RBC

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 30

RBC _______________

BCISIT-8

INTAKE TANK

TUBLAY , BENGUET

PROVINCE OF BENGUET

RBA _______________

BTE Jr. _____________

WVA _______________

DPF _______________

ABRAHAM B. AKILIT

OIC, ENG'G & OPERATION DIVISION

RECOMMENDING APPROVAL

SHEET 1 OF 1

DWG. No.

BSPP

APPROVED:

REVIEWED:

CHECKED:

SUBMITTED

DESIGNED

DRAWN

CORDILLERA ADMINISTRATIVE REGION

NATIONAL IRRIGATION ADMINISTRATION

DEPARTMENT OF AGRICULTURE

REPUBLIC OF THE PHILIPPINES

APPROVED

RECOM

CHECKED
BY

NATURE OF REVISION

DATE

REV. NO.

BORROMEO P. MELCHOR

REGIONAL IRRIGATION MANAGER

BABATAN CIS

BALIKATAN SAGIP PATUBIG PROGRAM (BSPP)

IRRIGATION COMPONENT

STA. 00+050 - TANK No. 9

mm.

m.

PCIPT-9

T A N K

BAKUN , BENGUET

PROVINCE OF BENGUET

RBA_______________

BTE Jr. _____________

CAN _______________

DPF _______________

ABRAHAM B. AKILIT

OIC,MANAGER ENG'G & OPERATION DIVISION

RECOMMENDING APPROVAL

SHEET 1 OF 5
DWG. No.

CHARM - ADB

APPROVED:

REVIEWED:

SUBMITTED:

DESIGNED

DRAWN

CORDILLERA ADMINISTRATIVE REGION

NATIONAL IRRIGATION ADMINISTRATION

DEPARTMENT OF AGRICULTURE

REPUBLIC OF THE PHILIPPINES

APPROVED

RECOM

CHECKED

BY

NATURE OF REVISION

DATE

REV. NO.

BORROMEO P. MELCHOR

REGIONAL IRRIGATION MANAGER

POBLACION C I P

CORDILLERA HIGHLAND AGRICULTURAL RESOURCE

MANAGEMENT (CHARM) PROGRAM

IRRIGATION COMPONENT

STA. 00+010

HYDRAULIC ELEMENTS
ELEMENTS

UNITS

ABOVE

BELOW

cu.m/s

OD

WT

AVAIL H

ACTUAL H

AVAIL. P

ACTUAL P

NET P

m/s

sq.m.

mm.

m/m

m.

kg/cm

kg/cm

GENERAL NOTES

1. ALL DIMENSIONS ARE IN METER UNLESS OTHERWISE SPECIFIED. 2. ALL CONCRETE STRUCTURES SHALL
BE CLASS 'A' MIXTURE UNLESS OTHERWISE SPECIFIED. 3. ALL EXPOSED EDGES OF CONCRETE SHALL
BE CHAMFERED & ROUNDED. 4. LAPPING OF BARS SHALL BE 40D FOR DEFORMED BARS & 50D FOR
ROUNDED BARS. 5. ALL ELEVATIONS ARE IN METER. 6.CONCRETE COVER FOR STEEL SHALL BE 75 mm.
FOR FOUNDATION & 40 mm. FOR STRUCTURES NOT EXPOSED TO EARTH.
0.00675

4.027

0.00230

63

2.60

0.0068

1.366

0.57

1366

570

796

2.45

0.15

5.50

0.15

0.15

5.50

0.15

0.15

5.50

0.15

0.10

0.20

0.80

0.35

2.00

0.10

2" f OVER FLOW PIPE

-136.8511767889746
-136.8511767889746

TO LATERAL TANKS

-136.8511767889746

-136.8511767889746

16 mm.f VERT. BARS SPACED @ .30 m. ON CENTER

10 mm.f HOR. BARS SPACED @ .25 m. ON CENTER

2" f OVERFLOW PIPE

EL. 16320

-136.8511767889746

-136.8511767889746

-136.8511767889746

-136.8511767889746

-136.8511767889746

-136.8511767889746

-136.8511767889746

-136.8511767889746

-136.8511767889746

-136.8511767889746

-136.8511767889746

\A1;1-\S1/2;" f INFLOW HDPE PIPE

SECTION THRU 'A-A'

