Office of the Executive Engineer
~31TcR qR"ll\'HI ~ ~-121 . -ffio~ofcro (~ ~)
Flyover Project Division F-121, PWD , Govt. of Delhi,
m -crrct. ~ ~1Cf),<~,< ~ ~
Ramesh Park near Shakarpur Police Station,
~-110092/Delhi-110092
Telephone No. 011-22056481,483,485 & 487 Fax:- 011-22056029
Email:-eepwddelhift21@gmail.com
~() 54 (11 ) /~~ "BO ~-121 I RO"fr0 1 Ito RO a ~ .08.2015

To /
~~!S Larsen & Toubro Ltd.,
L&T Construction , TC-3 Building,
ATower, 4th Floor
Mount Poonamallee Road,
Manapakkam, P.B No. 979,
Chennai-600089 (Fax:- 044-33192950)

Sub:- Construction of Elevated Road over BarapullahNallah starting from Sarai Kale Khan to
MayurVihar, New Delhi. (Phase-III).
SH:- Elevated Road, Extradosed Bridge, Flyover, Clover Leaves, Loops, Ramps,­
Footpath, CycieTrack, Road Work including Signages, Street LightWorks& Allied Works.

Ref:- Your office letter No. L&T-HCIC-BRPL-15-G1-179 dated 31.07.2015

Dear Sir (s),

Please enclosed find herewith the approved Method Statement of working pile contain ing
Pages (S.No. 1 to 23) to execute the work.

Encl: As above
Yours faithfully

(PC '£'~~
Exe~~eer,
Flyover Project Division F-121(GOD)
Ramesh Park, Pusta Road, Delhi
(for and on behalf of President of India)
Copy to:­
1. The Pro Chief Engineer, PWD Flyover Project Zone F-I, MSO Building, New Delhi for kind
information.
2. The Project Manager, PWD Flyover Project Circle F-12, Ramesh Park, Delhi for kind
information.
3. The Ass istant Execut ive Engineer, F-1200 , 1210 & AE-1211, 1212 & 1213 PWD Flyover
Project Division F-121, Ramesh Park, Delhi for information. . /
4. Guard file
Executive Engineer
rE
[W ,
LARSEN & TOUBRO LIMITED, Helle
BARAPULLAH (PHASE III) PROJECT. . .
I--------------+---------j
METHOD STATEMENT FOR PILE-BORING, REBAR CAGE PLACEMENT
Doc No­
BRPL/WP/OOSA
-
Rev. No Rl
.
Page
loF23

AND CONCRETING

Document Acceptance Note

Procedure Number :BRPL/WP/OOSA Rl

Procedure Name :METHOD STATEMENT FOR PILE-BORING, REBAR CAGE


PLACEMENT AND CONCRETING

Submitted By : Larsen & Toubro Limited, HCIIC

Agreement No. : 01/EE/PWD/F-121/2015-16

Name of Work :Construction Of Elevated Road Over Barapullah Nallah Starting From Sar<lli
Kale Khan To Mayur Vihar, New Delhi. {Phase-III)-Elevated Road,
Extradosed Bridge, Flyover, Clover Leaves, Loops, Ramps, Footpath, Cycle
Track, RoadWork Including Signages, Street Light Works & Allied Works

ABOVE METHOD STATEMENT/PROPOSAL HAS BEEN REVIEWED AND FOUND CONFIRMING TO rHE
REQUIREMENT OF PWD,GNCTD SPECIFCATIONS, RELEVANT CODES AND HENCE ACCEPTED BY US.

REGISTRATION No: DT:

NAME & DESIGNATION SIGNATURE

ROOf S?n-1Ql1
REVIEWED BY
A-C-E. ~ - \ ..( I

~ V/KRAt-J1' [.HAlJOHAR.'f

CONCURRED BY 5"1'. De.s,·~V\

TcPL-

c.lQ'J\.~'V\.Q.
- - '-­ -
APPROVED BY
t:.~~~ ~·11.'
-
LARSEN & TOUBRO LIMITED, Helle 2: Doc No­
BARAPULLAH (PHASE III) PROJECT BRPL/WP/OOSA
METHOD STATEMENTFOR PILE-BORING, REBAR CAGEPLACEMENT
AND CONCRETING
Rev. No Rl

METHOD STATEMENT

FOR

PILE~BORING,

REBAR CAGE PLACEMENT

AND
.

