Professional Documents
Culture Documents
Auto-Refractometer RM-9000
Auto-Refractometer RM-9000
Auto Ref/Keratometer
Repair Manual
Directory
§1 Troubleshooting................................................................................ 1
4.5 PD correction............................................................................19
§5 Sub Troubleshooting..................................................................... 21
Appendix.................................................................................................25
1 Removing covers........................................................................ 25
3 Replace main-board................................................................... 31
8 Instrument correction................................................................ 43
9 Update program...........................................................................46
10 Circuit chart................................................................................51
§1 Troubleshooting
1
1.2 Normal boot
2
1.3 Calibration Malfunction
3
1.4 Other Malfunction
If the problem you have met not appeared in our malfunction list,we are so
sorry about it.
Please recur the malfunction and record it by photo or video,so that we can
better to troubleshoot the fault.
4
§2 Sub not normal boot
5
2.2 White screen
6
2.3 Blurred screen
7
§3 Sub normal boot
8
3.2 Key no response
Figure 1
Figure 2
9
3.3 Connection Instruction
Please turn on the power, the system works,then enter into settings interface.
10
4.Press the “print” button at the right corner of
LCD screen, and set
the “print” on the screen as “off”.
6. Press the “PRT” button on the auto-refractometer , transmit the test data to
the control box of CV-7200.
11
§4 Sub calibration malfunction
4.1 Adjust brightness of CCD
1.we need to use “S:+20D” standard lens to do our
measurement .it will show the most appropriate
CCD2 brightness
Figure 1
Figure 2
3. Press both & button at same
time,the brightness will increase.
Press both & button at same
time,the brightness will reduce.
When a large number of yellow color appear in the
green zone gradually ,Please reduce the
brightness of the CCD2 until a bit yellow color
appears in the green zone (see figure 3), it’s
standard CCD2 brightness.
If some operation mistakes happen when we
are adjusting the brightness. For example :we
request to press both & button for increasing Figure 3
brightness.However you did not press both two buttons, just press one of them.You have
to turn off the instruction then turn it on ,adjust brightness again.
Note : As the figure 3 the green should be homogeneous.If some region appears a lot of
white ,maybe there is dust on the CCD2
12
4.2 No single malfunction
13
4.3 Spherical power correction
1. Applicable situation:
If a lot of people’s spherical power exists a situation that the value is higher or lower
than their real spherical power.You can take corrective measure .If this situation
happens only in one person and most people are correct.please do not take corrective
measure
2. Adjusting way:
2.1 Enter into the setting interface ,choose D-STF
2.3 We will give you a example that the real value is -5.25ds and the metrical value is
-5.00ds for explaining this situation.
14
2.3.1 As the following figure ,the metrical value
is -5.25ds,however the real value is
-5.00ds,that is to say lower than 0.25ds.
2.3.2 enter into the setting interface ,adjust the value of D-SFT to -0.25DS
2.3.3 press key_1 button serially ,exit the setting interface ,correction produce
completed.Now when we measuring the model eyes the metrical value is -5.25ds.
The result is correct.
15
4.4Solution of astigmatism uncertainly
16
The way to Calibrate astigmatism
17
3.press key6 button many times until choose
the interface as figure 1. Aim at the model eyes
which is marked 0;press the measurement
switch. According to way mentioned above,
finish the calibration as the figure 2
Figure 1
Figure 2
18
4.5 PD correction
1.Applicable situation:
If a lot of people’s PD value exists a situation that the value is higher or lower than their
real PD.You can take corrective measure .If this situation happens only in one person and
most people are correct.please do not take corrective measure
2. Adjusting way:
The key number is as follows:
19
2.3 Measure the right model eye then press key
2 button to finish measurement.
20
§5 Sub Troubleshooting
Figure 2
Figure 3
21
5.2 The solution of +12V open circuit fault
1. Open the enclosure in the bottom , as show in
Figure1 and Figure2
Figure 1
Figure2
Figure 3
22
3.pull out the blue wire
4.
23
5.3 Locking structure maintain
Figure 1
24
Appendix
1 Removing covers
1.1 Removing main covers
25
Switch out the fastener according to the pic
26
1.2Removing bottom cover and control level
27
1.3Removing chin-rest part
28
2 The way to enter into measurement interface
2. while holding down the key 7,and press the key 1 for
several seconds, then the screen will show “welcome!
Entry pad:”, the interfere should be as follows.
