GOVERNMENT OF KARNATAKA

STATE HIGHWAYS DEVELOPMENT PROJECT


Name of Work :Package 295 :

(D) Improvements to Begur NH - 04 to join NH- 207 road MDR from Km


0.00 to Km 14.60 (in selected reaches) in Nelamangala Taluk of Bangalore
Rural District
R A Bill 8th and Part Final

Project Management Consultancy:


Ninetech Infra Solution Pvt Ltd.
:#14, 3rd Floor, Hithaa complex, 80 feet Ring Road (Kengeri),Nagadevanhalli,
BENGALURU – 560056,
Karnataka
Estimate Amount Rs. 3820.450 Lakhs
RA Bill No 8th & Part Final Original/Duplicate/Triplicate CER NO 54,55,56 &57 /2018-19

CONTRACT CERTIFICATE
No (For other works) Dated
Division: Bangalore Rural Sub-Division: Doddaballapura
Bill received No Dated Cash Book Vr.No Dated
Scheduled Docket No Head of Account : - 5054-03-337-0-18-SHDP Plan

Name of Work:-PACKAGE 295(A) Improvements to Nelamangala - Chikkaballapura road SH-74 from Km 8.60 to Km 13.00 & Km 31.40 to Km
32.40 & loop Road Km 0.00 to Km 2.90 (in selected reaches) in Doddaballapura taluk of Bangalore Rural District (B) Improvements to KS road to
Balenahalli road MDR from Km 0.00 to Km 7.51 and Hadonahalli to Melekote MDR road from Km 0.00 to Km 0.50 (in selected reaches) in
Doddaballapura taluk of Bangaluru Rural Dist (C) Improvements to Channapattna - Nelamangala road New SH from km 75.90 to Km 77.90 (in
selected reaches) in Nelamangala Taluk of Bangalore Rural District (D) Improvements to Begur NH - 04 to join NH- 207 road MDR from Km
0.00 to Km 14.60 (in selected reaches) in Nelamangala Taluk of Bangalore Rural District

Name of Contractor and full M.Venkataramareddy, Reg. No. 2469/2010-15,


address: P.W.D. Class-I Contractor, No.36, Mestrappa Building,
80 Feet road, Hennur main road, Bangalore-84
Reference to Agreement No: 170/2019-20 Date 3/2/2020
Certified
that the measurements were taken by me on Date / / / 2021 and recorded in E.M.B. No -03 From Page No - To
Page No - and that the work is satisfactorily executed

Contractor Officer -in-charge of the work


Certified that the measurements were checked by me on and found correct.The work is satisfactorily executed

Certified that the quantities of materials shown in column of Account I have actually brought to the site of the work and the
contractor has not previously receivedany advance on this security. These materials are of an imperishable nature and are all required by
the contractor for immediate use on the work in connection with the itms for which rates for finished work have been agreed upon.A
formal agreement signed and executed by the contractor is recorded in Division office.

If Memorandum of Payment Sub-Divisional Officer


1 Total value of work done or supplies made asper Account within
2 Deduct amount to be held in reserve being percent Rs.
3 Balance
4 Deduct payments:-
a)Amount of previous payments as in Divisional/Sub-Divisional Cash Book
Vr.No Datedadjusted towards
b)Payment Amount S.D.No
cash advance recovery of cost of
Payments cost Store or other materials supplied
Recovery of amount creditable to this other work
Now made{ Amount paid on this bill by cheque/cash
Total
5 Balance being unpaid value of work done held in reserve
6 Deduct cash advance made on Divisional/Sub-Divisional cash Book
Vr.No Dated Less adjustments
7 Net amount due to or from Contractor
UN ADJUSTED ITEMS
8 Advance to contractor for materials brought to site(as detailed within)
Value of Government materials supplied

Contractors signature

Received (jn words)


……………………………………………………..
…………………..by cash and by adjustment of
payments as per memorandum
Witness:
1
2
Date Signature of contractor
Paid by me cheque No dated
Cash Rs
Date Initials of officer making payment
RA 7th and Part Bill
Royalty Statement
Package 295 : a) Improvements to Nelamangala - Chikkaballapura road SH-74 from Km 8.60 t o Km 13.00 & Km 31.40 to Km 32.40
& loop Road Km 0.00 to Km 2.90 (in selected reaches) in Doddaballapura taluk of Bangalore Rural District Via Uddichikkanahalli
cross, Kanasavadi, Doddaballapura Town, Heggadihalli, b) Improvements to KS road to Balenahalli road MDR from Km 0.00 to Km
7.51 and Hadonahalli to Melekote MDR road from Km 0.00 to Km 0.50 (in selected reaches) in Doddaballapura taluk of Bangaluru
Rural Dist Via Gaddambachahalli Cross , Tubagere Cross, Hadonahalli, c) Improvements to Channapattna - Nelamangala road
Name of Work: New SH from km 75.90 to Km 77.90 (in selected reaches) in Nelamangala Taluk of Bangalore Rural District Via Bramanipura -
Kavanapura - SRS Betta - Avverahalli - Kailancha - Nagohalli - Hunasanahalli - Uragahalli - Bidahi - Ganakallu ,d)
Improvements to Begur NH - 04 to join NH- 207 road MDR from Km 0.00 to Km 14.60 (in selected reaches) in Nelamangala
Taluk of Bangalore Rural District via Thayamagondlu, Niduvandha, Tumkur border.

Metal Sand Stones Gravel


Item No. Item of Work
Qty. Constant Total Qty. Constant Total Qty. Constant Total Qty. Constant Total
295 D
162 Embankment 10369.10 1.25 12961.38 - - - - - - 30721.50 1.00 30721.50
164 GSB 6825.80 1.330 9078.31 - - - - - - -
165 WMM 7680.37 1.330 10214.90 - - - - - - - -
170 BM 415.50 1.440 598.32 - - - - - - - - -
171 SDBC 221.50 1.416 313.64 0.00 30721.50
173 DBM 1396.35 1.44 2010.75
Sub 35177.30
Total 35177.30 0.00 30721.50

Material Quantity Rate Amount


Gravel 30721.50 30 921,645.00
Metal 35177.30 108.00 3,799,148.59
Sand 0.00 103.00 -
4,720,793.59
AE PWD Asst. Executive Engineer
Nelamangala Sub-Division P,W,P & I,W,T,D Sub-Division
Nelamangala
Page 4 of 74

R.A Bill No.8th and Part Final

PACKAGE 295(A) Improvements to Nelamangala - Chikkaballapura road SH-74


from Km 8.60 to Km 13.00 & Km 31.40 to Km 32.40 & loop Road Km 0.00 to Km
2.90 (in selected reaches) in Doddaballapura taluk of Bangalore Rural District (B)
Improvements to KS road to Balenahalli road MDR from Km 0.00 to Km 7.51 and
Hadonahalli to Melekote MDR road from Km 0.00 to Km 0.50 (in selected reaches) in
Name of Work:-
Doddaballapura taluk of Bangaluru Rural Dist (C) Improvements to Channapattna -
Nelamangala road New SH from km 75.90 to Km 77.90 (in selected reaches) in
Nelamangala Taluk of Bangalore Rural District (D) Improvements to Begur NH - 04
to join NH- 207 road MDR from Km 0.00 to Km 14.60 (in selected reaches) in
Nelamangala Taluk of Bangalore Rural District

Estimate cost Rs.3820.45 lakhs


Head of Account:- 5054-03-337-0-18
Tender Amount &
Rs.34,18,12,784.94 and 170/2019-20, Dated:02-03-2020
Agreement No :-
Sri.M.Venkataramareddy, RG No 2469/2010-15, P.W.D. Class-I Contractor, No.36,
Agency :-
Mestrappa Building, 80 Feet road, Hennur main road, Bangalore-84
BILL ABSTRACT
PACKAGE 295(D) Improvements to Begur NH - 04 to join NH- 207 road MDR from Km 0.00 to Km 14.60 (in
selected reaches) in Nelamangala Taluk of Bangalore Rural District
Sl No Item No Description Unit Qty Rate Amount Remarks
1 160 Clearing and grubbing roa Ha 1.503 19081.78 28,679.92 6th Bill & 7th Bill
2 161 Earthwork excavation Cum 13824.675 42.23 583,816.03 6th Bill & 7th Bill
3 162 Embankment Cum 10369.100 97.85 1,014,616.43 6th Bill & 7th Bill
4 163 Compaction Sqm 30721.500 6.18 189,858.87 6th Bill & 7th Bill
5 164 GSB Cum 6825.800 1802.50 12,303,504.50 6th Bill & 7th Bill
6 165 WMM Cum 7680.375 1944.64 14,935,564.44 6th Bill & 7th Bill
7 166 Slurry Seal Sqm 1111.850 28.84 32,065.75 6th Bill & 7th Bill
8 167 Filling Potholes Sqm 670.790 180.25 120,909.90 6th Bill & 7th Bill
9 168 Prime Coat Sqm 12861.500 28.84 370,925.66 6th Bill & 7th Bill
10 169 Tack Coat Sqm 32472.070 10.30 334,462.32 6th Bill & 7th Bill
11 170 BM Cum 415.500 7150.00 2,970,825.00 6th Bill & 7th Bill
12 173 DBM Cum 1396.354 7200.00 10,053,750.24 6th Bill & 7th Bill
13 171 SDBC Cum 221.500 9400.00 2,082,100.00 6th Bill & 7th Bill
15 198 Excavation Cum 42.655 51.50 2,196.76 8 th & Part Final
16 200 PCC Cum 3.656 5268.45 19,262.77 8 th & Part Final
17 199 M20 Cum 15.781 5328.19 84,085.50 8 th & Part Final
18 203 M25 Cum 9.138 6610.54 60,403.81 8 th & Part Final
19 202 TMT-SUB-STR Tonne 1.420 70279.99 99,819.55 8 th & Part Final
20 201 TMT-SUPER-STR Tonne 1.097 71898.12 78,836.29 8 th & Part Final
23 204 Filermedia Cum 33.000 2153.73 71,073.09 8 th & Part Final
24 205 Weepholes Nos 40.000 151.41 6,056.40 8 th & Part Final
Sub Total 45,442,813.22
Total 45,442,813.22
Add GST 12% 5,453,137.59
Total Bill Amt, Rs, 50,895,950.81

PMC Contractor

Assistant Executive Engineer, Executive Engineer,


PW.P & IWT D Bangalore
Section Officer PWD Sub - Division. Nelamangala
Division.
Page 5 of 74

GOVERNMENT OF KARNATAKA
PUBLIC WORKS, PORTS & INLAND WATER TRANSPORT DEPARTMENT
ANEKAL TALUK, BANGALORE RURAL DISTRICT
RA 7th and Part Bill
Name of Work:- Package 295 :
A) Improvements to Nelamangala - Chikkaballapura road SH-74 from Km 8.60 t o Km 13.00 & Km 31.40 to Km 32.40 & loop Road Km 0.00 to Km 2.90 (in selected reaches) in Doddaballapura taluk of Bangalore Rural District Via Uddichikkanahalli cross, Kanasavadi, Doddaballapura Town,
Heggadihalli,
B) Improvements to KS road to Balenahalli road MDR from Km 0.00 to Km 7.51 and Hadonahalli to Melekote MDR road from Km 0.00 to Km 0.50 (in selected reaches) in Doddaballapura taluk of Bangaluru Rural Dist Via Gaddambachahalli Cross , Tubagere Cross, Hadonahalli,
C) Improvements to Channapattna - Nelamangala road New SH from km 75.90 to Km 77.90 (in selected reaches) in Nelamangala Taluk of Bangalore Rural District Via Bramanipura - Kavanapura - SRS Betta - Avverahalli - Kailancha - Nagohalli - Hunasanahalli - Uragahalli - Bidahi - Ganakallu
D) Improvements to Begur NH - 04 to join NH- 207 road MDR from Km 0.00 to Km 14.60 (in selected reaches) in Nelamangala Taluk of Bangalore Rural District via Thayamagondlu, Niduvandha, Tumkur border

RA Bill No - 8th and Part Final


General Abstract
As per Tender Previous Present Upto Date
BOQ No
Item code Description of Work Unit Amount Amount Amount Amount Remarks
Qty Rate Qty Qty Qty
(Rs.) (Rs.) (Rs.) (Rs.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
PACKAGE 295(D) Improvements to Begur NH - 04 to join NH- 207 road MDR from Km 0.00 to Km 14.60 (in selected reaches) in Nelamangala Taluk of Bangalore Rural District via Thayamagondlu, Niduvandha, Tumkur border.Detail Estimate of Road
KSRRB M200-11.1. Clearing and grubbing road land
including uprooting rank vegetation, grass, bushes,
shrubs, saplings and trees girth up to 300 mm,
removalof stumps of trees cut earlier and disposal of
unserviceable materials and stacking of serviceable
160 18.15 material to be used or auctioned, including removal Ha 2.23 19,081.78 42,590.53 1.50 28,679.92 1.503 28,679.92
and disposal of top organic soil not exceeding 150
mm in thickness complete as per specifications . II.
By Mechanical Means:A. In area of light jungle.
MORTH Specification No. 201 ---- with all lead and
lifts, loading and unloading charges, cost of all
materials, labour, equipment etc., complete the work
KSRRB M300-14. Excavation for roadwork in all
types of soil by mechanical means including cutting
and loading to tippers, trimming bottom and side
slopes, in accordance with requirements of lines,
grades and cross sections, and transportation with a
161 19.14 lead of 1.00 km and complete as per specifications. cum 34,462.69 42.23 1,455,359.46 13,824.68 583,816.03 13,824.68 583,816.03
MORTH Specification No.301 ---- with all lead and
lifts, loading and unloading charges, cost of all
materials, labour, equipment etc., complete the work
as per specifications and directions of the Engineer
incharge of Work.
KSRRB M300-Construction of Embankment with
Material deposited from Roadway cutting. KSRRB
M300-54. Construction of embankment with
approved material deposited at site from roadway
cutting and excavation from drain and foundation of
162 19.61 other structures graded and compacted to meet cum 21,513.62 97.85 2,105,107.72 10,369.10 1,014,616.43 10,369.10 1,014,616.43
requirement of Table 300-2 complete asper
specifications.which includes , watering charges &
compaction by vibratory roller) MORTH
Specification No. 305 ---- with all lead and lifts,
loading and unloading charges, cost of all materials,
labour, equipment etc., complete the work as per
KSRRB 300-Compaction KSRRB 300-58.
Compaction of original ground with maximum of 6
passes of 8 to 10 tonnes power roller including filling
in depression occuring during rolling including cost
of all labour, HOM of machinery complete as per
163 19.64 specifications. MORTH / Chapter 3 ---- with all lead Sqm 54,114.45 6.18 334,427.30 30,721.50 189,858.87 30,721.50 189,858.87
and lifts, loading and unloading charges, cost of all
materials, labour, equipment etc., complete the work
as per specifications and directions of the Engineer
incharge of Work.

Construction of granular sub-base Grading-V as Sub-


base and drainage layer by providing coarse graded
crushed stone aggregates of granite/trap/basalt
material, mixing by mix in place method by rotavator
at OMC, spreading in uniform layers with motor
164 20.6 grader on prepared surface and compacting with cum 10,948.08 1,802.50 19,733,906.63 6,825.80 12,303,504.50 6,825.80 12,303,504.50
vibratory power roller to achieve the 98 % proctor
density, complete as per specifications. Clause 401 of
MORTH V Revision. ---- with all lead and lifts,
loading and unloading charges, cost of all materials,
labour, equipment etc., complete the work as per
specifications and directions of the Engineer incharge

PMC Contractor AE/JE PWD Nelamangala Sub Division AEE- PWD Nelamangala Sub Division
Page 6 of 74
Name of Work:- Package 295 :
A) Improvements to Nelamangala - Chikkaballapura road SH-74 from Km 8.60 t o Km 13.00 & Km 31.40 to Km 32.40 & loop Road Km 0.00 to Km 2.90 (in selected reaches) in Doddaballapura taluk of Bangalore Rural District Via Uddichikkanahalli cross, Kanasavadi, Doddaballapura Town,
Heggadihalli,
B) Improvements to KS road to Balenahalli road MDR from Km 0.00 to Km 7.51 and Hadonahalli to Melekote MDR road from Km 0.00 to Km 0.50 (in selected reaches) in Doddaballapura taluk of Bangaluru Rural Dist Via Gaddambachahalli Cross , Tubagere Cross, Hadonahalli,
C) Improvements to Channapattna - Nelamangala road New SH from km 75.90 to Km 77.90 (in selected reaches) in Nelamangala Taluk of Bangalore Rural District Via Bramanipura - Kavanapura - SRS Betta - Avverahalli - Kailancha - Nagohalli - Hunasanahalli - Uragahalli - Bidahi - Ganakallu
D) Improvements to Begur NH - 04 to join NH- 207 road MDR from Km 0.00 to Km 14.60 (in selected reaches) in Nelamangala Taluk of Bangalore Rural District via Thayamagondlu, Niduvandha, Tumkur border

RA Bill No - 8th and Part Final


General Abstract
As per Tender Previous Present Upto Date
BOQ No
Item code Description of Work Unit Amount Amount Amount Amount Remarks
Qty Rate Qty Qty Qty
(Rs.) (Rs.) (Rs.) (Rs.)
KSRRB M400- Wet Mix Macadam KSRRB M400-
17. Providing, laying, spreading and compacting
crushed stone aggregates of granite / trap / basalt to
wet mix macadam specifications including pre mixing
the material with water at OMC in mechanical mix
165 20.18 plant carriage of mixed method of tipper to site, cum 13,685.09 1,944.64 26,612,580.61 7,680.37 14,935,564.44 7,680.37 14,935,564.44
laying in uniform layers with paver in sub-base/base
course on well prepared surface and compacting with
vibratory roller to achieve the desired density
complete as per specifications. MORTH Specification
No. 406 ---- with all lead and lifts, loading and
unloading charges, cost of all materials, labour,
KSRRB M500-56.1. Providing and laying slurry seal
@ 5.40 kg/sqm (Residual binder@ 13% by wt. of dry
aggregate) consisting of a mixture of fine aggregates,
portland cement filler, bituminous emulsion and water
on a road surface including cleaning of surface,
166 21.64 mixing of slurry seal in a suitable mobile plant, laying Sqm 3,410.00 28.84 98,344.40 1,111.85 32,065.75 1,111.85 32,065.75
and compacting to provide even riding surface
Complete as per specifications. Type I : 2-3 mm
width hair cracks. Clause 512 of MORTH V revision
---- with all lead and lifts, loading and unloading
charges, cost of all materials, labour, equipment etc.,
complete the work as per specifications and directions
KSRRB 3000 Filling Pot-holes and Patch Repairs
with Open-Graded Premix Surfacing, 20 mm KSRRB
M3000-4. Removal of all failed material, trimming of
completed excavation to provide firm vertical faces,
cleaning of surface, applying tack coat on the sides
167 35.4 and base of excavation at 040 kgs/sqm as per clause Sqm 1,364.00 180.25 245,861.00 670.79 120,909.90 670.79 120,909.90
500.3, and filling the pot holes with open graded pre-
mix material as per clause 500.11, & sealing the
surface with Type-B seal coat as per clause 513
compacting the surface to form a smooth continuous
surface, including cost of materials, labour, HOM
complete as per specifications. MORTH Specification
KSRRB M500-6. Providing and applying primer coat
with S.S. bitumen emulsion on prepared surface of
granular base such as WMM including cleaning of
road surface and spraying primer at the rate of 0.60 kg
/ sqm using mechanical means complete as per
168 21.6 specifications. MORTH Specification No. 502 ---- Sqm 120,725.93 28.84 3,481,735.79 12,861.50 370,925.66 12,861.50 370,925.66
with all lead and lifts, loading and unloading charges,
cost of all materials, labour, equipment etc., complete
the work as per specifications and directions of the
Engineer incharge of Work.

KSRRB M500-10. Providing and applying tack coat


using 80/100 grade bitumen(VG10) in boiler fitted
with spray set distributor at the rate of 0.25 kg per
sqm on the existing prepared bituminous surface
(primed surface) cleaned with mechanical broom.
169 21.1 complete as per specifications. Clause 503 of Sqm 120,725.93 10.30 1,243,477.07 33,010.00 340,003.00 (537.93) (5,540.68) 32,472.07 334,462.32
MORTH V revision ---- with all lead and lifts,
loading and unloading charges, cost of all materials,
labour, equipment etc., complete the work as per
specifications and directions of the Engineer incharge
of Work.

PMC Contractor AE/JE PWD Nelamangala Sub Division AEE- PWD Nelamangala Sub Division
Page 7 of 74
Name of Work:- Package 295 :
A) Improvements to Nelamangala - Chikkaballapura road SH-74 from Km 8.60 t o Km 13.00 & Km 31.40 to Km 32.40 & loop Road Km 0.00 to Km 2.90 (in selected reaches) in Doddaballapura taluk of Bangalore Rural District Via Uddichikkanahalli cross, Kanasavadi, Doddaballapura Town,
Heggadihalli,
B) Improvements to KS road to Balenahalli road MDR from Km 0.00 to Km 7.51 and Hadonahalli to Melekote MDR road from Km 0.00 to Km 0.50 (in selected reaches) in Doddaballapura taluk of Bangaluru Rural Dist Via Gaddambachahalli Cross , Tubagere Cross, Hadonahalli,
C) Improvements to Channapattna - Nelamangala road New SH from km 75.90 to Km 77.90 (in selected reaches) in Nelamangala Taluk of Bangalore Rural District Via Bramanipura - Kavanapura - SRS Betta - Avverahalli - Kailancha - Nagohalli - Hunasanahalli - Uragahalli - Bidahi - Ganakallu
D) Improvements to Begur NH - 04 to join NH- 207 road MDR from Km 0.00 to Km 14.60 (in selected reaches) in Nelamangala Taluk of Bangalore Rural District via Thayamagondlu, Niduvandha, Tumkur border

RA Bill No - 8th and Part Final


General Abstract
As per Tender Previous Present Upto Date
BOQ No
Item code Description of Work Unit Amount Amount Amount Amount Remarks
Qty Rate Qty Qty Qty
(Rs.) (Rs.) (Rs.) (Rs.)
KSRRB 500-11. Providing and laying bituminous
macadam on prepared surface with crushed coarse
aggregates as per design mix formula for base /
binding course including loading of aggregates with
F.E. loader, hot mixing of stone aggregates and
170 21.11.6 bitumen in hot mix plant, transporting the mixed cum 460.00 7,150.00 3,289,000.00 415.50 2,970,825.00 415.50 2,970,825.00
material in tipper to paver and laying mixed materials
with paver finisher to the required level and grade,
rolling by smooth wheeled, vibratory & tandem
rollers to achieve the desired density, but excluding
cost of primer / tack coat & including lead, lift and
cost of all materials, labour, HOM complete as per
KSRRB M500-18. Providing and laying semi dense
bituminous concrete using crushed aggregates of
specified grading, premixed with bituminous binder
and filler, transporting the hot mix to work site, laying
with a paver finisher to the required grade, level and
171 21.20.6 alignment, rolling with smooth wheeled, vibratory cum 230.00 9,400.00 2,162,000.00 221.50 2,082,100.00 221.50 2,082,100.00
and tandem rollers to achieve the desired compaction
as per MORTH specification clause No. 508 complete
in all respects complete as per specifications. -
using40/60 TPH capacity H.M.P. with Mechanical
Paver Gr-II (25 mm to 30 mm) with 5 % VG-30
Bitumen ---- with all lead and lifts, loading and
KSRRB M500-19. Providing and laying bituminous
concrete using crushed aggregates of specified
grading, premixed with bituminous binder and filler,
transporting the hot mix to work site, laying with a
paver finisher to the required grade, level and
172 21.22.6 alignment, rolling with smooth wheeled, vibratory cum 3,345.78 9,500.00 31,784,889.10 - - - -
and tandem rollers to achieve the desired compaction
in all respects complete as per specifications. Clause
507 of MORTH V revision : using 40/60 TPH
capacity H.M.P. with Mechanical Paver Gr-II (30 mm
to 40 mm) with 5.4% VG-30 Bitumen ---- with all
lead and lifts, loading and unloading charges, cost of
KSRRB M500-17. Providing and laying dense graded
bituminous macadam using crushed aggregates of
specified grading, premixed with VG30 grade
bituminous binder and, transporting the hot mix to
work site, laying to the required grade, level and
173 21.17.6 alignment, rolling with smooth wheeled, vibratory cum 6,691.56 7,200.00 48,179,201.04 1,428.63 10,286,136.00 (32.28) (232,385.76) 1,396.35 10,053,750.24
and tandem rollers to achieve the desired compaction
as per MORTH table 500-10 complete in all respects
complete as per specifications.. MORTH
Specification No. 507 - using 40/60 TPH capacity
H.M.P. with Mechanical paver Gr-II (50 mm to 75
mm) with 4.5 % VG-30 Bitumen ---- with all lead and
KSRRB 800- Kilometre stone KSRRB M800-14.1.
Reinforced cement concrete M-15 5th Grade
kilometre stone of standard design as per IRC:8-1980,
fixing in position including painting and printing etc
complete as per specifications.including additional
174 24.16 M-15 concrete pedestal of 0.2mt. height above G.L. Nos 2.00 3,515.39 7,030.78 - - -
MORTH Specification No. 804 ---- with all lead and
lifts, loading and unloading charges, cost of all
materials, labour, equipment etc., complete the work
as per specifications and directions of the Engineer
incharge of Work.

PMC Contractor AE/JE PWD Nelamangala Sub Division AEE- PWD Nelamangala Sub Division
Page 8 of 74
Name of Work:- Package 295 :
A) Improvements to Nelamangala - Chikkaballapura road SH-74 from Km 8.60 t o Km 13.00 & Km 31.40 to Km 32.40 & loop Road Km 0.00 to Km 2.90 (in selected reaches) in Doddaballapura taluk of Bangalore Rural District Via Uddichikkanahalli cross, Kanasavadi, Doddaballapura Town,
Heggadihalli,
B) Improvements to KS road to Balenahalli road MDR from Km 0.00 to Km 7.51 and Hadonahalli to Melekote MDR road from Km 0.00 to Km 0.50 (in selected reaches) in Doddaballapura taluk of Bangaluru Rural Dist Via Gaddambachahalli Cross , Tubagere Cross, Hadonahalli,
C) Improvements to Channapattna - Nelamangala road New SH from km 75.90 to Km 77.90 (in selected reaches) in Nelamangala Taluk of Bangalore Rural District Via Bramanipura - Kavanapura - SRS Betta - Avverahalli - Kailancha - Nagohalli - Hunasanahalli - Uragahalli - Bidahi - Ganakallu
D) Improvements to Begur NH - 04 to join NH- 207 road MDR from Km 0.00 to Km 14.60 (in selected reaches) in Nelamangala Taluk of Bangalore Rural District via Thayamagondlu, Niduvandha, Tumkur border

RA Bill No - 8th and Part Final


General Abstract
As per Tender Previous Present Upto Date
BOQ No
Item code Description of Work Unit Amount Amount Amount Amount Remarks
Qty Rate Qty Qty Qty
(Rs.) (Rs.) (Rs.) (Rs.)
KSRRB M800-14.2. Reinforced cement concrete M-
15 Grade kilometre stone of standard design as per
IRC:8-1980, fixing in position including painting and
printing etc complete as per specifications.including
additional M-15 concrete pedestal of 0.2mt. height
175 24.17 above G.L. MORTH Specification No. 804 ---- with Nos 14.00 2,189.78 30,656.92 - - -
all lead and lifts, loading and unloading charges, cost
of all materials, labour, equipment etc., complete the
work as per specifications and directions of the
Engineer incharge of Work.