CONCRETING

-
DOCUMENT NO: BRPL/WP/OOSA Rl
~
'L -_\
LARSEN & TOUBRO LIMITED, HCIIC a, Doc No­
Page
\:D BARAPULLAH (PHASE III) PROJECT BRPL/WP/OOSA
30f23

- ,r---~--~~~----:=-_---"-----+------l
METHOD STATEMENT FOR PILE-BORING, REBAR CAGE PLACEMENT
AND CONCRETING

AGREEMENT NO.: Ol/EE/PWD/F-121/201S-16


Rev. No Rl

L&T DOCUMENT NO. : BRPL/WP/OOSA Rl

PREPARED BY:

EXECUTION ENGINEER
CHECKED BY:

PROJECT MANAGER
REVIEWED BY: )

HEAD-QAQC
APPROVED BY:

CHIEF PROJECT MANAGER


e:
"en LARSEN & TOUBRO LIMITED, Helle
I---~~-----'---~"=------+'-----l
BARAPULLAH (PHASE III) PROJECT
Doc No­
BRPL/WP/OOSA
Page
.4.of23

- METHODSTATEMENT FOR PILE-BORING, REBAR CAGE PLACEMENT


AND CONCRETING
Rev. No Rl

REVISION CONTROL SHEET

AGREEMENT NO. : Ol/EE/PWD/F-121/201S-1~

L&T DOCUMENT NO. : BRPL/WP/OOSA Rl

REVISION .
SL. NO. DETAIL NO. OF PAGES
No.
1 RO First Issue 22

2 Rl Second Issue 22
LARSEN & TOUBRO LIMITED, Helle Doc No­
Page
BARAPULLAH (PHASE III) PROJECT BRPL/WP/pOSA
50f23
METHOD STATEMENT FOR PILE-BORING, REBAR CAGE PLACEMENT
AND CONCRETING
Rev. No Rl

CONTENTS

1. Purpose: ; .: 6

2. Scope of Work: 6

3. Applicability: 6

4. References: 6

5. Workmanship: 6

6. Construction materials .plant & machinery: 6

7. Preliminary Activities: 7

8. Pile Installation: 8
9. Reinforcement: · 10

10.Finishing Works : 11

11.EnVironment, Health & Safety (Measures for ensuring Safety) 11

12.Attachments: 12
-.--.....
. ·:fL
~rJ
LARSEN & TOUBRO LIMITED, HCIIC
'" I-------=--.::.;....-=----~-~--"--:--~-_+__~______l
BARAPUllAH (PHASE III) PROJECT

-- METHOD STATEMENT FOR PILE-BORING, REBAR CAGE PLACEMEt'lT

iv. Batching plant


AND CONCRETING

v. Transit mixers
vi. Excavator & Tippers for Muck Disposal
vii. Water tank
viii. Tremie pipes & funnel
ix. Crane
x. Rebar cuttlngS bending m/c
xi. Trailer/truck
xii. Diesel Generator
List of major plant and machinery to be deployed can be increased / decreased as per the
requirement

6.2 Materials:
i. Concrete - M35 grade
ii. Water
iii. Reinforcement - Fe500D grade
iv. MS liner
v. Bentonite/Polymerfrom approved source as required
vi. (a) Viscosity of the polymer slurry should be measured using a Marsh Funnel at the tanks,
every time a new polymer is added, prior to sending slurry to the excavation, after receiving
polymer from the excavation dur!ng and after the pour and before sending slurry to the.
storage tanks. It should also be checked prior to leaving the excavation open overnight or
longer periods.
(b) A constant watch over the pH ofthe polymer slurry is also mandated, as it is the slurry's
only protection against chemical or containments in general
(c) Specific Gravity should be checked whenever deemed necessary, including prior to
placing of the reinforcement cage.
(d) Sand content should also be measured .
vii. (a) For bentonite & bentonite slurry control tests such as density, Marsh Cone Viscosity, pH
value shall be carried out.(refer attached format for bentonite)s
(c) Concreting shall not be taken up when the specific gravity of bottom bentonite slurry is
more than 1.12. The slurry should be maintained at 1.5 m above the ground water level.

