Electrical Yearly Maintenance Detail FPIP Site

Item Capacity Q'ty Loacation Discription Thermal Scanner Insulation RestanTorque Wrench

- Infrared thermal temperature scan If accessible, 30 mins thermal scanning max per MVSG
- Check equipment and component Insulation resistance if per MVSG, 30mins max inclusion removal and termination of both ends and testing
- Insulation test Cable Feeder to MVSG Panel Torque of main terminals (cables) 15mins per MVSG
1. Main MVSG 34.5Kv 5 Unit Outdoor - Check Torque equipment connection Cleaning, 30mins max per MVSG
- Fix or replace any found point trouble Reporting any damage if needed, if with replacement then the materials are carried by the end-user
- Recheck the result after fix any trouble point Extraction of oil, 30 mins per Trf'x per unit
- Clean and clear area and housing

4 Unit B.1 - Infrared thermal temperature scan INFRARED SCANNING 114 pcs ₱ 228,000.00 If all units needs reports 400 per unit included for assessment and LV 1 signatory
4 Unit B.2 - Check equipment and component INSULATION RESISTANC 114 sets ₱ 171,000.00
6 Unit B.3 - Insulation test Cable Feeder to Transformer RE-TORQUE 342 points ₱ 68,400.00
2. MVSG Panel 34.5 KV 5 Unit B.4 - Check Torque equipment connection TFF'X OQ/DGA 15 pcs ₱ 150,000.00
- Fix or replace any found point trouble MOB/DEMO 1 lot ₱ 10,000.00 1 day only
- Recheck the result after fix any trouble point MEALS (assume 10mp) 1 lot ₱ 6,000.00 1 time only
- Clean and clear area and housing CONTIGENCY 1 lot ₱ 31,670.00

2000 KVA 3 Unit B.1 - Check Transformer Oil (ORT & DGA) TOTAL ₱ 670,000.00
2000 KVA 2 Unit - ReconditionTransformer Oil (Depends of quality result)
B.2
2500 KVA 1 Unit - Infrared thermal temperature scan 2nd option for thermal scanning works (all) ₱120,000.00 With assessment and LV1 signatory included
2500 KVA 4 Unit - Check equipment and component Units with good IR thermal scanning will not have official reports but only those with anomallies found
B.3
3. Transformer 3000 KVA 1 Unit - Insulation test Cable Feeder to LVSG Panel
2000 KVA 2 Unit - Check Torque equipment connection
B.4
2500 KVA 2 Unit - Fix or replace any found point trouble
- Recheck the result after fix any trouble point
- Clean and clear area and housing

3 Unit B.1 - Infrared thermal temperature scan For thermal scanning works, work done will only be done during pre-shudown? One time only?
3 Unit B.2 - Check equipment and component
5 unit B.3 - Insulation test Cable Feeder to MDP Panel
4. LVSG Panel 400/230 V 4 Unit B.4 - Check Torque equipment connection Confirm if LV panels need retorquing?
- Fix or replace any found point trouble
- Recheck the result after fix any trouble point
- Clean and clear area and housing

10 Unit B.1 - Infrared thermal temperature scan


10 Unit B.2 - Check equipment and component
10 Unit B.3 - Insulation test Cable Feeder to DP Panel
5. Utilty MDP Panel 400/230 V 30 Unit B.4 - Check Torque equipment connection
- Fix or replace any found point trouble
- Recheck the result after fix any trouble point
- Clean and clear area and housing

Note:
1. Just have Photo and data report Before and After
2. Just have testing report with certificate in case testing transformer oil
Electrical Yearly Maintenance Detail LIMA Site
Item Capacity Q'ty Loacation Discription
- Infrared thermal temperature scan Thermal Scanner Insulation Restance Torque Wrench
- Check equipment and component If accessible, 30 mins thermal scanning max per MVSG
6 Units B.1 - Insulation test Cable Feeder to MVSG Panel Insulation resistance if per MVSG, 30mins max inclusion removal and termination of both ends and testing
- Insulation test Cable Feeder to Transformer Torque of main terminals (cables) 15mins per MVSG
1. MVSG Panel 34.5 KV
- Check Torque equipment connection Cleaning, 30mins max per MVSG
- Fix or replace any found point trouble Reporting any damage if needed, if with replacement then the materials are carried by the end-user
4 Units B.2 - Recheck the result after fix any trouble point Extraction of oil, 30 mins per Trf'x per unit
- Clean and clear area and housing

- Check Transformer Oil (ORT & DGA) INFRARED SCANNI 28 pcs ₱ 70,000.00 If all units needs reports 400 per unit included for assessment and LV 1 signatory
- ReconditionTransformer Oil (Depends of quality result) INSULATION RESI 28 sets ₱ 50,400.00
2000 KVA 4 Unites B.1
- Infrared thermal temperature scan RE-TORQUE 84 points ₱ 16,800.00
- Check equipment and component TFF'X OQ/DGA 4 pcs ₱ 40,000.00
2. Transformer - Insulation test Cable Feeder to LVSG Panel MOB/DEMO 1 lot ₱ 10,000.00 1 day only
- Check Torque equipment connection MEALS (assume 10m 1 lot ₱ 6,000.00 1 time only
- Fix or replace any found point trouble CONTIGENCY 1 lot ₱ 9,660.00
- Recheck the result after fix any trouble point
- Clean and clear area and housing TOTAL ₱ 203,000.00

- Infrared thermal temperature scan 2nd option for thermal scanning works (all) ₱40,000.00 With assessment and LV1 signatory included
- Check equipment and component Units with good IR thermal scanning will not have official reports but only those with anomallies found
- Insulation test Cable Feeder to MDP Panel
3. LVSG Panel 400/230 V 4 Unit B.1 - Check Torque equipment connection
- Fix or replace any found point trouble
- Recheck the result after fix any trouble point
- Clean and clear area and housing

- Infrared thermal temperature scan For thermal scanning works, work done will only be done during pre-shudown? One time only?
- Check equipment and component
- Insulation test Cable Feeder to DP Panel
4. Utility MDP Panel 400/230 V 10 Unit B.1 - Check Torque equipment connection Confirm if LV panels need retorquing?
- Fix or replace any found point trouble
- Recheck the result after fix any trouble point
- Clean and clear area and housing

Note:
1. Just have Photo and data report Before and After
2. Just have testing report with certificate in case testing transformer oil