EPD-EA-F01 & F02 (Env. Impacts Assesmt & Aspects Evaluation) - SAMPLE

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 12

EPD-EA-F01

Environmental Aspect Identification & Impact Assessment Rev: 2

Life-Cycle Process : Sales & Marketing (LC-1) and Purchasing (LC-2) Original date : 23.01.19
Department: Office (Sales, Purchasing, Logistics, Admin / HR) Review / Revision Date: 7 March 2023
Location: Building Unit G Env. Mgt Team: All
Note (1) : Significant (Risk / Opportunities) Rating :-
-- If 20 points and above or any rating with legal requirements, its ccnsidered as Risk for Environmental Impact and Potential Non-Compliance to Legal requirements); Below 20 points is considered as Opportunities (Environmental Controlled)
Note (2) : Reason of the significanty impact (change to the environment)
Note (3) : Positive impact (recycle, reuse, reduce usage) , the rating will be minus points accordingly

Input Aspects Output Aspects Existing Situation - P Type of Impact Significance of Total Additional
Process/Activity Signifcant Legal
(Consumption) (Undesired output) Control ( 2 point each, 10 points for legal)-Q Impact (1-5) - R rating Control

Score Q ( A+B+C+D+E+F+G+H)

Yes / Risk (If rating is 20 points


and above or any rating with

Environmental Quality Act


Score P (0,5,10 for each case)

G - Deplete Natural Resources

Else No / Opportunities
X - Likelihood of occurrence

Refers to EPD-EA-F02
Z - Severity of consequence

legal requirements).
E - Nuisance/noise/esctatic

(EQA), Regulation
E - Emergency (10 points)

W - Likelihood detection
A - Abnormal (5 points)

Y - Duration of impacts
H - Legal Requirement

Score R (W+X+Y+Z)

P+Q+R
N - Normal ( 0 Point)

F - Global warming
D - Flora & fauna
C - Water
B - Land
A - Air
Sales & Marketing (LC-1)
(Sales / Customer visit) Use of vehicle:
Petrol (Car, Smoke emission Proper planning to avoid multiple trips to 0 0 2 2 4 1 5 1 2 9 13 No
Airplane) customer place
Source for local customers (short distance) 0 0 2 2 4 1 5 1 2 9 13 No
Turn off engine if waiting > 3 minutes at 0 0 2 2 4 1 5 1 2 9 13 No
customer's place
Leakage of petrol Vehicle preventive maintenance 5 5 2 2 4 1 2 2 2 7 16 No
Engine oil Leakage of engine oil Vehicle preventive maintenance 5 5 2 2 4 1 2 2 2 7 16 No
Noise Vehicle preventive maintenance 0 0 2 2 1 5 2 2 10 12 No

Purchasing (LC-2)
(Delivery by Supplier / Use of vehicle:
Vendor) Diesel (Lorry) Smoke emission Proper purchasing planning (buy all the 0 0 2 2 4 1 5 1 2 9 13 No
required items at once) to save delivery trips
Source for local suppliers / vendors (shorter 0 0 2 2 4 1 5 1 2 9 13 No
distance)
Turn off engine if waiting > 3 minutes at EPD 0 0 2 2 4 1 5 1 2 9 13 No
Vehicle preventive maintenance by Supplier 5 5 2 2 4 1 2 2 2 7 16 No
Leakage of petrol Vehicle preventive maintenance by Supplier 5 5 2 2 4 1 2 2 2 7 16 No
Engine oil Leakage of engine oil Vehicle preventive maintenance by Supplier 5 5 2 2 4 1 2 2 2 7 16 No
Noise Vehicle preventive maintenance by Supplier 0 0 2 2 1 5 2 2 10 12 No

Prepared By: Reviewed & Approved By:

Name: Hoo Soo Yee Name: Ng Cheng Hock


Date: 7 March 2023 Date: 7 March 2023
EPD-EA-F01
Environmental Aspect Identification & Impact Assessment Rev: 1

Life Cycle Process : Storage (LC-3), Production (LC-4) & Delivery (LC-5) Original date : 23.01.19
Department: Production & Storage Review / Revision Date: 7 March 2023
Location: Building Unit G & F Env. Mgt Team: All
Note (1) : Significant (Risk / Opportunities) Rating :-
-- If 20 points and above or any rating with legal requirements, its ccnsidered as Risk for Environmental Impact and Potential Non-Compliance to Legal requirements); Below 20 points is considered as Opportunities (Environmental Controlled)
Note (2) : Reason of the significanty impact (change to the environment - Pollution / No Resource Conservation)
Note (3) : Positive impact (recycle, reuse, reduce usage) , the rating will be minus points accordingly

