FarTech Ltd.

, Promoting Industrial Rooftop Turn Your Roof Into Earning Source


Solar Plant Contact: +8801926990090, Email: fartech2017@gmail.com
www.farthechlimited.com
Advantages of 7kWp Solar System- Industrial Rooftop Budgetary Cost (Tentative)
Project:
Industrial sector is the most significant sector in Bangladesh 7kWp On-grid Solar Power System (5.6kWac) BDT
and can meet the renewable energy goal by using available EPC Cost first year 525000
empty-unused space of their factory roof. With rooftop solar Opex Per Year 10500
plant, industries can enjoy-
*Competitive flat rate over *LEED Certification Opex for 10 Years 105000
30 Years *Meet environmental Interest Rate 5% on Capex for 8 Years 210000
*Reduced tariff than Utility Compliance
Total Investment with Interest 5% till 10 yrs including
(BDT 3.43/kWHr) * Earn CER Credits 840000
*Ownership of the Solar 2 yrs grace period
Plant
Major Items:
Investment and Return Analysis (Tentative):
• Solar Module- Generates Power Up to 30 years
• On-grid Inverter- Converts DC to AC Power Up to Avg. Yearly Radiation in Bangladesh 1750 Hrs/Yr
10 years Yearly Generation 9800 kWh
• Minor maintenance through the year Generation over 25 Years 245000 kWh
Maintenance Rules: Levelized Cost of Energy (LCOE) over 25 Years 3.4286 BDT/kWh
• The Solar Panel must be cleaned regularly if found
Usual Govt. Tariff 8.50 BDT/Unit
dusty
• Every year structure tightening is required just after Yearly Revenue 83300 BDT
a big storm
• Structure should be maintained with anti- Simple Payback 10.08 Yrs
corrosive painting Solar Module Life for 25 Yrs
Total Revenue over 25 Yrs 2082500 BDT
Net Profit over 25 Yrs 1242500 BDT
Total CO2 saving over 25 years 147.168 Metric Tons
Additional Earning from Carbon Credit over 25 Yrs 809424 BDT
Total Earning (Net Profit+ Carbon Credit) over 25 Yrs 2051924 BDT

Endless Energy

Eco Friendly

OPEX Savings

Short Time Return

Electricity Savings

Promote Green Energy

*NB: This is a generic cost & revenue calculation. Site survey is must before submitting final proposal. Cost may vary as per site requirements.*