KSRRB M800-14.3. Reinforced cement concrete M-


15 Grade 200m stone of standard design as per
IRC:26-1980, fixing in position including painting
and printing etc complete as per specifications.
Including additional M-15 concrete pedestal of 0.2mt.
176 24.18 height above G.L. MORTH Specification No. 804 ---- Nos 49.00 557.23 27,304.27 - - -
with all lead and lifts, loading and unloading charges,
cost of all materials, labour, equipment etc., complete
the work as per specifications and directions of the
Engineer incharge of Work.

KSRRB M800-13.Road Marking with Hot Applied


Thermoplastic Compound with Reflectrising Glass
Beads on Bituminous Surface:- Providing and laying
of hot applied thermoplastic compound 2.5 mm thick
including reflectorising glass beads at 250 gms per
177 24.15 sqm area, thickness of 2.5 mm is exclusive of surface Sqm 4,290.33 441.87 1,895,768.12 - - - -
applied glass beads as per IRC:35. The finished
surface to be level, uniform and free from streaks and
holes complete as per specifications. MORTH
Specification No. 803 ---- with all lead and lifts,
loading and unloading charges, cost of all materials,
labour, equipment etc., complete the work as per
Direction and Place Identification Signs upto 0.9 sqm
Size Board: Providing and erecting direction and
place identification retro-reflectorised sign as per
IRC:67 made of high intensity grade sheeting vide
Clause 801.3, fixed over aluminium sheeting, 2 mm
178 24.3 thick with area not exceeding 0.9 sqm supported on a Sqm 12.00 7,068.89 84,826.68 - - - -
mild steel single angle iron post 75mm x 75mm x 6
mm firmly fixed to the ground by means of properly
designed foundation with M 15 grade cement
concrete 45cm x 45cm x 60 cm, 60 em below ground
level as per approved drawing. ---- with all lead and
lifts, loading and unloading charges, cost of all
KSRRB M800 Road markers I Road stud KSRRB
MS00-35. Supply and lnstalltion of Moulded Shank
Raised Pavement Markers made of polycarbonate and
ABS(Acrylonitrile Butadiene Styrene) moulded body
and reflective panels with micro prismatic lens
179 24.41 capable of providing total internal reflection of the Nos 5,784.00 347.11 2,007,684.24 - - - -
light entering the lens face and shall support a load of
16000 kg tested in accordance to Specifications of
Category A of MORTH Circular No RW/
NH/33023/10-97- DO Ill Dt 11.06. 1997. The height,
width and length shall not exceed 50 mm, 1DO mm
and 102 mm and with minimum reflective area of 13

PMC Contractor AE/JE PWD Nelamangala Sub Division AEE- PWD Nelamangala Sub Division
Page 9 of 74
Name of Work:- Package 295 :
A) Improvements to Nelamangala - Chikkaballapura road SH-74 from Km 8.60 t o Km 13.00 & Km 31.40 to Km 32.40 & loop Road Km 0.00 to Km 2.90 (in selected reaches) in Doddaballapura taluk of Bangalore Rural District Via Uddichikkanahalli cross, Kanasavadi, Doddaballapura Town,
Heggadihalli,
B) Improvements to KS road to Balenahalli road MDR from Km 0.00 to Km 7.51 and Hadonahalli to Melekote MDR road from Km 0.00 to Km 0.50 (in selected reaches) in Doddaballapura taluk of Bangaluru Rural Dist Via Gaddambachahalli Cross , Tubagere Cross, Hadonahalli,
C) Improvements to Channapattna - Nelamangala road New SH from km 75.90 to Km 77.90 (in selected reaches) in Nelamangala Taluk of Bangalore Rural District Via Bramanipura - Kavanapura - SRS Betta - Avverahalli - Kailancha - Nagohalli - Hunasanahalli - Uragahalli - Bidahi - Ganakallu
D) Improvements to Begur NH - 04 to join NH- 207 road MDR from Km 0.00 to Km 14.60 (in selected reaches) in Nelamangala Taluk of Bangalore Rural District via Thayamagondlu, Niduvandha, Tumkur border

RA Bill No - 8th and Part Final


General Abstract
As per Tender Previous Present Upto Date
BOQ No
Item code Description of Work Unit Amount Amount Amount Amount Remarks
Qty Rate Qty Qty Qty
(Rs.) (Rs.) (Rs.) (Rs.)
Retro-Reflectorised Traffic Signs Providing and
fixing of retro - reflectorised cautionary, mandatory
and informatory sign as per IRC:67 made of high
intensity grade sheeting vide Clause 801.3, fixed over
aluminium sheeting, 1.5 mm thick supported on a
180 24.2.4 mild steel angle iron post 75 mm x 75 mm x 6 mm No 2.00 4,219.91 8,439.82 - - - -
firmly fixed to the ground by means of properly
designed foundation with M 15 grade cement
concrete 45 em x 45 em x 60 em, 60 em below
ground level as per approved drawing. 600 X 800 mm
- TYPE XI ---- with all lead and lifts, loading and
unloading charges, cost of all materials, labour,
Retro-Reflectorised Traffic Signs Providing and
fixing of retro - reflectorised cautionary, mandatory
and informatory sign as per IRC:67 made of high
intensity grade sheeting vide Clause 801.3, fixed over
aluminium sheeting, 1.5 mm thick supported on a
181 24.2.2 mild steel angle iron post 75 mm x 75 mm x 6 mm No 24.00 2,567.79 61,626.96 - - - -
firmly fixed to the ground by means of properly
designed foundation with M 15 grade cement
concrete 45 cm x 45 cm x 60 cm, 60 em below
ground level as per approved drawing. 600 M M
Equilateral triangle -TYPE XI ---- with all lead and
lifts, loading and unloading charges, cost of all
Providing road humps for the entire formation width,
using bituminous premix materials and heavy duty
cobble stones 60 mm thick, having road hump
dimension of 1.00 mtr. (width) X 0.15 mtr (height)
rectangular sections and ramp on either side of road
182 38.40.2 hump of 0.85 mtr (wide), including providing WBM Unit 12.00 40,006.23 480,074.76 - - - -
(2 layers) for shoulder portion 1.7mts in length on
either side, completing with road marking paint with
applied thermoplastic compound with reflecting glass
beeds on bituminous surface and providing 2 Nos.
retro reflective traffic signs as per IRC SP 67 -2010
(for details refer IRC 99-1988) - Intermediate lane for
Retro-Reflectorised Traffic Signs Providing and
fixing of retro - reflectorised cautionary, mandatory
and informatory sign as per IRC:67 made of high
intensity grade sheeting vide Clause 801.3, fixed over
aluminium sheeting, 1.5 mm thick supported on a
183 24.2.6 mild steel angle iron post 75 mm x 75 mm x 6 mm No 4.00 5,198.41 20,793.64 - - - -
firmly fixed to the ground by means of properly
designed foundation with M 15 grade cement
concrete 45 em x 45 em x 60 em, 60 em below
ground level as per approved drawing. 900 M M
Octagon Stop Board -TYPE XI ---- with all lead and
lifts, loading and unloading charges, cost of all
Retro-Reflectorised Traffic Signs Providing and
fixing of retro - reflectorised cautionary, mandatory
and informatory sign as per IRC:67 made of high
intensity grade sheeting vide Clause 801.3, fixed over
aluminium sheeting, 1.5 mm thick supported on a
184 24.2.5 mild steel angle iron post 75 mm x 75 mm x 6 mm No 20.00 3,149.74 62,994.80 - - - -
firmly fixed to the ground by means of properly
designed foundation with M 15 grade cement
concrete 45 em x 45 em x 60 em, 60 em below
ground level as per approved drawing. 600 X 450 mm
- TYPE XI ---- with all lead and lifts, loading and
unloading charges, cost of all materials, labour,

PMC Contractor AE/JE PWD Nelamangala Sub Division AEE- PWD Nelamangala Sub Division
Page 10 of 74
Name of Work:- Package 295 :
A) Improvements to Nelamangala - Chikkaballapura road SH-74 from Km 8.60 t o Km 13.00 & Km 31.40 to Km 32.40 & loop Road Km 0.00 to Km 2.90 (in selected reaches) in Doddaballapura taluk of Bangalore Rural District Via Uddichikkanahalli cross, Kanasavadi, Doddaballapura Town,
Heggadihalli,
B) Improvements to KS road to Balenahalli road MDR from Km 0.00 to Km 7.51 and Hadonahalli to Melekote MDR road from Km 0.00 to Km 0.50 (in selected reaches) in Doddaballapura taluk of Bangaluru Rural Dist Via Gaddambachahalli Cross , Tubagere Cross, Hadonahalli,
C) Improvements to Channapattna - Nelamangala road New SH from km 75.90 to Km 77.90 (in selected reaches) in Nelamangala Taluk of Bangalore Rural District Via Bramanipura - Kavanapura - SRS Betta - Avverahalli - Kailancha - Nagohalli - Hunasanahalli - Uragahalli - Bidahi - Ganakallu
D) Improvements to Begur NH - 04 to join NH- 207 road MDR from Km 0.00 to Km 14.60 (in selected reaches) in Nelamangala Taluk of Bangalore Rural District via Thayamagondlu, Niduvandha, Tumkur border

RA Bill No - 8th and Part Final


General Abstract
As per Tender Previous Present Upto Date
BOQ No
Item code Description of Work Unit Amount Amount Amount Amount Remarks
Qty Rate Qty Qty Qty
(Rs.) (Rs.) (Rs.) (Rs.)
KSRRB M200-15.2. Dismantling of existing
structures like culverts, bridges, retaining walls and
other structure comprising of masonry, cement
concrete, wood work, steel work, including T&P and
scaffolding wherever necessary, sorting the
185 18.27 dismantled material, disposal of unserviceable cum 38.88 361.53 14,056.29 - - - -
material and stacking the serviceable material with all
lifts complete as per specifications. iii) Dismantling
Stone Masonry.B. Rubble stone masonry in cement
mortar. MORTH Specification No. 202 ---- with all
lead and lifts, loading and unloading charges, cost of
all materials, labour, equipment etc., complete the
Earth work in excavation for foundation of structures
like culverts, retaining walls etc., as per drawing and
technical specification, including setting out,
construction of shoring and bracing, dressing of sides
and bottom, backfilling with approved material,
186 34.15.2 disposal of balance earth as per specifications, cum 472.80 46.35 21,914.42 - - - -
including cost of labour, HOM etc. , complete. in all
kinds of soil by mechanical means. ---- with all lead
and lifts, loading and unloading charges, cost of all
materials, labour, equipment etc., complete the work
as per specifications and directions of the Engineer
incharge of Work.
KSRRB M2900-1. Plain cement concrete M10 mix
with crushed stone aggregate 40mm nominal size
mechanically mixed, placed in foundation and
compacted by vibration including curing including
cost of materials, labour, HOM complete as per
187 34.1 specifications. MORTH Specification No. 408 ---- cum 11.00 4,352.78 47,897.99 - - - -
with all lead and lifts, loading and unloading charges,
cost of all materials, labour, equipment etc., complete
the work as per specifications and directions of the
Engineer incharge of Work.

Providing and laying in position plain/Reinforced


cement cement concrete M20 for
sub-structure/Superstructure works, with cement @
320 kgs, 20 mm & down size graded granite metal
coarse aggregate @ 0.69 cum and fine aggregates @
188 34.17 0.46 cum machine mixed with super plasticisers @ 3 cum 131.74 5,128.37 675,635.05 - - - -
lts confirming to IS 9103-2008,concrete laid in layers,
well compacted and providing weep holes wherever
necessary with necessary scaffolding, form work etc.,
including cost of labour, HOM curing etc., complete.
---- with all lead and lifts, loading and unloading
charges, cost of all materials, labour, equipment etc.,
Providing and laying reinforced cement concrete pipe
NP3 for culverts including pointing ends, and fixing
collars with cement mortar 1:2 including cost of all
materials, labour, curing complete as per
specifications. Specifications. No. KSRB 1000, 2300
189 34.6.6 MOST Specification No.1000 / 2300 - - 1200mm. dia M 25.00 8,680.84 217,021.00 - - - -
---- with all lead and lifts, loading and unloading
charges, cost of all materials, labour, equipment etc.,
complete the work as per specifications and directions
of the Engineer incharge of Work.

PMC Contractor AE/JE PWD Nelamangala Sub Division AEE- PWD Nelamangala Sub Division
Page 11 of 74
Name of Work:- Package 295 :
A) Improvements to Nelamangala - Chikkaballapura road SH-74 from Km 8.60 t o Km 13.00 & Km 31.40 to Km 32.40 & loop Road Km 0.00 to Km 2.90 (in selected reaches) in Doddaballapura taluk of Bangalore Rural District Via Uddichikkanahalli cross, Kanasavadi, Doddaballapura Town,
Heggadihalli,
B) Improvements to KS road to Balenahalli road MDR from Km 0.00 to Km 7.51 and Hadonahalli to Melekote MDR road from Km 0.00 to Km 0.50 (in selected reaches) in Doddaballapura taluk of Bangaluru Rural Dist Via Gaddambachahalli Cross , Tubagere Cross, Hadonahalli,
C) Improvements to Channapattna - Nelamangala road New SH from km 75.90 to Km 77.90 (in selected reaches) in Nelamangala Taluk of Bangalore Rural District Via Bramanipura - Kavanapura - SRS Betta - Avverahalli - Kailancha - Nagohalli - Hunasanahalli - Uragahalli - Bidahi - Ganakallu
D) Improvements to Begur NH - 04 to join NH- 207 road MDR from Km 0.00 to Km 14.60 (in selected reaches) in Nelamangala Taluk of Bangalore Rural District via Thayamagondlu, Niduvandha, Tumkur border

RA Bill No - 8th and Part Final


General Abstract
As per Tender Previous Present Upto Date
BOQ No
Item code Description of Work Unit Amount Amount Amount Amount Remarks
Qty Rate Qty Qty Qty
(Rs.) (Rs.) (Rs.) (Rs.)
KSRRB M2200-6. Providing T.M.T. steel
reinforcement for R.C.C. work including
straightening, cutting, bending, hooking, placing in
position, lapping and/or welding wherever required,
tying with binding wire and anchoring to the
190 28.8.2 adjoining members wherever necessary complete as Tonne 1.64 70,279.99 115,174.85 - - - -
per disign (laps, hooks and wastage shall not be
measured and paid) cost of materials, labour, HOM
complete as per specification. MORTH Specification
No.1600 & 2200 TMT Fe 500 ---- with all lead and
lifts, loading and unloading charges, cost of all
materials, labour, equipment etc., complete the work
KSRRB M2200- Providing Weep Holes KSRRB
M2200-8. Providing weep holes in Brick masonry I
Plain I Reinforced concrete abutment, wing wall I
return wall with 100 mm dia AC pipe, extending
through the full width of the structure with slope of
191 28.1 1V :20H towards drawing force. Complete as per Nos/mtr 88.00 151.41 13,324.08 - - - -
drawing and Technical Specifications including cost
of materials, labour, HOM complete as per
specifications. MORTH Specification No.2706 &
2200 ---- with all lead and lifts, loading and unloading
charges, cost of all materials, labour, equipment etc.,
complete the work as per specifications and directions
Providing and constucting pithcing / Revetment of 30
cm thick on slopes using granite/basalt/trap/stones of
surface area not less than 0.04 sqm and wedged with
spalls including cost of all materials, labour etc.,
complete as per specification. ---- with all lead and
192 34.14 lifts, loading and unloading charges, cost of all Sqm 64.80 460.41 29,834.57 - - - -
materials, labour, equipment etc., complete the work
as per specifications and directions of the Engineer
incharge of Work.

KSRRB M2200- Filter Media KSRRB M2200-9.


Providing and laying of Filter media with granular
materials /stone crushed aggregates satisfying the
requirements laid down in clause 2504.2.2. of
MORTH specifications to a thickness of not less than
193 28.13 600 mm with smaller size towards the soil and bigger cum 16.81 2,153.73 36,208.51 - - - -
size towards the wall and provided over the entire
surface behind abutment, wing wall and return wall to
the full height compacted to a firm condition
complete as per drawing and Technical Specification
including cost of materials, labour, HOM complete as
per specifications. MORTH Specification No.
KSRRB M800- Painting Letters KSRRB M800-6.
Painting two coats on New Concrete Surface :
Painting two coats after filling the surface with
synthetic enamel paint in all shades on new plastered
concrete surfaces complete as per specifications.
194 24.7 MORTH Specification No. 803 ---- with all lead and Sqm 58.20 84.46 4,915.57 - - - -
lifts, loading and unloading charges, cost of all
materials, labour, equipment etc., complete the work
as per specifications and directions of the Engineer
incharge of Work.

PMC Contractor AE/JE PWD Nelamangala Sub Division AEE- PWD Nelamangala Sub Division
Page 12 of 74
Name of Work:- Package 295 :
A) Improvements to Nelamangala - Chikkaballapura road SH-74 from Km 8.60 t o Km 13.00 & Km 31.40 to Km 32.40 & loop Road Km 0.00 to Km 2.90 (in selected reaches) in Doddaballapura taluk of Bangalore Rural District Via Uddichikkanahalli cross, Kanasavadi, Doddaballapura Town,
Heggadihalli,
B) Improvements to KS road to Balenahalli road MDR from Km 0.00 to Km 7.51 and Hadonahalli to Melekote MDR road from Km 0.00 to Km 0.50 (in selected reaches) in Doddaballapura taluk of Bangaluru Rural Dist Via Gaddambachahalli Cross , Tubagere Cross, Hadonahalli,
C) Improvements to Channapattna - Nelamangala road New SH from km 75.90 to Km 77.90 (in selected reaches) in Nelamangala Taluk of Bangalore Rural District Via Bramanipura - Kavanapura - SRS Betta - Avverahalli - Kailancha - Nagohalli - Hunasanahalli - Uragahalli - Bidahi - Ganakallu
D) Improvements to Begur NH - 04 to join NH- 207 road MDR from Km 0.00 to Km 14.60 (in selected reaches) in Nelamangala Taluk of Bangalore Rural District via Thayamagondlu, Niduvandha, Tumkur border

RA Bill No - 8th and Part Final


General Abstract
As per Tender Previous Present Upto Date
BOQ No
Item code Description of Work Unit Amount Amount Amount Amount Remarks
Qty Rate Qty Qty Qty
(Rs.) (Rs.) (Rs.) (Rs.)
KSRRB M300-53. Construction of embankment with
approved material Gravel/Murrum with all lifts and
leads, transporting to site, spreading, grading to
required slope and compacting to meet requirement
Table 300-2 complete as per specifications, including
195 19.6 cost of gravel / murrum, watering charges & cum 60.40 334.75 20,218.57 - - - -
compaction by vibratory roller to 95% of modified
proctors density. MORTH Specification No. 305 ----
with all lead and lifts, loading and unloading charges,
cost of all materials, labour, equipment etc., complete
the work as per specifications and directions of the
Engineer incharge of Work.
Providing and laying reinforced cement concrete pipe
NP3 for culverts including pointing ends, and fixing
collars with cement mortar 1:2 including cost of all
materials, labour, curing complete as per
specifications. Specifications. No. KSRB 1000, 2300
196 34.6.5 MOST Specification No.1000 / 2300 - - 900mm. dia M 45.00 5,667.06 255,017.70 - - - -
---- with all lead and lifts, loading and unloading
charges, cost of all materials, labour, equipment etc.,
complete the work as per specifications and directions
of the Engineer incharge of Work.

KSRRB M200-12.1. Dismantling of existing


structures like culverts, bridges, retaining walls and
other structure comprising of masonry, cement
concrete, wood work, steel work, including T&P and
scaffolding wherever necessary, sorting the
197 18.17 dismantled material, disposal of unserviceable cum 53.20 467.62 24,877.38 - - - -
material and stacking the serviceable material with all
lifts complete as per specifications. i) Lime /Cement
Concrete. I. By Manual Means :A. Lime Concrete,
cement concrete grade M-10 and below. MORTH
Specification No. 202 ---- with all lead and lifts,
loading and unloading charges, cost of all materials,
“KSRRB M2100-2.1. Earth work in excavation for
foundation of structures as perdrawing and technical
specifications, including setting out, construction of
shoring and bracing, removal of stumps and other
deleterious matter, dressing of sides and bottom and
198 27.4 backfilling with approved material complete as per cum 565.35 51.50 29,115.60 - 42.66 2,196.76 42.66 2,196.76
specifications. B. Mechanical Means (i ) Depth upto 3
m” MORTH Specification No. 304 ---- with all lead
and lifts, loading and unloading charges, cost of all
materials, labour, equipment etc., complete the work
as per specifications and directions of the Engineer
incharge of Work.
KSRRB M2200-5.9. Providing and laying Design
mix M20 with OPC @ 320kgs, with 20mm and down
size graded granite metal coarse aggregates
@0.69cum and fine aggregates @ 0.46cum, with
superplastisiser @3lts confirming to IS9103-1999
199 28.7.9 Reaffirmed-2008 including cost of materials, labour, cum 172.21 5,328.19 917,542.02 - 15.78 84,085.50 15.78 84,085.50
HOM curing, form works, scaffolding and centering
complete as per specifications. - i) Upto 5 m height.
---- with all lead and lifts, loading and unloading
charges, cost of all materials, labour, equipment etc.,
complete the work as per specifications and directions
of the Engineer incharge of Work.

PMC Contractor AE/JE PWD Nelamangala Sub Division AEE- PWD Nelamangala Sub Division
Page 13 of 74
Name of Work:- Package 295 :
A) Improvements to Nelamangala - Chikkaballapura road SH-74 from Km 8.60 t o Km 13.00 & Km 31.40 to Km 32.40 & loop Road Km 0.00 to Km 2.90 (in selected reaches) in Doddaballapura taluk of Bangalore Rural District Via Uddichikkanahalli cross, Kanasavadi, Doddaballapura Town,
Heggadihalli,
B) Improvements to KS road to Balenahalli road MDR from Km 0.00 to Km 7.51 and Hadonahalli to Melekote MDR road from Km 0.00 to Km 0.50 (in selected reaches) in Doddaballapura taluk of Bangaluru Rural Dist Via Gaddambachahalli Cross , Tubagere Cross, Hadonahalli,
C) Improvements to Channapattna - Nelamangala road New SH from km 75.90 to Km 77.90 (in selected reaches) in Nelamangala Taluk of Bangalore Rural District Via Bramanipura - Kavanapura - SRS Betta - Avverahalli - Kailancha - Nagohalli - Hunasanahalli - Uragahalli - Bidahi - Ganakallu
D) Improvements to Begur NH - 04 to join NH- 207 road MDR from Km 0.00 to Km 14.60 (in selected reaches) in Nelamangala Taluk of Bangalore Rural District via Thayamagondlu, Niduvandha, Tumkur border

RA Bill No - 8th and Part Final


General Abstract
As per Tender Previous Present Upto Date
BOQ No
Item code Description of Work Unit Amount Amount Amount Amount Remarks
Qty Rate Qty Qty Qty
(Rs.) (Rs.) (Rs.) (Rs.)
KSRRB M2100-10. Providing and laying Plain
cement concrete of mix 1:3:6 with OPC @ 220kgs,
with crushed 40mm and down size graded granite
metal coarse aggregates @0.89cum and fine
aggregates @ 0.46cum, in foundation mechanically
200 27.18 mixed, placed in foundation and compacted by cum 16.15 5,268.45 85,080.20 - 3.66 19,262.77 3.66 19,262.77
vibration including curing for 14 days including cost
of all materials, labour, HOM curing, form works,
scaffolding and centering complete as per
specifications. MORTH Specification No. 2100 ----
with all lead and lifts, loading and unloading charges,
cost of all materials, labour, equipment etc., complete
KSRRB M2300-14. Providing T M. T steel
reinforcement for R.C.C. work including
straightening, cutting, bending, hooking, placing in
position, lapping and/or welding wherever required
tying with binding wire and anchoring to the
201 29.29.2 adjoining members wherever necessary complete as Tonne 3.28 71,898.12 235,538.24 - 1.10 78,836.29 1.10 78,836.29
per design (laps, hooks and wastage shall not be
measured and paid) including cost of materials,
labour, HOM complete as per specifications.
MORTH Specification No. 1600 & 2200 - TMT Bars
Fe 500 ---- with all lead and lifts, loading and
unloading charges, cost of all materials, labour,
KSRRB M2200-6. Providing T.M.T. steel
reinforcement for R.C.C. work including
straightening, cutting, bending, hooking, placing in
position, lapping and/or welding wherever required,
tying with binding wire and anchoring to the
202 28.8.2 adjoining members wherever necessary complete as Tonne 2.59 70,279.99 182,025.17 - 1.42 99,819.55 1.42 99,819.55
per disign (laps, hooks and wastage shall not be
measured and paid) cost of materials, labour, HOM
complete as per specification. MORTH Specification
No.1600 & 2200 TMT Fe 500 ---- with all lead and
lifts, loading and unloading charges, cost of all
materials, labour, equipment etc., complete the work
Solid slab super structure KSRRB M2300-3.1.
Furnishing and Placing Reinforced / Prestressed
cement concrete in super-structure as per drawing and
Technical Specification complete as per
specifications. B. RCC with OPC cement design mix
203 29.5.1 M25 @ 340kgs, with 20mm and down size graded cum 27.30 6,610.54 180,467.74 - 9.14 60,403.81 9.14 60,403.81
granite metal coarse aggregates @0.7cum and fine
aggregates @ 0.47cum, with superplastisiser @3lts
confirming to IS9103-1999 Reaffirmed- 2008, Case -
I : Using Concrete Mixer MORTH Specification No.
1500,1600 & 1700 - Height upto 5 m - ---- with all
lead and lifts, loading and unloading charges, cost of
KSRRB M2200- Filter Media KSRRB M2200-9.
Providing and laying of Filter media with granular
materials /stone crushed aggregates satisfying the
requirements laid down in clause 2504.2.2. of
MORTH specifications to a thickness of not less than
204 28.13 600 mm with smaller size towards the soil and bigger cum 57.75 2,153.73 124,377.91 - 33.00 71,073.09 33.00 71,073.09
size towards the wall and provided over the entire
surface behind abutment, wing wall and return wall to
the full height compacted to a firm condition
complete as per drawing and Technical Specification
including cost of materials, labour, HOM complete as
per specifications. MORTH Specification No.