Input Aspects Output Aspects Existing Situation - P Type of Impact Significance of Total Additional
Process/Activity Signifcant Legal
(Consumption) (Undesired output) Control ( 2 point each, 10 points for legal)-Q Impact (1-5) - R rating Control

Score Q ( A+B+C+D+E+F+G+H)

Yes / Risk (If rating is 20 points


and above or any rating with

Environmental Quality Act


Score P (0,5,10 for each case)

G - Deplete Natural Resources

Else No / Opportunities
O - Likelihood of occurrence

Refers to EPD-EA-F02
S - Severity of consequence
E - Nuisance/noise/esctatic

legal requirements).

(EQA), Regulation
E - Emergency (10 points)

D - Likelihood detection
A - Abnormal (5 points)

T - Duration of impacts
H - Legal Requirement

P+Q+R
Score R (D+O+T+S)
N - Normal ( 0 Point)

F - Global warming
D - Flora & fauna
C - Water
B - Land
A - Air
Material Incoming (LC-3) Diesel (by lorry) Smoke emission Turn off engine if waiting > 3 minutes 0 0 2 2 4 1 5 1 2 9 13 No
(Supplier Vehicle & Leakage of diesel Vehicle maintenance by supplier 5 5 2 2 4 1 2 2 2 7 16 No
Material Load) Engine oil Leakage of engine oil Vehicle maintenance by supplier 5 5 2 2 4 1 2 2 2 7 16 No
(at Unit G) Noise Preventive maintenance for forklift by Supplier 0 0 2 2 1 5 2 2 10 12 No
Dropping of materials Supplier to have tigher waste bundling 0 0 2 2 1 4 1 1 7 9 No

Weighing (LC-3) Diesel (by lorry) Smoke emission Turn off engine if waiting > 3 minutes 0 0 2 2 4 1 5 1 2 9 13 No
(at Unit G) Leakage of diesel Proper vehicle maintenance by supplier 5 5 2 2 4 1 2 2 2 7 16 No
Engine oil Leakage of engine oil Proper vehicle maintenance by supplier 5 5 2 2 4 1 2 2 2 7 16 No
Noise Preventive maintenance for forklift by Supplier 0 0 2 2 1 5 2 2 10 12 No
Dropping of materials Supplier to have tigher waste bundling 0 0 2 2 1 4 1 1 7 9 No

Unloading (LC-3) Diesel Smoke emission Turn off engine if waiting > 3 minutes 0 0 2 2 4 1 5 1 2 9 13 No
(at Unit G) (by lorry & forklift) Leakage of diesel Proper vehicle maintenance by supplier 5 5 2 2 4 1 2 2 2 7 16 No
Engine oil Leakage of engine oil Preventive maintenance for forklift 5 5 2 2 4 1 2 2 2 7 16 No
Noise Preventive maintenance for forklift 0 0 2 2 1 5 2 2 10 12 No
Dropping of materials Proper forklifting / forklift driving skill 0 0 2 2 1 4 1 1 7 9 No

Transferring & Storage Diesel Smoke emission Preventive maintenance for forklift 0 0 2 2 4 1 5 1 2 9 13 No
(at Unit G & F) (LC-3) (byforklift) Leakage of diesel Preventive maintenance for forklift 5 5 2 2 4 1 2 2 2 7 16 No
Engine oil Leakage of engine oil Preventive maintenance for forklift 5 5 2 2 4 1 2 2 2 7 16 No
Noise Preventive maintenance for forklift 0 0 2 2 1 5 2 2 10 12 No
Dropping of materials Proper forklifting / forklift driving skill 0 0 2 2 1 4 1 1 7 9 No

Sorting (LC-4) Materials Unwanted materials Proper selection / sorting skills 0 0 2 2 4 1 5 1 2 9 13 No


(at Unit G) Sold to waste collector (for recycle) 0 0 -2 2 0 1 5 1 2 9 9 No

Compression (LC-4) Lubricant oil Leakage of lubricant oil Preventive maintenance for the compressor 5 5 2 2 4 1 2 2 2 7 16 No
(at Unit G) Electricity Heat Preventive maintenance for the compressor 0 0 2 2 1 5 1 2 9 11 No
Noise Preventive maintenance for the compressor 0 0 2 2 1 5 2 2 10 12 No
Transferring & Storage Diesel Smoke emission Preventive maintenance for forklift 0 0 2 2 4 1 5 1 2 9 13 No
(for Sorted Materials & (byforklift) Leakage of diesel Proper vehicle maintenance by supplier 5 5 2 2 4 1 2 2 2 7 16 No
Waste) (at Unit G & F) Engine oil Leakage of engine oil Preventive maintenance for forklift 5 5 2 2 4 1 2 2 2 7 16 No
(LC-4 & LC-3) Noise Preventive maintenance for forklift 0 0 2 2 1 5 2 2 10 12 No
Dropping of sorted
Proper forklifting / forklift driving skill 0 0 2 2 1 4 1 1 7 9 No
materials
Leakage of unwanted Use of good conditon bag for waste 0 0 2 2 1 2 1 2 6 8 No
(from broken waste bag) (unwanted materials) storage