7. Preliminary Activities:
7.1 Traffic Management
• The traffic management shall be implemented as per the submitted 'Environment Health
& Safety' plan as per Clause no 1.66 & IRC: SP: 87-2010, Section 9 & IRC: SP: 55)

7.2 Structures & Other Encumbrances


I~

- • Identified structures and encroachments along the alignment shall be removed before
commence ofthe work
LARSEN & TOUBRO LIMITED, Helle
BARAPU LLAH (PHASE III) PROJECT
8
I .
Doc No­
BRPL/WP/005A
Page
8of23
METHODSTATEMENT FOR PILE-BORING, REBAR CAGE PLACEMENT
AND CONCRETING
Rev. No Rl

8. Pile Installation:
8.1 Formation of Pile bores
i. The pile boring shall be executed by rotary drilling method.
ii. The pile location shall be marked on the ground using 6 - 8mm rod] 15-20 cm long.
iii. The impression ofthe boring tool is made on around the point and the rig is correctly aligned
to the impression.
iv. On aligning the rig] boring shall be carried out to the required depth and then MS liner of
suitable length shall be placed in the pit concentric to the pile point. The liner is then pressed
inside with the arrangements available in the rotary rig.
v. Material inside the casing liner shall be removed progressively by the rig with the auger or
bucket tool.
vi. The soil boring shall continue with the drilling and mucking operation till the desired
founding level as per specified in the approved Drawing .
vii. The muck removed from the bore shall be disposed away·from the site.
viii. The depth of pile shall be checked by sounding chain and exact depth shall be recorded in
the pile report.

8.2 Control of Alignment


i.The piling rig itself has in-built provisions to check and maintain the verticality of the bore. In
case] if required] verticality can also be .checked using plumb bob and spirit level.
. ii. Piles shall be installed as accurately as possible .accordlng to the design and drawings either
vertically or to the specified batter] Greater care should be exercised in respect of
installation of single piles or piles in two pile groups. As a guide an angular deviation of 1.5
percent in alignment for vertical piles and a deviation of 4 percent for raker piles should not
be exceeded. Piles should not deviate more than 75 mm or 0/6 whichever is less (75 mm or
0/10 whichever is more in case of piles having diameter more than 600 mm) from their
designed positions at the working level.

8.3 Rotary Drilling Method


i.The mechanism of the machine is rotary drilling by using hydraulic feed. Boring is carried out
to the required depth using suitable auger attached to the telescopic Kelly bar.
ii. A bucket tool attached to the Kelly is used for mucking operation and an auger is used for
boring into soil/sand strata. .
iii.The boring operation shall be continued till the founding level as mentioned in the approved
GFC drawings.
iv.BentoniteLPolymer shall be mixed in tanks & shall be supplied to the pile location by pipes.
v.During boring operation] benton ite/polymer slurry shall be used for stabilizing the sides of
the bores.
vi.The bottom of pile bore shall be cleaned from all loose materials.
..~ LARSEN & TOUBRO LIMITED, HCIIC Doc No­
Page
-\.. '7J
'L \ BARAPULLAH (PHASE III) PROJECT
f.--------~~~~---:...:;..::..:........::....~----.-'---_t_____'_--'-~
METHOD STATEMENTFOR PILE-BORING, REBAR CAGE PLACEMENT
BRPL/WP/OOSA
90f23

AND CONCRETING
Rev. No Rl
~
8.4 Fabrication & Lowering of reinforcement cage
LThe reinforcement cage shall be fabricated in different lengths as required and transported
to site.
ii.After achieving the required founding level the pre-fabricated reinforcement cage shall be
lowered and binding will be done stage wise.
iiLThe rebar cage shall be lowered into the bore by rig or by crane as suited at site.
iv.The first length of cage shall be lowered and held with top of the bars adequately
strengthened above the bore on which upper cage is placed in position, lapped and joined in
place and then cage is lowered . These laps should be welded (at location/in-situ) or joined
with couplers before lowering.

8.5 Flushing in case bentonite slurry is used


LAfter cage lowering, tremie pipes in suitable lengths are to be lowered in the hole. The
operation is done by lowering one tremie pipe after another
,
and connecting them to
maintain water tightness throughout its length till the gap between the pile base and trernie
shall be minimum 300 mm.The tremie pipe shall be locked/supported from top to maintain
the level with funnel attached at top.
iLThe tremie head is connectedat top with the tremie pipe for the flushing activity. The bore is
flushed by fresh bentonite slurry through the tremie head. The pumping for flushing shall be
done by use of mud circulation pump. Flushing will be done to remove all the loose
sediments which might have accumulated on the founding strata. Further, the flushing
. .
operation shall be continued till the consistency of inflowing and out flowing slurry is similar.
Out flowing slurry shall be collected in a collection tank and the same shall be used for boring
of next pile.

