10/09/2023, 18:32 WPD End-Term Exam on 16-Nov-2021 (Part C)

WPD End-Term Exam on 16-Nov-2021


(Part C)
Total points 13/40

Marks: 40. Duration: 50 minutes.


CLO 2: Improve industrial work systems by using principles of work and process design.
(CLO2-C4-PLO3)
All questions are based on the case study 'H. R. Anna Company' provided to you.
For numerical answers, type a number only. Do not type a comma, symbol, or alphabet.
Select the closest answer for MCQs-type numerical questions.

It is a closed-book exam.

Good luck!

Email *

razamianali947@gmail.com

0 of 0 points

Roll Number and Name e.g. 01 Muhammad Asjid *

24-ALI RAZA TARIQ

Please enter password. *

wpd_end_c

WPD End-Term Exam Part C 13 of 40 points

All questions are based on the case study of H. R. Anna Company provided to you in hard

https://docs.google.com/forms/d/e/1FAIpQLScDEIHt3Yq4olyRfhEziQCu9uAbPuz2gWsO3q798PjilWcGLw/viewscore?vc=0&c=0&w=1&flr=0&viewscor… 1/7
10/09/2023, 18:32 WPD End-Term Exam on 16-Nov-2021 (Part C)

form.

What is the capacity of the stamping process in boxes per week. Type a number 0/4
only. Do not type a comma, symbol, or alphabet.

675

What is the capacity of the painting process in boxes per week. Type a number 0/4
only. Do not type a comma, symbol, or alphabet.

2083

What is the capacity of the assembly process in boxes per week. Type a number 0/4
only. Do not type a comma, symbol, or alphabet.

667

If H. R. Anna Company decides to pace its production according to average 0/3


demand of 800 boxes per week, what will be the utilization of the stamping
process? Select the closest answer.

85%

90%

89%

92%

95%

https://docs.google.com/forms/d/e/1FAIpQLScDEIHt3Yq4olyRfhEziQCu9uAbPuz2gWsO3q798PjilWcGLw/viewscore?vc=0&c=0&w=1&flr=0&viewscor… 2/7
10/09/2023, 18:32 WPD End-Term Exam on 16-Nov-2021 (Part C)

If H. R. Anna Company decides to pace its production according to average 3/3


demand of 800 boxes per week, what will be the utilization of the painting
process? Select the closest answer.

40%

25%

35%

30%

20%

If H. R. Anna Company decides to pace its production according to average 3/3


demand of 800 boxes per week, what will be the utilization of the assembly
process? Select the closest answer.

73%

72%

75%

76%

74%

https://docs.google.com/forms/d/e/1FAIpQLScDEIHt3Yq4olyRfhEziQCu9uAbPuz2gWsO3q798PjilWcGLw/viewscore?vc=0&c=0&w=1&flr=0&viewscor… 3/7
10/09/2023, 18:32 WPD End-Term Exam on 16-Nov-2021 (Part C)

If two of the twelve assembly workers are spared from assembly process and 0/2
assigned to material handling task, what will be the impact? (2 best answers)

Assembly will have the lowest capacity

The company will not be able to meet the demand of 800 boxes per week

Stamping will have the lowest capacity

Painting will have the lowest capacity

The company will be able to meet the demand of 800 boxes per week

What will be the new capacity of stamping process, in boxes per week, if the 0/3
batch size is doubled i.e. increased to 720 boxes.

990

Doubling the batch size has 2/2

Increased the capacity of stamping process

Not impacted the capacity of stamping process

Decreased the capacity of stamping process

Increased the capacity of stamping process 1.5 times

Doubled the capacity of stamping process

What will be the new capacity of painting process, in boxes per week, if the 0/3
batch size is doubled i.e. increased to 720 boxes.

2893

https://docs.google.com/forms/d/e/1FAIpQLScDEIHt3Yq4olyRfhEziQCu9uAbPuz2gWsO3q798PjilWcGLw/viewscore?vc=0&c=0&w=1&flr=0&viewscor… 4/7
10/09/2023, 18:32 WPD End-Term Exam on 16-Nov-2021 (Part C)

Doubling the batch size has 2/2

Not impacted the capacity of painting process

Increased the capacity of painting process 1.25 times

Doubled the capacity of painting process

Increased the capacity of painting process

Decreased the capacity of painting process

What will be the new capacity of assembly process, in boxes per week, if the 0/2
batch size is doubled i.e. increased to 720 boxes.

Doubling the batch size has 0/2

Decreased the capacity of assembly process

Increased the capacity of assembly process 1.25 times

Not impacted the capacity of assembly process

Increased the capacity of assembly process

Doubled the capacity of assembly process

https://docs.google.com/forms/d/e/1FAIpQLScDEIHt3Yq4olyRfhEziQCu9uAbPuz2gWsO3q798PjilWcGLw/viewscore?vc=0&c=0&w=1&flr=0&viewscor… 5/7
10/09/2023, 18:32 WPD End-Term Exam on 16-Nov-2021 (Part C)

In batch production, increasing the batch size: 1/1

Increases the WIP inventory

Decreases the WIP inventory

Increases the variety produced by the system

Makes quality inspection easier to perform

Management is considering investing in a setup reduction program for the 2/2


stamping machine. Suppose the setup time could be reduced to 20 minutes,
with some additional investment cost. Which of the following statements are
true after this reduction in time? (2 best answers)

Assembly will have the lowest capacity

Stamping will have the lowest capacity

Capacity of the stamping will increase by about 25%

Capacity of the stamping will increase by about 66%

Painting will have the lowest capacity

Capacity of the stamping will increase by about 35%

This content is neither created nor endorsed by Google. - Terms of Service - Privacy Policy

Forms

https://docs.google.com/forms/d/e/1FAIpQLScDEIHt3Yq4olyRfhEziQCu9uAbPuz2gWsO3q798PjilWcGLw/viewscore?vc=0&c=0&w=1&flr=0&viewscor… 6/7
10/09/2023, 18:32 WPD End-Term Exam on 16-Nov-2021 (Part C)

https://docs.google.com/forms/d/e/1FAIpQLScDEIHt3Yq4olyRfhEziQCu9uAbPuz2gWsO3q798PjilWcGLw/viewscore?vc=0&c=0&w=1&flr=0&viewscor… 7/7

You might also like