Preventive maintenance for the crushing


Crushing (LC-4) Lubricant oil Leakage of lubricant oil 5 5 2 2 4 1 2 2 2 7 16 No
machine
(Crushing machine Electricity Heat Control usage / Minimum usage 0 0 2 2 1 5 1 2 9 11 No
Preventive maintenance for the crushing
at Unit E) Noise 0 0 2 2 1 5 2 2 10 12 No
machine
Proper placing of material onto the crusher
Sorted materials Dropping of materials 0 0 2 2 1 4 1 1 7 9 No
conveyor

Preventive maintenance for the washing


Washing (LC-4) Lubricant oil Leakage of lubricant oil 5 5 2 2 4 1 2 2 2 7 16 No
machine
(Washing machines Electricity Heat Control usage / Minimum usage 0 0 2 2 1 5 1 2 9 11 No
Preventive maintenance for the washing
at Unit E) Noise 0 0 2 2 1 5 2 2 10 12 No
machine
Preventive maintenance for the washing
Water Leakage of water
machine
Env.
Quality
Waste Water Treatment & Water Analysis
Waste water 0 0 2 2 10 14 2 5 1 1 9 23 Yes (Industrial AC-01
conducted and monitored
Effluent)
Reg. 2009
Preventive maintenance for the washing
Crushed materials Dropping of materials 0 0 2 2 1 4 1 1 7 9 No
machine

Drying (LC-4) Lubricant oil Leakage of lubricant oil Preventive maintenance for the drying machine 5 5 2 2 4 1 2 2 2 7 16 No
(Drying machines Electricity Heat Control usage / Minimum usage 0 0 2 2 1 5 1 2 9 11 No
(at Unit E) Noise Preventive maintenance for the drying machine 0 0 2 2 1 5 2 2 10 12 No
Water Leakage of water Preventive maintenance for the drying machine 0 0 2 2 1 2 1 2 6 8 No
Used Water Recycle Use of Water 0 0 -2 -2 1 5 1 2 9 7 No
Washed materials Dropping of materials Preventive maintenance for the drying machine 0 0 2 2 1 4 1 1 7 9 No
Transferring & Storage Diesel Smoke emission Preventive maintenance for forklift 0 0 2 2 4 1 5 1 2 9 13 No
(for Dried Materials) (byforklift) Leakage of diesel Preventive maintenance for forklift 5 5 2 2 4 1 2 2 2 7 16 No
(at Unit E & G) Engine oil Leakage of engine oil Preventive maintenance for forklift 5 5 2 2 4 1 2 2 2 7 16 No
(LC-4 & LC-3) Noise Preventive maintenance for forklift 0 0 2 2 1 5 2 2 10 12 No
Dropping of materials Proper forklifting / forklift driving skill 0 0 2 2 1 4 1 1 7 9 No

Preventive maintenance for the extruder


Extrusion (LC-4) Lubricant oil Leakage of hydraulic oil 5 5 2 2 4 1 2 2 2 7 16 No
machine
Preventive maintenance for the extruder
(at Unit E) Electricity Heat 0 0 2 2 1 5 1 2 9 11 No
machine
Preventive maintenance for the extruder
Noise 0 0 2 2 1 5 2 2 10 12 No
machine
Defective product Used for lower / other grade products 0 0 -2 2 0 1 5 1 2 9 9 No

Preventive maintenance for the packing


Packing (LC-4) Hydraulic oil Leakage of hydraulic oil 5 5 2 2 4 1 2 2 2 7 16 No
machine
(at Unit E) Electricity Heat Control usage / Minimum usage 0 0 2 2 1 5 1 2 9 11 No
Preventive maintenance for the packing
Noise 0 0 2 2 1 5 2 2 10 12 No
machine
Plastic bag Damaged plastic bags Sold to waste collector (for recycle) 0 0 -2 2 0 1 5 1 2 9 9 No