8.6 Pile Concreting


L The M35 grade concrete shall be prepared at batching plant & transported to site in transit
mixers.
iLOnly fresh batched concrete shall be used .and the concreting has to be done continuously
without interruption.
iiLTremie pipe concreting shall be done joining a series of pipes. The hopper at the top shall
have a volume greater that the tremie pipe volume.
. lv.A suitable steel stopper at the neck of the hopper which can be withdrawn with least
resistance or a sliding plug can be used.
v.The hopper and pipe shall be cleaned of encrusted concrete, dust, debris etc., and shall be
watertight.
vLConcrete placing into the hopper shall be facilitated using suitable ramps for direct pour
from the transit mixers: In case of inaccessible locations, concrete can alternatively be placed
into the hopper-by concrete pump.
viLThe hopper shall be filled with concrete completely and then the stopper plate is removed to
allow the concrete to flow into the pipe.
-1J'l
-' \ LARSEN & TOUBRO LIMITED, HCIIC Doc No­
Page
) \.'7J
-
BARAPULLAH (PHASE III) PROJECT BRPL/WP/OOSA
~~--,---------'-,..--,-----<,....--,---=-_--=.:..----t------l 10of23
METHOD STATEMENT FOR PILE-BORING, REBAR CAGE PLACEMENT
-...... AND CONCRETING
Rev. No R1
viiLSubsequent charges of concrete shall be maintained continuous as required till the pile bore
is cast to the specified height.
ix.The bottom oftremie pipe shall always be inside concrete forming watertight system . The tip
shall be minimum 1 metre inside concrete depending upon rate of pouring concrete.
x.The tremie pipe shall be withdrawn in stages as and when concrete builds up in the bore .
xl.Particular care shall be taken when vertical movement is imparted on tremie pipe to force
concrete down into the pipe and also when tremie pipe is raised so that the rebar cage is not
disturbed from its position.
xll .Where cut off level is less than 2.5 m below the ground level, concrete shall be cast to a
minimum of 600 mm above cut-off level.For each additional 0.3 m increase in cut-off level
below the working level, additional coverage of minimum 50 mm shall be allowed . Higher
allowance may be necessary depending on the length of the pile . When concrete is placed
by tremic method, concrete shall be cast up to the ground level to permit overflow of
concrete for visual inspection or to a minimum of one metre above cut-off level. In the
circumstances where cut-off level is below ground water level, the need to maintain a
pressure on the unset concrete equal to or greater than water pressure should be-observed
and accordingly length of extra concrete above cut-off level shall be determined.
xlll.The slump of concrete shall be 150 to 200 mm at the time of pouring.

8.7 Pile cut-off and extension


l.Excavatlon shall be carried out up to the bottom of the pile cap with necessary shoring.
ll.The pile shall be chipped and th -e debris be carted away to the approved dumping ground.
During chipping and trimming off piles, care shall be taken to avoid damaging of concrete.
lll .The overflow concrete with laitance from the completed pile/s will be removed by regular
pile chipping after three days of the pile casting.
iv.The top of pile after stripping shall project in to Pile cap at least SOmm,
v.lf stripping of pile concrete is required to be done to a level lower than the specified cut-off
level on account of defective concreting, workmanship etc., the pile shall be built-up with
good concrete of specified grade.On completion of pile cut-off; all exposed reinforcement
shall be cleaned.

9. Reinforcement:
LAII reinforcement shall be as per the approved drawings. The reinforcement shall be
assembled and tied together and made up into cages sufficiently rigid to withstand handling
without any damage and distortion.
ll. Where the number and diameters of the reinforcement bars change as per the drawing, laps
of the reinforcement bars shall be as indicated on the drawing/as approved. Joints in ­
longitudinal bars shall be made by lapping by stitch welding, as per code provisions or by
couplers, to prevent distortion of the reinforcing cage. Joints in the reinforcement shall be
such that the full strength of each bar is effective across the joint and shall be made such
LARSEN & TOUBRO LIMITED, HCIIC -­ Doc No­
Page
B-ARAPULLAH (PHASE III) PROJEC.T , " .1"1­ BR~L/WP /005.P;
11 of23
METHOD STATEMENT FOR PILE-BORING, REBAR CAGE PLACEMENT
AND CONCRETING
Rev. No in
that there is no detrimental displacement of the reinforcement during construction of the
pile'.
iii. The projecting lengths of the longitudinal bars beyond the pile cut-off level shall be as
indicated in the drawing.
iv.The lateral links or helical reinforcement shall fit closely around the main longitudinal bars
and be fixed by 18 gauge annealed binding wires .
v.Concrete cover to all the reinforcement, including lateral links or helical, shall be as per
approved drawing. Suitable and adequate cover blocks shall be provided, The cover blocks
shall be circular with a center hole of adequate size to allow lateral reinforcement to pass
through and allow free rotation. The cover blocks shall be manufactured with concrete of
same grade.