PLAN

GRAVEL BLANKET

2" f DRAINAGE PIPE

\A1;1-\S1/2;" f OUTFLOW HDPE PIPE W/ STRAINER & GATE VALVE

10 mm.f HOR. BARS SPACED @ .25 m. ON CENTER and 16 mm.f VERT. BARS SPACED @ .30 m. ON
CENTER
16 mm. f BOTTOM BARS SPACED @ 0.30m. ON CENTER BOTHWAYS

10mm. f HOR. BARS SPACED @ 0.25m. ON CENTER

16mm. f VERT. BARS SPACED @ 0.30 m. ON CENTER

\A1;1-\S1/2;" f HDPE PIPE OUTFLOW W/ STRAINER

\A1;1-\S1/2;" f INFLOW HDPE PIPE

2" f DRAINAGE PIPE W/ GATE VALVE

-136.8511767889746

0.15

2.225

1.00

0.175

1.83

0.175

0.175

1.83

0.175

.175

1.83

.175

0.175

0.10

2.40

-15.0

DRAINAGE PIPE W/ GATE VALVE

16mm. f VERT. BARS SPACED @ 0.30 m. ON CENTER

10mm. f HOR. BARS SPACED @ 0.2O m. ON CENTER

16 mm. f BOTTOM BARS SPACED @ 0.30m. ON CENTER BOTHWAYS

10 mm.f HOR. BARS SPACED @ 0.20 m. ON CENTER and 16 mm.f VERT. BARS SPACED @ 0.30 m. ON
CENTER
OUTFLOW PIPE W/ STRAINER & GATE VALVE

DRAINAGE PIPE W/ GATE VALVE

GRAVEL BLANKET

P L A N

SECTION THRU 'A-A'

HDPE INFLOW PIPE

-15.0

OVERFLOW PIPE

-15.0

-15.0

-15.0

-15.0

-15.0

-15.0

-15.0

-15.0

-15.0

-15.0

OVERFLOW PIPE

-15.0

10 mm.f HOR. BARS SPACED @ 0.20 m. ON CENTER

16 mm.f VERT. BARS SPACED @ 0.30 m. ON CENTER

TO LATERAL PIPES

-15.0

-15.0

EL. 1593.00

MAX. W.S = EL. 1522.10


\A1;\S5/8;\H1.429x;" \fSymbol|b0|i0|c2|p18;\H0.8696x;f\fArial|b0|i0|c0|p34; CABLE CLIP

\A1;\S5/8;\H1.429x;"\fArial|b0|i0|c0|p34;\H0.8696x; \fSymbol|b0|i0|c2|p18;f\fArial|b0|i0|c0|p34;
CABLE WIRE

CABLE GUIDE

GRAVEL BLANKET

-15.0

45

GRAVEL BLANKET

-15.0

3-16mm f RE BARS SPACED EQUALLY O.C.

6-16mm f REBARS SPACED EQUALLY O.C.

6-16mm f REBARS SPACED EQUALLY O.C.

3-16mm f RE BARS SPACED EQUALLY O.C.

-15.0

DETAIL OF ANCHOR BLOCK

DETAIL OF TOWER FOOTING

SEE DETAIL 'A'

SEE DETAIL 'C'

SEE DETAIL 'B'

# 8 TIE WIRE CABLE HANGER SPACED @ 1.0m. O.C.

\A1;1-\S1/2;\fArial|b0|i0|c0|p34;\H1.242x;" \fSymbol|b0|i0|c2|p18;f \fArial|b0|i0|c0|p34;HDPE PIPE

# 8 TIE WIRE CABLE HANGER SPACED @ 1.0 m. O.C.

\A1;1-\H0.7x;\S1/2;\H1.429x;" f HDPE PIPE

\A1;\S5/8;\H1.429x;"\fArial|b0|i0|c0|p34;\H0.8696x; \fSymbol|b0|i0|c2|p18;f\fArial|b0|i0|c0|p34;
CABLE WIRE

\A1;\S5/8;\H1.429x;"\fArial|b0|i0|c0|p34;\H0.8696x; \fSymbol|b0|i0|c2|p18;f\fArial|b0|i0|c0|p34;
CABLE WIRE

STA. 00+150
TOWER

ANCHOR BLOCK

ANCHOR BLOCK

TOWER

ANCHOR BLOCK

TOWER

TOWER

ANCHOR BLOCK

DETAIL 'C'

DETAIL ' B'

DETAIL 'A'

SECTION

P L A N

SECTION

P L A N

SECTION THRU 'A-A'

