This document provides details of the structural completion of a project. It lists 14 tasks to confirm that various structural elements like supports, members, walkways, and penetrations were installed according to specifications. It also checks that temporary equipment was removed, welding and testing was completed, and the area was cleaned and cleared for painting. Signatures from the contractor and project development officer are required to accept the work.
This document provides details of the structural completion of a project. It lists 14 tasks to confirm that various structural elements like supports, members, walkways, and penetrations were installed according to specifications. It also checks that temporary equipment was removed, welding and testing was completed, and the area was cleaned and cleared for painting. Signatures from the contractor and project development officer are required to accept the work.
This document provides details of the structural completion of a project. It lists 14 tasks to confirm that various structural elements like supports, members, walkways, and penetrations were installed according to specifications. It also checks that temporary equipment was removed, welding and testing was completed, and the area was cleaned and cleared for painting. Signatures from the contractor and project development officer are required to accept the work.
PROJECT DESCRIPTION LEKH_LEK_USEM LEK- F Ph-1- PROJECT ID No NOL0000L0868 B_11307587 SUB-SYSTEM Acc scope - WI slot - WIM 2 (Existing) - SUB-SYSTEM No 13E-CL-01 DESCRIPTION Civil TAG DESCRIPTION: Pipe Support Structure - WI slot - WIM 2 TAG No: PS STR - WI slot - WIM 2 (Existing) (Existing) AREA Drawing No. LOCATION
No. Description of Task Signature OK N/A PL
1** Confirm that all structural supports, main structural members, roof structure, wall cladding, etc are installed as per AFC drawings, Project Specifications, and removed all temporary aids / brackets. 2 Confirm that all platforms and walkways are installed as per AFC drawings, Project Specifications and removed all temporary aids / brackets. 3 Confirm that gratings to gullies are installed and the drains and sumps are clean. 4 Confirm that all penetrations installed, with sleeves / kick plates of specified size complete with drain holes. 5 Confirm that all grating installed, secured and no gaps exist that allow the penetration of a ball bearing of diameter >15 mm. 6** Confirm that all Packers used under uprights to be fabricated from good quality CS & to be blasted & primed as a minimum 7 Confirm that all handrails, ladders are installed as per AFC drawings and specifications and ladder entrances have safety bar complete with protected landing end and portable hand railings are secured. 8** Confirm that all bolting are installed and tightened 9 Confirm that all maintenance / scaffolding lugs are installed as per AFC drawings with the correct orientation 10 Confirm that Main and Interface dimensions are checked and accepted. 11 Confirm that all temporary steel works are removed at a later date, and are clearly marked and identified on the relevant drawings 12 Confirm that all Welding, Stress Relief and NDT work completed and cleared. 13 Confirm that all items covered by this record are undamaged and clean. 14 Confirm that all Quality Records have been completed and accepted. REMARKS / OBSERVATIONS ** PDO SPOT INSPECTION POINT Cleared for painting
Comments:
CONTRACTOR - COMPLETED By CONTRACTOR - APPROVED By PDO - ACCEPTED By