10. Finishing Works


10.1 Installation Records
i. Detailed pile installation records in duplicate for each pile installed shall be maintained. The
details of the record shall include among others, pile number, coordinates, pile size, pile
elevation, pile cut-off, ground level, pile bore data (such as length of liner, boring duration,
bored length, pile length etc.), concreting record (grade of concrete, as mixed slump, volume
of concrete, timing, pile cage details, etc.)

10.2 Clean-up
LUpon completion of piling, casings, equipment, construction tools, debris, scrap, muck etc.
shall be removed from the place of work . Muck shall be disposed from site to the dumping
place designated by local authorities. Exposed and finished concrete and dowel surface shall
be left in a clean condition.

11. Environment, Health & Safety (Measures for ensuring Safety)


LAII safety norms and precautions to be taken care as per the site safetvplan (EHS plan) for
each activity and safety clearance to be taken before commencing the activity.
iLAII staff and workmen shall wear safety gear such as helmet, fluorescent vest etc. Safety
harness while working at height and face shield with suitable dark glass for welding work
shall be used.
iii.The work area shall be properly barricaded as laid down in the traffic management plan.
iv.First aid box shall be kept at site.
v.Rig-operator, Rig%ers and Foreman shall have adequate knowledge and experience.
vi. Lifting tools and tackles shall have load test certificates of Competent Person.
_,_ _ vll.Persons shall not be unde r- the suspended load while lifting load.
viii. Loose materials/tools shall not be left at height in the mast .
ix.Piling area shall be restricte ~ to u_n ~uthorized perso_ns.
x.While the rig is in operation, nobody including the concerned w orkmen shall be allowed in
the operation area.
LARSEN & TOUBRO LIMITED, Helle Doc No­
Page
BARAPULLAH (PHASE III) PROJECT BRPL/WP/OOSA
12of23
METHOD STATEMENT FOR PILE-BORING, REBAR CAGE PLACEMENT
AND CONCRETING
Rev. No Rl
xi. Exposed reinforcement heads shall be properly covered and the area barricaded.

12. Attachments:

Annexure-l Sample Format for BBS

Annexure-2 Sample Format for Boring Record

Annexure-3 Sample Format for Pour Card

Annexure-4 Sample Format for Concrete Requisition

Annexure-S Sample Format for Concrete Dispatch Slip

Annexure-G Sample Format for Polymer

Annexure-7 Sample Format for Bentonite

Annexure-8 Hazard Identification and Risk assessment (HIRA)


. .

-\
tz" -
LARSEN & TOUBRO LIMITED, HCIIC
BARAPULW\.HjPHASE III) PROJECT
..

. ..
13
.....
.~

Doc No­
BRPL/WP/OO5A

. Page
13 of23
r:7J
-­ METHODSTATEMENT FOR PILE-BORING, REBAR CAGE PLACEMENT
AND CONCRETING
Rev. No Rl

Annexure-l

. .

- -
n\.:. -n LARSEN & TOUBRO LIMITED, HCIIC
BARAPULLAH <rHASE III) PROJECT ...
t------~---,----;.....:-----='-'------'--"'-----'-'--__+_-=--=---~
METHOD STATEMENT FOR PILE-BORING, REBAR CAGE PLACEMENT
AND CONCRETING
14 Doc No­
BRPL/WP/OOSA
. _.

Rev. No Rl
­
Page
14of23

--:"""""

LARSEN &TOUBRO

ob:·Construction of Elevated Road over Barapullah Nallah starling from Saral Kale Khan to Mayur Vihar, New Delhi. (Phase·III)· Elevated Road, Extradosed Bridge, F1yover, Oover leaves, loops,Ramps, Footpath,
Cycle Track, Road Work IncludingSignages, Street tight Works &Allied Works

BAR BENDING SCHEDULE

location:· TP3(lIST Pile 3) length of Pile (Mtr):- 22.(00 lap Vertical:­ 54 '0' Date:· JJ/04/2015
OiaofPile(Mtrl:' 15 Tolal Pile length(Mlr):. 24.250 Spirallap:­ 35"0" Ref Owg No:- EB·312-5T-E·0021

