Blastingt

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

PREVENTIVE MAINTENANCE Doc no : MNT-F06

CHECK LIST FOR A/T Rev : 00

Machine Model : Blasting Machine Frequency : 4-Monthly / Yearly


Machine No : Date Plan :

STATUS ACTION BY
NO Description ACTION DURING SERVICING TIME REMARKS
C KIV NA (name)

Cleaning of electrical control cabinet


Check and clean ventilating fan
Check and test all the safety devices including emergency switch
1 Electrical Check power supply cables conditions and connections
Check tap box and isolator conditions and connections
Check cables connections for loose contact
Replace ventilation fans
Check and apply grease for wheel and bearing,
4-Monthly

Blasting Check oil level at motor gear, replace if needed.


2
bunker Check and clean the rail gear, apply grease if needed.
Check hinger door system

Check for any lekage and damage in all componen (hose, conector, valve)

3 High Pressure Check all the filter for wear and tear, replace if necessary.
Check pressure pump
Change seal kit, replace if necessary
Cleaning of machine body
4 Machine body
cleaness Clearing of chips at machine surrounding

5 Air Purifier Check the filter condition (max. hours is 6000) , replace if needed

Status : Completed = C or Keep in view = KIV or Not Applicable = NA


Memo :

VERIFY BY SUPERVISOR (Name / Sign) : Date :

VERIFY BY MAINTENANCE (Name / Sign) : Date :

You might also like