Cheshmeh-khosh, Dalpari and East Paydar Oil Fields Contract No. IFO-CMK-053 CMK
Dayli Plan
1 4412 Electromotor Electrical CPF Demulsifier Package PM of CPF, Demulsifier Package, Electromotor, 20-M-2103A 20-M-2103A 63, Sch.1, Att.A PM M. kiani M.Beigzadeh
2 4413 Electromotor Electrical CPF Demulsifier Package PM of CPF, Demulsifier Package, Electromotor, 20-M-2103B 20-M-2103B 63, Sch.1, Att.A PM M. kiani M.Beigzadeh
3 4441 Electromotor Electrical Desalting Unit Desalting Area PM of DU, Desalting Area, Electromotor, M-1001S M-1001S 63, Sch.1, Att.A PM M. kiani M.Beigzadeh
4 4445 Electromotor Electrical Desalting Unit Desalting Area PM of DU, Desalting Area, Electromotor, M-5001B M-5001B 46, Sch.1, Att.A PM M. kiani M.Beigzadeh
5 4080 Electromotor Electrical CPF CPF Preventive maintenance of CPF, 20-MM-2101A 20-MM-2101A 63, Sch.1, Att.A PM S. Kayedkhordeh M.Beigzadeh
6 4081 Electromotor Electrical CPF CPF Preventive maintenance of CPF, 20-MM-2103A 20-MM-2103A 63, Sch.1, Att.A PM S. Kayedkhordeh M.Beigzadeh
7 4082 Electromotor Electrical CPF CPF Preventive maintenance of CPF, 20-FW-M-101A 20-FW-M-101A 63, Sch.1, Att.A PM S. Kayedkhordeh M.Beigzadeh
8 4083 Electromotor Electrical CPF CPF Preventive maintenance of CPF, 20-FW-M-102A 20-FW-M-102A 63, Sch.1, Att.A PM S. Kayedkhordeh M.Beigzadeh
9 4356 Pump Mechanical CPF Chemical Package Preventive maintenance of Reciprocating Pump - 20-P-2103A 20-P-2103A 11, Sch. 1, Att.A PM F.Saripour A.Gharibzade
10 4357 Pump Mechanical CPF Chemical Package Preventive maintenance of Reciprocating Pump - 20-P-2103B 20-P-2103B 11, Sch. 1, Att.A PM F.Saripour A.Gharibzade
11 4360 Pump Mechanical CPF Fire Water Station PM of Jockey Pump C - P-CH.OP.PU-903A Jockey/diesel /electro pump CH.OP.PU-903A 9,Sch. 1, Att.A PM F.Saripour A.Gharibzade
12 4323 Pump Instrument East Paydar Lube Oil Pump 1A01 EP PM of TSHH 1A01 MPP 1A01 29, Sch.1, Att.A PM S. Alimoradi D.Shevliakov
13 4324 Pump Instrument East Paydar Lube Oil Pump 1A01 EP PM of TSHH 1A02-510 MPP 1A01 29, Sch.1, Att.A PM S. Alimoradi D.Shevliakov
14 4325 Pump Instrument East Paydar Lube Oil Pump 1A01 EP PM of TI 1A02 MPP 1A01 30, Sch.1, Att.A PM S. Alimoradi D.Shevliakov
15 4326 Pump Instrument East Paydar Lube Oil Pump 1A01 EP PM of PT 1A02 MPP 1A01 28, Sch.1, Att.A PM E. Matoghi D.Shevliakov
16 4327 Pump Instrument East Paydar Lube Oil Pump 1A01 EP PM of PSLL 1A02 MPP 1A01 27, Sch.1, Att.A PM E. Matoghi D.Shevliakov
17 82 Enviroment Civil DU DU Building the curbs and slabs - Deal UR A. Abdi A. Viner
18 95 Enviroment Civil DU Out side area of DU Leveling the asphalt surface outside the DU - Deal UR A. Abdi A. Viner
19 833 Enviroment Civil CPF CPF Cleaning and housekeeping at inlet manifold - 833 TCP H. Zarei A. Viner
Preparation of schedules for maintenance and calibration of
20 836 Tanks Instrument CPF CPF - 836 TCP M. Maleki D. shevliakov
instrumentation and automation equipment (data gathering)
21 2177 Turbine #4 Mech CPF CPF Repairing and start up of turbine #4 - 2177 TCP F. Saremipour A. Raei Tabar
22 2182 pipeline Mech CMK CK #13 painting the pipeline - 2182 TCP M. Ebrahimi Chahroostaei
23 120 Separator Mech CPF New Separator New Separator test activity - 120 UR F. Saremipour A. Mitin
24 3602 flow transmitter Instrument CPF test separator Installation Flow Transmitter on Test Separator - 3602 TCP S. Alimoradi D. shevliakov
25 133 fences Civil CMK CK#2 painting the fences and handrail - 133 UR E. Absalan A. Viner