P L A N

EL. 1521.20

ANCHOR BLOCK

16mm. f REBAR

RC TOWER

EL.1522

EL. 1522.70

EL. 1521.75

EL. 1520.75

EL. 1521

\A1;1-\S1/2;\fArial|b0|i0|c0|p34;\H1.242x;" HDPE PIPE

\A1;\S5/8;\H1.429x;"\fSymbol|b0|i0|c2|p18;\H0.8696x;f\fArial|b0|i0|c0|p34; CABLE CLIP

# 8 TIE WIRE
\A1;\S5/8;\H1.429x;"\fArial|b0|i0|c0|p34;\H0.8696x; \fSymbol|b0|i0|c2|p18;f\fArial|b0|i0|c0|p34;
CABLE WIRE

16mm f REBARS

4-16mm f BOTTOM BARS SPACED EQUALLY O.C. BOTH WAYS

4-16mm f VERT. BARS SPACED EQUALLY O.C. w/ 10mm. f LAT. TIES SPACED 5 @ 0.10, REST @ 0.20 m. O.
C.

4-16mm f VERT. BARS SPACED EQUALLY O.C.w/ 10mm f LAT. TIES SPACED @ 0.20 O.C.

4-16mm f BOTTOM BARS SPACED EQUALLY O.C. BOTH WAYS

-15.0

-15.0

-15.0

-15.0

-15.0

-15.0

-15.0

-15.0

-15.0

-15.0

45

STA. 00+006

EL.1524

EL. 1524.70

EL. 1523

EL. 1522.75

EL. 1523.75

\A1;\S5/8;\H1.429x;"\fSymbol|b0|i0|c2|p18;\H0.8696x;f\fArial|b0|i0|c0|p34; CABLE WIRE

0.80

0.80

0.20
0.20

1.50

0.20

1.0

0.80

0.80

0.80

0.20

0.10

0.10

1350

193.20

650

6.80

2000

200

0.65

.0068

2.0

0.20

0.0068

0.0068

42.60

42.60

0.00143

0.00143

0.84

2.60

0.00065
0.00065

kg/cm

kg/cm

m.

m/m

m.

sq.m.

m/s

NET P

P due to Head Loss

P due to H Avail

HEAD LOSS

AVAIL H

cu.m/s

BELOW

UNITS

ELEMENTS

ABOVE

kg/m

GENERAL NOTES

1. ALL DIMENSIONS ARE IN METER UNLESS OTHERWISE SPECIFIED. 2. ALL CONCRETE STRUCTURES SHALL
BE CLASS 'A' MIXTURE UNLESS OTHERWISE SPECIFIED. 3. ALL EXPOSED EDGES OF CONCRETE SHALL
BE CHAMFERED & ROUNDED. 4. LAPPING OF BARS SHALL BE 40D FOR DEFORMED BARS & 50D FOR
ROUNDED BARS. 5. ALL ELEVATIONS ARE IN METER. 6. CONCRETE COVER FOR STEEL SHALL BE 75
mm.FOR FOUNDATION & 40 mm. FOR STRUCTURES NOT EXPOSED TO EARTH.

HYDRAULIC ELEMENTS

0.10

0.10

0.25

0.40

0.40

0.40

0.50

0.20

1.75

0.25

0.25

0.80

0.80

1.00

4-16mm f VERT. BARS

10mm. f LAT. TIES SPACED 5 @ 0.10, REST @ 0.20 m. O. C.

STEEL BASE PLATE

-15.0

3-\S3/8;" f CABLE CLIP

\S3/8;" f CABLE WIRE

NGL

10mm. f LAT. TIES SPACED 5 @ 0.10, REST @ 0.20 m. O. C.

SEE DETAIL 'B'

25mm f RSB ANCHOR BAR

\A1;\S3/8;\H2.041x;"\fSymbol|b0|i0|c2|p18;\H0.8699x;f\fArial|b0|i0|c0|p34; CABLE WIRE


EL. 1207.62

EL. 1207.42

EL. 1209.42

EL.1208.62

STA.00+720

45

-15.0

-15.0

-15.0

-15.0

-15.0

-15.0

-15.0

-15.0

-15.0

-15.0

4-16mm f BOTTOM BARS SPACED EQUALLY O.C. BOTH WAYS

4-16mm f VERT. BARS

4-16mm f BOTTOM BARS SPACED EQUALLY O.C. BOTH WAYS

25mm f RSB ANCHOR BAR

\A1;\S3/8;\H2.041x;"\fArial|b0|i0|c0|p34;\H0.8702x; \fSymbol|b0|i0|c2|p18;f\fArial|b0|i0|c0|p34;
CABLE WIRE

