Drainage System Inspection Report


Drainage System: County Ditch 27C
Inspection Date: 2022-05-10
Next Inspection Date: 2027
Inspection Completed By: Austin Hilbrands

Commissioner District(s): Type of Inspection:


District 1: By Foot: X
District 2: X ATV: X
District 3: Pickup:
District 4: Drone:
District 5:

Comments:

Required Repairs
Repair Number Request Date Repair Type Comments Township Section
22-029 2022-05-10 Rusted Pipe Wellington 11
22-030 2022-05-10 Flow Issue Check for cleanout Wellington 11
22-028 2022-05-10 Blockage Dip center to realign channel Wellington 27
22-031 2022-05-17 Flow Issue Check cleanout Wellington 10

Completed Repairs
There were no completed repairs found for this inspection.

16.5' Buffer Non Compliance


Buffer compliance was met for ditch County Ditch 27C

Noxious Weeds Present


There were no noxious weeds found in County Ditch 27C

Trees Present
There were no trees found in County Ditch 27C
The following is made for the Renville County Board of Commissioners pursuant to
2/14/2023 the provisions of Minnesota State Statutes Section 103E. p. 1
Drainage Department
Government Services Center
105 South 5th Street - Suite 319 - Olivia, MN 56277
Office: 320-523-3759 - Fax: 320-523-3755
www.renvillecountymn.com

Drainage System Repair Report - 2022


Drainage System: County Ditch 27C

Requested Repairs (Points)


Repair # Status Township Sec Repair Type Comments Repair Cost
20-260 Closed Wellington 22 Washout Multi 3 washouts - corn $14,508.58
20-259 Closed Wellington 22 Washout Washout - corn
20-144 Closed Wellington 27 Washout Ditch bank washout $1,388.93
21-294 Closed Wellington 9 Illegal Dump Rocks in buffer from cleanout
22-428 Closed Tree Spraying $2,295.00
Final Repair Cost $18,192.51

Requested Repairs (Lines)


Repair # Status Township Sec. Repair Type Comments Length Repair Cost
Final Repair Cost

Repairs Collected During Inspection


Repair # Status Township Sec. Repair Type Comments Repair Cost
22-029 Awaiting Wellington 11 Rusted Pipe
22-030 Awaiting Wellington 11 Flow Issue Check for cleanout
22-028 Closed Wellington 27 Blockage Dip center to realign channel $720.00
22-031 Level/Seed Wellington 10 Flow Issue Check cleanout
Final Repair Cost $720.00

Total Ditch Repair Cost: $18,912.51

The following is made for the Renville County Board of Commissioners pursuant to
2/14/2023 the provisions of Minnesota State Statutes Section 103E. p. 1
County Rd 67
2 1 6 5 4 3 2 1

710th Ave
Rusted Pipe

490th St
Flow Issue 22-029
22-030
Flow Issue
C
11 12 7 8 9 10 22-031 27 11 12
CD

510th St
)2

C
"

27
CD
14 13 18 17 «4
¬ 16 15 14 13
County Rd 74

BANDON

510th St
470th St
16
"
) WELLINGTON
690th Ave

CD 2
Tree
Spraying

7
23

C
24 19 20 21 22-428 22 23 24
27
"
)
C
27
680th Ave CD County Rd 75

490th St
Blockage

F
26 25 30 29 28 27 26 25
22-028

660th Ave 660th Ave


35 31 32 33 34 35 36
36 Renville County, MN, Eagle View Technologies, Inc., Pro-West & Associates, Renville County, MN

County Ditch 27C


Legend
Open Ditch Awaiting Level/Seed Noxious Weeds

Tile Closed Open Buffer Noncompliances

2-10-2023 Invoiced Tree Maint. Segments