SINOHYDRO COOPERATION LIMITED COMPANY

SPARK DRYPORT PROJECT Contract No: 6600050462

Specific Fall protection plan for warehouse


B.I No.: 25-00040-0020
SAPMT Comments:
SL SAPMT COMMENTS SINOHYDRO STATUS REMARKS
NO: RESPONSE

1 Contractor shall provide the calculations Comment has been Closed


of SWL capacity of lifeline to install and incorporated please check
what is the accuracy of the load limit page number 5.
determined. refer to CSM Fall Protection
Section 5.6

2 Contractor to ensure that all listed fall Comment has been Closed
protection system requirements, devices, incorporated please
equipment and resources shall be check page number 6.
provided and has valid certification as
required.

3 Specific JSA for the work shall be develop Rectified- JSA has Closed
and applied all the control measure before been attached
and during the work execution,
Competency of supervisor and workers are
highly to consider prior to start the work.