LB-06 SF Warm Air 931 3203 20 68 50 100
9 Lobby LB-01 SF Warm Air 3496 12026 20 68 175 350
10 Hall & Lobby HA-01 SF Transfer Air 2372 8160 20 68
11 Toilet WC-02 SF Transfer Air 1642 5648 20 68 390 780
12 Toilet WC-04 SF Transfer Air 1416 4871 20 68 315 630
13 Toilet WC-03 SF Transfer Air 1416 4871 20 68 315 630
14 Class Room CL-01 SF Radiator 6467 22246 22 72 170 340 0.17 2.22 20 3/4 44 95 2X1100
15 Class Room CL-02 SF Radiator 5451 18751 22 72 170 340 0.14 1.88 15 1/2 38 82 2X950
16 Class Room CL-03 SF Radiator 5451 18751 22 72 170 340 0.14 1.88 15 1/2 38 82 2X950
17 Class Room CL-04 SF Radiator 8261 28418 22 72 170 340 0.22 2.84 20 3/4 57 123 2X1425
18 Class Room CL-05 SF Radiator 6467 22246 22 72 170 340 0.17 2.22 15 1/2 44 95 2X1100
19 Class Room CL-06 SF Radiator 5451 18751 22 72 170 340 0.14 1.88 15 1/2 38 82 2X950
20 Class Room CL-07 SF Radiator 5451 18751 22 72 170 340 0.14 1.88 15 1/2 38 82 2X950
21 Class Room CL-08 SF Radiator 6467 22246 22 72 170 340 0.17 2.22 20 3/4 44 95 2X1100
22 Office OF-01 SF Radiator 4166 14331 22 72 0.11 1.43 15 1/2 29 63 1X1450
23 Office OF-02 SF Radiator 2635 9064 22 72 0.07 0.91 15 1/2 18 39 1X900
24 Office OF-03 SF Radiator 2635 9064 22 72 0.07 0.91 15 1/2 18 39 1X900
25 Office OF-04 SF Radiator 2635 9064 22 72 0.07 0.91 15 1/2 18 39 1X900
26 Office OF-05 SF Radiator 4166 14331 22 72 0.11 1.43 15 1/2 29 63 1X1450
27 Office OF-06 SF Radiator 2023 6959 22 72 0.05 0.70 15 1/2 14 31 1X700
28 Office OF-07 SF Radiator 2023 6959 22 72 0.05 0.70 15 1/2 14 31 1X700
29 Library LY-01 SF Warm Air 16464 56636 22 72 640 1280 640 1280 640 1280
30 Office OF-09 SF Warm Air 1443 4964 22 72

Total Heating Load 146096 502570 1247

You might also like