Transferring & Storage Diesel Smoke emission Preventive maintenance for forklift 0 0 2 2 4 1 5 1 2 9 13 No
(Finished Products) (byforklift) Leakage of diesel Proper vehicle maintenance by supplier 5 5 2 2 4 1 2 2 2 7 16 No
(at Unit F) Engine oil Leakage of engine oil Preventive maintenance for forklift 5 5 2 2 4 1 2 2 2 7 16 No
(LC-3) Dropping of products Proper forklifting / forklift driving skill 0 0 2 2 1 4 1 1 7 9 No
Noise Preventive maintenance for forklift 0 0 2 2 1 5 2 2 10 12 No

Delivery Loading (LC-5) Use of vehicle:


(at Unit F) Diesel (Lorry) Smoke emission Proper planning to avoid multiple delivery trips 0 0 2 2 4 1 5 1 2 9 13 No
to customer place
Source for local customers (short distance) 0 0 2 2 4 1 5 1 2 9 13 No
Turn off engine if waiting > 3 minutes at 0 0 2 2 4 1 5 1 2 9 13 No
customer's place
Leakage of petrol Vehicle preventive maintenance 5 5 2 2 4 1 2 2 2 7 16 No
Engine oil Leakage of engine oil Vehicle preventive maintenance 5 5 2 2 4 1 2 2 2 7 16 No
Noise Vehicle preventive maintenance 0 0 2 2 1 5 2 2 10 12 No

Prepared By: Reviewed & Approved By:

Name: Hoo Soo Yee Name: Ng Cheng Hock


Date: 7 March 2023 Date: 7 March 2023
EPD-EA-F01
Environmental Aspect Identification & Impact Assessment Rev: 2

Life-Cycle Process : Maintenance (LC-6) & Others (Waste Handling, ERP & WWTP) (LC-7) Original date : 23.01.19
Department: Production & Storage Review / Revision Date: 7 March 2023
Location: Building Unit G & F Env. Mgt Team: All

Note (1) : Significant (Risk / Opportunities) Rating :-


-- If 20 points and above or any rating with legal requirements, its ccnsidered as Risk for Environmental Impact and Potential Non-Compliance to Legal requirements); Below 20 points is considered as Opportunities (Environmental Controlled)
Note (2) : Reason of the significanty impact (change to the environment)
Note (3) : Positive impact (recycle, reuse, reduce usage) , the rating will be minus points accordingly

Input Aspects Output Aspects Existing Situation - P Type of Impact Significance of Total Additional
Process/Activity Signifcant Legal
(Consumption) (Undesired output) Control ( 2 point each, 10 points for legal)-Q Impact (1-5) - R rating Control

Score Q ( A+B+C+D+E+F+G+H)

Yes / Risk (If rating is 20 points


and above or any rating with

Environmental Quality Act


Score P (0,5,10 for each case)

G - Deplete Natural Resources

Else No / Opportunities
X - Likelihood of occurrence

Refers to EPD-EA-F02
Z - Severity of consequence

legal requirements).
E - Nuisance/noise/esctatic

(EQA), Regulation
E - Emergency (10 points)

W - Likelihood detection
A - Abnormal (5 points)

Y - Duration of impacts
H - Legal Requirement

Score R (W+X+Y+Z)

P+Q+R
N - Normal ( 0 Point)

F - Global warming
D - Flora & fauna
C - Water
B - Land
A - Air
MAINTENANCE (LC-6)
Machine Proper operating (follow operating manual) 0 0 2 2 1 2 4 4 11 13 No

Machinery maintenance New parts (for Control usage (only change if really required);
0 0 2 2 1 2 4 4 11 13 No
(Compression machine, replacement) Proper handling (follow instruction manual)
Crushing machine,
Washing machine, Damaged parts Sold as scraps (recycle) 5 5 2 -2 0 1 2 4 4 11 16 No
Drying machine,
Extrusion machine,
Scrubber, Collected back by vendor upon repair /
5 5 2 -2 0 1 2 4 4 11 16 No
Packing machine) maintenance completion

Weighing bridge Machine Proper operating (follow instruction manual) 0 0 2 2 1 2 4 4 11 13 No


Damaged parts Sold as scraps (recycle) 5 5 2 -2 0 1 2 4 4 11 16 No
Collected back by vendor upon repair /
5 5 2 -2 0 1 2 4 4 11 16 No
maintenance completion

Compressor Air filter Control usage (only change if really required) 0 0 2 2 1 2 4 4 11 13 No