# 8 TIE WIRE

\A1;\S3/8;\H2.041x;"\fSymbol|b0|i0|c2|p18;\H0.8699x;f\fArial|b0|i0|c0|p34; CABLE CLIP

4\H0.8694x;" HDPE PIPE SDR 11

EL. 1207.00

EL. 1207.20

EL. 1209.00

EL.1208.01
RC TOWER

25mm. f REBAR

ANCHOR BLOCK

EL. 1203.00

P L A N

SECTION THRU 'A-A'

P L A N

SECTION

P L A N

SECTION

DETAIL 'A'

DETAIL ' B'

DETAIL 'C'

ANCHOR BLOCK

TOWER

TOWER

ANCHOR BLOCK

TOWER

ANCHOR BLOCK

ANCHOR BLOCK

TOWER

STA. 00+738

\S3/8;\H2.041x;"\fSymbol|b0|i0|c2|p18;\H0.8699x;f\fArial|b0|i0|c0|p34; CABLE WIRE

\S3/8;\H2.041x;"\fArial|b0|i0|c0|p34;\H0.8699x; \fSymbol|b0|i0|c2|p18;f\fArial|b0|i0|c0|p34;
CABLE WIRE

4" f HDPE PIPE SDR 11

# 8 TIE WIRE CABLE HANGER SPACED @ 1.0 m. O.C.

4\H0.8694x;" \fSymbol|b0|i0|c2|p18;f \fArial|b0|i0|c0|p34;HDPE PIPE SDR 11

# 8 TIE WIRE CABLE HANGER SPACED @ 1.0m. O.C.


SEE DETAIL 'B'

SEE DETAIL 'C'

SEE DETAIL 'A'

DETAIL OF COLUMN & FOOTING

DETAIL OF ANCHOR BLOCK

-15.0

-15.0

GRAVEL BLANKET

45

-15.0

GRAVEL BLANKET

25mm f RSB

MAX. W.S = EL.1205.20

1.00

1.0

1.0

0.20

0.20

2.00

0.20

0.50

0.50

0.50

0.50

0.20

0.10

0.10
1.00

1.00

1.0

1.0

0.20

0.20

2.00

0.20

0.50

0.50

0.50

0.50

0.20

0.10

0.10

1.00
PROPOSED SUSPENDED PIPELINE

MASACOCO, KAPANGAN, BENGUET

PROVINCE OF BENGUET

\LBENITO T. ESPIQUE Jr.

RECOMMENDING APPROVAL

SHEET 1 OF \L1

DWG. No.: MCIP - PSP

APPROVED:

CHECKED:

CORDILLERA ADMINISTRATIVE REGION WANGAL, LA TRINIDAD, BENGUET

NATIONAL IRRIGATION ADMINISTRATION

REPUBLIC OF THE PHILIPPINES

APPROVED

RECOM.

CHECKED

BY

NATURE OF REVISION

DATE

REV. NO.

\LJOHN L. SOCALO

REGIONAL MANAGER A DATE

MASACOCO CIP

4-16mm f VERT. BARS


10mm. f LAT. TIES SPACED @ 0.10 m. O. C.

1.00

NGL

10mm. f LAT. TIES SPACED @ 0.10 m. O. C.

SEE DETAIL 'B'

16 mm f RSB ANCHOR BAR

STA. = 01 + 200

1.0

1.0

0.20

0.20

2.00

0.20

0.50

0.50

0.50

0.50

16mm f BOTTOM BARS SPACED @ 0.20 m. O.C. BOTH WAYS

4-16mm f VERT. BARS

16mm f BOTTOM BARS SPACED @ 0.20 m O.C. BOTH WAYS

16mm f RSB ANCHOR BAR

\A1;# 6 TIE WIRE

# 14 TIE WIRE

1" f HDPE, SDR 13.5

P L A N

SECTION THRU 'A-A'

P L A N

SECTION
P L A N

SECTION

DETAIL 'A'

ANCHOR BLOCK

TOWER

TOWER

ANCHOR BLOCK

TOWER

ANCHOR BLOCK

ANCHOR BLOCK

TOWER

STA. = 01 + 500

\A1;# 6 TIE WIRE

# 14 TIE WIRE HANGER SPACED @ 1.0 m. O.C.

# 14 TIE WIRE HANGER SPACED @ 1.0m. O.C.

SEE DETAIL 'B'