DIMENSIONS (m) Total Length (MT)


Bar Spacin ~'"
=
.=~
Mark g
Bar Shape 0 0
.....:z: x y z =c==
=",­
0 .....
6 10 12 . 16 20 25 28 32

0.278 15 20 6.760 6.760 101.400 Top

0.278 15 20 12.000 12.000 180.000 Mid

0.278 15 20 8.000 8.000 120.000 Bottom

0.278 . 1516 6.544 6.544 98.160 Top

0.278 15 16 12.000 12.000 180.000 Mid

0.278 15 16 7.784 7.784 116.760 Botiom

0.200
~
.:
~ 10 578.031 578.031 578.031

A 2.500 0 12 20 4.151 4.151 49.807 • Masler Ring

~k n 6 20 0.600 0.600

Total Length (Mtr 578.031 394.920 454.807


3.600 Ufting hook

Un~Weight(Kg) 0.222 0.395 0.6 17 0.888 1.580 2.470 3.850 4.830 6.310
Total Weight (Kg) 356.645 623.9741,123.374
. Gross Weight (Kg) 2,103.993
Gross Weight Mtl 2.104

l&T PWD
om -
LARSEN & TOUBRO LIMITED, HCIIC
BARAPULLAH (PHASE III) PROJECT
--
-:1 5
.!.:..
Doc No­
BRPL/WP/OO5A
-
Page

~7J
° •
150f23
METHOD STATEMENT FOR PILE-BORING, REBAR CAGE PLACEMENT
~ AND CONCRETING
Rev. No Rl
Annexure-2

-
Ew~
Public Works
Con stru ction of Elevate d Road over Barapull ah N all ah sta rti ng from Sarai Kale Khan
to M ay urVihar, New Del h i. (Ph ase-III), SH:- Elevated Road, Extradosed Bridge ,
Flyover, Clov e r l eave s, loops, Ramps, Footpath, Cycle Track , Road Work includ ing
Sign age s, Street ligh t W orks & All ied Wo r ks.
e
QSF!L&T!BRPL!QOO
5
Department/Fl21 RO
CLIENT : PWD Govt . of NeT Deihl
Tandon Consultants Pvt Ltd. (Permanent Design)
CONSULTANTS:
AECOM- Proof Checking
TPIA: RITES Ltd.
AGENCY: LARSEN & TOUBRO LIMITED- CONSTRUCTlON (HEAVY CIVILINFRA Ie)
BORING RECORD
Locatio n/St ruct ure Pi le No Descrip tion Uni t As per Drg As pe r actua l

Pile 01. (mnm) Pier No Ground Level

liner Thickness(m m) Cutoff Level


Pile Coordi nates
Line r Dia (mm) liner TopLevel
Vertic.lilly checked Yes/No Lengt h of ca sing/li ne r li ner sot torn Level

Liner Perm an en t/Temporary Fou ndlngLevel


Elevation St rat a Details
From(Rl) TO (RL) Activity Date Start Tim e Finish time Depth (m) So il Description

,
- =­
L
- I, .-
,
r.'. - - ,- .~I ---- -
l&T Representative TPIA Representat ive PWD Rep res entati v e
N ame : ":-1 - Na me: - --- Na me: - - --
Date ....................::::::: Date ..:::............... ....... Date ...........................
-m
_. -­
I -

LARSEN & TOUBRO LIMITED, HCIIC ~.r~ Doc No-


BRPLjWPJOOSA
Page
BARAPULLAH (PHASE III) PROJECT 16of23
~V ~
METHOD STATEMENT FOR PILE-BORING, REBAR CAGE PLACEMENT
AND CONCRETING
Rev. No Rl

Annexure-3

-
£w~
Publfc Works
Construction of Elevated Road over Barapullah Nallah start ing f rom Sarai Kale Khan
to May ur Vihar, New Del hi. (Phase-III}, SH:- Elevate d Road, Extradosed Bridge,
Flyover, Clover Leaves, Loops, Ramps, Foot pat h, Cycle Track, Road Work including
Signages, Street Light Works & All ied Works .
e
QSF/L &T/ BRPL/ Q Ol 2
Department/Fl2l RO

CLIENT : PWD Govt. of NCT Deihl

Tandem Consu ltants Pvt Ltd . (Permane nt Design)


CON SULTANTS :
AECOM - Proof Checking

TPIA: RITES ltd.