PMC Contractor AE/JE PWD Nelamangala Sub Division AEE- PWD Nelamangala Sub Division
Page 14 of 74
Name of Work:- Package 295 :
A) Improvements to Nelamangala - Chikkaballapura road SH-74 from Km 8.60 t o Km 13.00 & Km 31.40 to Km 32.40 & loop Road Km 0.00 to Km 2.90 (in selected reaches) in Doddaballapura taluk of Bangalore Rural District Via Uddichikkanahalli cross, Kanasavadi, Doddaballapura Town,
Heggadihalli,
B) Improvements to KS road to Balenahalli road MDR from Km 0.00 to Km 7.51 and Hadonahalli to Melekote MDR road from Km 0.00 to Km 0.50 (in selected reaches) in Doddaballapura taluk of Bangaluru Rural Dist Via Gaddambachahalli Cross , Tubagere Cross, Hadonahalli,
C) Improvements to Channapattna - Nelamangala road New SH from km 75.90 to Km 77.90 (in selected reaches) in Nelamangala Taluk of Bangalore Rural District Via Bramanipura - Kavanapura - SRS Betta - Avverahalli - Kailancha - Nagohalli - Hunasanahalli - Uragahalli - Bidahi - Ganakallu
D) Improvements to Begur NH - 04 to join NH- 207 road MDR from Km 0.00 to Km 14.60 (in selected reaches) in Nelamangala Taluk of Bangalore Rural District via Thayamagondlu, Niduvandha, Tumkur border

RA Bill No - 8th and Part Final


General Abstract
As per Tender Previous Present Upto Date
BOQ No
Item code Description of Work Unit Amount Amount Amount Amount Remarks
Qty Rate Qty Qty Qty
(Rs.) (Rs.) (Rs.) (Rs.)
KSRRB M2200- Providing Weep Holes KSRRB
M2200-8. Providing weep holes in Brick masonry I
Plain I Reinforced concrete abutment, wing wall I
return wall with 100 mm dia AC pipe, extending
through the full width of the structure with slope of
205 28.1 1V :20H towards drawing force. Complete as per Nos/mtr 70.00 151.41 10,598.70 - 40.00 6,056.40 40.00 6,056.40
drawing and Technical Specifications including cost
of materials, labour, HOM complete as per
specifications. MORTH Specification No.2706 &
2200 ---- with all lead and lifts, loading and unloading
charges, cost of all materials, labour, equipment etc.,
complete the work as per specifications and directions
Providing and constucting pithcing / Revetment of 30
cm thick on slopes using granite/basalt/trap/stones of
surface area not less than 0.04 sqm and wedged with
spalls including cost of all materials, labour etc.,
complete as per specification. ---- with all lead and
206 34.14 lifts, loading and unloading charges, cost of all Sqm 71.40 460.41 32,873.27 - - - -
materials, labour, equipment etc., complete the work
as per specifications and directions of the Engineer
incharge of Work.

KSRRB M300-53. Construction of embankment with


approved material Gravel/Murrum with all lifts and
leads, transporting to site, spreading, grading to
required slope and compacting to meet requirement
Table 300-2 complete as per specifications, including
207 19.6 cost of gravel / murrum, watering charges & cum 218.75 334.75 73,226.56 - - - -
compaction by vibratory roller to 95% of modified
proctors density. MORTH Specification No. 305 ----
with all lead and lifts, loading and unloading charges,
cost of all materials, labour, equipment etc., complete
the work as per specifications and directions of the
Engineer incharge of Work.
KSRRB M800- Painting Letters KSRRB M800-6.
Painting two coats on New Concrete Surface :
Painting two coats after filling the surface with
synthetic enamel paint in all shades on new plastered
concrete surfaces complete as per specifications.
208 24.7 MORTH Specification No. 803 ---- with all lead and Sqm 77.70 84.46 6,562.54 - - - - -
lifts, loading and unloading charges, cost of all
materials, labour, equipment etc., complete the work
as per specifications and directions of the Engineer
incharge of Work.

PMC Contractor AE/JE PWD Nelamangala Sub Division AEE- PWD Nelamangala Sub Division
Page 15 of 74
Name of Work:- Package 295 :
A) Improvements to Nelamangala - Chikkaballapura road SH-74 from Km 8.60 t o Km 13.00 & Km 31.40 to Km 32.40 & loop Road Km 0.00 to Km 2.90 (in selected reaches) in Doddaballapura taluk of Bangalore Rural District Via Uddichikkanahalli cross, Kanasavadi, Doddaballapura Town,
Heggadihalli,
B) Improvements to KS road to Balenahalli road MDR from Km 0.00 to Km 7.51 and Hadonahalli to Melekote MDR road from Km 0.00 to Km 0.50 (in selected reaches) in Doddaballapura taluk of Bangaluru Rural Dist Via Gaddambachahalli Cross , Tubagere Cross, Hadonahalli,
C) Improvements to Channapattna - Nelamangala road New SH from km 75.90 to Km 77.90 (in selected reaches) in Nelamangala Taluk of Bangalore Rural District Via Bramanipura - Kavanapura - SRS Betta - Avverahalli - Kailancha - Nagohalli - Hunasanahalli - Uragahalli - Bidahi - Ganakallu
D) Improvements to Begur NH - 04 to join NH- 207 road MDR from Km 0.00 to Km 14.60 (in selected reaches) in Nelamangala Taluk of Bangalore Rural District via Thayamagondlu, Niduvandha, Tumkur border

RA Bill No - 8th and Part Final


General Abstract
As per Tender Previous Present Upto Date
BOQ No
Item code Description of Work Unit Amount Amount Amount Amount Remarks
Qty Rate Qty Qty Qty
(Rs.) (Rs.) (Rs.) (Rs.)
Earth work in excavation for foundation of structures
like culverts, retaining walls etc., as per drawing and
technical specification, including setting out,
construction of shoring and bracing, dressing of sides
and bottom, backfilling with approved material,
209 34.15.2 disposal of balance earth as per specifications, cum 327.25 46.35 15,168.04 - - - -
including cost of labour, HOM etc. , complete. in all
kinds of soil by mechanical means. ---- with all lead
and lifts, loading and unloading charges, cost of all
materials, labour, equipment etc., complete the work
as per specifications and directions of the Engineer
incharge of Work.
KSRRB M2200-6. Providing T.M.T. steel
reinforcement for R.C.C. work including
straightening, cutting, bending, hooking, placing in
position, lapping and/or welding wherever required,
tying with binding wire and anchoring to the
210 28.8.2 adjoining members wherever necessary complete as Tonne 5.45 70,279.99 382,801.05 - - - -
per disign (laps, hooks and wastage shall not be
measured and paid) cost of materials, labour, HOM
complete as per specification. MORTH Specification
No.1600 & 2200 TMT Fe 500 ---- with all lead and
lifts, loading and unloading charges, cost of all
materials, labour, equipment etc., complete the work
Providing and laying plain/reinforced cement
concrete for side drains using M20 nominal mix
concrete with OPC at 300 kgs. with 20mm and down
size granite metal coarse aggregates at 0.69 cum and
fine aggregates at 0.43 cum machine mixed, well
211 37.59.2 compacted for walls and bottom including centering, cum 105.00 6,870.10 721,360.50 - - - -
shuttering, cost of materials, HOM of machinery,
curing etc., complete excluding cost of steel as per
MORTH specification No. 1500, 1700, 2200.
including cost of materials, labour, HOM complete as
per specifications. Wall & bottom thickness 15cm ----
with all lead and lifts, loading and unloading charges,
KSRRB M2900-1. Plain cement concrete M10 mix
with crushed stone aggregate 40mm nominal size
mechanically mixed, placed in foundation and
compacted by vibration including curing including
cost of materials, labour, HOM complete as per
212 34.1 specifications. MORTH Specification No. 408 ---- cum 38.50 4,352.78 167,582.03 - - - -
with all lead and lifts, loading and unloading charges,
cost of all materials, labour, equipment etc., complete
the work as per specifications and directions of the
Engineer incharge of Work.

Solid slab super structure KSRRB M2300-3.1.


Furnishing and Placing Reinforced / Prestressed
cement concrete in super-structure as per drawing and
Technical Specification complete as per
specifications. B. RCC with OPC cement design mix
213 29.5.1 M25 @ 340kgs, with 20mm and down size graded cum 23.63 6,610.54 156,174.01 - - -
granite metal coarse aggregates @0.7cum and fine
aggregates @ 0.47cum, with superplastisiser @3lts
confirming to IS9103-1999 Reaffirmed- 2008, Case -
I : Using Concrete Mixer MORTH Specification No.
1500,1600 & 1700 - Height upto 5 m - ---- with all
lead and lifts, loading and unloading charges, cost of
Tender Amount Rs. 150,252,271.21 45,259,005.50 183,807.72 45,442,813.22
Add GST 12 % 18,030,272.55 5,431,080.66 22,056.93 5,453,137.59
Total Amount Rs. 168,282,543.75 50,690,086.16 205,864.65 50,895,950.81
Certified that work has been carried out satisfactorily and as per Standard technical detailed specifications.

PMC Contractor AE/JE PWD Nelamangala Sub Division AEE- PWD Nelamangala Sub Division
30964 30964
640978.6 640978.6
1014616 1014616
208448.3 208448.3
12303504 12303504
16397934 16397934
32065.75 32065.75
120909.9 120909.9
370925.7 370925.7
340003 340003
2970825 2970825
2082100 10286136
0 2082100
10286136 2196.758
0 19262.77
0 84085.5
0 60403.81
0 99819.55
0 78836.29
0 71073.09
0 6056.4
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2196.758
84085.5
19262.77
78836.29
99819.55
60403.81
71073.09
6056.4
0
0
0
0
0
0
0
0
Volume Report

6 TO 6.5 6.6TO 7.1 7.1 TO 7.4 7.4-7.5


38.46 36.285 35.01 48.585
52.215 39.57 35.055 51.78
94.44 49.215 35.67 35.115
96.855 58.635 47 0
86.445 43.41 55
124.17 27.21 39.255
129.51 49.98 24.375
174.405 46.8 21.765
268.14 36.24 25.8
223.485 41.115 43.575
138.195 32.88 46.35
87.24 39.51 0
93.195 43.5
86.94 28.095
102.45 33.735
146.205 37.38
140.145 22.41
2082.495 25.155
691.125
olume Report

7.5-7.7 7.87-8.00 8-8.2


42.105 25.455 48.93
55.245 32.79 31.245
49.71 31.995 42.06
46.905 32.19 43.035
41.115 32.19 30.99
32.865 53.43 27.33
25.335 0 31.425
0 255.015
Page 20

GOVERNMENT OF KARNATAKA
PUBLIC WORKS, PORTS & INLAND WATER TRANSPORT DEPARTMENT
DODDABALLAPURA BANGALORE RURAL DISTRICT
PRE MEASUREMENT SHEET
R.A Bill No. 8th and Part Final
Package 295(D) Improvements to Begur NH - 04 to join NH- 207 road MDR from Km 0.00 to Km 14.60 (in selected reaches) in
Nelamangala Taluk of Bangalore Rural District
KSRRB M200-11.1. Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees
girth up to 300 mm, removalof stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material
to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness complete as per
specifications . II. By Mechanical Means:A. In area of light jungle. MORTH Specification No. 201 ---- with all lead and lifts, loading
160 and unloading charges, cost of all materials, labour, equipment etc., complete the work as per specifications and directions of the
Engineer incharge of Work.

B B1 Avg B
Chainage No Length Depth Unit Qnty Remarks
(m) (m) (m)

CH 0.000 to 6.500 KM
Ch: 0.000 to 0.030 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 0.030 to 0.060 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 0.060 to 0.090 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 0.090 to 0.120 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 0.120 to 0.150 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 0.150 to 0.180 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 0.180 to 0.210 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 0.210 to 0.240 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 0.240 to 0.270 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 0.270 to 0.300 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 0.300 to 0.330 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 0.330 to 0.360 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 0.360 to 0.390 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 0.390 to 0.420 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 0.420 to 0.450 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 0.450 to 0.480 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 0.480 to 0.510 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 0.510 to 0.540 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 0.540 to 0.570 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 0.570 to 0.600 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 0.600 to 0.630 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 0.630 to 0.660 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 0.660 to 0.690 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 0.690 to 0.720 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 0.720 to 0.750 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 0.750 to 0.780 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 0.780 to 0.810 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 0.810 to 0.840 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 0.840 to 0.870 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 0.870 to 0.900 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 0.900 to 0.930 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 0.930 to 0.960 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 0.960 to 0.990 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 0.990 to 1.020 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 1.020 to 1.050 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 1.050 to 1.080 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 1.080 to 1.110 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 1.110 to 1.140 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 1.140 to 1.170 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 1.170 to 1.200 2 30.00 1.50 1.50 1.50 Sqm 90.00

Contractor PMC Section Officer AEE PWD Nelamangala Sub-division


Page 21
Ch: 1.200 to 1.230 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 1.230 to 1.260 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 1.260 to 1.290 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 1.290 to 1.320 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 1.320 to 1.350 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 1.350 to 1.380 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 1.380 to 1.410 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 1.410 to 1.440 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 1.440 to 1.470 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 1.470 to 1.500 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 1.500 to 1.530 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 1.530 to 1.560 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 1.560 to 1.590 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 1.590 to 1.620 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 1.620 to 1.650 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 1.650 to 1.680 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 1.680 to 1.710 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 1.710 to 1.740 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 1.740 to 1.770 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 1.770 to 1.800 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 1.800 to 1.830 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 1.830 to 1.860 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 1.860 to 1.890 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 1.890 to 1.920 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 1.920 to 1.950 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 1.950 to 1.980 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 1.980 to 2.010 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 2.010 to 2.040 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 2.040 to 2.070 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 2.070 to 2.100 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 2.100 to 2.130 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 2.130 to 2.160 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 2.160 to 2.190 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 2.190 to 2.220 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 2.220 to 2.250 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 2.250 to 2.280 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 2.280 to 2.310 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 2.310 to 2.340 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 2.340 to 2.370 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 2.370 to 2.400 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 2.400 to 2.430 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 2.430 to 2.460 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 2.460 to 2.490 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 2.490 to 2.520 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 2.520 to 2.550 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 2.550 to 2.580 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 2.580 to 2.610 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 2.610 to 2.640 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 2.640 to 2.670 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 2.670 to 2.700 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 2.700 to 2.730 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 2.730 to 2.760 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 2.760 to 2.790 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 2.790 to 2.820 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 2.820 to 2.850 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 2.850 to 2.880 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 2.880 to 2.910 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 2.910 to 2.940 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 2.940 to 2.970 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 2.970 to 3.000 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 3.000 to 3.030 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 3.030 to 3.060 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 3.060 to 3.090 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 3.090 to 3.120 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 3.120 to 3.150 2 30.00 1.50 1.50 1.50 Sqm 90.00

Contractor PMC Section Officer AEE PWD Nelamangala Sub-division


Page 22
Ch: 3.150 to 3.180 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 3.180 to 3.210 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 3.210 to 3.240 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 3.240 to 3.270 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 3.270 to 3.300 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 3.300 to 3.330 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 3.330 to 3.360 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 3.360 to 3.390 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 3.390 to 3.420 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 3.420 to 3.450 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 3.450 to 3.480 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 3.480 to 3.510 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 3.510 to 3.540 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 3.540 to 3.570 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 3.570 to 3.600 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 3.600 to 3.630 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 3.630 to 3.660 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 3.660 to 3.690 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 3.690 to 3.720 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 3.720 to 3.750 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 3.750 to 3.780 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 3.780 to 3.810 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 3.810 to 3.840 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 3.840 to 3.870 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 3.870 to 3.900 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 3.900 to 3.930 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 3.930 to 3.960 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 3.960 to 3.990 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 3.990 to 4.020 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 4.020 to 4.050 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 4.050 to 4.080 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 4.080 to 4.110 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 4.110 to 4.140 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 4.140 to 4.170 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 4.170 to 4.200 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 4.200 to 4.230 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 4.230 to 4.260 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 4.260 to 4.290 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 4.290 to 4.320 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 4.320 to 4.350 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 4.350 to 4.380 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 4.380 to 4.410 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 4.410 to 4.440 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 4.440 to 4.470 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 4.470 to 4.500 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 4.500 to 4.530 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 4.530 to 4.560 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 4.560 to 4.590 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 4.590 to 4.620 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 4.620 to 4.650 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 4.650 to 4.680 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 4.680 to 4.710 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 4.710 to 4.740 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 4.740 to 4.770 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 4.770 to 4.800 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 4.800 to 4.830 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 4.830 to 4.860 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 4.860 to 4.890 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 4.890 to 4.920 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 4.920 to 4.950 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 4.950 to 4.980 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 4.980 to 5.010 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 5.010 to 5.040 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 5.040 to 5.070 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 5.070 to 5.100 2 30.00 1.50 1.50 1.50 Sqm 90.00

Contractor PMC Section Officer AEE PWD Nelamangala Sub-division


Page 23
Ch: 5.100 to 5.130 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 5.130 to 5.160 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 5.160 to 5.190 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 5.190 to 5.220 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 5.220 to 5.250 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 5.250 to 5.280 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 5.280 to 5.310 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 5.310 to 5.340 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 5.340 to 5.370 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 5.370 to 5.400 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 5.400 to 5.430 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 5.430 to 5.460 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 5.460 to 5.490 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 5.490 to 5.520 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 5.520 to 5.550 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 5.550 to 5.580 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 5.580 to 5.610 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 5.610 to 5.640 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 5.640 to 5.670 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 5.670 to 5.700 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 5.700 to 5.730 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 5.730 to 5.760 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 5.760 to 5.790 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 5.790 to 5.820 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 5.820 to 5.850 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 5.850 to 5.880 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 5.880 to 5.910 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 5.910 to 5.940 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 5.940 to 5.970 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 5.970 to 6.000 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch 6.0 -6.50 Km Not Tackled

Ch: 6.600 to 6.630 2 30.00 1.50 1.50 1.50 Sqm 90.00


Ch: 6.630 to 6.660 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 6.660 to 6.690 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 6.690 to 6.720 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 6.720 to 6.750 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 6.750 to 6.780 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 6.780 to 6.810 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 6.810 to 6.840 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 6.840 to 6.870 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 6.870 to 6.900 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 6.900 to 6.930 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 6.930 to 6.960 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 6.960 to 6.990 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 6.990 to 7.020 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 7.020 to 7.050 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 7.050 to 7.080 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch: 7.080 to 7.100 2 20.00 1.50 1.50 1.50 Sqm 60.00

19500.00
Deduct 40% Voids Sqm 7800.00
Sub Total 1.17
Chainage Km 13.3 to Km 14.5
Ch. 13.30 to 13.33 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch. 13.33 to 13.36 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch. 13.36 to 13.39 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch. 13.39 to 13.42 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch. 13.42 to 13.45 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch. 13.45 to 13.48 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch. 13.48 to 13.51 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch. 13.51 to 13.54 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch. 13.54 to 13.57 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch. 13.57 to 13.60 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch. 13.60 to 13.63 2 30.00 1.50 1.50 1.50 Sqm 90.00

Contractor PMC Section Officer AEE PWD Nelamangala Sub-division


Page 24
Ch. 13.63 to 13.66 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch. 13.66 to 13.69 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch. 13.69 to 13.72 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch. 13.72 to 13.75 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch. 13.75 to 13.78 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch. 13.78 to 13.81 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch. 13.81 to 13.84 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch. 13.84 to 13.87 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch. 13.87 to 13.90 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch. 13.90 to 13.93 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch. 13.93 to 13.96 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch. 13.96 to 13.99 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch. 13.99 to 14.02 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch. 14.02 to 14.05 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch. 14.05 to 14.08 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch. 14.08 to 14.11 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch. 14.11 to 14.14 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch. 14.14 to 14.17 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch. 14.17 to 14.20 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch. 14.20 to 14.23 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch. 14.23 to 14.26 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch. 14.26 to 14.29 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch. 14.29 to 14.32 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch. 14.32 to 14.35 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch. 14.35 to 14.38 2 30.00 1.50 1.50 1.50 Sqm 90.00
Ch. 14.38 14.41 2 30.00 1.50 1.50 1.50 Sqm 90.00
Sqm 3330.00

Sub Total 0.33


Total Qty 1.50
Total BoQ Qty 2.23
Balance BoQ Qty 0.73

Contractor PMC Section Officer AEE PWD Nelamangala Sub-division


Page 25
161 KSRRB M300-14. Excavation for roadwork in all types of soil by mechanical means including cutting and loading to tippers,
trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transportation with a lead
of 1.00 km and complete as per specifications. MORTH Specification No.301 ---- with all lead and lifts, loading and unloading
charges, cost of all materials, labour, equipment etc., complete the work as per specifications and directions of the Engineer incharge
of Work.

B B1 Avg B
Chainage No Length Depth Unit Qnty Remarks
(m) (m) (m)
CH 0.000 to 6.00 KM
Ch: 0 to 0.03 2 30 0.00 0.00 0.00 0.45 cum 0
Ch: 0.03 to 0.06 2 30 0.00 0.00 0.00 0.45 cum 0
Ch: 0.06 to 0.09 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 0.09 to 0.12 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 0.12 to 0.15 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 0.15 to 0.18 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 0.18 to 0.21 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 0.21 to 0.24 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 0.24 to 0.27 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 0.27 to 0.3 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 0.3 to 0.33 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 0.33 to 0.36 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 0.36 to 0.39 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 0.39 to 0.42 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 0.42 to 0.45 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 0.45 to 0.48 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 0.48 to 0.51 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 0.51 to 0.54 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 0.54 to 0.57 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 0.57 to 0.6 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 0.6 to 0.63 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 0.63 to 0.66 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 0.66 to 0.69 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 0.69 to 0.72 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 0.72 to 0.75 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 0.75 to 0.78 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 0.78 to 0.81 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 0.81 to 0.84 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 0.84 to 0.87 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 0.87 to 0.9 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 0.9 to 0.93 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 0.93 to 0.96 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 0.96 to 0.99 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 0.99 to 1.02 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 1.02 to 1.05 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 1.05 to 1.08 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 1.08 to 1.11 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 1.11 to 1.14 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 1.14 to 1.17 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 1.17 to 1.2 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 1.2 to 1.23 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 1.23 to 1.26 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 1.26 to 1.29 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 1.29 to 1.32 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 1.32 to 1.35 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 1.35 to 1.38 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 1.38 to 1.41 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 1.41 to 1.44 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 1.44 to 1.47 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 1.47 to 1.5 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 1.5 to 1.53 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 1.53 to 1.56 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 1.56 to 1.59 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 1.59 to 1.62 2 30 2.35 2.35 2.35 0.45 cum 63.45

Contractor PMC Section Officer AEE PWD Nelamangala Sub-division


Page 26
Ch: 1.62 to 1.65 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 1.65 to 1.68 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 1.68 to 1.71 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 1.71 to 1.74 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 1.74 to 1.77 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 1.77 to 1.8 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 1.8 to 1.83 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 1.83 to 1.86 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 1.86 to 1.89 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 1.89 to 1.92 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 1.92 to 1.95 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 1.95 to 1.98 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 1.98 to 2.01 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 2.01 to 2.04 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 2.04 to 2.07 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 2.07 to 2.1 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 2.1 to 2.13 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 2.13 to 2.16 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 2.16 to 2.19 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 2.19 to 2.22 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 2.22 to 2.25 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 2.25 to 2.28 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 2.28 to 2.31 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 2.31 to 2.34 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 2.34 to 2.37 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 2.37 to 2.4 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 2.4 to 2.43 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 2.43 to 2.46 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 2.46 to 2.49 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 2.49 to 2.52 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 2.52 to 2.55 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 2.55 to 2.58 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 2.58 to 2.61 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 2.61 to 2.64 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 2.64 to 2.67 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 2.67 to 2.7 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 2.7 to 2.73 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 2.73 to 2.76 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 2.76 to 2.79 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 2.79 to 2.82 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 2.82 to 2.85 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 2.85 to 2.88 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 2.88 to 2.91 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 2.91 to 2.94 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 2.94 to 2.97 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 2.97 to 3 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 3 to 3.03 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 3.03 to 3.06 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 3.06 to 3.09 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 3.09 to 3.12 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 3.12 to 3.15 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 3.15 to 3.18 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 3.18 to 3.21 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 3.21 to 3.24 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 3.24 to 3.27 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 3.27 to 3.3 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 3.3 to 3.33 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 3.33 to 3.36 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 3.36 to 3.39 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 3.39 to 3.42 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 3.42 to 3.45 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 3.45 to 3.48 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 3.48 to 3.51 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 3.51 to 3.54 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 3.54 to 3.57 2 30 2.35 2.35 2.35 0.45 cum 63.45

Contractor PMC Section Officer AEE PWD Nelamangala Sub-division


Page 27
Ch: 3.57 to 3.6 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 3.6 to 3.63 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 3.63 to 3.66 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 3.66 to 3.69 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 3.69 to 3.72 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 3.72 to 3.75 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 3.75 to 3.78 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 3.78 to 3.81 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 3.81 to 3.84 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 3.84 to 3.87 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 3.87 to 3.9 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 3.9 to 3.93 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 3.93 to 3.96 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 3.96 to 3.99 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 3.99 to 4.02 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 4.02 to 4.05 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 4.05 to 4.08 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 4.08 to 4.11 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 4.11 to 4.14 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 4.14 to 4.17 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 4.17 to 4.2 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 4.2 to 4.23 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 4.23 to 4.26 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 4.26 to 4.29 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 4.29 to 4.32 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 4.32 to 4.35 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 4.35 to 4.38 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 4.38 to 4.41 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 4.41 to 4.44 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 4.44 to 4.47 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 4.47 to 4.5 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 4.5 to 4.53 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 4.53 to 4.56 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 4.56 to 4.59 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 4.59 to 4.62 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 4.62 to 4.65 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 4.65 to 4.68 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 4.68 to 4.71 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 4.71 to 4.74 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 4.74 to 4.77 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 4.77 to 4.8 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 4.8 to 4.83 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 4.83 to 4.86 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 4.86 to 4.89 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 4.89 to 4.92 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 4.92 to 4.95 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 4.95 to 4.98 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 4.98 to 5.01 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 5.01 to 5.04 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 5.04 to 5.07 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 5.07 to 5.1 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 5.1 to 5.13 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 5.13 to 5.16 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 5.16 to 5.19 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 5.19 to 5.22 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 5.22 to 5.25 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 5.25 to 5.28 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 5.28 to 5.31 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 5.31 to 5.34 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 5.34 to 5.37 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 5.37 to 5.4 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 5.4 to 5.43 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 5.43 to 5.46 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 5.46 to 5.49 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 5.49 to 5.52 2 30 2.35 2.35 2.35 0.45 cum 63.45

