Professional Documents
Culture Documents
Approach Bung Design Submition
Approach Bung Design Submition
675.39 675.39
672.820
672.225
671.705
670.730
670.090
669.400
666.590
666.590
653.640
GI REALING
200 MM CONCREATE
WMM 200 MM
FINAL COMPACTED
LAYER
A
SLOPE 1:1.5
A' SLOPE 1:1.5
ROCK SOIL
MIXTURE
Section A-A' PREPARED FOR : EXECTIVE ENGINEER MAHARASHTRA JEEVAN PRADHIKARAN DIVISION KARAD
NAME OF WORK: APPROACH BUND, MARDI WATER SUPPLY SCHEME
CONTRACTOR : WATER STEWARDSHIP ORG INDIA PVT.LTD
SECT.ENGR S.D.E EX. ENGR SUPT. ENGR