AGENCY: LARSEN & TOUBRO LIMITED- CONSTRUCTION (HEAVY CIVIL INFRA Ie)

_ ._- - I J i I L_ __~_ I
PILLING POUR
_._- CARD
- -- -- r:
Pier No.
-- - _._- . . _. _. - I - -
- 1 Pi le No.
- _. _ -_ . _- ~ _ . _ .

- -1 - --- ' -
,
.·~I;;~l e ~ I ~-T · ~1 -~=-=
Piling Details Meter
O rig inal Ground Level (GL)
- ~ I~
Found ing Level (FL)
L 1I -- - - -
I I
Liner D ia

Li ne r Top Level
-r
j
i, t+------
I .
I
i
f

.
I
Concre te cut-off Level ._ _ __ I ~
! i i
C ---- ~------i -~ -- - - -
Roc k touch Level
I
!
I I I ,
-----r---
I ,

Desc ription Date Time


--j
Soil bo ring started _J
Soil boring completed

Cage lowe ring st arted

Cage low eri ng completed

Fl ushi ng st a rt ed
1- - -
I-

Flushi ng completed

Concreting start

Co ncreting completed

Cas ing removed


, I
--
I
~

I I I

t
j I
I

SUMMARY OF MATERIAL CONSUMED

Grade of concrete

Reinforcement TOR (MT) 1- i


1 - - ._ - - -

-- I­
! I
I
I
L&T Rep resentative
- -1-- -
TP-IA Representative
- --
-
iI
r
- - - I.
PWD Representative
- - 1- ­

Nam e: I Name: i
I
Name:
Dat e........................... Date ........................... ! Date ...........................
- _.
~ "<
LARSEN & TOUBRO LIMITED, HCIIC :4 7
tr;)
Doc No-
Page
BARAPULLAH (PHASE III) PROJECT BRPL/WP/OOSA
17of23
\:~
-- METHOD STATEMENT FOR PILE-BORING, REBAR CAGE PLACEMENT
AND CONCRETING
Rev. No Rl

Annexure-4

f3
PublicWorks
W
Department/Fl2l
Construction of Elevated Road over Barapullah Nallah starting from Sarai Kale Khan to
Mayur Vihar, New Del hi. (Phase-III), SH:- Elevated Road, Extradosed Bridge, Flyover,
Clover Leaves, Loops, Ramps, Footpath, Cycle Track, Road Work including Signages,
Street Light Works & Allied Works .
e
QSF/L&T/BRPL/QOO2
RO
CLIENT: PWD Govt. of NCT Deihl
landon Consultants Pvt ltd. (Permanent Design)
CONSULlANTS :
AECOM - Proof Checking
lPIA: RITES ltd.

AGENCY: LARSEN & TOUBRO lIMITED- CONSTRUCTION (HEAVY CIVil INFRA IC)

--
-.
-

_ ____ 1__ ___ 1.


--- -
I
-- --
-L ! _+___
CONCRETE REQUISITION

L-----j- ----L-.
SLIP
-- -;- -
---~ - --- - 1-- ------· -- --

1_
--- l-- - T
,Dat e:

ITim e:
_ I
I

Location
I I I
-~
- - -
Structure
! I
; I I
I I I
! i
I I
,I
structure ID
I: \:

-i-=+
Ii
- -- - - -"--- --- - - -- - - - - - -- - - --
I .
Grade of Concrete j .
i ._- I -- - - - - _ ._.
II ,
Quantity required II t:
I

I
i I

-
Slump requied at site

Expected Date & Time of Concreting


L.: '-1
_I---1
'
1
I:

I:

Placement Method (Boom Placer/Pump/Crane Bucket/Manua :

I . ! I
-- i -r- I
I

I
I
L&T Representative I
Name: I - -- - -j
,
-
I
I

Date........................... !

- - - -- -
- -
LARSEN & TOUBRO LIMITED, Helle Doc No­
Page
BARAPUllAH (PHASE III) PROJECT BRPL/WP/OOSA
18of23
METHOD STATEMENT FOR PILE-BORING, REBAR CAGE PLACEMENT
AND CONCRETING
Rev. No Rl

Annexure-S

E~
Construction of Elevated Road over Barapullah Nallah starting from Sarai Kale Khan to­
MayurVihar, New Delhi. (Phase-III) , SH:- Elevated Road, Extradosed Bridge, Flyover,
f-­ ----lClover Leaves, Loops, Ramps, Footpath, Cycle Track, Road Work including Signages ,
QSF/L&T/BRPL/QOO
Street Light Works & Allied Works.
Public Works 4
Department/F 121 RO
CLIENT: PWD Govt. of NCT Delhi
Tandon Consultants Pvt ltd. (Permanent Design)
CONSULTANTS:
AECOM - Proof Checking
TPIA: RITES ltd.

