Professional Documents
Culture Documents
Modified Monthly Progress Report For Levant Construction LTD
Modified Monthly Progress Report For Levant Construction LTD
Modified Monthly Progress Report For Levant Construction LTD
[DOCUMENT TITLE]
[Document subtitle]
[DATE]
[COMPANY NAME]
[Company address]
[DATE]
[COMPANY NAME]
[Company address]
All these particulars below should be added to the cover page
1
TABLE OF CONTENTS (edit this to suit the report)
TABLE OF CONTENT
LIST OF TABLE
APPENDIX
EXECUTIVE SUMMARY
SALIENT FEATURES
1. INTRODUCTION
1.1 Project component
1.2 Scope of work
2. PHYSICAL PROGRESS OF WORKS
2.1 Road
2.2 Drainage
2.3 Culvert
2.4 Stone pitching
2.5 Gabion
2.6 Fencing
2.7 Reclamation of land
2.8 Cumulative Total of Physical Progress of works
3. FINANCIAL PROGRESS AND CASH FLOW
4. DETAILS OF SAFEGUARD ACTIVITIES
5. WORK PLAN FOR NEXT MONTH
5.1 Key issues and remarks
6. RESOURCE PLAN
6.1 Details of contractor’s personnel at site and position
6.2 Details of Equipment at site, condition and number
6.3 Detail of Material on site
7. CONCLUSION
2
LIST OF TABLE
Table 1. Physical Progress of Works
Table 2. Cumulative Total Physical Progress of Works
Table 3. Financial Progress and Cash Flow
Table 4. Detail of Contractor’s Personnel at Site
Table 5. Detail of Equipment at Site/ Contractor Yard
Table 6. Details of Material on Site/ Contractors Yard
3
APPENDIX
i. ORGANIZATIONAL CHART
ii. PROGRESS PHOTOGRAPHS
iii. LABORATORY TEST RESULT AND REPORT OF THE MONTH
4
EXECUTIVE SUMMARY
Detail out in summary the activities of project for the month
5
SALIENT FEATURES
GENERAL FEATURES
Employer
Funded By
Project Title
Location
Contract No.
Consultant
Contractor
Commencement Date
Completion Date
Contract Period
Physical Progress
to Date
Financial Progress
Contract Amount with
PS & VAT
6
1.0 INTRODUCTION
Give a brief introduction of the project, stating the essence and impact to the community.
1.
2.
3.
4.
5.
SUB TOTAL
1.
2.
3.
4.
5.
SUB TOTAL
7
2.3 PHYSICAL PROGRESS OF CULVERT WORKS
1.
2.
3.
4.
5.
SUB TOTAL
1. .
2.
3.
4.
5.
SUB TOTAL
1.
2.
3.
4.
5.
SUB TOTAL
8
2.6 PHYSICAL PROGRESS OF FENCING WORKS
1.
2.
3.
4.
5.
SUB TOTAL
1.
2.
3.
4.
5.
SUB TOTAL
2.8 CUMULATIVE TOTAL OF PHYSICAL WORKS (add & remove table for other items )
9
3.0 FINANCIAL PROGRESS AND CASH FLOW
1. IPC NO. 1
2. IPC NO. 2
3.
4.
Total Amount
10
6.2 Detail of Equipment on Site/ Contractor Yard (add or remove table if needed)
S/N Equipment Condition Capacity Nos
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
6.3 Details of Material on Site/ Contractors Yard (add or remove table if needed)
S/N Material Quantity
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
7.0 CONCLUSION
Write the conclusion for the report.
11
APPENDIX
i. ORGANIZATIONAL CHART
The contractor should place their site organizational chart.
12