Oil filter Control usage (only change if really required) 0 0 2 2 1 2 4 4 11 13 No
Waste air filter Sold as scraps (recycle) 5 5 2 -2 0 1 2 4 4 11 16 No
Waste oil filter Sold as scraps (recycle) 5 5 2 -2 0 1 2 4 4 11 16 No
Collected back by vendor upon repair /
5 5 2 -2 0 1 2 4 4 11 16 No
maintenance completion

Forklift Diesel Control usage / use only enough quantity 0 0 2 2 1 2 3 4 10 12 No

New parts (for Control usage (only change if really required);


0 0 2 2 1 2 4 4 11 13 No
replacement) Proper handling (follow instruction manual)

Hydraulic oil Control usage / use only enough quantity 0 0 2 2 1 2 4 5 12 14 No


Lubricant oil Control usage / use only enough quantity 0 0 2 2 1 2 4 5 12 14 No
Used / damaged parts Sold as scraps (recycle) 0 0 2 -2 0 1 2 4 4 11 11 No
Forklift (continue) Env. Quality
(Control of
Emission
Exhaust smoke Stop engine when not in used 0 0 2 10 12 1 2 1 3 7 19 Yes AC-02
from Diesel
Engines)
Reg. 1996
EQA (Part
Machine Noise Proper maintenance 0 0 2 10 12 1 4 1 2 8 20 Yes IV Section AC-03
23)
Scheduled
Leakage of petrol Proper maintenance 5 5 2 10 12 1 2 3 4 10 27 Yes Waste Reg. AC-04
2005 - SW
408
Scheduled
Leakage of lubricant oil Dispose through licensed contractors 5 5 2 10 12 1 2 4 5 12 29 Yes Waste Reg. AC-05
2005 - SW
408
Scheduled
Leakage of hydraulic oil Dispose through licensed contractors 5 5 2 10 12 1 2 4 5 12 29 Yes Waste Reg. AC-06
2005 - SW
408
Scheduled
Used Lubricant Oil Dispose through licensed contractors 5 5 2 10 12 1 2 4 5 12 29 Yes Waste Reg. AC-21
2005 - SW
305
Skid Tank Petrol Control usage / use only enough quantity 0 0 2 2 1 2 3 4 10 12 No
Scheduled
Availability of secondary containment at the Waste Reg.
(Petrol Storage) Leakage of petrol 5 5 2 10 12 1 2 3 4 10 27 Yes AC-07
storage area 2005 - SW
408

WASTE MANAGEMENT (LC-7)


General waste Food Food waste No spillage on floor 5 5 2 2 1 2 1 1 5 12 No
General - Paper,
Other general wastes
Broom, dust pan, Municipal waste collector 5 5 2 2 1 2 2 1 6 13 No
(wood, rubbish, etc.)
etc.

Plastic striper, Plastic strip / sheet /


Recycle waste Sold as scrap (recycle) 5 5 2 -2 0 1 3 2 2 8 13 No
Jambo Bags bottle
Metal scrap Sold as scrap (recycle) 0 0 2 -2 0 1 4 2 2 9 9 No
Scheduled
Keep & dispose to approved DOE vendor / Waste Reg.
Schedule waste (SW) Sludge 5 5 2 10 12 1 2 4 2 9 26 Yes AC-08
proper handling 2005 - SW
204
Scheduled
Contaminated cantainers Keep & dispose to approved DOE vendor / Waste Reg.
5 5 2 10 12 1 2 3 2 8 25 Yes AC-09
(with SW / Chemicals) proper handling 2005 - SW
409
Scheduled
Contaminated rags, Keep & dispose to approved DOE vendor / Waste Reg.
5 5 2 10 12 1 2 3 2 8 25 Yes AC-10
plastics, paper, gloves proper handling 2005 - SW
410

Hydraulic waste oil Collect by supplier / vendor & proper handling 5 5 2 -2 0 2 2 3 3 10 15 No

Scheduled
Keep & dispose to approved DOE vendor / Waste Reg.
Lubricant waste oil 5 5 2 10 12 2 2 4 5 13 30 Yes AC-22
proper handling 2005 - SW
305

EMERGENCY SITUATION (LC-7)