Contractor PMC Section Officer AEE PWD Nelamangala Sub-division


Page 28
Ch: 5.52 to 5.55 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 5.55 to 5.58 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 5.58 to 5.61 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 5.61 to 5.64 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 5.64 to 5.67 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 5.67 to 5.7 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 5.7 to 5.73 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 5.73 to 5.76 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 5.76 to 5.79 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 5.79 to 5.82 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 5.82 to 5.85 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 5.85 to 5.88 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 5.88 to 5.91 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 5.91 to 5.94 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 5.94 to 5.97 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 5.97 to 6 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch 6.0 -6.50 Km Not Tackled

Ch: 6.6 to 6.63 2 30 2.35 2.35 2.35 0.45 cum 63.45


Ch: 6.63 to 6.66 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 6.66 to 6.69 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 6.69 to 6.72 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 6.72 to 6.75 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 6.75 to 6.78 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 6.78 to 6.81 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 6.81 to 6.84 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 6.84 to 6.87 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 6.87 to 6.9 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 6.9 to 6.93 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 6.93 to 6.96 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 6.96 to 6.99 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 6.99 to 7.02 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 7.02 to 7.05 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 7.05 to 7.08 2 30 2.35 2.35 2.35 0.45 cum 63.45
Ch: 7.08 to 7.1 2 20 2.35 2.35 2.35 0.45 cum 42.3

Sub Total 13620.6


Chainage Km 13.3 to Km 14.5
Ch. 13.30 to 13.33 2 30.00 0.85 0.85 0.85 0.45 Cum 22.95
Ch. 13.33 to 13.36 2 30.00 0.85 0.85 0.85 0.45 Cum 22.95
Ch. 13.36 to 13.39 2 30.00 0.85 0.85 0.85 0.45 Cum 22.95
Ch. 13.39 to 13.42 2 30.00 0.85 0.85 0.85 0.45 Cum 22.95
Ch. 13.42 to 13.45 2 30.00 0.85 0.85 0.85 0.45 Cum 22.95
Ch. 13.45 to 13.48 2 30.00 0.85 0.85 0.85 0.45 Cum 22.95
Ch. 13.48 to 13.51 2 30.00 0.85 0.85 0.85 0.45 Cum 22.95
Ch. 13.51 to 13.54 2 30.00 0.85 0.85 0.85 0.45 Cum 22.95
Ch. 13.54 to 13.57 2 30.00 0.85 0.85 0.85 0.45 Cum 22.95
Ch. 13.57 to 13.60 2 30.00 0.85 0.85 0.85 0.45 Cum 22.95
Ch. 13.60 to 13.63 2 30.00 0.85 0.85 0.85 0.45 Cum 22.95
Ch. 13.63 to 13.66 2 30.00 0.85 0.85 0.85 0.45 Cum 22.95
Ch. 13.66 to 13.69 2 30.00 0.85 0.85 0.85 0.45 Cum 22.95
Ch. 13.69 to 13.72 2 30.00 0.85 0.85 0.85 0.45 Cum 22.95
Ch. 13.72 to 13.75 2 30.00 0.85 0.85 0.85 0.45 Cum 22.95
Ch. 13.75 to 13.78 2 30.00 0.85 0.85 0.85 0.45 Cum 22.95
Ch. 13.78 to 13.81 2 30.00 0.85 0.85 0.85 0.45 Cum 22.95
Ch. 13.81 to 13.84 2 30.00 0.85 0.85 0.85 0.45 Cum 22.95
Ch. 13.84 to 13.87 2 30.00 0.85 0.85 0.85 0.45 Cum 22.95
Ch. 13.87 to 13.90 2 30.00 0.85 0.85 0.85 0.45 Cum 22.95
Ch. 13.90 to 13.93 2 30.00 0.85 0.85 0.85 0.45 Cum 22.95
Ch. 13.93 to 13.96 2 30.00 0.85 0.85 0.85 0.45 Cum 22.95
Ch. 13.96 to 13.99 2 30.00 0.85 0.85 0.85 0.45 Cum 22.95
Ch. 13.99 to 14.02 2 30.00 0.85 0.85 0.85 0.45 Cum 22.95
Ch. 14.02 to 14.05 2 30.00 0.85 0.85 0.85 0.45 Cum 22.95
Ch. 14.05 to 14.08 2 30.00 0.85 0.85 0.85 0.45 Cum 22.95
Ch. 14.08 to 14.11 2 30.00 0.85 0.85 0.85 0.45 Cum 22.95

Contractor PMC Section Officer AEE PWD Nelamangala Sub-division


Page 29
Ch. 14.11 to 14.14 2 30.00 0.85 0.85 0.85 0.45 Cum 22.95

Contractor PMC Section Officer AEE PWD Nelamangala Sub-division


Page 30
Ch. 14.14 to 14.17 2 30.00 0.85 0.85 0.85 0.45 Cum 22.95
Ch. 14.17 to 14.20 2 30.00 0.85 0.85 0.85 0.45 Cum 22.95
Ch. 14.20 to 14.23 2 30.00 0.85 0.85 0.85 0.45 Cum 22.95
Ch. 14.23 to 14.26 2 30.00 0.85 0.85 0.85 0.45 Cum 22.95
Ch. 14.26 to 14.29 2 30.00 0.85 0.85 0.85 0.45 Cum 22.95
Ch. 14.29 to 14.32 2 30.00 0.85 0.85 0.85 0.45 Cum 22.95
Ch. 14.32 14.35 2 30.00 0.85 0.85 0.85 0.45 Cum 22.95
Ch. 14.35 14.38 2 30.00 0.85 0.85 0.85 0.45 Cum 22.95
Ch. 14.38 14.41 2 30.00 0.85 0.85 0.85 0.45 Cum 22.95
Subtotal 849.15
Deduct for Tree Portion( LHS)
Ch 0.517 to 0.527 1 10 2.35 2.35 2.35 0.45 cum 10.575
Ch 0.573 to 0.583 1 10 2.35 2.35 2.35 0.45 cum 10.575
Ch 0.885 to 0.895 1 10 2.35 2.35 2.35 0.45 cum 10.575
Ch 1.452 to 1.462 1 10 2.35 2.35 2.35 0.45 cum 10.575
Ch 1.495 to 1.505 1 10 2.35 2.35 2.35 0.45 cum 10.575
Ch 1.99 to 2 1 10 2.35 2.35 2.35 0.45 cum 10.575
Ch 2.015 to 2.025 1 10 2.35 2.35 2.35 0.45 cum 10.575
Ch 2.035 to 2.045 1 10 2.35 2.35 2.35 0.45 cum 10.575
Ch 2.172 to 2.182 1 10 2.35 2.35 2.35 0.45 cum 10.575
Ch 2.295 to 2.305 1 10 2.35 2.35 2.35 0.45 cum 10.575
Ch 2.388 to 2.398 1 10 2.35 2.35 2.35 0.45 cum 10.575
Ch 2.908 to 2.918 1 10 2.35 2.35 2.35 0.45 cum 10.575
Ch 2.945 to 2.955 1 10 2.35 2.35 2.35 0.45 cum 10.575
Ch 3 to 3.01 1 10 2.35 2.35 2.35 0.45 cum 10.575
Ch 3.07 to 3.08 1 10 2.35 2.35 2.35 0.45 cum 10.575
Ch 3.08 to 3.09 1 10 2.35 2.35 2.35 0.45 cum 10.575
Ch 3.205 to 3.215 1 10 2.35 2.35 2.35 0.45 cum 10.575
Ch 3.255 to 3.265 1 10 2.35 2.35 2.35 0.45 cum 10.575
Ch 3.32 to 3.33 1 10 2.35 2.35 2.35 0.45 cum 10.575
Ch 3.37 to 3.38 1 10 2.35 2.35 2.35 0.45 cum 10.575
Ch 3.405 to 3.415 1 10 2.35 2.35 2.35 0.45 cum 10.575
Ch 3.43 to 3.44 1 10 2.35 2.35 2.35 0.45 cum 10.575
Ch 3.532 to 3.542 1 10 2.35 2.35 2.35 0.45 cum 10.575
Ch 3.665 to 3.675 1 10 2.35 2.35 2.35 0.45 cum 10.575
Ch 3.775 to 3.785 1 10 2.35 2.35 2.35 0.45 cum 10.575
Ch 3.788 to 3.798 1 10 2.35 2.35 2.35 0.45 cum 10.575
Ch 4.02 to 4.03 1 10 2.35 2.35 2.35 0.45 cum 10.575
Ch 4.23 to 4.24 1 10 2.35 2.35 2.35 0.45 cum 10.575
Ch 4.46 to 4.47 1 10 2.35 2.35 2.35 0.45 cum 10.575
Ch 4.497 to 4.507 1 10 2.35 2.35 2.35 0.45 cum 10.575
Ch 4.91 to 4.92 1 10 2.35 2.35 2.35 0.45 cum 10.575

Sub Total 327.825

Deduct for Tree Portion( RHS)


Ch 0.32 to 0.33 1 10 2.35 2.35 2.35 0.45 cum 10.575
Ch 0.517 to 0.527 1 10 2.35 2.35 2.35 0.45 cum 10.575
Ch 0.868 to 0.878 1 10 2.35 2.35 2.35 0.45 cum 10.575
Ch 1.305 to 1.315 1 10 2.35 2.35 2.35 0.45 cum 10.575
Ch 1.365 to 1.375 1 10 2.35 2.35 2.35 0.45 cum 10.575
Ch 1.46 to 1.47 1 10 2.35 2.35 2.35 0.45 cum 10.575
Ch 1.585 to 1.595 1 10 2.35 2.35 2.35 0.45 cum 10.575
Ch 1.955 to 1.965 1 10 2.35 2.35 2.35 0.45 cum 10.575
Ch 1.98 to 1.99 1 10 2.35 2.35 2.35 0.45 cum 10.575
Ch 2.23 to 2.24 1 10 2.35 2.35 2.35 0.45 cum 10.575
Ch 2.435 to 2.445 1 10 2.35 2.35 2.35 0.45 cum 10.575
Ch 2.67 to 2.68 1 10 2.35 2.35 2.35 0.45 cum 10.575
Ch 2.865 to 2.875 1 10 2.35 2.35 2.35 0.45 cum 10.575
Ch 2.91 to 2.92 1 10 2.35 2.35 2.35 0.45 cum 10.575
Ch 2.92 to 2.93 1 10 2.35 2.35 2.35 0.45 cum 10.575
Ch 2.926 to 2.936 1 10 2.35 2.35 2.35 0.45 cum 10.575
Ch 2.933 to 2.943 1 10 2.35 2.35 2.35 0.45 cum 10.575
Ch 3.115 to 3.125 1 10 2.35 2.35 2.35 0.45 cum 10.575
Ch 3.185 to 3.195 1 10 2.35 2.35 2.35 0.45 cum 10.575

Contractor PMC Section Officer AEE PWD Nelamangala Sub-division


Page 31
Ch 3.205 to 3.215 1 10 2.35 2.35 2.35 0.45 cum 10.575
Ch 3.34 to 3.35 1 10 2.35 2.35 2.35 0.45 cum 10.575
Ch 3.485 to 3.495 1 10 2.35 2.35 2.35 0.45 cum 10.575
Ch 3.683 to 3.693 1 10 2.35 2.35 2.35 0.45 cum 10.575
Ch 3.691 to 3.701 1 10 2.35 2.35 2.35 0.45 cum 10.575
Ch 3.775 to 3.785 1 10 2.35 2.35 2.35 0.45 cum 10.575
Ch 3.81 to 3.82 1 10 2.35 2.35 2.35 0.45 cum 10.575
Ch 4.015 to 4.025 1 10 2.35 2.35 2.35 0.45 cum 10.575
Ch 4.085 to 4.095 1 10 2.35 2.35 2.35 0.45 cum 10.575
Ch 4.31 to 4.32 1 10 2.35 2.35 2.35 0.45 cum 10.575
Ch 4.51 to 4.52 1 10 2.35 2.35 2.35 0.45 cum 10.575
Sub Total 317.25
Total Qty 13824.68
Total BoQ Qty 34462.69
Balance BoQ Qty 20638.02

Contractor PMC Section Officer AEE PWD Nelamangala Sub-division


Page 32
KSRRB M300-Construction of Embankment with Material deposited from Roadway cutting. KSRRB M300-54.
Construction of embankment with approved material deposited at site from roadway cutting and excavation from drain
and foundation of other structures graded and compacted to meet requirement of Table 300-2 complete asper
162
specifications.which includes , watering charges & compaction by vibratory roller) MORTH Specification No. 305 ----
with all lead and lifts, loading and unloading charges, cost of all materials, labour, equipment etc., complete the work as
per specifications and directions of the Engineer incharge of Work.
Chainage No Length Avg Avg Depth Unit Qnty Remarks
B B1 Breadth

CH 0.000 to 6.50 KM
Ch: cum 10487.495
cum
From Quantity Statement A For CH 0.000 to6.0 KM,6.6-7.1 KM

Chainage 13.30-14.410 Km
Ch: From Quantity Statement A For CH 13.30 to 14.41 KM cum 136.62
Sub Total 10369.10
Total BoQ Qty 21513.62
Balance BoQ Qty 11144.52

Contractor PMC Section Officer AEE PWD Nelamangala Sub-division


Page 33
163 KSRRB 300-Compaction KSRRB 300-58. Compaction of original ground with maximum of 6 passes of 8 to 10 tonnes
power roller including filling in depression occuring during rolling including cost of all labour, HOM of machinery
complete as per specifications. MORTH / Chapter 3 ---- with all lead and lifts, loading and unloading charges, cost of all
materials, labour, equipment etc., complete the work as per specifications and directions of the Engineer incharge of
Work.

B B1 Avg B
Chainage No Length Depth Unit Qnty Remarks
(m) (m) (m)
CH 0.000 to 6.00 KM
Ch: 0 to 0.03 2 30 0.00 0.00 0.00 Sqm 0
Ch: 0.03 to 0.06 2 30 0.00 0.00 0.00 Sqm 0
Ch: 0.06 to 0.09 2 30 2.35 2.35 2.35 Sqm 141
Ch: 0.09 to 0.12 2 30 2.35 2.35 2.35 Sqm 141
Ch: 0.12 to 0.15 2 30 2.35 2.35 2.35 Sqm 141
Ch: 0.15 to 0.18 2 30 2.35 2.35 2.35 Sqm 141
Ch: 0.18 to 0.21 2 30 2.35 2.35 2.35 Sqm 141
Ch: 0.21 to 0.24 2 30 2.35 2.35 2.35 Sqm 141
Ch: 0.24 to 0.27 2 30 2.35 2.35 2.35 Sqm 141
Ch: 0.27 to 0.3 2 30 2.35 2.35 2.35 Sqm 141
Ch: 0.3 to 0.33 2 30 2.35 2.35 2.35 Sqm 141
Ch: 0.33 to 0.36 2 30 2.35 2.35 2.35 Sqm 141
Ch: 0.36 to 0.39 2 30 2.35 2.35 2.35 Sqm 141
Ch: 0.39 to 0.42 2 30 2.35 2.35 2.35 Sqm 141
Ch: 0.42 to 0.45 2 30 2.35 2.35 2.35 Sqm 141
Ch: 0.45 to 0.48 2 30 2.35 2.35 2.35 Sqm 141
Ch: 0.48 to 0.51 2 30 2.35 2.35 2.35 Sqm 141
Ch: 0.51 to 0.54 2 30 2.35 2.35 2.35 Sqm 141
Ch: 0.54 to 0.57 2 30 2.35 2.35 2.35 Sqm 141
Ch: 0.57 to 0.6 2 30 2.35 2.35 2.35 Sqm 141
Ch: 0.6 to 0.63 2 30 2.35 2.35 2.35 Sqm 141
Ch: 0.63 to 0.66 2 30 2.35 2.35 2.35 Sqm 141
Ch: 0.66 to 0.69 2 30 2.35 2.35 2.35 Sqm 141
Ch: 0.69 to 0.72 2 30 2.35 2.35 2.35 Sqm 141
Ch: 0.72 to 0.75 2 30 2.35 2.35 2.35 Sqm 141
Ch: 0.75 to 0.78 2 30 2.35 2.35 2.35 Sqm 141
Ch: 0.78 to 0.81 2 30 2.35 2.35 2.35 Sqm 141
Ch: 0.81 to 0.84 2 30 2.35 2.35 2.35 Sqm 141
Ch: 0.84 to 0.87 2 30 2.35 2.35 2.35 Sqm 141
Ch: 0.87 to 0.9 2 30 2.35 2.35 2.35 Sqm 141
Ch: 0.9 to 0.93 2 30 2.35 2.35 2.35 Sqm 141
Ch: 0.93 to 0.96 2 30 2.35 2.35 2.35 Sqm 141
Ch: 0.96 to 0.99 2 30 2.35 2.35 2.35 Sqm 141
Ch: 0.99 to 1.02 2 30 2.35 2.35 2.35 Sqm 141
Ch: 1.02 to 1.05 2 30 2.35 2.35 2.35 Sqm 141
Ch: 1.05 to 1.08 2 30 2.35 2.35 2.35 Sqm 141
Ch: 1.08 to 1.11 2 30 2.35 2.35 2.35 Sqm 141
Ch: 1.11 to 1.14 2 30 2.35 2.35 2.35 Sqm 141
Ch: 1.14 to 1.17 2 30 2.35 2.35 2.35 Sqm 141
Ch: 1.17 to 1.2 2 30 2.35 2.35 2.35 Sqm 141
Ch: 1.2 to 1.23 2 30 2.35 2.35 2.35 Sqm 141
Ch: 1.23 to 1.26 2 30 2.35 2.35 2.35 Sqm 141
Ch: 1.26 to 1.29 2 30 2.35 2.35 2.35 Sqm 141
Ch: 1.29 to 1.32 2 30 2.35 2.35 2.35 Sqm 141
Ch: 1.32 to 1.35 2 30 2.35 2.35 2.35 Sqm 141
Ch: 1.35 to 1.38 2 30 2.35 2.35 2.35 Sqm 141
Ch: 1.38 to 1.41 2 30 2.35 2.35 2.35 Sqm 141
Ch: 1.41 to 1.44 2 30 2.35 2.35 2.35 Sqm 141
Ch: 1.44 to 1.47 2 30 2.35 2.35 2.35 Sqm 141
Ch: 1.47 to 1.5 2 30 2.35 2.35 2.35 Sqm 141
Ch: 1.5 to 1.53 2 30 2.35 2.35 2.35 Sqm 141
Ch: 1.53 to 1.56 2 30 2.35 2.35 2.35 Sqm 141
Ch: 1.56 to 1.59 2 30 2.35 2.35 2.35 Sqm 141
Ch: 1.59 to 1.62 2 30 2.35 2.35 2.35 Sqm 141
Ch: 1.62 to 1.65 2 30 2.35 2.35 2.35 Sqm 141

Contractor PMC Section Officer AEE PWD Nelamangala Sub-division


Page 34
Ch: 1.65 to 1.68 2 30 2.35 2.35 2.35 Sqm 141
Ch: 1.68 to 1.71 2 30 2.35 2.35 2.35 Sqm 141
Ch: 1.71 to 1.74 2 30 2.35 2.35 2.35 Sqm 141
Ch: 1.74 to 1.77 2 30 2.35 2.35 2.35 Sqm 141
Ch: 1.77 to 1.8 2 30 2.35 2.35 2.35 Sqm 141
Ch: 1.8 to 1.83 2 30 2.35 2.35 2.35 Sqm 141
Ch: 1.83 to 1.86 2 30 2.35 2.35 2.35 Sqm 141
Ch: 1.86 to 1.89 2 30 2.35 2.35 2.35 Sqm 141
Ch: 1.89 to 1.92 2 30 2.35 2.35 2.35 Sqm 141
Ch: 1.92 to 1.95 2 30 2.35 2.35 2.35 Sqm 141
Ch: 1.95 to 1.98 2 30 2.35 2.35 2.35 Sqm 141
Ch: 1.98 to 2.01 2 30 2.35 2.35 2.35 Sqm 141
Ch: 2.01 to 2.04 2 30 2.35 2.35 2.35 Sqm 141
Ch: 2.04 to 2.07 2 30 2.35 2.35 2.35 Sqm 141
Ch: 2.07 to 2.1 2 30 2.35 2.35 2.35 Sqm 141
Ch: 2.1 to 2.13 2 30 2.35 2.35 2.35 Sqm 141
Ch: 2.13 to 2.16 2 30 2.35 2.35 2.35 Sqm 141
Ch: 2.16 to 2.19 2 30 2.35 2.35 2.35 Sqm 141
Ch: 2.19 to 2.22 2 30 2.35 2.35 2.35 Sqm 141
Ch: 2.22 to 2.25 2 30 2.35 2.35 2.35 Sqm 141
Ch: 2.25 to 2.28 2 30 2.35 2.35 2.35 Sqm 141
Ch: 2.28 to 2.31 2 30 2.35 2.35 2.35 Sqm 141
Ch: 2.31 to 2.34 2 30 2.35 2.35 2.35 Sqm 141
Ch: 2.34 to 2.37 2 30 2.35 2.35 2.35 Sqm 141
Ch: 2.37 to 2.4 2 30 2.35 2.35 2.35 Sqm 141
Ch: 2.4 to 2.43 2 30 2.35 2.35 2.35 Sqm 141
Ch: 2.43 to 2.46 2 30 2.35 2.35 2.35 Sqm 141
Ch: 2.46 to 2.49 2 30 2.35 2.35 2.35 Sqm 141
Ch: 2.49 to 2.52 2 30 2.35 2.35 2.35 Sqm 141
Ch: 2.52 to 2.55 2 30 2.35 2.35 2.35 Sqm 141
Ch: 2.55 to 2.58 2 30 2.35 2.35 2.35 Sqm 141
Ch: 2.58 to 2.61 2 30 2.35 2.35 2.35 Sqm 141
Ch: 2.61 to 2.64 2 30 2.35 2.35 2.35 Sqm 141
Ch: 2.64 to 2.67 2 30 2.35 2.35 2.35 Sqm 141
Ch: 2.67 to 2.7 2 30 2.35 2.35 2.35 Sqm 141
Ch: 2.7 to 2.73 2 30 2.35 2.35 2.35 Sqm 141
Ch: 2.73 to 2.76 2 30 2.35 2.35 2.35 Sqm 141
Ch: 2.76 to 2.79 2 30 2.35 2.35 2.35 Sqm 141
Ch: 2.79 to 2.82 2 30 2.35 2.35 2.35 Sqm 141
Ch: 2.82 to 2.85 2 30 2.35 2.35 2.35 Sqm 141
Ch: 2.85 to 2.88 2 30 2.35 2.35 2.35 Sqm 141
Ch: 2.88 to 2.91 2 30 2.35 2.35 2.35 Sqm 141
Ch: 2.91 to 2.94 2 30 2.35 2.35 2.35 Sqm 141
Ch: 2.94 to 2.97 2 30 2.35 2.35 2.35 Sqm 141
Ch: 2.97 to 3 2 30 2.35 2.35 2.35 Sqm 141
Ch: 3 to 3.03 2 30 2.35 2.35 2.35 Sqm 141
Ch: 3.03 to 3.06 2 30 2.35 2.35 2.35 Sqm 141
Ch: 3.06 to 3.09 2 30 2.35 2.35 2.35 Sqm 141
Ch: 3.09 to 3.12 2 30 2.35 2.35 2.35 Sqm 141
Ch: 3.12 to 3.15 2 30 2.35 2.35 2.35 Sqm 141
Ch: 3.15 to 3.18 2 30 2.35 2.35 2.35 Sqm 141
Ch: 3.18 to 3.21 2 30 2.35 2.35 2.35 Sqm 141
Ch: 3.21 to 3.24 2 30 2.35 2.35 2.35 Sqm 141
Ch: 3.24 to 3.27 2 30 2.35 2.35 2.35 Sqm 141
Ch: 3.27 to 3.3 2 30 2.35 2.35 2.35 Sqm 141
Ch: 3.3 to 3.33 2 30 2.35 2.35 2.35 Sqm 141
Ch: 3.33 to 3.36 2 30 2.35 2.35 2.35 Sqm 141
Ch: 3.36 to 3.39 2 30 2.35 2.35 2.35 Sqm 141
Ch: 3.39 to 3.42 2 30 2.35 2.35 2.35 Sqm 141
Ch: 3.42 to 3.45 2 30 2.35 2.35 2.35 Sqm 141
Ch: 3.45 to 3.48 2 30 2.35 2.35 2.35 Sqm 141
Ch: 3.48 to 3.51 2 30 2.35 2.35 2.35 Sqm 141
Ch: 3.51 to 3.54 2 30 2.35 2.35 2.35 Sqm 141
Ch: 3.54 to 3.57 2 30 2.35 2.35 2.35 Sqm 141
Ch: 3.57 to 3.6 2 30 2.35 2.35 2.35 Sqm 141