AGENCY: LARSEN & TOUBRO LIMITED- CONSTRUCTION (HEAVY CIVIL INFRA ic)

L&T Representative
LARSEN & TOUBRO LIMITED, HCIIC Doc No­
BARAPULLAH (PHASE III) PROJECT BRPL/WP/OOSA
METHOD STATEMENT FOR PILE-BORING, REBAR CAGE PLACEMENT
Rev. No Rl
AND CONCRETING

Annexure-6

.. --­ ..

S
Construction of Elevated Road over Barapullah Nallah starting

f3
Public Works
W from Sarai Kale Khan to MayurVihar, New Delhi. (Phase-III), SH:­
Elevated Road, Extradosed Bridge, Flyover, Clover Leaves, Loops,
Ramps, Footpath, Cycle Track, Road Work including Signages,
Street Light Works & Allied Works . QSF!L&T!BRPL!Q049
Department/F121 RO
CLIENT : PWD Govt. of NCT Delhi
Tandon Consultants Pvt Ltd. (Permanent Design)
CONSULTANTS:
AECOM - Proof Checking
TPIA: RITES ltd.

AGENCY: LARSEN & TOUBRO LIMITED· CONSTRUCTION (HEAVY CIVIL INFRA Ie)

POLYMER (as per ABNT-NBR 6122:2010)

. Requirement!
SI.No. Parameters Observed Remarks
Norms

Density before
1 < 1.0Sgm/cc
concreting
Marsh Cone
2 Viscosity before 3Ssto 120s
concretlnz
pH Value before
3 8-12
concreting

Sand content
4 upto 3%
before concreting

Remarks
TIck the appropriate
Test Result OK NOTOK

Re-test required Yes No

OK NOTOK
Re-test result

I::~~~.r~.:~.~~~;:i~e ~::~~.:2:~.".t.~.ti~
1&T Representative
Name: -l
Date...........................
q,
, .~
LARSEN & TOUBRO LIMITED] HCIIC
BARAPULLAH (PHASE III) PROJECT
:20 Doc No-
BRPL/WP/OOSA
Page
, ~o of23
C'T)'
~
METHOD STATEMENT FOR PILE-BORING, REBAR CAGE PLACEMENT
AND CONCRETING
Rev. No Rl

Annexure-7

~w~
Public Works
Department/F121
Construction of Elevated Road over Barapullah Nallah starting
from Sarai Kale Khan to Mayur Vihar, New Delhi. (Phase-III), SH:­
Elevated Road, Extradosed Bridge, Flyover, Clover Leaves, Loops,
Ramps, Footpath, Cycle Track, Road Work including Signages,
Street Light Works & Allied Works.
e
QSF/L&T/BRPL/QOSO
RO
CLIENT: PWD Govt. of NCT Delhi
Tandon Consultants Pvt Ltd. (Permanent Design)
CONSULTANTS:
AECOM - Proof Checking

TPIA: RITES Ltd.

AGENCY: LARSEN & TOUBRO L1MITED- CONSTRUCTION (HEAVY CIVIL INFRA Ie)

BENTONITE (As per (I 4.44.3.6 of Contract Agreement)

Requirement/
51.No. Parameters Observed Remarks
Norms

1 Mud Density S 1.05gm/cc

, Marsh Cone
2 30to 40 sec
Viscosity

3 pHValue 9.5-12

Particles with size


4 <1% Once at the time of mixing
more than 75 Il

Once at the time of mixing


5 Liquid Limit >400%
IS 2720 Part-5

Remarks
Tick the appropriate
Test Result OK NOTOK

Re-test required Yes No

OK NOTOK
Re-test result

.- ~

L&T Representative -- - ­ TPIA Representative IPWD'Represe ntative


I~::~.:. . . . ~. . . ~........
Name: Name:
Date........................... Date...........................
.' -1.'

LARSEN & TOUBRO LIMITED, HCIIC ...; ' Doc No­


Page
BARAPULLAH (PHASE III) PROJECT BRPL/WP/OOSA
21of23
METHOD STATEMENT FOR PILE-BORING, REBAR CAGE PLACEMENT
Rev. No Rl .
AND CONCRETING