Fire Service
Keep away flammable material from ignition
Emergency situation - Fire 10 10 2 2 10 14 1 1 1 4 7 31 Yes Act (Act AC-11
source
341) 1988
Fire Service
Fire-fighting system in place 10 10 2 2 10 14 1 1 1 4 7 31 Yes Act (Act AC-12
341) 1988
Scheduled
Spillage of SW (in Waste Reg.
- Designated SW storage area 10 10 2 10 12 1 1 4 3 9 31 Yes AC-13
Storage area) 2005 - SW
408
Scheduled
Availability of secondary containment at the Waste Reg.
10 10 2 10 12 1 1 4 3 9 31 Yes AC-14
storage area 2005 - SW
408
Scheduled
Spillage of SW (during Waste Reg.
- Proper handling of SW follow work instruction 10 10 2 10 12 1 1 4 3 9 31 Yes AC-15
transferring) 2005 - SW
408
Scheduled
Spillage of SW (during Waste Reg.
- Proper handling of SW follow work instruction 10 10 2 10 12 1 1 4 3 9 31 Yes AC-16
decanting) 2005 - SW
408
WASTE WATER TREATMENT PLANT (WWTP) (LC-7)
Breakdown WWTP Units / Operate according per Vendor instruction
0 0 2 2 4 1 1 5 5 12 16 No
Parts (e.g. pipes (Use of Auto Mode - Pre-set by Vendor)
leaking, pump /
reading Preventive maintenance by Vendor by weekly
0 0 2 2 4 1 1 5 5 12 16 No
mulfunction, etc.) basis

Damaged / mulfunction
parts (broken paip, parts Collect by supplier / vendor & proper handling 0 0 2 2 -2 2 1 1 5 5 12 14 No
in pump, etc.)

Overflow Effluent / waste Water Treatment (WWTP & Water Analysis


0 0 2 2 4 2 4 1 1 8 12 No
water conducted)
Env. Quality
Untreated effluent / (Industrial
Will cause environmental pollution 5 5 2 10 12 1 2 5 5 13 30 Yes AC-17
waste water Effluent)
Reg. 2009

Prepared By: Reviewed & Approved By:

Name: Hoo Soo Yee Name: Ng Cheng Hock


Date: 7 March 2023 Date: 7 March 2023
EPD-EA-F01
Environmental Aspect Identification & Impact Assessment Rev: 2

Life-Cycle Process : Others (LC-7) Original date : 23.01.19


Department: Office (Sales, Purchasing, Logistics, Admin / HR) Review / Revision Date: 7 March 2023
Location: Building Unit G Env. Mgt Team: All

Note (1) : Significant (Risk / Opportunities) Rating :-


-- If 20 points and above or any rating with legal requirements, its ccnsidered as Risk for Environmental Impact and Potential Non-Compliance to Legal requirements); Below 20 points is considered as Opportunities (Environmental Controlled)
Note (2) : Reason of the significanty impact (change to the environment)
Note (3) : Positive impact (recycle, reuse, reduce usage) , the rating will be minus points accordingly

Input Aspects Output Aspects Existing Situation - P Type of Impact Significance of Total Additional
Process/Activity Signifcant Legal
(Consumption) (Undesired output) Control ( 2 point each, 10 points for legal)-Q Impact (1-5) - R rating Control

Score Q ( A+B+C+D+E+F+G+H)

Yes / Risk (If rating is 20 points


and above or any rating with

Environmental Quality Act


Score P (0,5,10 for each case)

G - Deplete Natural Resources

Else No / Opportunities
X - Likelihood of occurrence

Refers to EPD-EA-F02
Z - Severity of consequence

legal requirements).
E - Nuisance/noise/esctatic

(EQA), Regulation
E - Emergency (10 points)

W - Likelihood detection
A - Abnormal (5 points)

Y - Duration of impacts
H - Legal Requirement

Score R (W+X+Y+Z)

P+Q+R
N - Normal ( 0 Point)

F - Global warming
D - Flora & fauna
C - Water
B - Land
A - Air
Air Conditioner CFC gas
Control usage / use if only required 0 0 2 2 1 2 3 4 10 12 No
consumption
New replacement
Control usage (only change if really required) 0 0 2 2 1 2 4 4 11 13 No
parts
Worn off / used parts Sold as scraps (recycle) 5 5 2 -2 0 1 2 4 4 11 16 No
Collected back by vendor upon repair /
5 5 2 -2 0 1 2 4 4 11 16 No
maintenance completion
CFC gas leak Proper maintenance practice (by vendor) 5 5 2 2 2 1 4 5 12 19 No
Dust from air-filter
Proper maintenance practice (by vendor) 0 0 2 2 1 2 5 2 10 12 No
cleaning

Computer, Printer, Printer Toner /


Control usage / use if only required 0 0 2 2 1 2 3 4 10 12 No
Photocopy Machine Cartridge
New Replacement
Control usage (only change if really required) 0 0 2 2 1 2 4 4 11 13 No
Parts
Printing Ink Control usage / use if only required 0 0 2 2 1 2 3 4 10 12 No
Worn off / used parts Sold as scraps (recycle) 0 0 2 -2 0 1 2 4 4 11 11 No
Collected back by vendor upon repair /
0 0 2 -2 0 1 2 4 4 11 11 No
maintenance completion
Ink cartridge Return & trade in to vendors 0 0 2 -2 0 1 2 4 4 11 11 No