Contractor PMC Section Officer AEE PWD Nelamangala Sub-division


Page 35
Ch: 3.6 to 3.63 2 30 2.35 2.35 2.35 Sqm 141
Ch: 3.63 to 3.66 2 30 2.35 2.35 2.35 Sqm 141
Ch: 3.66 to 3.69 2 30 2.35 2.35 2.35 Sqm 141
Ch: 3.69 to 3.72 2 30 2.35 2.35 2.35 Sqm 141
Ch: 3.72 to 3.75 2 30 2.35 2.35 2.35 Sqm 141
Ch: 3.75 to 3.78 2 30 2.35 2.35 2.35 Sqm 141
Ch: 3.78 to 3.81 2 30 2.35 2.35 2.35 Sqm 141
Ch: 3.81 to 3.84 2 30 2.35 2.35 2.35 Sqm 141
Ch: 3.84 to 3.87 2 30 2.35 2.35 2.35 Sqm 141
Ch: 3.87 to 3.9 2 30 2.35 2.35 2.35 Sqm 141
Ch: 3.9 to 3.93 2 30 2.35 2.35 2.35 Sqm 141
Ch: 3.93 to 3.96 2 30 2.35 2.35 2.35 Sqm 141
Ch: 3.96 to 3.99 2 30 2.35 2.35 2.35 Sqm 141
Ch: 3.99 to 4.02 2 30 2.35 2.35 2.35 Sqm 141
Ch: 4.02 to 4.05 2 30 2.35 2.35 2.35 Sqm 141
Ch: 4.05 to 4.08 2 30 2.35 2.35 2.35 Sqm 141
Ch: 4.08 to 4.11 2 30 2.35 2.35 2.35 Sqm 141
Ch: 4.11 to 4.14 2 30 2.35 2.35 2.35 Sqm 141
Ch: 4.14 to 4.17 2 30 2.35 2.35 2.35 Sqm 141
Ch: 4.17 to 4.2 2 30 2.35 2.35 2.35 Sqm 141
Ch: 4.2 to 4.23 2 30 2.35 2.35 2.35 Sqm 141
Ch: 4.23 to 4.26 2 30 2.35 2.35 2.35 Sqm 141
Ch: 4.26 to 4.29 2 30 2.35 2.35 2.35 Sqm 141
Ch: 4.29 to 4.32 2 30 2.35 2.35 2.35 Sqm 141
Ch: 4.32 to 4.35 2 30 2.35 2.35 2.35 Sqm 141
Ch: 4.35 to 4.38 2 30 2.35 2.35 2.35 Sqm 141
Ch: 4.38 to 4.41 2 30 2.35 2.35 2.35 Sqm 141
Ch: 4.41 to 4.44 2 30 2.35 2.35 2.35 Sqm 141
Ch: 4.44 to 4.47 2 30 2.35 2.35 2.35 Sqm 141
Ch: 4.47 to 4.5 2 30 2.35 2.35 2.35 Sqm 141
Ch: 4.5 to 4.53 2 30 2.35 2.35 2.35 Sqm 141
Ch: 4.53 to 4.56 2 30 2.35 2.35 2.35 Sqm 141
Ch: 4.56 to 4.59 2 30 2.35 2.35 2.35 Sqm 141
Ch: 4.59 to 4.62 2 30 2.35 2.35 2.35 Sqm 141
Ch: 4.62 to 4.65 2 30 2.35 2.35 2.35 Sqm 141
Ch: 4.65 to 4.68 2 30 2.35 2.35 2.35 Sqm 141
Ch: 4.68 to 4.71 2 30 2.35 2.35 2.35 Sqm 141
Ch: 4.71 to 4.74 2 30 2.35 2.35 2.35 Sqm 141
Ch: 4.74 to 4.77 2 30 2.35 2.35 2.35 Sqm 141
Ch: 4.77 to 4.8 2 30 2.35 2.35 2.35 Sqm 141
Ch: 4.8 to 4.83 2 30 2.35 2.35 2.35 Sqm 141
Ch: 4.83 to 4.86 2 30 2.35 2.35 2.35 Sqm 141
Ch: 4.86 to 4.89 2 30 2.35 2.35 2.35 Sqm 141
Ch: 4.89 to 4.92 2 30 2.35 2.35 2.35 Sqm 141
Ch: 4.92 to 4.95 2 30 2.35 2.35 2.35 Sqm 141
Ch: 4.95 to 4.98 2 30 2.35 2.35 2.35 Sqm 141
Ch: 4.98 to 5.01 2 30 2.35 2.35 2.35 Sqm 141
Ch: 5.01 to 5.04 2 30 2.35 2.35 2.35 Sqm 141
Ch: 5.04 to 5.07 2 30 2.35 2.35 2.35 Sqm 141
Ch: 5.07 to 5.1 2 30 2.35 2.35 2.35 Sqm 141
Ch: 5.1 to 5.13 2 30 2.35 2.35 2.35 Sqm 141
Ch: 5.13 to 5.16 2 30 2.35 2.35 2.35 Sqm 141
Ch: 5.16 to 5.19 2 30 2.35 2.35 2.35 Sqm 141
Ch: 5.19 to 5.22 2 30 2.35 2.35 2.35 Sqm 141
Ch: 5.22 to 5.25 2 30 2.35 2.35 2.35 Sqm 141
Ch: 5.25 to 5.28 2 30 2.35 2.35 2.35 Sqm 141
Ch: 5.28 to 5.31 2 30 2.35 2.35 2.35 Sqm 141
Ch: 5.31 to 5.34 2 30 2.35 2.35 2.35 Sqm 141
Ch: 5.34 to 5.37 2 30 2.35 2.35 2.35 Sqm 141
Ch: 5.37 to 5.4 2 30 2.35 2.35 2.35 Sqm 141
Ch: 5.4 to 5.43 2 30 2.35 2.35 2.35 Sqm 141
Ch: 5.43 to 5.46 2 30 2.35 2.35 2.35 Sqm 141
Ch: 5.46 to 5.49 2 30 2.35 2.35 2.35 Sqm 141
Ch: 5.49 to 5.52 2 30 2.35 2.35 2.35 Sqm 141
Ch: 5.52 to 5.55 2 30 2.35 2.35 2.35 Sqm 141

Contractor PMC Section Officer AEE PWD Nelamangala Sub-division


Page 36
Ch: 5.55 to 5.58 2 30 2.35 2.35 2.35 Sqm 141
Ch: 5.58 to 5.61 2 30 2.35 2.35 2.35 Sqm 141
Ch: 5.61 to 5.64 2 30 2.35 2.35 2.35 Sqm 141
Ch: 5.64 to 5.67 2 30 2.35 2.35 2.35 Sqm 141
Ch: 5.67 to 5.7 2 30 2.35 2.35 2.35 Sqm 141
Ch: 5.7 to 5.73 2 30 2.35 2.35 2.35 Sqm 141
Ch: 5.73 to 5.76 2 30 2.35 2.35 2.35 Sqm 141
Ch: 5.76 to 5.79 2 30 2.35 2.35 2.35 Sqm 141
Ch: 5.79 to 5.82 2 30 2.35 2.35 2.35 Sqm 141
Ch: 5.82 to 5.85 2 30 2.35 2.35 2.35 Sqm 141
Ch: 5.85 to 5.88 2 30 2.35 2.35 2.35 Sqm 141
Ch: 5.88 to 5.91 2 30 2.35 2.35 2.35 Sqm 141
Ch: 5.91 to 5.94 2 30 2.35 2.35 2.35 Sqm 141
Ch: 5.94 to 5.97 2 30 2.35 2.35 2.35 Sqm 141
Ch: 5.97 to 6 2 30 2.35 2.35 2.35 Sqm 141
Ch 6.0 -6.50 Km Not Tackled

Ch: 6.6 to 6.63 2 30 2.35 2.35 2.35 Sqm 141


Ch: 6.63 to 6.66 2 30 2.35 2.35 2.35 Sqm 141
Ch: 6.66 to 6.69 2 30 2.35 2.35 2.35 Sqm 141
Ch: 6.69 to 6.72 2 30 2.35 2.35 2.35 Sqm 141
Ch: 6.72 to 6.75 2 30 2.35 2.35 2.35 Sqm 141
Ch: 6.75 to 6.78 2 30 2.35 2.35 2.35 Sqm 141
Ch: 6.78 to 6.81 2 30 2.35 2.35 2.35 Sqm 141
Ch: 6.81 to 6.84 2 30 2.35 2.35 2.35 Sqm 141
Ch: 6.84 to 6.87 2 30 2.35 2.35 2.35 Sqm 141
Ch: 6.87 to 6.9 2 30 2.35 2.35 2.35 Sqm 141
Ch: 6.9 to 6.93 2 30 2.35 2.35 2.35 Sqm 141
Ch: 6.93 to 6.96 2 30 2.35 2.35 2.35 Sqm 141
Ch: 6.96 to 6.99 2 30 2.35 2.35 2.35 Sqm 141
Ch: 6.99 to 7.02 2 30 2.35 2.35 2.35 Sqm 141
Ch: 7.02 to 7.05 2 30 2.35 2.35 2.35 Sqm 141
Ch: 7.05 to 7.08 2 30 2.35 2.35 2.35 Sqm 141
Ch: 7.08 to 7.1 2 20 2.35 2.35 2.35 Sqm 94

Sub Total 30268


Chainage Km 13.3 to Km 14.5
Ch. 13.3 to 13.33 2 30 0.85 0.85 0.85 Sqm 51
Ch. 13.33 to 13.36 2 30 0.85 0.85 0.85 Sqm 51
Ch. 13.36 to 13.39 2 30 0.85 0.85 0.85 Sqm 51
Ch. 13.39 to 13.42 2 30 0.85 0.85 0.85 Sqm 51
Ch. 13.42 to 13.45 2 30 0.85 0.85 0.85 Sqm 51
Ch. 13.45 to 13.48 2 30 0.85 0.85 0.85 Sqm 51
Ch. 13.48 to 13.51 2 30 0.85 0.85 0.85 Sqm 51
Ch. 13.51 to 13.54 2 30 0.85 0.85 0.85 Sqm 51
Ch. 13.54 to 13.57 2 30 0.85 0.85 0.85 Sqm 51
Ch. 13.57 to 13.6 2 30 0.85 0.85 0.85 Sqm 51
Ch. 13.6 to 13.63 2 30 0.85 0.85 0.85 Sqm 51
Ch. 13.63 to 13.66 2 30 0.85 0.85 0.85 Sqm 51
Ch. 13.66 to 13.69 2 30 0.85 0.85 0.85 Sqm 51
Ch. 13.69 to 13.72 2 30 0.85 0.85 0.85 Sqm 51
Ch. 13.72 to 13.75 2 30 0.85 0.85 0.85 Sqm 51
Ch. 13.75 to 13.78 2 30 0.85 0.85 0.85 Sqm 51
Ch. 13.78 to 13.81 2 30 0.85 0.85 0.85 Sqm 51
Ch. 13.81 to 13.84 2 30 0.85 0.85 0.85 Sqm 51
Ch. 13.84 to 13.87 2 30 0.85 0.85 0.85 Sqm 51
Ch. 13.87 to 13.9 2 30 0.85 0.85 0.85 Sqm 51
Ch. 13.9 to 13.93 2 30 0.85 0.85 0.85 Sqm 51
Ch. 13.93 to 13.96 2 30 0.85 0.85 0.85 Sqm 51
Ch. 13.96 to 13.99 2 30 0.85 0.85 0.85 Sqm 51
Ch. 13.99 to 14.02 2 30 0.85 0.85 0.85 Sqm 51
Ch. 14.02 to 14.05 2 30 0.85 0.85 0.85 Sqm 51
Ch. 14.05 to 14.08 2 30 0.85 0.85 0.85 Sqm 51
Ch. 14.08 to 14.11 2 30 0.85 0.85 0.85 Sqm 51
Ch. 14.11 to 14.14 2 30 0.85 0.85 0.85 Sqm 51

Contractor PMC Section Officer AEE PWD Nelamangala Sub-division


Page 37
Ch. 14.14 to 14.17 2 30 0.85 0.85 0.85 Sqm 51
Ch. 14.17 to 14.2 2 30 0.85 0.85 0.85 Sqm 51
Ch. 14.2 to 14.23 2 30 0.85 0.85 0.85 Sqm 51
Ch. 14.23 to 14.26 2 30 0.85 0.85 0.85 Sqm 51
Ch. 14.26 to 14.29 2 30 0.85 0.85 0.85 Sqm 51
Ch. 14.29 to 14.32 2 30 0.85 0.85 0.85 Sqm 51
Ch. 14.32 to 14.35 2 30 0.85 0.85 0.85 Sqm 51
Ch. 14.35 to 14.38 2 30 0.85 0.85 0.85 Sqm 51
Ch. 14.38 to 14.41 2 30 0.85 0.85 0.85 Sqm 51
Sub Total 1887.00

Deduct for Tree Portion( LHS)


Ch 0.517 to 0.527 1 10 2.35 2.35 2.35 Sqm 23.5
Ch 0.573 to 0.583 1 10 2.35 2.35 2.35 Sqm 23.5
Ch 0.885 to 0.895 1 10 2.35 2.35 2.35 Sqm 23.5
Ch 1.452 to 1.462 1 10 2.35 2.35 2.35 Sqm 23.5
Ch 1.495 to 1.505 1 10 2.35 2.35 2.35 Sqm 23.5
Ch 1.99 to 2 1 10 2.35 2.35 2.35 Sqm 23.5
Ch 2.015 to 2.025 1 10 2.35 2.35 2.35 Sqm 23.5
Ch 2.035 to 2.045 1 10 2.35 2.35 2.35 Sqm 23.5
Ch 2.172 to 2.182 1 10 2.35 2.35 2.35 Sqm 23.5
Ch 2.295 to 2.305 1 10 2.35 2.35 2.35 Sqm 23.5
Ch 2.388 to 2.398 1 10 2.35 2.35 2.35 Sqm 23.5
Ch 2.908 to 2.918 1 10 2.35 2.35 2.35 Sqm 23.5
Ch 2.945 to 2.955 1 10 2.35 2.35 2.35 Sqm 23.5
Ch 3 to 3.01 1 10 2.35 2.35 2.35 Sqm 23.5
Ch 3.07 to 3.08 1 10 2.35 2.35 2.35 Sqm 23.5
Ch 3.08 to 3.09 1 10 2.35 2.35 2.35 Sqm 23.5
Ch 3.205 to 3.215 1 10 2.35 2.35 2.35 Sqm 23.5
Ch 3.255 to 3.265 1 10 2.35 2.35 2.35 Sqm 23.5
Ch 3.32 to 3.33 1 10 2.35 2.35 2.35 Sqm 23.5
Ch 3.37 to 3.38 1 10 2.35 2.35 2.35 Sqm 23.5
Ch 3.405 to 3.415 1 10 2.35 2.35 2.35 Sqm 23.5
Ch 3.43 to 3.44 1 10 2.35 2.35 2.35 Sqm 23.5
Ch 3.532 to 3.542 1 10 2.35 2.35 2.35 Sqm 23.5
Ch 3.665 to 3.675 1 10 2.35 2.35 2.35 Sqm 23.5
Ch 3.775 to 3.785 1 10 2.35 2.35 2.35 Sqm 23.5
Ch 3.788 to 3.798 1 10 2.35 2.35 2.35 Sqm 23.5
Ch 4.02 to 4.03 1 10 2.35 2.35 2.35 Sqm 23.5
Ch 4.23 to 4.24 1 10 2.35 2.35 2.35 Sqm 23.5
Ch 4.46 to 4.47 1 10 2.35 2.35 2.35 Sqm 23.5
Ch 4.497 to 4.507 1 10 2.35 2.35 2.35 Sqm 23.5
Ch 4.91 to 4.92 1 10 2.35 2.35 2.35 Sqm 23.5
Sub Total 728.5

Deduct for Tree Portion( RHS)


Ch 0.32 to 0.33 1 10 2.35 2.35 2.35 Sqm 23.5
Ch 0.517 to 0.527 1 10 2.35 2.35 2.35 Sqm 23.5
Ch 0.868 to 0.878 1 10 2.35 2.35 2.35 Sqm 23.5
Ch 1.305 to 1.315 1 10 2.35 2.35 2.35 Sqm 23.5
Ch 1.365 to 1.375 1 10 2.35 2.35 2.35 Sqm 23.5
Ch 1.46 to 1.47 1 10 2.35 2.35 2.35 Sqm 23.5
Ch 1.585 to 1.595 1 10 2.35 2.35 2.35 Sqm 23.5
Ch 1.955 to 1.965 1 10 2.35 2.35 2.35 Sqm 23.5
Ch 1.98 to 1.99 1 10 2.35 2.35 2.35 Sqm 23.5
Ch 2.23 to 2.24 1 10 2.35 2.35 2.35 Sqm 23.5
Ch 2.435 to 2.445 1 10 2.35 2.35 2.35 Sqm 23.5
Ch 2.67 to 2.68 1 10 2.35 2.35 2.35 Sqm 23.5
Ch 2.865 to 2.875 1 10 2.35 2.35 2.35 Sqm 23.5
Ch 2.91 to 2.92 1 10 2.35 2.35 2.35 Sqm 23.5
Ch 2.92 to 2.93 1 10 2.35 2.35 2.35 Sqm 23.5
Ch 2.926 to 2.936 1 10 2.35 2.35 2.35 Sqm 23.5
Ch 2.933 to 2.943 1 10 2.35 2.35 2.35 Sqm 23.5
Ch 3.115 to 3.125 1 10 2.35 2.35 2.35 Sqm 23.5
Ch 3.185 to 3.195 1 10 2.35 2.35 2.35 Sqm 23.5

Contractor PMC Section Officer AEE PWD Nelamangala Sub-division


Page 38
Ch 3.205 to 3.215 1 10 2.35 2.35 2.35 Sqm 23.5
Ch 3.34 to 3.35 1 10 2.35 2.35 2.35 Sqm 23.5
Ch 3.485 to 3.495 1 10 2.35 2.35 2.35 Sqm 23.5
Ch 3.683 to 3.693 1 10 2.35 2.35 2.35 Sqm 23.5
Ch 3.691 to 3.701 1 10 2.35 2.35 2.35 Sqm 23.5
Ch 3.775 to 3.785 1 10 2.35 2.35 2.35 Sqm 23.5
Ch 3.81 to 3.82 1 10 2.35 2.35 2.35 Sqm 23.5
Ch 4.015 to 4.025 1 10 2.35 2.35 2.35 Sqm 23.5
Ch 4.085 to 4.095 1 10 2.35 2.35 2.35 Sqm 23.5
Ch 4.31 to 4.32 1 10 2.35 2.35 2.35 Sqm 23.5
Ch 4.51 to 4.52 1 10 2.35 2.35 2.35 Sqm 23.5
Sub Total 705
Total Qty 30721.50
Total BoQ Qty 54114.45
Balance BoQ Qty 23392.95

Contractor PMC Section Officer AEE PWD Nelamangala Sub-division


Page 39
164 Construction of granular sub-base Grading-V as Sub-base and drainage layer by providing coarse graded crushed stone
aggregates of granite/trap/basalt material, mixing by mix in place method by rotavator at OMC, spreading in uniform
layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the 98 % proctor
density, complete as per specifications. Clause 401 of MORTH V Revision. ---- with all lead and lifts, loading and
unloading charges, cost of all materials, labour, equipment etc., complete the work as per specifications and directions of
the Engineer incharge of Work.

B B1 Avg B
Chainage No Length Depth Unit Qnty Remarks
(m) (m) (m)
CH 0.000 to 6.000 KM (1st Layer)
Ch: 0 to 0.03 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 0.03 to 0.06 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 0.06 to 0.09 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 0.09 to 0.12 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 0.12 to 0.15 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 0.15 to 0.18 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 0.18 to 0.21 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 0.21 to 0.24 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 0.24 to 0.27 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 0.27 to 0.3 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 0.3 to 0.33 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 0.33 to 0.36 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 0.36 to 0.39 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 0.39 to 0.42 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 0.42 to 0.45 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 0.45 to 0.48 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 0.48 to 0.51 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 0.51 to 0.54 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 0.54 to 0.57 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 0.57 to 0.6 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 0.6 to 0.63 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 0.63 to 0.66 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 0.66 to 0.69 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 0.69 to 0.72 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 0.72 to 0.75 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 0.75 to 0.78 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 0.78 to 0.81 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 0.81 to 0.84 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 0.84 to 0.87 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 0.87 to 0.9 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 0.9 to 0.93 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 0.93 to 0.96 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 0.96 to 0.99 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 0.99 to 1.02 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 1.02 to 1.05 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 1.05 to 1.08 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 1.08 to 1.11 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 1.11 to 1.14 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 1.14 to 1.17 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 1.17 to 1.2 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 1.2 to 1.23 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 1.23 to 1.26 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 1.26 to 1.29 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 1.29 to 1.32 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 1.32 to 1.35 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 1.35 to 1.38 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 1.38 to 1.41 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 1.41 to 1.44 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 1.44 to 1.47 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 1.47 to 1.5 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 1.5 to 1.53 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 1.53 to 1.56 2 30 2.35 2.35 2.35 0.2 cum 28.2

Contractor PMC Section Officer AEE PWD Nelamangala Sub-division


Page 40
Ch: 1.56 to 1.59 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 1.59 to 1.62 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 1.62 to 1.65 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 1.65 to 1.68 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 1.68 to 1.71 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 1.71 to 1.74 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 1.74 to 1.77 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 1.77 to 1.8 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 1.8 to 1.83 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 1.83 to 1.86 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 1.86 to 1.89 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 1.89 to 1.92 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 1.92 to 1.95 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 1.95 to 1.98 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 1.98 to 2.01 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 2.01 to 2.04 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 2.04 to 2.07 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 2.07 to 2.1 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 2.1 to 2.13 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 2.13 to 2.16 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 2.16 to 2.19 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 2.19 to 2.22 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 2.22 to 2.25 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 2.25 to 2.28 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 2.28 to 2.31 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 2.31 to 2.34 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 2.34 to 2.37 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 2.37 to 2.4 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 2.4 to 2.43 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 2.43 to 2.46 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 2.46 to 2.49 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 2.49 to 2.52 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 2.52 to 2.55 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 2.55 to 2.58 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 2.58 to 2.61 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 2.61 to 2.64 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 2.64 to 2.67 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 2.67 to 2.7 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 2.7 to 2.73 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 2.73 to 2.76 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 2.76 to 2.79 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 2.79 to 2.82 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 2.82 to 2.85 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 2.85 to 2.88 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 2.88 to 2.91 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 2.91 to 2.94 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 2.94 to 2.97 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 2.97 to 3 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 3 to 3.03 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 3.03 to 3.06 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 3.06 to 3.09 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 3.09 to 3.12 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 3.12 to 3.15 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 3.15 to 3.18 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 3.18 to 3.21 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 3.21 to 3.24 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 3.24 to 3.27 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 3.27 to 3.3 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 3.3 to 3.33 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 3.33 to 3.36 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 3.36 to 3.39 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 3.39 to 3.42 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 3.42 to 3.45 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 3.45 to 3.48 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 3.48 to 3.51 2 30 2.35 2.35 2.35 0.2 cum 28.2

Contractor PMC Section Officer AEE PWD Nelamangala Sub-division


Page 41
Ch: 3.51 to 3.54 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 3.54 to 3.57 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 3.57 to 3.6 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 3.6 to 3.63 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 3.63 to 3.66 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 3.66 to 3.69 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 3.69 to 3.72 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 3.72 to 3.75 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 3.75 to 3.78 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 3.78 to 3.81 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 3.81 to 3.84 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 3.84 to 3.87 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 3.87 to 3.9 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 3.9 to 3.93 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 3.93 to 3.96 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 3.96 to 3.99 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 3.99 to 4.02 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 4.02 to 4.05 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 4.05 to 4.08 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 4.08 to 4.11 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 4.11 to 4.14 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 4.14 to 4.17 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 4.17 to 4.2 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 4.2 to 4.23 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 4.23 to 4.26 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 4.26 to 4.29 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 4.29 to 4.32 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 4.32 to 4.35 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 4.35 to 4.38 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 4.38 to 4.41 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 4.41 to 4.44 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 4.44 to 4.47 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 4.47 to 4.5 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 4.5 to 4.53 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 4.53 to 4.56 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 4.56 to 4.59 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 4.59 to 4.62 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 4.62 to 4.65 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 4.65 to 4.68 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 4.68 to 4.71 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 4.71 to 4.74 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 4.74 to 4.77 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 4.77 to 4.8 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 4.8 to 4.83 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 4.83 to 4.86 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 4.86 to 4.89 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 4.89 to 4.92 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 4.92 to 4.95 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 4.95 to 4.98 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 4.98 to 5.01 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 5.01 to 5.04 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 5.04 to 5.07 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 5.07 to 5.1 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 5.1 to 5.13 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 5.13 to 5.16 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 5.16 to 5.19 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 5.19 to 5.22 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 5.22 to 5.25 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 5.25 to 5.28 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 5.28 to 5.31 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 5.31 to 5.34 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 5.34 to 5.37 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 5.37 to 5.4 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 5.4 to 5.43 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 5.43 to 5.46 2 30 2.35 2.35 2.35 0.2 cum 28.2

Contractor PMC Section Officer AEE PWD Nelamangala Sub-division


Page 42
Ch: 5.46 to 5.49 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 5.49 to 5.52 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 5.52 to 5.55 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 5.55 to 5.58 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 5.58 to 5.61 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 5.61 to 5.64 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 5.64 to 5.67 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 5.67 to 5.7 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 5.7 to 5.73 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 5.73 to 5.76 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 5.76 to 5.79 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 5.79 to 5.82 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 5.82 to 5.85 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 5.85 to 5.88 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 5.88 to 5.91 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 5.91 to 5.94 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 5.94 to 5.97 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 5.97 to 6 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch 6.0 -6.50 Km Not Tackled

Ch: 6.6 to 6.63 2 30 2.35 2.35 2.35 0.2 cum 28.2


Ch: 6.63 to 6.66 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 6.66 to 6.69 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 6.69 to 6.72 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 6.72 to 6.75 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 6.75 to 6.78 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 6.78 to 6.81 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 6.81 to 6.84 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 6.84 to 6.87 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 6.87 to 6.9 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 6.9 to 6.93 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 6.93 to 6.96 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 6.96 to 6.99 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 6.99 to 7.02 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 7.02 to 7.05 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 7.05 to 7.08 2 30 2.35 2.35 2.35 0.2 cum 28.2
Ch: 7.08 to 7.1 2 20 2.35 2.35 2.35 0.2 cum 18.8

Sub Total 6110


Chainage Km 13.3 to Km 14.5
Ch. 13.30 to 13.33 2 30.00 0.85 0.85 0.85 0.20 Cum 10.20
Ch. 13.33 to 13.36 2 30.00 0.85 0.85 0.85 0.20 Cum 10.20
Ch. 13.36 to 13.39 2 30.00 0.85 0.85 0.85 0.20 Cum 10.20
Ch. 13.39 to 13.42 2 30.00 0.85 0.85 0.85 0.20 Cum 10.20
Ch. 13.42 to 13.45 2 30.00 0.85 0.85 0.85 0.20 Cum 10.20
Ch. 13.45 to 13.48 2 30.00 0.85 0.85 0.85 0.20 Cum 10.20
Ch. 13.48 to 13.51 2 30.00 0.85 0.85 0.85 0.20 Cum 10.20
Ch. 13.51 to 13.54 2 30.00 0.85 0.85 0.85 0.20 Cum 10.20
Ch. 13.54 to 13.57 2 30.00 0.85 0.85 0.85 0.20 Cum 10.20
Ch. 13.57 to 13.60 2 30.00 0.85 0.85 0.85 0.20 Cum 10.20
Ch. 13.60 to 13.63 2 30.00 0.85 0.85 0.85 0.20 Cum 10.20
Ch. 13.63 to 13.66 2 30.00 0.85 0.85 0.85 0.20 Cum 10.20
Ch. 13.66 to 13.69 2 30.00 0.85 0.85 0.85 0.20 Cum 10.20
Ch. 13.69 to 13.72 2 30.00 0.85 0.85 0.85 0.20 Cum 10.20
Ch. 13.72 to 13.75 2 30.00 0.85 0.85 0.85 0.20 Cum 10.20
Ch. 13.75 to 13.78 2 30.00 0.85 0.85 0.85 0.20 Cum 10.20
Ch. 13.78 to 13.81 2 30.00 0.85 0.85 0.85 0.20 Cum 10.20
Ch. 13.81 to 13.84 2 30.00 0.85 0.85 0.85 0.20 Cum 10.20
Ch. 13.84 to 13.87 2 30.00 0.85 0.85 0.85 0.20 Cum 10.20
Ch. 13.87 to 13.90 2 30.00 0.85 0.85 0.85 0.20 Cum 10.20
Ch. 13.90 to 13.93 2 30.00 0.85 0.85 0.85 0.20 Cum 10.20
Ch. 13.93 to 13.96 2 30.00 0.85 0.85 0.85 0.20 Cum 10.20
Ch. 13.96 to 13.99 2 30.00 0.85 0.85 0.85 0.20 Cum 10.20
Ch. 13.99 to 14.02 2 30.00 0.85 0.85 0.85 0.20 Cum 10.20
Ch. 14.02 to 14.05 2 30.00 0.85 0.85 0.85 0.20 Cum 10.20

