Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

1 2 3

1 2 3
C C
4
1 2 3
C3 C3
4
C2 C2
C C
1 2 3
4 C C C3 C3
C2 C2
C3 C3
C2 C2
C C

C3 C3
C2 C2

80 cm
B B
C2
C1 C1 C2
F 3 rd
G.F 1 ST 2 nd For All
4 Ø10/m B B
C2
B
C2
B
C1 C1 C2
C2 EDGE COl C1 MID COl C

80 cm
Ø10@10 cm
Reinforcment DIM Reinforcment DIM Reinforcment DIM DIM C2

40 cm
Ø10@5 cm
Reinforcment Stirrups
ɸ
cm cm cm cm C1 C1
ɸ B B
ɸ
ɸ C2
6 Ø 16 6 Ø 16 C2
30x100 30x100 30x100 30x100 Ø 10@25 cm C1 C1

ɸ
ɸ C1 18 Ø 16 18 Ø 16

ɸ
COLUMN ABOVE THE SAME 12 Ø 20 12 Ø 20
A
ɸ

C3 Corner COl C3 C2 C2 C3
C2 12 Ø 16 30x80 12 Ø 16 30x80 12 Ø 16 30x80 12 Ø 16 30x80 Ø 10@25 cm
A A A

A
C3 8 Ø 16 30x60 8 Ø 16 30x60 8 Ø 16 30x60 8 Ø 16 30x60 Ø 10@25 cm
C3 C2 C2 C3
A
A 1 2 3 1 2 3
4 4
C3 C2 C2 C3
A

1 2 3
4

1 2 3
Notes:- 4

- take cover equal to 40mm


- stirrups are ɸ 10
-Use concrete compression Strength equal to 30MP (C-30)
-Use Fy= 420MP for main bars
-Use Fy= 240MP for stirrups
-Planted column will be placed According to the site
engineer instructions during the construction works.

1 2 3
4

C
B2 C
1 2 3
4
1 2 3 1 2 3
4 4 B2 B2
B4
C C

C
B2 B2 B4 B2
C C C C
B2 B2
B2 B2 B2 B2
B4 B4 B1 B1 B1
B2
B4 B4
B1 B4 B1 B1 B2
B1 B1 B1 B1 B1 B2
B4
B4 (30X50) B2 B2 B4
B3 (20X30)
B5(20X40)
B4 B4
B1 B1 B4
Section 2-2 Section 3-3
B1
B4 B4
Section 1-1

B B
B2 (40X50) EDGE beam
0.3 L1 or 0.3 L2 (Greater)

B1(40X50) Main beam Standard end hook


R4

R3
0.3 L1 or 0.3 L2 (Greater)
R4

R3
0.3 L2 or 0.3 L3 (Greater)
2 ɸ16 2 ɸ16 2 ɸ16
2 ɸ16 2 ɸ16 2 ɸ16

2 ɸ16 2 ɸ16 2 ɸ16

ɸ16 ɸ16

3 ɸ16 @140 mm c/c 3 ɸ16 @140 mm c/c

B1 B1
3 ɸ16 @140 mm c/c
ɸ16 ɸ16 ɸ16

2 ɸ16 2 ɸ16 2 ɸ16

B1
3 ɸ16 @90 mm c/c 3 ɸ16 @90 mm c/c 3 ɸ16 @90 mm c/c ɸ16 ɸ16

ɸ16 ɸ16
ɸ16

R2

ɸ16
R2 R1 R1 2 ɸ16 2 ɸ16 ɸ16 2 ɸ16

B1 B1 B1 B1
Section 1-1 Section 2-2 Section 3-3

B B
B1 B1
4 ɸ16 @95 mm c/c 4 ɸ16 @95 mm c/c 4 ɸ16 @95 mm c/c L3
3 ɸ16 @140 mm c/c
3 ɸ16 @140 mm c/c Section 1-1 Section 2-2 Section 3-3
3 ɸ16 @140 mm c/c