Paper and stationary Paper Control usage / use if only required 0 0 2 2 1 2 3 4 10 12 No


Stationery Control usage / use if only required 0 0 2 2 1 2 3 4 10 12 No
Waste Paper Reuse both side of the paper 0 0 2 2 1 2 3 4 10 12 No
Used Stationery Municipal waste collector 0 0 2 2 1 2 3 4 10 12 No

Electricity
Utilities Switch off when not use 0 0 2 2 1 2 3 4 10 12 No
consumption

Turn off water tap when not use 0 0 2 2 1 2 3 4 10 12 No


Water consumption
Use of toilet -
Turn off water tap when not use 0 0 2 2 1 2 3 4 10 12 No
Water consumption
Detergent / Soap - Control usage / use if only required 0 0 2 2 1 2 3 4 10 12 No
Env. Quality
Sewerage Septic tank & IWK services 5 5 2 2 4 1 3 3 3 10 19 Yes (Sewage) AC-18
- Reg. 2009

Fire Service
- Fire Fire fighting system 10 10 2 10 12 1 1 1 2 5 27 Yes Act (Act AC-19
Emergency situation 341) 1988
Scheduled
Waste Reg.
Chemical spill First aid / send to nearest hospital 10 10 2 10 12 1 1 3 3 8 30 Yes AC-20
2005 - SW
- 408

Prepared By: Reviewed & Approved By:

Name: Hoo Soo Yee Name: Ng Cheng Hock


Date: 7 March 2023 Date: 7 March 2023
EPD-EA-F02
SIGNIFICANT ASPECT ADDITIONAL CONTROL PROGRAM MONITORING Rev: 2

Life-Cycle Process : All Relevant Original date : 23.01.19


Department: All Relevant Review / Revision Date: 7 March 2023
Location: All Relevant Env. Mgt Team: All
Note (1) : Significant (Risk / Opportunities) Rating :-
-- If 20 points and above or any rating with legal requirements, its ccnsidered as Risk for Environmental Impact and Potential Non-Compliance to Legal requirements); Below 20 points is considered as Opportunities (Environmental Controlled)
Note (2) : Reason of the significanty impact (change to the environment)
Note (3) : Positive impact (recycle, reuse, reduce usage) , the rating will be minus points accordingly

AFTER PREVIOUS ADDITIONAL CONTROL


REMARKS
Situation - P Type of Impact - Q Significance of Total
Significant
AFTER (2 points each, 10 points for legal) Impact (1-5) - R Rating

and above or any rating with legal


Yes / Risk (If rating is 20 points
Score Q ( A+B+C+D+E+F+G)
Score P (0,5,10 for each case)

Else No / Opportunities
G - Deplete Natural Resources
DATE FOR

X - Likelihood of occurrence
LIFE-CYCLE EXISTING CONTROL

Z - Severity of consequence
W - Likelihood of detection
ADDITIONAL PROCESS / NEXT

E - Nuisance/noise/esctatic
EFFECTIVE

E - Emergency (10 points)


PROCESS DEPARTMENT (FROM PREVIOUS CONTROL / ADDITIONAL CONTROL

requirements).
CONTROL NO. ACTIVITY REVIEW / RE-

D - Flora & fauna/noise


A - Abnormal (5 points)
(Yes / No)

Y - Duration of impacts
(LC-x) ADDITIONAL CONTROL)