Contractor PMC Section Officer AEE PWD Nelamangala Sub-division


Page 43
Ch. 14.05 to 14.08 2 30.00 0.85 0.85 0.85 0.20 Cum 10.20

Contractor PMC Section Officer AEE PWD Nelamangala Sub-division


Page 44
Ch. 14.08 to 14.11 2 30.00 0.85 0.85 0.85 0.20 Cum 10.20
Ch. 14.11 to 14.14 2 30.00 0.85 0.85 0.85 0.20 Cum 10.20
Ch. 14.14 to 14.17 2 30.00 0.85 0.85 0.85 0.20 Cum 10.20
Ch. 14.17 to 14.20 2 30.00 0.85 0.85 0.85 0.20 Cum 10.20
Ch. 14.20 to 14.23 2 30.00 0.85 0.85 0.85 0.20 Cum 10.20
Ch. 14.23 to 14.26 2 30.00 0.85 0.85 0.85 0.20 Cum 10.20
Ch. 14.26 to 14.29 2 30.00 0.85 0.85 0.85 0.20 Cum 10.20
Ch. 14.29 to 14.32 2 30.00 0.85 0.85 0.85 0.20 Cum 10.20
Ch. 14.32 to 14.35 2 30.00 0.85 0.85 0.85 0.20 Cum 10.20
Ch. 14.35 to 14.38 2 30.00 0.85 0.85 0.85 0.20 Cum 10.20
Ch. 14.38 to 14.41 2 30.00 0.85 0.85 0.85 0.20 Cum 10.20
Sub Total 377.40
Deduct for Tree Portion( LHS)
Ch 0.517 to 0.527 1 10 2.35 2.35 2.35 0.2 cum 4.7
Ch 0.573 to 0.583 1 10 2.35 2.35 2.35 0.2 cum 4.7
Ch 0.885 to 0.895 1 10 2.35 2.35 2.35 0.2 cum 4.7
Ch 1.452 to 1.462 1 10 2.35 2.35 2.35 0.2 cum 4.7
Ch 1.495 to 1.505 1 10 2.35 2.35 2.35 0.2 cum 4.7
Ch 1.99 to 2 1 10 2.35 2.35 2.35 0.2 cum 4.7
Ch 2.015 to 2.025 1 10 2.35 2.35 2.35 0.2 cum 4.7
Ch 2.035 to 2.045 1 10 2.35 2.35 2.35 0.2 cum 4.7
Ch 2.172 to 2.182 1 10 2.35 2.35 2.35 0.2 cum 4.7
Ch 2.295 to 2.305 1 10 2.35 2.35 2.35 0.2 cum 4.7
Ch 2.388 to 2.398 1 10 2.35 2.35 2.35 0.2 cum 4.7
Ch 2.908 to 2.918 1 10 2.35 2.35 2.35 0.2 cum 4.7
Ch 2.945 to 2.955 1 10 2.35 2.35 2.35 0.2 cum 4.7
Ch 3 to 3.01 1 10 2.35 2.35 2.35 0.2 cum 4.7
Ch 3.07 to 3.08 1 10 2.35 2.35 2.35 0.2 cum 4.7
Ch 3.08 to 3.09 1 10 2.35 2.35 2.35 0.2 cum 4.7
Ch 3.205 to 3.215 1 10 2.35 2.35 2.35 0.2 cum 4.7
Ch 3.255 to 3.265 1 10 2.35 2.35 2.35 0.2 cum 4.7
Ch 3.32 to 3.33 1 10 2.35 2.35 2.35 0.2 cum 4.7
Ch 3.37 to 3.38 1 10 2.35 2.35 2.35 0.2 cum 4.7
Ch 3.405 to 3.415 1 10 2.35 2.35 2.35 0.2 cum 4.7
Ch 3.43 to 3.44 1 10 2.35 2.35 2.35 0.2 cum 4.7
Ch 3.532 to 3.542 1 10 2.35 2.35 2.35 0.2 cum 4.7
Ch 3.665 to 3.675 1 10 2.35 2.35 2.35 0.2 cum 4.7
Ch 3.775 to 3.785 1 10 2.35 2.35 2.35 0.2 cum 4.7
Ch 3.788 to 3.798 1 10 2.35 2.35 2.35 0.2 cum 4.7
Ch 4.02 to 4.03 1 10 2.35 2.35 2.35 0.2 cum 4.7
Ch 4.23 to 4.24 1 10 2.35 2.35 2.35 0.2 cum 4.7
Ch 4.46 to 4.47 1 10 2.35 2.35 2.35 0.2 cum 4.7
Ch 4.497 to 4.507 1 10 2.35 2.35 2.35 0.2 cum 4.7
Ch 4.91 to 4.92 1 10 2.35 2.35 2.35 0.2 cum 4.7
Sub Total 169.2

Deduct for Tree Portion( RHS)


Ch 0.32 to 0.33 1 10 2.35 2.35 2.35 0.2 cum 4.7
Ch 0.517 to 0.527 1 10 2.35 2.35 2.35 0.2 cum 4.7
Ch 0.868 to 0.878 1 10 2.35 2.35 2.35 0.2 cum 4.7
Ch 1.305 to 1.315 1 10 2.35 2.35 2.35 0.2 cum 4.7
Ch 1.365 to 1.375 1 10 2.35 2.35 2.35 0.2 cum 4.7
Ch 1.46 to 1.47 1 10 2.35 2.35 2.35 0.2 cum 4.7
Ch 1.585 to 1.595 1 10 2.35 2.35 2.35 0.2 cum 4.7
Ch 1.955 to 1.965 1 10 2.35 2.35 2.35 0.2 cum 4.7
Ch 1.98 to 1.99 1 10 2.35 2.35 2.35 0.2 cum 4.7
Ch 2.23 to 2.24 1 10 2.35 2.35 2.35 0.2 cum 4.7
Ch 2.435 to 2.445 1 10 2.35 2.35 2.35 0.2 cum 4.7
Ch 2.67 to 2.68 1 10 2.35 2.35 2.35 0.2 cum 4.7
Ch 2.865 to 2.875 1 10 2.35 2.35 2.35 0.2 cum 4.7
Ch 2.91 to 2.92 1 10 2.35 2.35 2.35 0.2 cum 4.7
Ch 2.92 to 2.93 1 10 2.35 2.35 2.35 0.2 cum 4.7
Ch 2.926 to 2.936 1 10 2.35 2.35 2.35 0.2 cum 4.7
Ch 2.933 to 2.943 1 10 2.35 2.35 2.35 0.2 cum 4.7
Ch 3.115 to 3.125 1 10 2.35 2.35 2.35 0.2 cum 4.7

Contractor PMC Section Officer AEE PWD Nelamangala Sub-division


Page 45
Ch 3.185 to 3.195 1 10 2.35 2.35 2.35 0.2 cum 4.7
Ch 3.205 to 3.215 1 10 2.35 2.35 2.35 0.2 cum 4.7
Ch 3.34 to 3.35 1 10 2.35 2.35 2.35 0.2 cum 4.7
Ch 3.485 to 3.495 1 10 2.35 2.35 2.35 0.2 cum 4.7
Ch 3.683 to 3.693 1 10 2.35 2.35 2.35 0.2 cum 4.7
Ch 3.691 to 3.701 1 10 2.35 2.35 2.35 0.2 cum 4.7
Ch 3.775 to 3.785 1 10 2.35 2.35 2.35 0.2 cum 4.7
Ch 3.81 to 3.82 1 10 2.35 2.35 2.35 0.2 cum 4.7
Ch 4.015 to 4.025 1 10 2.35 2.35 2.35 0.2 cum 4.7
Ch 4.085 to 4.095 1 10 2.35 2.35 2.35 0.2 cum 4.7
Ch 4.31 to 4.32 1 10 2.35 2.35 2.35 0.2 cum 4.7
Ch 4.51 to 4.52 1 10 2.35 2.35 2.35 0.2 cum 4.7
Sub Total 141
Total Qty 6825.80
Total BoQ Qty 10948.08
Balance BoQ Qty 4122.28

Contractor PMC Section Officer AEE PWD Nelamangala Sub-division


Page 46
165 KSRRB M400- Wet Mix Macadam KSRRB M400-17. Providing, laying, spreading and compacting crushed stone
aggregates of granite / trap / basalt to wet mix macadam specifications including pre mixing the material with water at
OMC in mechanical mix plant carriage of mixed method of tipper to site, laying in uniform layers with paver in sub-
base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density complete as
per specifications. MORTH Specification No. 406 ---- with all lead and lifts, loading and unloading charges, cost of all
materials, labour, equipment etc., complete the work as per specifications and directions of the Engineer incharge of
Work.

B B1 Avg B
Chainage No Length Depth Unit Qnty Remarks
(m) (m) (m)
CH 0.000 to 6.000KM
Ch: 0 to 0.03 2 0 2.35 2.35 2.35 0.25 cum 0
Ch: 0.03 to 0.06 2 0 2.35 2.35 2.35 0.25 cum 0
Ch: 0.06 to 0.09 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 0.09 to 0.12 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 0.12 to 0.15 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 0.15 to 0.18 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 0.18 to 0.21 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 0.21 to 0.24 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 0.24 to 0.27 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 0.27 to 0.3 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 0.3 to 0.33 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 0.33 to 0.36 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 0.36 to 0.39 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 0.39 to 0.42 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 0.42 to 0.45 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 0.45 to 0.48 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 0.48 to 0.51 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 0.51 to 0.54 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 0.54 to 0.57 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 0.57 to 0.6 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 0.6 to 0.63 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 0.63 to 0.66 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 0.66 to 0.69 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 0.69 to 0.72 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 0.72 to 0.75 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 0.75 to 0.78 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 0.78 to 0.81 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 0.81 to 0.84 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 0.84 to 0.87 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 0.87 to 0.9 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 0.9 to 0.93 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 0.93 to 0.96 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 0.96 to 0.99 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 0.99 to 1.02 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 1.02 to 1.05 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 1.05 to 1.08 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 1.08 to 1.11 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 1.11 to 1.14 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 1.14 to 1.17 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 1.17 to 1.2 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 1.2 to 1.23 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 1.23 to 1.26 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 1.26 to 1.29 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 1.29 to 1.32 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 1.32 to 1.35 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 1.35 to 1.38 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 1.38 to 1.41 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 1.41 to 1.44 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 1.44 to 1.47 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 1.47 to 1.5 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 1.5 to 1.53 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 1.53 to 1.56 2 30 2.35 2.35 2.35 0.25 cum 35.25

Contractor PMC Section Officer AEE PWD Nelamangala Sub-division


Page 47
Ch: 1.56 to 1.59 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 1.59 to 1.62 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 1.62 to 1.65 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 1.65 to 1.68 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 1.68 to 1.71 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 1.71 to 1.74 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 1.74 to 1.77 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 1.77 to 1.8 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 1.8 to 1.83 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 1.83 to 1.86 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 1.86 to 1.89 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 1.89 to 1.92 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 1.92 to 1.95 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 1.95 to 1.98 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 1.98 to 2.01 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 2.01 to 2.04 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 2.04 to 2.07 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 2.07 to 2.1 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 2.1 to 2.13 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 2.13 to 2.16 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 2.16 to 2.19 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 2.19 to 2.22 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 2.22 to 2.25 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 2.25 to 2.28 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 2.28 to 2.31 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 2.31 to 2.34 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 2.34 to 2.37 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 2.37 to 2.4 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 2.4 to 2.43 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 2.43 to 2.46 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 2.46 to 2.49 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 2.49 to 2.52 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 2.52 to 2.55 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 2.55 to 2.58 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 2.58 to 2.61 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 2.61 to 2.64 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 2.64 to 2.67 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 2.67 to 2.7 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 2.7 to 2.73 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 2.73 to 2.76 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 2.76 to 2.79 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 2.79 to 2.82 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 2.82 to 2.85 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 2.85 to 2.88 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 2.88 to 2.91 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 2.91 to 2.94 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 2.94 to 2.97 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 2.97 to 3 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 3 to 3.03 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 3.03 to 3.06 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 3.06 to 3.09 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 3.09 to 3.12 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 3.12 to 3.15 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 3.15 to 3.18 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 3.18 to 3.21 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 3.21 to 3.24 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 3.24 to 3.27 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 3.27 to 3.3 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 3.3 to 3.33 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 3.33 to 3.36 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 3.36 to 3.39 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 3.39 to 3.42 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 3.42 to 3.45 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 3.45 to 3.48 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 3.48 to 3.51 2 30 2.35 2.35 2.35 0.25 cum 35.25

Contractor PMC Section Officer AEE PWD Nelamangala Sub-division


Page 48
Ch: 3.51 to 3.54 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 3.54 to 3.57 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 3.57 to 3.6 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 3.6 to 3.63 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 3.63 to 3.66 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 3.66 to 3.69 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 3.69 to 3.72 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 3.72 to 3.75 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 3.75 to 3.78 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 3.78 to 3.81 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 3.81 to 3.84 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 3.84 to 3.87 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 3.87 to 3.9 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 3.9 to 3.93 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 3.93 to 3.96 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 3.96 to 3.99 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 3.99 to 4.02 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 4.02 to 4.05 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 4.05 to 4.08 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 4.08 to 4.11 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 4.11 to 4.14 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 4.14 to 4.17 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 4.17 to 4.2 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 4.2 to 4.23 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 4.23 to 4.26 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 4.26 to 4.29 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 4.29 to 4.32 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 4.32 to 4.35 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 4.35 to 4.38 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 4.38 to 4.41 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 4.41 to 4.44 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 4.44 to 4.47 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 4.47 to 4.5 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 4.5 to 4.53 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 4.53 to 4.56 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 4.56 to 4.59 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 4.59 to 4.62 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 4.62 to 4.65 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 4.65 to 4.68 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 4.68 to 4.71 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 4.71 to 4.74 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 4.74 to 4.77 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 4.77 to 4.8 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 4.8 to 4.83 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 4.83 to 4.86 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 4.86 to 4.89 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 4.89 to 4.92 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 4.92 to 4.95 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 4.95 to 4.98 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 4.98 to 5.01 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 5.01 to 5.04 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 5.04 to 5.07 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 5.07 to 5.1 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 5.1 to 5.13 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 5.13 to 5.16 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 5.16 to 5.19 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 5.19 to 5.22 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 5.22 to 5.25 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 5.25 to 5.28 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 5.28 to 5.31 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 5.31 to 5.34 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 5.34 to 5.37 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 5.37 to 5.4 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 5.4 to 5.43 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 5.43 to 5.46 2 30 2.35 2.35 2.35 0.25 cum 35.25

Contractor PMC Section Officer AEE PWD Nelamangala Sub-division


Page 49
Ch: 5.46 to 5.49 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 5.49 to 5.52 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 5.52 to 5.55 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 5.55 to 5.58 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 5.58 to 5.61 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 5.61 to 5.64 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 5.64 to 5.67 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 5.67 to 5.7 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 5.7 to 5.73 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 5.73 to 5.76 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 5.76 to 5.79 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 5.79 to 5.82 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 5.82 to 5.85 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 5.85 to 5.88 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 5.88 to 5.91 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 5.91 to 5.94 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 5.94 to 5.97 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 5.97 to 6 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch 6.0 -6.50 Km Not Tackled

Ch: 6.6 to 6.63 2 30 2.35 2.35 2.35 0.25 cum 35.25


Ch: 6.63 to 6.66 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 6.66 to 6.69 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 6.69 to 6.72 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 6.72 to 6.75 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 6.75 to 6.78 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 6.78 to 6.81 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 6.81 to 6.84 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 6.84 to 6.87 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 6.87 to 6.9 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 6.9 to 6.93 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 6.93 to 6.96 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 6.96 to 6.99 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 6.99 to 7.02 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 7.02 to 7.05 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 7.05 to 7.08 2 30 2.35 2.35 2.35 0.25 cum 35.25
Ch: 7.08 to 7.1 2 20 2.35 2.35 2.35 0.25 cum 23.5

Sub Total 7567


Chainage Km 13.3 to Km 14.5
Ch. 13.30 to 13.33 2 30.00 0.85 0.85 0.85 0.25 Cum 12.75
Ch. 13.33 to 13.36 2 30.00 0.85 0.85 0.85 0.25 Cum 12.75
Ch. 13.36 to 13.39 2 30.00 0.85 0.85 0.85 0.25 Cum 12.75
Ch. 13.39 to 13.42 2 30.00 0.85 0.85 0.85 0.25 Cum 12.75
Ch. 13.42 to 13.45 2 30.00 0.85 0.85 0.85 0.25 Cum 12.75
Ch. 13.45 to 13.48 2 30.00 0.85 0.85 0.85 0.25 Cum 12.75
Ch. 13.48 to 13.51 2 30.00 0.85 0.85 0.85 0.25 Cum 12.75
Ch. 13.51 to 13.54 2 30.00 0.85 0.85 0.85 0.25 Cum 12.75
Ch. 13.54 to 13.57 2 30.00 0.85 0.85 0.85 0.25 Cum 12.75
Ch. 13.57 to 13.60 2 30.00 0.85 0.85 0.85 0.25 Cum 12.75
Ch. 13.60 to 13.63 2 30.00 0.85 0.85 0.85 0.25 Cum 12.75
Ch. 13.63 to 13.66 2 30.00 0.85 0.85 0.85 0.25 Cum 12.75
Ch. 13.66 to 13.69 2 30.00 0.85 0.85 0.85 0.25 Cum 12.75
Ch. 13.69 to 13.72 2 30.00 0.85 0.85 0.85 0.25 Cum 12.75
Ch. 13.72 to 13.75 2 30.00 0.85 0.85 0.85 0.25 Cum 12.75
Ch. 13.75 to 13.78 2 30.00 0.85 0.85 0.85 0.25 Cum 12.75
Ch. 13.78 to 13.81 2 30.00 0.85 0.85 0.85 0.25 Cum 12.75
Ch. 13.81 to 13.84 2 30.00 0.85 0.85 0.85 0.25 Cum 12.75
Ch. 13.84 to 13.87 2 30.00 0.85 0.85 0.85 0.25 Cum 12.75
Ch. 13.87 to 13.90 2 30.00 0.85 0.85 0.85 0.25 Cum 12.75
Ch. 13.90 to 13.93 2 30.00 0.85 0.85 0.85 0.25 Cum 12.75
Ch. 13.93 to 13.96 2 30.00 0.85 0.85 0.85 0.25 Cum 12.75
Ch. 13.96 to 13.99 2 30.00 0.85 0.85 0.85 0.25 Cum 12.75
Ch. 13.99 to 14.02 2 30.00 0.85 0.85 0.85 0.25 Cum 12.75
Ch. 14.02 to 14.05 2 30.00 0.85 0.85 0.85 0.25 Cum 12.75

Contractor PMC Section Officer AEE PWD Nelamangala Sub-division


Page 50
Ch. 14.05 to 14.08 2 30.00 0.85 0.85 0.85 0.25 Cum 12.75

Contractor PMC Section Officer AEE PWD Nelamangala Sub-division


Page 51
Ch. 14.08 to 14.11 2 30.00 0.85 0.85 0.85 0.25 Cum 12.75
Ch. 14.11 to 14.14 2 30.00 0.85 0.85 0.85 0.25 Cum 12.75
Ch. 14.14 to 14.17 2 30.00 0.85 0.85 0.85 0.25 Cum 12.75
Ch. 14.17 to 14.20 2 30.00 0.85 0.85 0.85 0.25 Cum 12.75
Ch. 14.20 to 14.23 2 30.00 0.85 0.85 0.85 0.25 Cum 12.75
Ch. 14.23 to 14.26 2 30.00 0.85 0.85 0.85 0.25 Cum 12.75
Ch. 14.26 to 14.29 2 30.00 0.85 0.85 0.85 0.25 Cum 12.75
Ch. 14.29 to 14.32 2 30.00 0.85 0.85 0.85 0.25 Cum 12.75
Ch. 14.32 to 14.35 2 30.00 0.85 0.85 0.85 0.25 Cum 12.75
Ch. 14.35 to 14.38 2 30.00 0.85 0.85 0.85 0.25 Cum 12.75
Ch. 14.38 to 14.41 2 30.00 0.85 0.85 0.85 0.25 Cum 12.75
Sub Total 471.75

Deduct for Tree Portion( LHS)


Ch 0.517 to 0.527 1 10 2.35 2.35 2.35 0.25 cum 5.875
Ch 0.573 to 0.583 1 10 2.35 2.35 2.35 0.25 cum 5.875
Ch 0.885 to 0.895 1 10 2.35 2.35 2.35 0.25 cum 5.875
Ch 1.452 to 1.462 1 10 2.35 2.35 2.35 0.25 cum 5.875
Ch 1.495 to 1.505 1 10 2.35 2.35 2.35 0.25 cum 5.875
Ch 1.99 to 2 1 10 2.35 2.35 2.35 0.25 cum 5.875
Ch 2.015 to 2.025 1 10 2.35 2.35 2.35 0.25 cum 5.875
Ch 2.035 to 2.045 1 10 2.35 2.35 2.35 0.25 cum 5.875
Ch 2.172 to 2.182 1 10 2.35 2.35 2.35 0.25 cum 5.875
Ch 2.295 to 2.305 1 10 2.35 2.35 2.35 0.25 cum 5.875
Ch 2.388 to 2.398 1 10 2.35 2.35 2.35 0.25 cum 5.875
Ch 2.908 to 2.918 1 10 2.35 2.35 2.35 0.25 cum 5.875
Ch 2.945 to 2.955 1 10 2.35 2.35 2.35 0.25 cum 5.875
Ch 3 to 3.01 1 10 2.35 2.35 2.35 0.25 cum 5.875
Ch 3.07 to 3.08 1 10 2.35 2.35 2.35 0.25 cum 5.875
Ch 3.08 to 3.09 1 10 2.35 2.35 2.35 0.25 cum 5.875
Ch 3.205 to 3.215 1 10 2.35 2.35 2.35 0.25 cum 5.875
Ch 3.255 to 3.265 1 10 2.35 2.35 2.35 0.25 cum 5.875
Ch 3.32 to 3.33 1 10 2.35 2.35 2.35 0.25 cum 5.875
Ch 3.37 to 3.38 1 10 2.35 2.35 2.35 0.25 cum 5.875
Ch 3.405 to 3.415 1 10 2.35 2.35 2.35 0.25 cum 5.875
Ch 3.43 to 3.44 1 10 2.35 2.35 2.35 0.25 cum 5.875
Ch 3.532 to 3.542 1 10 2.35 2.35 2.35 0.25 cum 5.875
Ch 3.665 to 3.675 1 10 2.35 2.35 2.35 0.25 cum 5.875
Ch 3.775 to 3.785 1 10 2.35 2.35 2.35 0.25 cum 5.875
Ch 3.788 to 3.798 1 10 2.35 2.35 2.35 0.25 cum 5.875
Ch 4.02 to 4.03 1 10 2.35 2.35 2.35 0.25 cum 5.875
Ch 4.23 to 4.24 1 10 2.35 2.35 2.35 0.25 cum 5.875
Ch 4.46 to 4.47 1 10 2.35 2.35 2.35 0.25 cum 5.875
Ch 4.497 to 4.507 1 10 2.35 2.35 2.35 0.25 cum 5.875
Ch 4.91 to 4.92 1 10 2.35 2.35 2.35 0.25 cum 5.875

Sub Total 182.125

Deduct for Tree Portion( RHS)


Ch 0.32 to 0.33 1 10 2.35 2.35 2.35 0.25 cum 5.875
Ch 0.517 to 0.527 1 10 2.35 2.35 2.35 0.25 cum 5.875
Ch 0.868 to 0.878 1 10 2.35 2.35 2.35 0.25 cum 5.875
Ch 1.305 to 1.315 1 10 2.35 2.35 2.35 0.25 cum 5.875
Ch 1.365 to 1.375 1 10 2.35 2.35 2.35 0.25 cum 5.875
Ch 1.46 to 1.47 1 10 2.35 2.35 2.35 0.25 cum 5.875
Ch 1.585 to 1.595 1 10 2.35 2.35 2.35 0.25 cum 5.875
Ch 1.955 to 1.965 1 10 2.35 2.35 2.35 0.25 cum 5.875
Ch 1.98 to 1.99 1 10 2.35 2.35 2.35 0.25 cum 5.875
Ch 2.23 to 2.24 1 10 2.35 2.35 2.35 0.25 cum 5.875
Ch 2.435 to 2.445 1 10 2.35 2.35 2.35 0.25 cum 5.875
Ch 2.67 to 2.68 1 10 2.35 2.35 2.35 0.25 cum 5.875
Ch 2.865 to 2.875 1 10 2.35 2.35 2.35 0.25 cum 5.875
Ch 2.91 to 2.92 1 10 2.35 2.35 2.35 0.25 cum 5.875
Ch 2.92 to 2.93 1 10 2.35 2.35 2.35 0.25 cum 5.875
Ch 2.926 to 2.936 1 10 2.35 2.35 2.35 0.25 cum 5.875

Contractor PMC Section Officer AEE PWD Nelamangala Sub-division


Page 52
Ch 2.933 to 2.943 1 10 2.35 2.35 2.35 0.25 cum 5.875
Ch 3.115 to 3.125 1 10 2.35 2.35 2.35 0.25 cum 5.875
Ch 3.185 to 3.195 1 10 2.35 2.35 2.35 0.25 cum 5.875
Ch 3.205 to 3.215 1 10 2.35 2.35 2.35 0.25 cum 5.875
Ch 3.34 to 3.35 1 10 2.35 2.35 2.35 0.25 cum 5.875
Ch 3.485 to 3.495 1 10 2.35 2.35 2.35 0.25 cum 5.875
Ch 3.683 to 3.693 1 10 2.35 2.35 2.35 0.25 cum 5.875
Ch 3.691 to 3.701 1 10 2.35 2.35 2.35 0.25 cum 5.875
Ch 3.775 to 3.785 1 10 2.35 2.35 2.35 0.25 cum 5.875
Ch 3.81 to 3.82 1 10 2.35 2.35 2.35 0.25 cum 5.875
Ch 4.015 to 4.025 1 10 2.35 2.35 2.35 0.25 cum 5.875
Ch 4.085 to 4.095 1 10 2.35 2.35 2.35 0.25 cum 5.875
Ch 4.31 to 4.32 1 10 2.35 2.35 2.35 0.25 cum 5.875
Ch 4.51 to 4.52 1 10 2.35 2.35 2.35 0.25 cum 5.875
Sub Total 176.25
Total Qty 7680.37
Total BoQ Qty 13685.09
Balance BoQ Qty 6004.72

Contractor PMC Section Officer AEE PWD Nelamangala Sub-division


Page 53
KSRRB M500-6. Providing and applying primer coat with S.S. bitumen emulsion on prepared surface of granular base such as WMM including
cleaning of road surface and spraying primer at the rate of 0.60 kg / sqm using mechanical means complete as per specifications. MORTH
168 Specification No. 502 ---- with all lead and lifts, loading and unloading charges, cost of all materials, labour, equipment etc., complete the work
as per specifications and directions of the Engineer incharge of Work.