SEE DETAIL 'C'

SEE DETAIL 'A'

DETAIL OF COLUMN & FOOTING

DETAIL OF ANCHOR BLOCK

0.20

0.10

GRAVEL BLANKET

0.10

GRAVEL BLANKET

1" F HDPE Pipe SDR 13.5

1.00
NOT DRAWN TO SCALE

MANAGER, ENGINEERING & OPERATIONS DIVISION DATE

1. ALL DIMENSIONS ARE IN METER UNLESS OTHERWISE SPECIFIED. 2. ALL CONCRETE STRUCTURES SHALL
BE CLASS 'A' MIXTURE UNLESS OTHERWISE SPECIFIED. 3. ALL EXPOSED EDGES OF CONCRETE SHALL
BE CHAMFERED & ROUNDED. 4. LAPPING OF BARS SHALL BE 40D FOR DEFORMED BARS & 50D FOR
ROUNDED BARS. 5. ALL ELEVATIONS ARE IN METER. 6.CONCRETE COVER FOR STEEL SHALL BE 75 mm.
FOR FOUNDATION & 40 mm. FOR STRUCTURES NOT EXPOSED TO EARTH.

GENERAL NOTES

ELEVATION VARIES

16mm f BOTTOM BARS SPACED @ 0.10 m O.C. BOTH WAYS

SIP FUND - CY 2014

DCA _____________

LCC _______________

PREPARED :

1" F HDPE Pipe SDR 13.5

ELEV. = VARIES

STA 01+200 - STA 01+500

REVIEWED:

BGG _______________

\A1;# 6 TIE WIRE

DEPARTMENT OF AGRICULTURE

ELEV. = VARIES

PROPOSED SUSPENDED PIPELINE

MASACOCO, KAPANGAN, BENGUET

PROVINCE OF BENGUET

\LBENITO T. ESPIQUE Jr.

RECOMMENDING APPROVAL

SHEET 1 OF \L1

DWG. No.: MCIP - PSP

APPROVED:
CHECKED:

CORDILLERA ADMINISTRATIVE REGION WANGAL, LA TRINIDAD, BENGUET

NATIONAL IRRIGATION ADMINISTRATION

REPUBLIC OF THE PHILIPPINES

APPROVED

RECOM.

CHECKED

BY

NATURE OF REVISION

DATE

REV. NO.

\LJOHN L. SOCALO

REGIONAL MANAGER A DATE

MASACOCO CIP

4-16mm f VERT. BARS

10mm. f LAT. TIES SPACED @ 0.10 m. O. C.

1.00

NGL

10mm. f LAT. TIES SPACED @ 0.10 m. O. C.

SEE DETAIL 'B'

16 mm f RSB ANCHOR BAR

STA. = 03 + 500

1.0

1.0

0.20

0.20
2.00

0.20

0.50

0.50

0.50

0.50

16mm f BOTTOM BARS SPACED @ 0.20 m. O.C. BOTH WAYS

4-16mm f VERT. BARS

16mm f BOTTOM BARS SPACED @ 0.20 m O.C. BOTH WAYS

16mm f RSB ANCHOR BAR

\A1;# 6 TIE WIRE

# 14 TIE WIRE

1" f HDPE, SDR 13.5

P L A N

SECTION THRU 'A-A'

P L A N

SECTION

P L A N

SECTION

DETAIL 'A'

ANCHOR BLOCK

TOWER

TOWER

ANCHOR BLOCK

TOWER

ANCHOR BLOCK

ANCHOR BLOCK

TOWER

STA. = 04 + 000
\A1;# 6 TIE WIRE

# 14 TIE WIRE HANGER SPACED @ 1.0 m. O.C.

# 14 TIE WIRE HANGER SPACED @ 1.0m. O.C.

SEE DETAIL 'B'

SEE DETAIL 'C'

SEE DETAIL 'A'

DETAIL OF COLUMN & FOOTING

DETAIL OF ANCHOR BLOCK

0.20

0.10

GRAVEL BLANKET

0.10

GRAVEL BLANKET

1" F HDPE Pipe SDR 13.5

1.00

NOT DRAWN TO SCALE

MANAGER, ENGINEERING & OPERATIONS DIVISION DATE

1. ALL DIMENSIONS ARE IN METER UNLESS OTHERWISE SPECIFIED. 2. ALL CONCRETE STRUCTURES SHALL
BE CLASS 'A' MIXTURE UNLESS OTHERWISE SPECIFIED. 3. ALL EXPOSED EDGES OF CONCRETE SHALL
BE CHAMFERED & ROUNDED. 4. LAPPING OF BARS SHALL BE 40D FOR DEFORMED BARS & 50D FOR
ROUNDED BARS. 5. ALL ELEVATIONS ARE IN METER. 6.CONCRETE COVER FOR STEEL SHALL BE 75 mm.
FOR FOUNDATION & 40 mm. FOR STRUCTURES NOT EXPOSED TO EARTH.