ɸ20 ɸ20 ɸ20 B B B B


5 ɸ16 @70 mm c/c 5 ɸ16 @70 mm c/c
5 ɸ16 @70 mm c/c
Size,mm Main Reinforcmentment Stirrups 1 2 3 1 2 3
Beam
Bottom Top
Spacing from each Column Face
Mark b h Continous Cut Continous Cut
(cm)
1 2 3
B1
(R1) (R2) (R3)
Section 1-1 (R4)
Section 1-1 Section 2-2 Section 3-3
Section 2-2 Section 3-3 B1 400 500 5 Ø 16 2 Ø 20 3 Ø 16 2 Ø 20 Ø 10 @ 15 cm c/c
B2 400 500 4 Ø 16 2 Ø 16 3 Ø 16 2 Ø 16 Ø 10 @ 15 cm c/c
1 2 3 B3 200 300 2 Ø 16 2 Ø 16 2 Ø 16 2 Ø 16 Ø 10 @ 15 cm c/c
1 2 3
B1
B4 300 500 3 Ø 16 2 Ø 16 2 Ø 16 2 Ø 16 Ø 10 @ 15 cm c/c

B1
B5 200 400 2 Ø 16 2 Ø 16 2 Ø 16 2 Ø 16 Ø 10 @ 15 cm c/c
1 2 3 1 2 3
1 2 3 B2 B1
1 2 3 B1
1 2 3
B1 B1
B1 B1 A

B1 B1 B1 B1 B5 B5 B5
B2 B2 B2 B2 B2
A

A A

B2 B2 B2 B2 B2 B2
A 1 2 3 1 2 3
A
4 4
B3 B3 B3
B3 B3 B3
B3 B3
B3
1 1 2 3
4 4

2 3

Ø12 @15 cm C/C


4Ø16-EDG BARS 4Ø16-EDG BARS
Ø16 @15 cm C/C

Shear Connect Ø10 @30 cm C/C Ø16 @15 cm C/C


Vertical & Horizontal

Ø12 @15 cm C/C

Ø12 @15 cm C/C 4Ø16-EDG BARS


4Ø16-EDG BARS Ø16 @15 cm C/C

1 2 3
4

C
B2 C
1 2 3
4
1 2 3 1 2 3
4 4 B2 B2
B4
C C

a
B2 B2 B4 B2
C C C C
B2 B2
B2 B2 B2 B2
B4 B4 B1 B1 B1

a
B2

b
a

a
B4 B4
B1 B4 B1 B1 B2
B1 B1 B1 B1 B1 B2

b
B4
B2 B2 B4
b

b
B4 B4
B1 B1 B4
B4 B1
B4 B B

d
B1 B1
B1
B1 B1 B1 B1 B1 B1 B B

d
B B B B
d
d d
d
d

d
B1 b b b
b b b
a

b
B1 a B1 B1
B2 B1
d d B1 B1
d d

b
b b b B1 b b b B1 A
b

b
B1 a B1 B1 a B1 B5 B5 B5
B2 B2 B2 B2
B2
A A A

A A

B2 B2 B2 B2 B2 B2
A 1 2 3 1 2 3
A
4 4

B3 B3 B3 B3
B3 B3
B3 B3
B3
1 2 3 1 2 3
4 4

1 2 3
4

C C

F3

F4 F2

F1 F1
B
B B

F2 F2

F2
F2
F3 F3

A A

1 2 3
4

B
F
F

F F
F F
General Notes:- F
F
F
F
- take cover equal to 75mm F

- stirrups are ɸ10 F

-Use concrete compression Strength equal to 30MP (C-30)


-Use Fy= 420MP for main bars
-Use Fy= 240MP for stirrups
-All (main) tie beams dimension that are linked with the
foundation are 1m Width and 60cm depth
- All (secondary) tie beams dimension that carries the walls
and are not linked with the foundation are 60cm Width and
60cm depth.

You might also like