B B1 Avg B
Chainage No Length Depth Unit Qnty Remarks
(m) (m) (m)
Chainage Km 0.09 to Km 1.20
Ch. 0.09 to 0.12 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 0.12 to 0.15 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 0.15 to 0.18 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 0.18 to 0.21 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 0.21 to 0.24 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 0.24 to 0.27 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 0.27 to 0.3 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 0.3 to 0.33 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 0.33 to 0.36 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 0.36 to 0.39 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 0.39 to 0.42 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 0.42 to 0.45 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 0.45 to 0.48 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 0.48 to 0.51 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 0.51 to 0.54 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 0.54 to 0.57 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 0.57 to 0.60 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 0.6 to 0.63 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 0.63 to 0.66 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 0.66 to 0.69 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 0.69 to 0.72 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 0.72 to 0.75 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 0.75 to 0.78 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 0.78 to 0.81 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 0.81 to 0.84 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 0.84 to 0.87 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 0.87 to 0.90 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 0.9 to 0.93 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 0.93 to 0.96 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 0.96 to 0.99 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 0.99 to 1.02 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 1.02 to 1.05 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 1.05 to 1.08 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 1.08 to 1.11 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 1.11 to 1.14 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 1.14 to 1.17 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 1.17 to 1.20 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 1.2 to 1.23 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 1.23 to 1.26 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 1.26 to 1.29 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 1.29 to 1.32 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 1.32 to 1.35 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 1.35 to 1.38 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 1.38 to 1.41 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 1.41 to 1.44 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 1.44 to 1.47 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 1.47 to 1.50 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 1.5 to 1.53 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 1.53 to 1.56 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 1.56 to 1.59 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 1.59 to 1.62 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 1.62 to 1.65 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 1.65 to 1.68 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 1.68 to 1.71 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 1.71 to 1.74 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 1.74 to 1.77 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 1.77 to 1.80 2 30 2.35 2.35 2.35 Sqm 141.00

Contractor PMC Section Officer AEE PWD Nelamangala Sub-division


Page 54
Ch. 1.8 to 1.83 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 1.83 to 1.86 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 1.86 to 1.89 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 1.89 to 1.92 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 1.92 to 1.95 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 1.95 to 1.98 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 1.98 to 2.01 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 2.01 to 2.04 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 2.04 to 2.07 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 2.07 to 2.10 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 2.1 to 2.13 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 2.13 to 2.16 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 2.16 to 2.19 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 2.19 to 2.22 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 2.22 to 2.25 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 2.25 to 2.28 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 2.28 to 2.31 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 2.31 to 2.34 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 2.34 to 2.37 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 2.37 to 2.40 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 2.4 to 2.43 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 2.43 to 2.46 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 2.46 to 2.49 2 30 2.35 2.35 2.35 Sqm 141.00
Ch. 2.49 to 2.50 2 10 2.35 2.35 2.35 Sqm 47.00
Chainage Km 13.3 to Km 14.5
Ch. 13.30 to 13.33 2 30.00 0.85 0.85 0.85 Sqm 51.00
Ch. 13.33 to 13.36 2 30.00 0.85 0.85 0.85 Sqm 51.00
Ch. 13.36 to 13.39 2 30.00 0.85 0.85 0.85 Sqm 51.00
Ch. 13.39 to 13.42 2 30.00 0.85 0.85 0.85 Sqm 51.00
Ch. 13.42 to 13.45 2 30.00 0.85 0.85 0.85 Sqm 51.00
Ch. 13.45 to 13.48 2 30.00 0.85 0.85 0.85 Sqm 51.00
Ch. 13.48 to 13.51 2 30.00 0.85 0.85 0.85 Sqm 51.00
Ch. 13.51 to 13.54 2 30.00 0.85 0.85 0.85 Sqm 51.00
Ch. 13.54 to 13.57 2 30.00 0.85 0.85 0.85 Sqm 51.00
Ch. 13.57 to 13.60 2 30.00 0.85 0.85 0.85 Sqm 51.00
Ch. 13.60 to 13.63 2 30.00 0.85 0.85 0.85 Sqm 51.00
Ch. 13.63 to 13.66 2 30.00 0.85 0.85 0.85 Sqm 51.00
Ch. 13.66 to 13.69 2 30.00 0.85 0.85 0.85 Sqm 51.00
Ch. 13.69 to 13.72 2 30.00 0.85 0.85 0.85 Sqm 51.00
Ch. 13.72 to 13.75 2 30.00 0.85 0.85 0.85 Sqm 51.00
Ch. 13.75 to 13.78 2 30.00 0.85 0.85 0.85 Sqm 51.00
Ch. 13.78 to 13.81 2 30.00 0.85 0.85 0.85 Sqm 51.00
Ch. 13.81 to 13.84 2 30.00 0.85 0.85 0.85 Sqm 51.00
Ch. 13.84 to 13.87 2 30.00 0.85 0.85 0.85 Sqm 51.00
Ch. 13.87 to 13.90 2 30.00 0.85 0.85 0.85 Sqm 51.00
Ch. 13.90 to 13.93 2 30.00 0.85 0.85 0.85 Sqm 51.00
Ch. 13.93 to 13.96 2 30.00 0.85 0.85 0.85 Sqm 51.00
Ch. 13.96 to 13.99 2 30.00 0.85 0.85 0.85 Sqm 51.00
Ch. 13.99 to 14.02 2 30.00 0.85 0.85 0.85 Sqm 51.00
Ch. 14.02 to 14.05 2 30.00 0.85 0.85 0.85 Sqm 51.00
Ch. 14.05 to 14.08 2 30.00 0.85 0.85 0.85 Sqm 51.00
Ch. 14.08 to 14.11 2 30.00 0.85 0.85 0.85 Sqm 51.00
Ch. 14.11 to 14.14 2 30.00 0.85 0.85 0.85 Sqm 51.00
Ch. 14.14 to 14.17 2 30.00 0.85 0.85 0.85 Sqm 51.00
Ch. 14.17 to 14.20 2 30.00 0.85 0.85 0.85 Sqm 51.00
Ch. 14.20 to 14.23 2 30.00 0.85 0.85 0.85 Sqm 51.00
Ch. 14.23 to 14.26 2 30.00 0.85 0.85 0.85 Sqm 51.00
Ch. 14.26 to 14.29 2 30.00 0.85 0.85 0.85 Sqm 51.00
Ch. 14.29 to 14.32 2 30.00 0.85 0.85 0.85 Sqm 51.00
Ch. 14.32 to 14.35 2 30.00 0.85 0.85 0.85 Sqm 51.00
Ch. 14.35 to 14.38 2 30.00 0.85 0.85 0.85 Sqm 51.00
Ch. 14.38 to 14.41 2 30.00 0.85 0.85 0.85 Sqm 51.00
Sub Total 13214.00
Deduct for Tree Portion( LHS)
Ch 0.517 to 0.527 -1 10.00 2.35 2.35 2.35 Sqm -23.50

Contractor PMC Section Officer AEE PWD Nelamangala Sub-division


Page 55
Ch 0.573 to 0.583 -1 10.00 2.35 2.35 2.35 Sqm -23.50
Ch 0.885 to 0.895 -1 10.00 2.35 2.35 2.35 Sqm -23.50
Ch 1.452 to 1.462 -1 10.00 2.35 2.35 2.35 Sqm -23.50
Ch 1.495 to 1.505 -1 10.00 2.35 2.35 2.35 Sqm -23.50
Deduct for Tree Portion( RHS)
Ch 0.320 to 0.330 -1 10.00 2.35 2.35 2.35 Sqm -23.50
Ch 0.517 to 0.527 -1 10.00 2.35 2.35 2.35 Sqm -23.50
Ch 0.868 to 0.878 -1 10.00 2.35 2.35 2.35 Sqm -23.50
Ch 1.305 to 1.315 -1 10.00 2.35 2.35 2.35 Sqm -23.50
Ch 1.365 to 1.375 -1 10.00 2.35 2.35 2.35 Sqm -23.50
Ch 1.46 to 1.470 -1 10.00 2.35 2.35 2.35 Sqm -23.50
Sub Total -258.50
Deduct for Tree Portion( LHS)
Ch 1.990 to 2.000 -1 10.00 2.35 2.35 2.35 Sqm -23.50
Deduct for Tree Portion( RHS)
Ch 1.585 to 1.595 -1 10.00 2.35 2.35 2.35 Sqm -23.50
Ch 1.955 to 1.965 -1 10.00 2.35 2.35 2.35 Sqm -23.50
Ch 1.98 to 1.990 -1 10.00 2.35 2.35 2.35 Sqm -23.50
Sub Total -94.00
Total 12861.50
Total BoQ Qty 120725.93
Balance BoQ Qty 107864.43

Contractor PMC Section Officer AEE PWD Nelamangala Sub-division


Page 56
KSRRB M500-10. Providing and applying tack coat using 80/100 grade bitumen(VG10) in boiler fitted with spray set distributor at the rate of
0.25 kg per sqm on the existing prepared bituminous surface (primed surface) cleaned with mechanical broom. complete as per specifications.
169 Clause 503 of MORTH V revision ---- with all lead and lifts, loading and unloading charges, cost of all materials, labour, equipment etc.,
complete the work as per specifications and directions of the Engineer incharge of Work.

B B1 Avg B
Chainage No Length Depth Unit Qnty Remarks
(m) (m) (m)
Chainage Km 0.09 to Km 1.20
Ch. 0.09 to 0.12 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 0.12 to 0.15 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 0.15 to 0.18 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 0.18 to 0.21 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 0.21 to 0.24 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 0.24 to 0.27 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 0.27 to 0.3 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 0.3 to 0.33 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 0.33 to 0.36 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 0.36 to 0.39 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 0.39 to 0.42 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 0.42 to 0.45 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 0.45 to 0.48 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 0.48 to 0.51 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 0.51 to 0.54 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 0.54 to 0.57 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 0.57 to 0.6 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 0.6 to 0.63 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 0.63 to 0.66 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 0.66 to 0.69 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 0.69 to 0.72 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 0.72 to 0.75 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 0.75 to 0.78 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 0.78 to 0.81 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 0.81 to 0.84 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 0.84 to 0.87 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 0.87 to 0.9 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 0.9 to 0.93 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 0.93 to 0.96 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 0.96 to 0.99 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 0.99 to 1.02 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 1.02 to 1.05 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 1.05 to 1.08 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 1.08 to 1.11 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 1.11 to 1.14 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 1.14 to 1.17 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 1.17 to 1.2 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 1.2 to 1.23 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 1.23 to 1.26 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 1.26 to 1.29 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 1.29 to 1.32 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 1.32 to 1.35 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 1.35 to 1.38 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 1.38 to 1.41 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 1.41 to 1.44 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 1.44 to 1.47 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 1.47 to 1.5 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 1.5 to 1.53 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 1.53 to 1.56 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 1.56 to 1.59 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 1.59 to 1.62 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 1.62 to 1.65 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 1.65 to 1.68 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 1.68 to 1.71 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 1.71 to 1.74 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 1.74 to 1.77 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 1.77 to 1.8 1 30 10.00 10.00 10.00 Sqm 300.00

Contractor PMC Section Officer AEE PWD Nelamangala Sub-division


Page 57
Ch. 1.8 to 1.83 1 30 10.00 10.00 10.00 Sqm 300.00

Contractor PMC Section Officer AEE PWD Nelamangala Sub-division


Page 58
Ch. 1.83 to 1.86 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 1.86 to 1.89 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 1.89 to 1.92 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 1.92 to 1.95 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 1.95 to 1.98 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 1.98 to 2.01 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 2.01 to 2.04 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 2.04 to 2.07 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 2.07 to 2.1 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 2.1 to 2.13 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 2.13 to 2.16 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 2.16 to 2.19 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 2.19 to 2.22 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 2.22 to 2.25 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 2.25 to 2.28 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 2.28 to 2.31 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 2.31 to 2.34 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 2.34 to 2.37 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 2.37 to 2.4 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 2.4 to 2.43 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 2.43 to 2.46 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 2.46 to 2.49 1 30 10.00 10.00 10.00 Sqm 300.00
Ch. 2.49 to 2.5 1 10 10.00 10.00 10.00 Sqm 100.00
Chainage Km 13.3 to Km 14.5
Ch. 13.30 to 13.33 1 30.00 7.00 7.00 7.00 Sqm 210.00
Ch. 13.33 to 13.36 1 30.00 7.00 7.00 7.00 Sqm 210.00
Ch. 13.36 to 13.39 1 30.00 7.00 7.00 7.00 Sqm 210.00
Ch. 13.39 to 13.42 1 30.00 7.00 7.00 7.00 Sqm 210.00
Ch. 13.42 to 13.45 1 30.00 7.00 7.00 7.00 Sqm 210.00
Ch. 13.45 to 13.48 1 30.00 7.00 7.00 7.00 Sqm 210.00
Ch. 13.48 to 13.51 1 30.00 7.00 7.00 7.00 Sqm 210.00
Ch. 13.51 to 13.54 1 30.00 7.00 7.00 7.00 Sqm 210.00
Ch. 13.54 to 13.57 1 30.00 7.00 7.00 7.00 Sqm 210.00
Ch. 13.57 to 13.60 1 30.00 7.00 7.00 7.00 Sqm 210.00
Ch. 13.60 to 13.63 1 30.00 7.00 7.00 7.00 Sqm 210.00
Ch. 13.63 to 13.66 1 30.00 7.00 7.00 7.00 Sqm 210.00
Ch. 13.66 to 13.69 1 30.00 7.00 7.00 7.00 Sqm 210.00
Ch. 13.69 to 13.72 1 30.00 7.00 7.00 7.00 Sqm 210.00
Ch. 13.72 to 13.75 1 30.00 7.00 7.00 7.00 Sqm 210.00
Ch. 13.75 to 13.78 1 30.00 7.00 7.00 7.00 Sqm 210.00
Ch. 13.78 to 13.81 1 30.00 7.00 7.00 7.00 Sqm 210.00
Ch. 13.81 to 13.84 1 30.00 7.00 7.00 7.00 Sqm 210.00
Ch. 13.84 to 13.87 1 30.00 7.00 7.00 7.00 Sqm 210.00
Ch. 13.87 to 13.90 1 30.00 7.00 7.00 7.00 Sqm 210.00
Ch. 13.90 to 13.93 1 30.00 7.00 7.00 7.00 Sqm 210.00
Ch. 13.93 to 13.96 1 30.00 7.00 7.00 7.00 Sqm 210.00
Ch. 13.96 to 13.99 1 30.00 7.00 7.00 7.00 Sqm 210.00
Ch. 13.99 to 14.02 1 30.00 7.00 7.00 7.00 Sqm 210.00
Ch. 14.02 to 14.05 1 30.00 7.00 7.00 7.00 Sqm 210.00
Ch. 14.05 to 14.08 1 30.00 7.00 7.00 7.00 Sqm 210.00
Ch. 14.08 to 14.11 1 30.00 7.00 7.00 7.00 Sqm 210.00
Ch. 14.11 to 14.14 1 30.00 7.00 7.00 7.00 Sqm 210.00
Ch. 14.14 to 14.17 1 30.00 7.00 7.00 7.00 Sqm 210.00
Ch. 14.17 to 14.20 1 30.00 7.00 7.00 7.00 Sqm 210.00
Ch. 14.20 to 14.23 1 30.00 7.00 7.00 7.00 Sqm 210.00
Ch. 14.23 to 14.26 1 30.00 7.00 7.00 7.00 Sqm 210.00
Ch. 14.26 to 14.29 1 30.00 7.00 7.00 7.00 Sqm 210.00
Ch. 14.29 to 14.32 1 30.00 7.00 7.00 7.00 Sqm 210.00
Ch. 14.32 to 14.35 1 30.00 7.00 7.00 7.00 Sqm 210.00
Ch. 14.35 to 14.38 1 30.00 7.00 7.00 7.00 Sqm 210.00
Ch. 14.38 to 14.41 1 30.00 7.00 7.00 7.00 Sqm 210.00
Ch. 14.41 to 14.44 1 30.00 6.00 6.00 6.00 Sqm 180.00
Ch. 14.44 to 14.47 1 30.00 6.00 6.00 6.00 Sqm 180.00
Ch. 14.47 to 14.50 1 30.00 6.00 6.00 6.00 Sqm 180.00
Ch. 14.50 to 14.53 1 30.00 6.00 6.00 6.00 Sqm 180.00

Contractor PMC Section Officer AEE PWD Nelamangala Sub-division


Page 59
Ch. 14.53 to 14.56 1 30.00 6.00 6.00 6.00 Sqm 180.00
Ch. 14.56 to 14.59 1 30.00 6.00 6.00 6.00 Sqm 180.00
Ch. 14.59 to 14.60 1 10.00 6.00 6.00 6.00 Sqm 60.00
33010.00

Deduct for Tree Portion( LHS)


Ch 0.517 to 0.527 -1 10.00 2.35 2.35 6.00 Sqm -60.00
Ch 0.573 to 0.583 -1 10.00 2.35 2.35 6.00 Sqm -60.00
Ch 0.885 to 0.895 -1 10.00 2.35 2.35 6.00 Sqm -60.00
Ch 1.452 to 1.462 -1 10.00 2.35 2.35 6.00 Sqm -60.00
Ch 1.495 to 1.505 -1 10.00 2.35 2.35 6.00 Sqm -60.00
Deduct for Tree Portion( RHS)
Ch 0.320 to 0.330 -1 10.00 2.35 2.35 2.35 Sqm -23.50
Ch 0.517 to 0.527 -1 10.00 2.35 2.35 2.35 Sqm -23.50
Ch 0.868 to 0.878 -1 10.00 2.35 2.35 2.35 Sqm -23.50
Ch 1.305 to 1.315 -1 10.00 2.35 2.35 2.35 Sqm -23.50
Ch 1.365 to 1.375 -1 10.00 2.35 2.35 2.35 Sqm -23.50
Ch 1.46 to 1.470 -1 10.00 2.35 2.35 2.35 Sqm -23.50
Sub Total -441.00
Deduct for Tree Portion( LHS)
Ch 1.990 to 2.000 -1 10.00 2.35 2.35 2.35 Sqm -23.50
Deduct for Tree Portion( RHS)
Ch 1.585 to 1.595 -1 10.00 2.35 2.35 2.35 Sqm -23.50
Ch 1.955 to 1.965 -1 10.00 2.35 2.35 2.35 Sqm -23.50
Ch 1.98 to 1.990 -1 10.00 2.35 2.35 2.35 Sqm -23.50
Sub Total -94.00
Deduct for Tree Portion( LHS)
Ch 0.513 Km -1 25.40 2.80 2.80 2.80 Sqm -71.12
Ch 1.490 Km -1 10.00 2.50 2.50 2.50 Sqm -25.00
Ch 2.175 Km -1 21.00 4.30 4.30 4.30 Sqm -90.30
Ch 2.552 Km -1 30.00 2.50 2.50 2.50 Sqm -75.00
Ch 2.582 Km -1 30.00 3.50 3.50 3.50 Sqm -105.00
Sub Total -366.42
Deduct for Tree Portion( RHS)
Ch 0.256 Km -1 20.00 3.60 3.60 3.60 Sqm -72.00
Ch 0.323Km -1 15.50 2.50 2.50 2.50 Sqm -38.75
Ch 0.877 Km -1 14.30 3.20 3.20 3.20 Sqm -45.76
Ch 2.23 Km -1 7.50 2.00 2.00 2.00 Sqm -15.00
Sub Total -171.51
Total 31937.07
Total BoQ Qty 120725.93
Balance BoQ Qty 88788.86

Contractor PMC Section Officer AEE PWD Nelamangala Sub-division


Page 60

KSRRB M500-17. Providing and laying dense graded bituminous macadam using crushed aggregates of specified grading, premixed with VG30
grade bituminous binder and, transporting the hot mix to work site, laying to the required grade, level and alignment, rolling with smooth
wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH table 500-10 complete in all respects complete as per
specifications.. MORTH Specification No. 507 - using 40/60 TPH capacity H.M.P. with Mechanical paver Gr-II (50 mm to 75 mm) with 4.5 %
173 VG-30 Bitumen ---- with all lead and lifts, loading and unloading charges, cost of all materials, labour, equipment etc., complete the work as per
specifications and directions of the Engineer incharge of Work.

B B1 Avg B
Chainage No Length Depth Unit Qnty Remarks
(m) (m) (m)
Chainage Km 0.09 to Km 1.20
Ch. 0.09 to 0.12 1.00 30.00 10.90 10.70 10.80 0.06 Cum 19.44
Ch. 0.12 to 0.15 1.00 30.00 10.70 10.65 10.68 0.06 Cum 19.22
Ch. 0.15 to 0.18 1.00 30.00 10.65 10.60 10.63 0.06 Cum 19.13
Ch. 0.18 to 0.21 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 0.21 to 0.24 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 0.24 to 0.27 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 0.27 to 0.30 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 0.30 to 0.33 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 0.33 to 0.36 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 0.36 to 0.39 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 0.39 to 0.42 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 0.42 to 0.45 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 0.45 to 0.48 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 0.48 to 0.51 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 0.51 to 0.54 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 0.54 to 0.57 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 0.57 to 0.60 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 0.60 to 0.63 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 0.63 to 0.66 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 0.66 to 0.69 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 0.69 to 0.72 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 0.72 to 0.75 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 0.75 to 0.78 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 0.78 to 0.81 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 0.81 to 0.84 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 0.84 to 0.87 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 0.87 to 0.90 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 0.90 to 0.93 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 0.93 to 0.96 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 0.96 to 0.99 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 0.99 to 1.02 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 1.02 to 1.05 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 1.05 to 1.08 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 1.08 to 1.11 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 1.11 to 1.14 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 1.14 to 1.17 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 1.17 to 1.20 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 1.20 to 1.23 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 1.23 to 1.26 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 1.26 to 1.29 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 1.29 to 1.32 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 1.32 to 1.35 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 1.35 to 1.38 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 1.38 to 1.41 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 1.41 to 1.44 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 1.44 to 1.47 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 1.47 to 1.50 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 1.50 to 1.53 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 1.53 to 1.56 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 1.56 to 1.59 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 1.59 to 1.62 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 1.62 to 1.65 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 1.65 to 1.68 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 1.68 to 1.71 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 1.71 to 1.74 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 1.74 to 1.77 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00

Contractor PMC Section Officer AEE PWD Nelamangala Sub-division


Page 61
Ch. 1.77 to 1.80 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 1.80 to 1.83 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 1.83 to 1.86 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 1.86 to 1.89 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 1.89 to 1.92 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 1.92 to 1.95 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 1.95 to 1.98 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 1.98 to 2.01 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 2.01 to 2.04 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 2.04 to 2.07 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 2.07 to 2.10 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 2.10 to 2.13 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 2.13 to 2.16 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 2.16 to 2.19 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 2.19 to 2.22 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 2.22 to 2.25 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 2.25 to 2.28 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 2.28 to 2.31 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 2.31 to 2.34 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 2.34 to 2.37 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 2.37 to 2.40 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 2.40 to 2.43 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 2.43 to 2.46 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 2.46 to 2.49 1.00 30.00 10.00 10.00 10.00 0.06 Cum 18.00
Ch. 2.49 to 2.50 1.00 10.00 10.00 10.00 10.00 0.06 Cum 6.00
1449.78
Deduct for Tree Portion( LHS)
Ch 0.517 to 0.527 -1 10.00 2.35 2.35 2.35 0.06 Cum -1.41
Ch 0.573 to 0.583 -1 10.00 2.35 2.35 2.35 0.06 Cum -1.41
Ch 0.885 to 0.895 -1 10.00 2.35 2.35 2.35 0.06 Cum -1.41
Ch 1.452 to 1.462 -1 10.00 2.35 2.35 2.35 0.06 Sqm -1.41
Ch 1.495 to 1.505 -1 10.00 2.35 2.35 2.35 0.06 Sqm -1.41
Deduct for Tree Portion( RHS)
Ch 0.320 to 0.330 -1 10.00 2.35 2.35 2.35 0.06 Cum -1.41
Ch 0.517 to 0.527 -1 10.00 2.35 2.35 2.35 0.06 Cum -1.41
Ch 0.868 to 0.878 -1 10.00 2.35 2.35 2.35 0.06 Cum -1.41
Ch 1.305 to 1.315 -1 10.00 2.35 2.35 2.35 0.06 Sqm -1.41
Ch 1.365 to 1.375 -1 10.00 2.35 2.35 2.35 0.06 Sqm -1.41
Ch 1.46 to 1.470 -1 10.00 2.35 2.35 2.35 0.06 Sqm -1.41
Sub Total -15.51
Deduct for Tree Portion( LHS)
Ch 1.990 to 2.000 -1 10.00 2.35 2.35 2.35 0.06 Cum -1.41
Deduct for Tree Portion( RHS)
Ch 1.585 to 1.595 -1 10.00 2.35 2.35 2.35 0.06 Cum -1.41
Ch 1.955 to 1.965 -1 10.00 2.35 2.35 2.35 0.06 Cum -1.41
Ch 1.98 to 1.990 -1 10.00 2.35 2.35 2.35 0.06 Cum -1.41
Sub Total -5.64
Deduct for Tree Portion( LHS)
Ch 0.513 Km -1 25.40 2.80 2.80 2.80 0.06 Cum -4.27
Ch 1.490 Km -1 10.00 2.50 2.50 2.50 0.06 Cum -1.50
Ch 2.175 Km -1 21.00 4.30 4.30 4.30 0.06 Cum -5.42
Ch 2.552 Km -1 30.00 2.50 2.50 2.50 0.06 Cum -4.50
Ch 2.582 Km -1 30.00 3.50 3.50 3.50 0.06 Cum -6.30
Sub Total -21.99
Deduct for Tree Portion( RHS)
Ch 0.256 Km -1 20.00 3.60 3.60 3.60 0.06 Cum -4.32
Ch 0.323Km -1 15.50 2.50 2.50 2.50 0.06 Cum -2.32
Ch 0.877 Km -1 14.30 3.20 3.20 3.20 0.06 Cum -2.75
Ch 2.23 Km -1 7.50 2.00 2.00 2.00 0.06 Cum -0.90
Sub Total -10.29
Total 1396.35
Total BoQ Qty 6691.56
Balance BoQ Qty 5295.20

Contractor PMC Section Officer AEE PWD Nelamangala Sub-division


Page 62
KSRRB M500-56.1. Providing and laying slurry seal @ 5.40 kg/sqm (Residual binder@ 13% by wt. of dry aggregate) consisting of a mixture of
fine aggregates, portland cement filler, bituminous emulsion and water on a road surface including cleaning of surface, mixing of slurry seal in a
suitable mobile plant, laying and compacting to provide even riding surface Complete as per specifications. Type I : 2-3 mm width hair cracks.
166 Clause 512 of MORTH V revision ---- with all lead and lifts, loading and unloading charges, cost of all materials, labour, equipment etc.,
complete the work as per specifications and directions of the Engineer incharge of Work.