GENERAL NOTES

ELEVATION VARIES

16mm f BOTTOM BARS SPACED @ 0.10 m O.C. BOTH WAYS

SIP FUND - CY 2014

DCA _____________

LCC _______________
PREPARED :

1" F HDPE Pipe SDR 13.5

ELEV. = VARIES

STA 03+500 - STA 04+000

REVIEWED:

BGG _______________

\A1;# 6 TIE WIRE

DEPARTMENT OF AGRICULTURE

ELEV. = VARIES

0.30

0.30

2.20

0.30

0.80

0.80

0.80

0.80

0.30

0.10

0.10

1.00

1.00

1.0

1.0

45 m
4-16mm f VERT. BARS

10mm. f LAT. TIES SPACED @ 0.10 m. O. C.

1.00

NGL

10mm. f LAT. TIES SPACED @ 0.10 m. O. C.

SEE DETAIL 'B'

2-16 mm f RSB ANCHOR BAR

STA. 00 + 230

1.0

1.0

0.30

0.30

2.20

0.30

0.80

0.80
0.80

0.80

5-16mm f BOTTOM BARS SPACED @ 0.20 m. O.C. BOTH WAYS

4-16mm f VERT. BARS

5-16mm f BOTTOM BARS SPACED @ 0.20 m O.C. BOTH WAYS

2-16mm f RSB ANCHOR BAR

# 10 TIE WIRE

RC TOWER

2-16mm. f REBAR

ANCHOR BLOCK

P L A N

SECTION THRU 'A-A'

P L A N

SECTION

P L A N

SECTION

DETAIL 'A'

DETAIL ' B'

DETAIL 'C'

ANCHOR BLOCK

TOWER

TOWER

ANCHOR BLOCK

TOWER

ANCHOR BLOCK

ANCHOR BLOCK

TOWER

STA. 00 + 275

\A1;\S3/8;" F CABLE WIRE


# 10 TIE WIRE HANGER SPACED @ 1.0 m. O.C.

# 10 TIE WIRE HANGER SPACED @ 1.0m. O.C.

SEE DETAIL 'B'

SEE DETAIL 'C'

SEE DETAIL 'A'

DETAIL OF COLUMN & FOOTING

DETAIL OF ANCHOR BLOCK

0.30

0.10

GRAVEL BLANKET

0.10

GRAVEL BLANKET

16mm f RSB

\A1;2" F HDPE Pipe SDR 17

1.00

NOT DRAWN TO SCALE

1. ALL DIMENSIONS ARE IN METER UNLESS OTHERWISE SPECIFIED. 2. ALL CONCRETE STRUCTURES SHALL
BE CLASS 'A' MIXTURE UNLESS OTHERWISE SPECIFIED. 3. ALL EXPOSED EDGES OF CONCRETE SHALL
BE CHAMFERED & ROUNDED. 4. LAPPING OF BARS SHALL BE 40D FOR DEFORMED BARS & 50D FOR
ROUNDED BARS. 5. ALL ELEVATIONS ARE IN METER. 6.CONCRETE COVER FOR STEEL SHALL BE 75 mm.
FOR FOUNDATION & 40 mm. FOR STRUCTURES NOT EXPOSED TO EARTH.

GENERAL NOTES

2 " f GI PIPE

ELEVATION VARIES

5-16mm f BOTTOM BARS SPACED @ 0.10 m O.C. BOTH WAYS

ELEV. VARIES

ELEV. VARIES

45 m
\A1;\S3/8;" F CABLE WIRE

\A1;2" F HDPE Pipe SDR 17

\A1;\S3/8;" F CABLE WIRE

\A1;\S3/8;" F CABLE WIRE

\A1;\S3/8;" F CABLE CLIP

\A1;\S3/8;" F CABLE WIRE

\A1;2" F HDPE Pipe SDR 17

You might also like