29
3.Press the key 6 for more then 8 times, and then
press key 7 once, the calibration interface will show
as follows.
30
3 Replace main-board
Open the body cover.
1.Firstly pull out the ICs from the PCB.
31
After take it out, pls put it back to the new PCB, in
case it would be easily lost.
2. Pull out all the plugs and take care of the plug
orders.
The details:
32
3.Screw out the screws on the PCB.
33
4 Replace light source
1.Remove the black cover on the light source.
34
2.Screw out all the three screw
First screw:take care of this screw, because
near it there is mirror, it could be easily
broken.
Second screw:
Third screw:
35
2.Take it from the machine as pic.
36
5 The way to replace CCD1
1.Open the outer cover and optical base cover under the
maintenance manual
Figure 1
Figure 2
3. Adjustment the special tool to make the red "+ "in the
LCD screen at the center spot, to ensure that special tool
stationary when the process of replacing the CCD.
Figure 3
37
4. Turn off the power, according to unplug the data line
in Figure 4, to unscrew the two screws fixed on the CCD
board with a small screwdriver, replace the CCD board,
plug in the data line, turn the power on, adjust the
position of CCD board, until the cursor is located in the
center of the cross (Figure 3). Then tighten screws.
Figure 4
Note: If there is no good fixed special tools, you can use hot melt glue or glass fixed and
then to replace. Otherwise can not be replaced (may cause equipment can not work well)
38
6 The way to replace CCD2
1. Open the outer cover and optical base cover under
the maintenance manual as shown in Figure 1.
Figure 1
Figure 2
3. Adjustment the special tool to make the red "+ "in the
LCD screen at the center spot, to ensure that special
tool stationary when the process of replacing the CCD.
Figure 3
39
4.Turn off the power, according to unplug the data
line in Figure 1, to unscrew the two screws fixed on
the CCD board with a small screwdriver, replace
the CCD board, plug in the data line, turn the
power on, adjust the position of CCD board, until
the cursor is located in the center of the cross
(Figure 4). Then tighten screws.
Figure 4
Note1:According to appendix two, when you enter the measurement interface ,choose the
item called test image ,you can enter the interface as figure 4
Note2: If there is no good fixed special tools, you can use hot melt glue or glass fixed and
then to replace, otherwise cannot be replay cause equipment can not work well)
40
7 The way to replace LCD monitor
1.Please pull out the connector which marked by
numbers 2,3,4 and pull out the LCD cable carefully and
gently.
41
3.pull out wire connector carefully and gently in order
to prevent component damage on the backlight -drive.
4.Screw out the four screws ,then take the holder out.
42
8 Instrument correction
1.When we calibration this instrument, we must use
the standard model eyes
43
3.Press the key 6 and select the “4.REF Adjustment”
and then press the key 7 once, the interface will be
as follows:
44
6.When we have calibration all the degrees, then
press the key 1 once, and then holding press
key 3 for 3 seconds to exit the calibration
interface, and then press the key 3 for 3
seconds once more, the data will be saved. the
screen will show the following interface:
45
9 Update program
HARDWARE REQUIREMENT
A PC extension cable, or USB converter to serial cable
46
Software Setup is finished, serial port is initialized and started serial port connection.
click ”Connect”under” Serial Port”; If the connection is successful then the title will display
a serial number with its baud rate,please find connection-following figure:
If you do not see the serial number and the serial baud rate, there may have been
occupied by another program, or you do not have this serial port; if you use a USB to
serial cable, it is possible that the cable is unplugged or line driver is not installed, please
consult the relevant manual install and try again.
Program upgrade
1. With a PC serial port extension cable, or USB to serial cable, connect PC, and the
refractometer communication port. While refractometer connected to the power wire.
2. if the above procedure runs DNW.EXE, start the serial port connection.
Press the refractometer handle measurement button, turn the power switch.
Refractometer on-screen display following interface, and then release the button.
BIOS_MSKJ ver2010.2
Updata program :
47
DNW program show as following:
48
5. click DNW”Transmit”under program”Serial Port” , The pop-up dialog box, select the
downloaded program file *.bin. Open is download, square represents the download
progress of the program as follows:.
49
7. Enter”y”,upgrade program; DNW program displays the memory section of the
programmer and completed information,find below pic:
8.The upgrade is complete, turn off the machine, re-start in 5 seconds . and running the
new program.
50
10.circuit chart
51