B B1 Avg B
Chainage No Length Depth Unit Qnty Remarks
(m) (m) (m)
Chainage 0.09-2.50 Km
1 2.00 3.00 Sqm 6.00
1 6.00 1.50 Sqm 13.50
1 2.00 0.90 Sqm 2.40
1 1.50 1.00 Sqm 1.42
1 3.00 1.20 Sqm 3.30
1 1.80 2.50 Sqm 3.33
1 8.00 2.00 Sqm 18.00
1 10.00 1.20 Sqm 16.00
1 5.00 2.00 Sqm 8.00
1 15.00 3.00 Sqm 37.50
1 3.20 1.20 Sqm 6.72
1 5.00 3.00 Sqm 10.50
1 8.00 2.00 Sqm 20.00
1 12.00 3.00 Sqm 30.00
1 2.00 0.90 Sqm 3.90
1 6.00 2.00 Sqm 8.70
1 6.00 4.50 Sqm 19.50
1 3.50 5.00 Sqm 16.63
1 4.00 3.80 Sqm 17.60
1 5.00 3.50 Sqm 18.25
1 15.00 4.80 Sqm 62.25
1 4.80 3.70 Sqm 20.40
1 12.00 2.80 Sqm 39.00
1 6.00 3.50 Sqm 18.90
1 5.30 2.00 Sqm 14.58
1 3.20 4.50 Sqm 10.40
1 1.80 5.00 Sqm 8.55
1 6.10 3.80 Sqm 26.84
1 12.10 2.30 Sqm 36.90
1 14.00 3.40 Sqm 39.90
1 3.00 4.00 Sqm 11.10
1 10.00 3.00 Sqm 35.00
1 3.20 1.20 Sqm 6.72
1 5.00 3.00 Sqm 10.50
1 8.00 2.00 Sqm 20.00
1 12.00 3.00 Sqm 30.00
1 2.00 0.90 Sqm 3.90
1 15.00 3.00 Sqm 29.25
1 3.20 1.20 Sqm 6.72
1 5.00 3.00 Sqm 10.50
1 8.00 2.00 Sqm 20.00
1 12.00 3.00 Sqm 30.00
1 2.00 0.90 Sqm 3.90
1 6.00 2.00 Sqm 8.70

Contractor PMC Section Officer AEE PWD Nelamangala Sub-division


Page 63
1 6.00 4.50 Sqm 19.50
1 3.50 5.00 Sqm 16.63
1 4.00 3.80 Sqm 17.60
1 5.00 3.50 Sqm 18.25
1 15.00 4.80 Sqm 62.25
1 4.80 3.70 Sqm 20.40
1 12.00 2.80 Sqm 39.00
1 6.00 3.50 Sqm 18.90
1 5.30 2.00 Sqm 14.58
1 5.00 2.00 Sqm 10.00
1 10.00 3.00 Sqm 25.00
1 3.20 1.20 Sqm 6.72
1 5.00 3.00 Sqm 10.50
1 8.00 2.00 Sqm 20.00
1 5.00 3.80 Sqm 14.50
1 5.80 3.50 Sqm 21.17
Sub Total 1100
From Chainage 13.30-14.40 Km
1 5.00 3.70 Sqm 9.25
1 3.00 1.20 Sqm 7.35
1 5.00 2.00 Sqm 8.00
1 10.00 3.00 Sqm 25.00
1 3.20 1.20 Sqm 6.72
1 5.00 3.00 Sqm 10.50
1 8.00 2.00 Sqm 20.00
1 12.00 3.00 Sqm 30.00
1 2.00 0.90 Sqm 3.90
1 8.00 2.00 Sqm 11.60
1 12.00 3.00 Sqm 30.00
1 2.00 0.90 Sqm 3.90
1 6.00 2.00 Sqm 8.70
1 6.00 4.50 Sqm 19.50
1 4.00 5.00 Sqm 19.00
1 4.00 3.80 Sqm 17.60
1 3.00 3.50 Sqm 10.95
Sub Total 241.97
Total Qty 1111.85
Total BoQ Qty 3410.00
Balance BoQ Qty 2298.15

Contractor PMC Section Officer AEE PWD Nelamangala Sub-division


Page 64

KSRRB 3000 Filling Pot-holes and Patch Repairs with Open-Graded Premix Surfacing, 20 mm KSRRB M3000-4. Removal of all failed
material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, applying tack coat on the sides and base of
excavation at 040 kgs/sqm as per clause 500.3, and filling the pot holes with open graded pre-mix material as per clause 500.11, & sealing the
surface with Type-B seal coat as per clause 513 compacting the surface to form a smooth continuous surface, including cost of materials, labour,
167 HOM complete as per specifications. MORTH Specification No. 3004.2 ---- with all lead and lifts, loading and unloading charges, cost of all
materials, labour, equipment etc., complete the work as per specifications and directions of the Engineer incharge of Work.

B B1 Avg B
Chainage No Length Depth Unit Qnty Remarks
(m) (m) (m)
From Chainage 0.09-2.50 Km
1 2.00 3.00 Sqm 6.00
1 6.00 1.50 Sqm 13.50
1 2.00 0.90 Sqm 2.40
1 1.50 1.00 Sqm 1.42
1 3.00 1.20 Sqm 3.30
1 1.80 2.50 Sqm 3.33
1 8.00 2.00 Sqm 18.00
1 10.00 1.20 Sqm 16.00
1 5.00 2.00 Sqm 8.00
1 15.00 3.00 Sqm 37.50
1 3.20 1.20 Sqm 6.72
1 5.00 3.00 Sqm 10.50
1 8.00 2.00 Sqm 20.00
1 12.00 3.00 Sqm 30.00
1 2.00 0.90 Sqm 3.90
1 6.00 2.00 Sqm 8.70
1 6.00 4.50 Sqm 19.50
1 3.50 5.00 Sqm 16.63
1 4.00 3.80 Sqm 17.60
1 5.00 3.50 Sqm 18.25
1 15.00 4.80 Sqm 62.25
1 4.80 3.70 Sqm 20.40
1 12.00 2.80 Sqm 39.00
1 6.00 3.50 Sqm 18.90
1 5.30 2.00 Sqm 14.58
1 3.20 4.50 Sqm 10.40
1 1.80 5.00 Sqm 8.55
1 6.10 3.80 Sqm 26.84
1 12.10 2.30 Sqm 36.90
1 14.00 3.40 Sqm 39.90
1 3.00 4.00 Sqm 11.10
Sub Total 550
From Chainage 13.30-14.50 Km
1.00 5.00 3.70 Sqm 9.25
1.00 3.00 1.20 Sqm 7.35
1.00 5.00 2.00 Sqm 8.00
1.00 10.00 3.00 Sqm 25.00
1.00 3.20 1.20 Sqm 6.72
1.00 5.00 3.00 Sqm 10.50
1.00 8.00 2.00 Sqm 20.00
1.00 12.00 3.00 Sqm 30.00
1.00 2.00 0.90 Sqm 3.90
Sub Total 120.72
Total Qty 670.79
Total BoQ Qty 1364.00
Balance BoQ Qty 693.21

Contractor PMC Section Officer AEE PWD Nelamangala Sub-division


Page 65

KSRRB 500-11. Providing and laying bituminous macadam on prepared surface with crushed coarse aggregates as per design mix formula for
base / binding course including loading of aggregates with F.E. loader, hot mixing of stone aggregates and bitumen in hot mix plant, transporting
the mixed material in tipper to paver and laying mixed materials with paver finisher to the required level and grade, rolling by smooth wheeled,
vibratory & tandem rollers to achieve the desired density, but excluding cost of primer / tack coat & including lead, lift and cost of all materials,
labour, HOM complete as per specifications. Clause 504 of MORTH V revision using 40/60 TPH capacity H.M.P. with Mechanical paver Gr-II
170 (50 mm to 75 mm) with 3.4% VG-30 Bitumen ---- with all lead and lifts, loading and unloading charges, cost of all materials, labour, equipment
etc., complete the work as per specifications and directions of the Engineer incharge of Work.

B B1 Avg B
Chainage No Length Depth Unit Qnty Remarks
(m) (m) (m)
Chainage Km 13.3 to Km 14.5
Ch. 13.30 to 13.33 1 30.00 7.00 7.00 7.00 0.05 Cum 10.50
Ch. 13.33 to 13.36 1 30.00 7.00 7.00 7.00 0.05 Cum 10.50
Ch. 13.36 to 13.39 1 30.00 7.00 7.00 7.00 0.05 Cum 10.50
Ch. 13.39 to 13.42 1 30.00 7.00 7.00 7.00 0.05 Cum 10.50
Ch. 13.42 to 13.45 1 30.00 7.00 7.00 7.00 0.05 Cum 10.50
Ch. 13.45 to 13.48 1 30.00 7.00 7.00 7.00 0.05 Cum 10.50
Ch. 13.48 to 13.51 1 30.00 7.00 7.00 7.00 0.05 Cum 10.50
Ch. 13.51 to 13.54 1 30.00 7.00 7.00 7.00 0.05 Cum 10.50
Ch. 13.54 to 13.57 1 30.00 7.00 7.00 7.00 0.05 Cum 10.50
Ch. 13.57 to 13.60 1 30.00 7.00 7.00 7.00 0.05 Cum 10.50
Ch. 13.60 to 13.63 1 30.00 7.00 7.00 7.00 0.05 Cum 10.50
Ch. 13.63 to 13.66 1 30.00 7.00 7.00 7.00 0.05 Cum 10.50
Ch. 13.66 to 13.69 1 30.00 7.00 7.00 7.00 0.05 Cum 10.50
Ch. 13.69 to 13.72 1 30.00 7.00 7.00 7.00 0.05 Cum 10.50
Ch. 13.72 to 13.75 1 30.00 7.00 7.00 7.00 0.05 Cum 10.50
Ch. 13.75 to 13.78 1 30.00 7.00 7.00 7.00 0.05 Cum 10.50
Ch. 13.78 to 13.81 1 30.00 7.00 7.00 7.00 0.05 Cum 10.50
Ch. 13.81 to 13.84 1 30.00 7.00 7.00 7.00 0.05 Cum 10.50
Ch. 13.84 to 13.87 1 30.00 7.00 7.00 7.00 0.05 Cum 10.50
Ch. 13.87 to 13.90 1 30.00 7.00 7.00 7.00 0.05 Cum 10.50
Ch. 13.90 to 13.93 1 30.00 7.00 7.00 7.00 0.05 Cum 10.50
Ch. 13.93 to 13.96 1 30.00 7.00 7.00 7.00 0.05 Cum 10.50
Ch. 13.96 to 13.99 1 30.00 7.00 7.00 7.00 0.05 Cum 10.50
Ch. 13.99 to 14.02 1 30.00 7.00 7.00 7.00 0.05 Cum 10.50
Ch. 14.02 to 14.05 1 30.00 7.00 7.00 7.00 0.05 Cum 10.50
Ch. 14.05 to 14.08 1 30.00 7.00 7.00 7.00 0.05 Cum 10.50
Ch. 14.08 to 14.11 1 30.00 7.00 7.00 7.00 0.05 Cum 10.50
Ch. 14.11 to 14.14 1 30.00 7.00 7.00 7.00 0.05 Cum 10.50
Ch. 14.14 to 14.17 1 30.00 7.00 7.00 7.00 0.05 Cum 10.50

Contractor PMC Section Officer AEE PWD Nelamangala Sub-division


Page 66
Ch. 14.17 to 14.20 1 30.00 7.00 7.00 7.00 0.05 Cum 10.50
Ch. 14.20 to 14.23 1 30.00 7.00 7.00 7.00 0.05 Cum 10.50
Ch. 14.23 to 14.26 1 30.00 7.00 7.00 7.00 0.05 Cum 10.50
Ch. 14.26 to 14.29 1 30.00 7.00 7.00 7.00 0.05 Cum 10.50
Ch. 14.29 to 14.32 1 30.00 7.00 7.00 7.00 0.05 Cum 10.50
Ch. 14.32 to 14.35 1 30.00 7.00 7.00 7.00 0.05 Cum 10.50
Ch. 14.35 to 14.38 1 30.00 7.00 7.00 7.00 0.05 Cum 10.50
Ch. 14.38 to 14.41 1 30.00 7.00 7.00 7.00 0.05 Cum 10.50
Ch. 14.41 to 14.44 1 30.00 6.00 6.00 6.00 0.05 Cum 9.00
Ch. 14.44 to 14.47 1 30.00 6.00 6.00 6.00 0.05 Cum 9.00
Ch. 14.47 to 14.50 1 30.00 6.00 6.00 6.00 0.05 Cum 9.00
Sub Total 415.50

Total BoQ Qty 460.00


Balance BoQ Qty 44.50

Contractor PMC Section Officer AEE PWD Nelamangala Sub-division


Page 67

KSRRB M500-18. Providing and laying semi dense bituminous concrete using crushed aggregates of specified grading, premixed with
bituminous binder and filler, transporting the hot mix to work site, laying with a paver finisher to the required grade, level and alignment, rolling
with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 508 complete in
all respects complete as per specifications. - using40/60 TPH capacity H.M.P. with Mechanical Paver Gr-II (25 mm to 30 mm) with 5 % VG-30
171 Bitumen ---- with all lead and lifts, loading and unloading charges, cost of all materials, labour, equipment etc., complete the work as per
specifications and directions of the Engineer incharge of Work.

B B1 Avg B
Chainage No Length Depth Unit Qnty Remarks
(m) (m) (m)
Chainage Km 13.30 to Km 14.60
Ch. 13.30 to 13.33 1 30.00 7.00 7.00 7.00 0.025 Cum 5.25
Ch. 13.33 to 13.36 1 30.00 7.00 7.00 7.00 0.025 Cum 5.25
Ch. 13.36 to 13.39 1 30.00 7.00 7.00 7.00 0.025 Cum 5.25
Ch. 13.39 to 13.42 1 30.00 7.00 7.00 7.00 0.025 Cum 5.25
Ch. 13.42 to 13.45 1 30.00 7.00 7.00 7.00 0.025 Cum 5.25
Ch. 13.45 to 13.48 1 30.00 7.00 7.00 7.00 0.025 Cum 5.25
Ch. 13.48 to 13.51 1 30.00 7.00 7.00 7.00 0.025 Cum 5.25
Ch. 13.51 to 13.54 1 30.00 7.00 7.00 7.00 0.025 Cum 5.25
Ch. 13.54 to 13.57 1 30.00 7.00 7.00 7.00 0.025 Cum 5.25
Ch. 13.57 to 13.60 1 30.00 7.00 7.00 7.00 0.025 Cum 5.25
Ch. 13.60 to 13.63 1 30.00 7.00 7.00 7.00 0.025 Cum 5.25
Ch. 13.63 to 13.66 1 30.00 7.00 7.00 7.00 0.025 Cum 5.25
Ch. 13.66 to 13.69 1 30.00 7.00 7.00 7.00 0.025 Cum 5.25
Ch. 13.69 to 13.72 1 30.00 7.00 7.00 7.00 0.025 Cum 5.25
Ch. 13.72 to 13.75 1 30.00 7.00 7.00 7.00 0.025 Cum 5.25
Ch. 13.75 to 13.78 1 30.00 7.00 7.00 7.00 0.025 Cum 5.25
Ch. 13.78 to 13.81 1 30.00 7.00 7.00 7.00 0.025 Cum 5.25
Ch. 13.81 to 13.84 1 30.00 7.00 7.00 7.00 0.025 Cum 5.25
Ch. 13.84 to 13.87 1 30.00 7.00 7.00 7.00 0.025 Cum 5.25
Ch. 13.87 to 13.90 1 30.00 7.00 7.00 7.00 0.025 Cum 5.25
Ch. 13.90 to 13.93 1 30.00 7.00 7.00 7.00 0.025 Cum 5.25
Ch. 13.93 to 13.96 1 30.00 7.00 7.00 7.00 0.025 Cum 5.25
Ch. 13.96 to 13.99 1 30.00 7.00 7.00 7.00 0.025 Cum 5.25
Ch. 13.99 to 14.02 1 30.00 7.00 7.00 7.00 0.025 Cum 5.25
Ch. 14.02 to 14.05 1 30.00 7.00 7.00 7.00 0.025 Cum 5.25
Ch. 14.05 to 14.08 1 30.00 7.00 7.00 7.00 0.025 Cum 5.25
Ch. 14.08 to 14.11 1 30.00 7.00 7.00 7.00 0.025 Cum 5.25
Ch. 14.11 to 14.14 1 30.00 7.00 7.00 7.00 0.025 Cum 5.25
Ch. 14.14 to 14.17 1 30.00 7.00 7.00 7.00 0.025 Cum 5.25
Ch. 14.17 to 14.20 1 30.00 7.00 7.00 7.00 0.025 Cum 5.25

Contractor PMC Section Officer AEE PWD Nelamangala Sub-division


Page 68
Ch. 14.20 to 14.23 1 30.00 7.00 7.00 7.00 0.025 Cum 5.25
Ch. 14.23 to 14.26 1 30.00 7.00 7.00 7.00 0.025 Cum 5.25
Ch. 14.26 to 14.29 1 30.00 7.00 7.00 7.00 0.025 Cum 5.25
Ch. 14.29 to 14.32 1 30.00 7.00 7.00 7.00 0.025 Cum 5.25
Ch. 14.32 to 14.35 1 30.00 7.00 7.00 7.00 0.025 Cum 5.25
Ch. 14.35 to 14.38 1 30.00 7.00 7.00 7.00 0.025 Cum 5.25
Ch. 14.38 to 14.41 1 30.00 7.00 7.00 7.00 0.025 Cum 5.25
Ch. 14.41 to 14.44 1 30.00 6.00 6.00 6.00 0.025 Cum 4.50
Ch. 14.44 to 14.47 1 30.00 6.00 6.00 6.00 0.025 Cum 4.50
Ch. 14.47 to 14.50 1 30.00 6.00 6.00 6.00 0.025 Cum 4.50
Ch. 14.50 to 14.53 1 30.00 5.50 5.50 5.50 0.025 Cum 4.12
Ch. 14.53 to 14.56 1 30.00 5.50 5.50 5.50 0.025 Cum 4.12
Ch. 14.56 to 14.59 1 30.00 5.50 5.50 5.50 0.025 Cum 4.12
Ch. 14.59 to 14.60 1 10.00 5.50 5.50 5.50 0.025 Cum 1.38
Sub Total 221.50
Qty Now to be paid Cum 221.50
Total BoQ Qty 230.00
Balance BoQ Qty 8.50

Contractor PMC Section Officer AEE PWD Nelamangala Sub-division


Page 69
Earth work in excavation for foundation of structures like culverts, retaining walls etc., as per drawing
and technical specification, including setting out, construction of shoring and bracing, dressing of sides
and bottom, backfilling with approved material, disposal of balance earth as per specifications,
including cost of labour, HOM etc. , complete. in all kinds of soil by mechanical means. ---- with all lead
and lifts, loading and unloading charges, cost of all materials, labour, equipment etc., complete the
198
work as per specifications and directions of the Engineer incharge of Work.

B B1 Avg B
No Length Depth Unit Qnty Remarks
(m) (m) (m)
at Ch: 4.7 Km 1 2.50 2.40 1.60 Cum
9.60
at Ch: 2.4 Km 1 2.30 2.30 1.70 Cum 8.99
at Ch: 6.0 Km 1 2.50 2.60 2.10 Cum 13.65
at Ch: 4.9 km 1 2.45 2.5 1.70 Cum 10.41
Total 42.66

Contractor PMC Section Officer AEE PWD Nelamangala Sub-division


Page 70
KSRRB M2900-1. Plain cement concrete M10 mix with crushed stone aggregate 40mm nominal size
mechanically mixed, placed in foundation and compacted by vibration including curing including cost
of materials, labour, HOM complete as per specifications. MORTH Specification No. 408 ---- with all
lead and lifts, loading and unloading charges, cost of all materials, labour, equipment etc., complete the
200 work as per specifications and directions of the Engineer incharge of Work.

B B1 Avg B
No Length Depth Unit Qnty Remarks
(m) (m) (m)
at Ch: 4.7 Km 1 2.50 2.40 0.15 Cum 0.90
at Ch: 2.4 Km 1 2.50 2.30 0.15 Cum 0.86
at Ch: 6.0 Km 1 2.50 2.60 0.15 Cum 0.98
at Ch: 4.9 km 1 2.45 2.50 0.15 Cum 0.92
Cum 3.66
Total 3.66

Contractor PMC Section Officer AEE PWD Nelamangala Sub-division


Page 71
Providing and laying in position plain/Reinforced cement cement concrete M20 for
sub-structure/Superstructure works, with cement @ 320 kgs, 20 mm & down size graded granite metal
coarse aggregate @ 0.69 cum and fine aggregates @ 0.46 cum machine mixed with super plasticisers @ 3
lts confirming to IS 9103-2008,concrete laid in layers, well compacted and providing weep holes
wherever necessary with necessary scaffolding, form work etc., including cost of labour, HOM curing
199 etc., complete. ---- with all lead and lifts, loading and unloading charges, cost of all materials, labour,
equipment etc., complete the work as per specifications and directions of the Engineer incharge of
Work.

at Ch: 4.7 Km
Wall 2 2.4 0.50 0.900 2.16
Raft 1 2.50 2.40 0.150 0.90
Parapet Wall 2 2.40 0.50 0.300 0.72
at Ch: 2.4 Km
Wall 2 2.3 0.50 1.000 2.30
Raft 1 2.50 2.30 0.150 0.86
Parapet Wall 2 2.30 0.50 0.350 0.80
at Ch: 6.0 Km
Wall 2 2.6 0.50 1.400 3.64
Raft 1 2.50 2.60 0.150 0.98
at Ch: 4.9 km
Wall 2 2.5 0.50 1.000 2.50
Raft 1 2.45 2.50 0.150 0.92
15.78
Total 15.78

Contractor PMC Section Officer AEE PWD Nelamangala Sub-division


Page 72
K8RRB M2200-5.12 Providing and placing reinforce/prestreesed cement concrete in super structure as
per drawing and technical specification complete as per specification. B. RCC with OPC cement design
mix M25 @ 340kgs, with 20mm and down size graded granite metal coarse aggregates @0.7cum and fine
aggregates @ 0.47cum, with superplastisiser @3lts confirming to IS9103-1999 Reaffirmed- 2008, Case - I :
Using Concrete Mixer MORTH Specification No. 1500,1600 & 1700 - Height upto 5 m - ---- with all lead
203 and lifts, loading and unloading charges, cost of all materials, labour, equipment etc., complete the
work as per specifications and directions of the Engineer incharge of Work.

B B1 Avg B
No Length Depth Unit Qnty Remarks
(m) (m) (m)
at Ch: 4.7 Km
1 2.50 2.400 0.40 Cum 2.40
at Ch: 2.4 Km
1 2.50 2.300 0.40 Cum 2.30
at Ch: 6.0 Km
1 2.50 2.600 0.40 Cum 2.60
at Ch: 4.9 km
1 2.50 2.450 0.30 Cum 1.84
9.14
0.00 Total 9.14

Contractor PMC Section Officer AEE PWD Nelamangala Sub-division


Page 73
KSRRB M2200-6. Providing T.M.T. steel reinforcement for R.C.C. work including straightening, cutting,
bending, hooking, placing in position, lapping and/or welding wherever required, tying with binding
wire and anchoring to the adjoining members wherever necessary complete as per disign (laps, hooks
and wastage shall not be measured and paid) cost of materials, labour, HOM complete as per
specification. MORTH Specification No.1600 & 2200 TMT Fe 500 ---- with all lead and lifts, loading and
202 unloading charges, cost of all materials, labour, equipment etc., complete the work as per specifications
and directions of the Engineer incharge of Work.

B B1 Avg B
No Length Depth Unit Qnty Remarks
(m) (m) (m)
For Sub structure
(90 kg per Cum)
1 15.78 90.00 Tonne 1420.31

Total 1.42

Contractor PMC Section Officer AEE PWD Nelamangala Sub-division


Page 74
KSRRB M2300-14. Providing T M. T steel reinforcement for R.C.C. work including straightening,
cutting, bending, hooking, placing in position, lapping and/or welding wherever required tying with
binding wire and anchoring to the adjoining members wherever necessary complete as per design (laps,
hooks and wastage shall not be measured and paid) including cost of materials, labour, HOM complete
as per specifications. MORTH Specification No. 1600 & 2200 - TMT Bars Fe 500 ---- with all lead and
201 lifts, loading and unloading charges, cost of all materials, labour, equipment etc., complete the work as
per specifications and directions of the Engineer incharge of Work.

B B1 Avg B
No Length Depth Unit Qnty Remarks
(m) (m) (m)
For Super Structure
1 9.14 120.00 Tonne 1096.50

Total 1.10
KSRRB M2200- Filter Media KSRRB M2200-9. Providing and laying of Filter media with granular
materials /stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of
MORTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and
bigger size towards the wall and provided over the entire surface behind abutment, wing wall and
return wall to the full height compacted to a firm condition complete as per drawing and Technical
Specification including cost of materials, labour, HOM complete as per specifications. MORTH
204 Specification No. 2504.2.2 ---- with all lead and lifts, loading and unloading charges, cost of all materials,
labour, equipment etc., complete the work as per specifications and directions of the Engineer incharge
of Work.

B B1 Avg B
No Length Depth Unit Qnty Remarks
(m) (m) (m)
Behind Head wall 2 2.5 0.60 2.75 Cum 8.25
4 Nos 33.00
KSRRB M2200- Providing Weep Holes KSRRB M2200-8. Providing weep holes in Brick masonry I Plain
I Reinforced concrete abutment, wing wall I return wall with 100 mm dia AC pipe, extending through
the full width of the structure with slope of 1V :20H towards drawing force. Complete as per drawing
and Technical Specifications including cost of materials, labour, HOM complete as per specifications.
MORTH Specification No.2706 & 2200 ---- with all lead and lifts, loading and unloading charges, cost of
205 all materials, labour, equipment etc., complete the work as per specifications and directions of the
Engineer incharge of Work.

B B1 Avg B
No Length Depth Unit Qnty Remarks
(m) (m) (m)
For Head wall 2 5 Nos 10.00
4 Nos 40.00

Contractor PMC Section Officer AEE PWD Nelamangala Sub-division