H - Legal Requirement

Score R (W+X+Y+Z)
EVALUATION

N - Normal ( 0 Point)
If No -
P+Q+R

F - Global warming
Continue
Additional
Control

C - Water
B - Land
A - Air
Review and weekly monitoring by
Washing Take corrective action if any non
Production vendor on Water Treatment Plant
AC-01 Production (Washing machine at 0 0 2 2 10 14 2 4 1 1 8 22 Yes / Risk Yes compliance practice or failed test By 7 Mar 2024
(LC-4) operation and Effluent Discharge
Unit E) result found.
Lab Testing for compliances
AC-02 Exhaust smoke Stop engine when not in used 0 0 2 10 12 1 2 1 3 7 19 Yes / Risk Yes
AC-03 Machine Noise Proper maintenance 0 0 2 10 12 1 4 1 2 8 20 Yes / Risk Yes Continue carry out:
AC-04 Production Leakage of petrol Proper maintenance 5 5 2 10 12 1 2 3 4 10 27 Yes / Risk Yes 1) Evaluation of compliance
Maintenance
(Maintenance - Leakage of lubricant ensuring compliance By 7 Mar 2024
AC-05 (LC-6) Dispose through licensed contractors 5 5 2 10 12 1 2 4 4 11 28 Yes / Risk Yes
Forklift) oil 2) Monitoring for Environmental
Leakage of hydraulic practice
AC-06 Dispose through licensed contractors 5 5 2 10 12 1 2 4 4 11 28 Yes / Risk Yes
oil
Monitor the condition and
Petrol Storage - Skid Availability of secondary containment
AC-07 Others (LC-7) Office 5 5 2 10 12 1 2 3 4 10 27 Yes / Risk Yes Environmental practice use of the By 7 Mar 2024
Tank at the storage area
containment
Keep & dispose to approved DOE Continue carry out:
AC-08 Sludge 5 5 2 10 12 1 2 4 2 9 26 Yes / Risk Yes
Production & vendor / proper handling 1) Evaluation of compliance
Office Contaminated ensuring compliance By 7 Mar 2024
Keep & dispose to approved DOE 2) Monitoring for Environmental
AC-09 (Waste cantainers (with SW / 5 5 2 10 12 1 2 3 2 8 25 Yes / Risk Yes
Others (LC-7) vendor / proper handling practice
Management - Chemicals)
Schedule Waste Contaminated rags, Monitor the Quantity of the SW and
(SW)) Keep & dispose to approved DOE
AC-10 plastics, paper, 5 5 2 10 12 1 2 3 2 8 25 Yes / Risk Yes ensuring the vendor license is valid By 7 Mar 2024
vendor / proper handling
gloves and not overdue
Keep away flammable material from
AC-11 10 10 2 2 10 14 1 1 1 4 7 31 Yes / Risk Yes
Fire ignition source
AC-12 Fire-fighting system in place 10 10 2 2 10 14 1 1 1 4 7 31 Yes / Risk Yes
AC-13 Designated SW storage area 10 10 2 10 12 1 1 3 3 8 30 Yes / Risk Yes Continue carry out:
Production & Spillage of SW (in
1) Evaluation of compliance
Production Office Storage area) Availability of secondary containment
AC-14 10 10 2 10 12 1 1 3 3 8 30 Yes / Risk Yes ensuring compliance By 7 Mar 2024
(LC-4) (Emergency at the storage area
2) Monitoring for Environmental
Situation - ERP) Spillage of SW Proper handling of SW follow work
AC-15 10 10 2 10 12 1 1 3 3 8 30 Yes / Risk Yes practice
(during transferring) instruction
Spillage of SW Proper handling of SW follow work
AC-16 10 10 2 10 12 1 1 3 3 8 30 Yes / Risk Yes
(during decanting) instruction
Production Review and weekly monitoring by
Take corrective action if any non
(Waste Water Untreated effluent / vendor on Water Treatment Plant
AC-17 Others (LC-7) 5 5 2 10 12 1 2 5 5 13 30 Yes / Risk Yes compliance practice or failed test By 7 Mar 2024
Treatment Plant - waste water operation and Effluent Discharge
result found.
WWTP) Lab Testing for compliances
Production
AC-18 Production Sewerage Septic tank & IWK services 5 5 2 2 4 1 3 3 3 10 19 Yes / Risk Yes
(LC-4) Continue carry out:
Production 1) Evaluation of compliance
Production &
AC-19 (LC-4) & Others Fire Fire fighting system 10 10 2 10 12 1 1 1 2 5 27 Yes / Risk Yes ensuring compliance By 7 Mar 2024
Office
(LC-7) 2) Monitoring for Environmental
Production practice
AC-20 Production Chemical spill First aid / send to nearest hospital 10 10 2 10 12 1 1 3 3 8 30 Yes / Risk Yes
(LC-4)
Production
Maintenance Keep & dispose to approved DOE Continue carry out:
AC-21 (Maintenance - Used Lubricant Oil 5 5 2 10 12 1 2 4 5 12 29 Yes / Risk Yes
(LC-6) vendor / proper handling 1) Evaluation of compliance
Forklift)
ensuring compliance By 7 Mar 2024
Waste 2) Monitoring for Environmental
Production - Keep & dispose to approved DOE
AC-22 Management Used Lubricant Oil 5 5 2 10 12 2 2 4 5 13 30 Yes / Risk Yes practice
Storage vendor / proper handling
(LC-7)
s

Prepared By: Reviewed & Approved By:

Name: Hoo Soo Yee Name: Ng Cheng Hock


Date: 7 March 2023 Date: 7 March 2023

You might also like