Download as pdf or txt
Download as pdf or txt
You are on page 1of 16

Mochammad Iqbal Soetrisno Putra

Welding Inspector/QA - QC Inspector


Jl. Taman Tropikana Blok B4 No.30 Cikarang Baru, Bekasi
Tel: 085219223420 ♦ Email: iqbal.soetrisno@gmail.com

INTRODUCTION

I am bachelor degree of Mechanical Engineering and certified Welding Inspector also NDT (RI, MT, PT, UT).
i’m a hard worker, good communicator, and responsible person. Always willing to learn new skills. Also can
coorperate with team work and adaptable to all challenging situation.

EDUCATION

SMA NEGRI 1 KARAWANG


Science Major 2011-2014

NATIONAL INSTITUTE OF TECHNOLOGY BANDUNG (ITENAS)


MECHANICHAL ENGINEERING (Gpa 2.93/4.00) 2014-2019 (Graduate on April 2019)
Final Assigment : Realization and Testing of Vibration Isolation Systems
On Foundation Vibration Test Equipment Four Cylinder Crank Slider
Mechanism

PROFESSIONAL TRAINING

Pompa Sentrifugal dan Aplikasi di Industri


FLOWSERVE (Institute Teknologi Nasional Bandung) 15 – 16 April 2019

NDT (UT, PT, MT) Level 1 (ASNT)


Balai Besar Bahan dan Barang Teknik (B4T) 2 – 25 July 2019

Welding Inspector
Balai Besar Bahan dan Barang Teknik (B4T) 6 August – 8 November 2019

Radiography Interpreter Level II (ASNT)


Balai Besar Bahan dan Barang Teknik (B4T) 14 – 28 November 2019

Magnetic Particle Testing Technician Level 2


PT. INOVASI MULTI DIMENSI 20 – 23 February 2021

Liquid Penetrant Testing Technician Level 2


PT INOVASI MULTI DIMENSI 25 – 28 February 2021
ORGANIZATION EXPERIENCE

HIMPUNAN MAHASISWA MESIN 2014 - 2019


Pejabat Sementara HMM Itenas
Mesin Superleague 2016 Secretary Coordinator
PPA 2016 Deputy Coordinator Danus
M-Night 2015 Deputy Coordinator Pubdok
Diesnatalis HMM 2017 Deputy Coordinator Pubdok
Diesnatalis Institut Teknologi 2017
Nasional Deputy Coordinator Div. Posyandu dan Pengobatan Gratis

PROFESIONAL SKILL AND KNOWLEDGE

 Have almost 3 years as QA/QC Inspector and Welding Inspector for Contruction, Inspection and Testing
such as pipeline, piping, steel structure, Welder Test, and WPS creation and Testing.
 Have a good knowledge about welding technique and welding process
 Have knowledge about welding inspection and NDT Inspection ( MT, PT , UT, RT )
 Have a knowledge about oil and gas and Civil Project
 Have knowledge about reading WPS,PWPS,Mechanical Test Report, Drawing, Specification, Standard &
Code.
 Can excecution inspection and test per ITP, quality plant & specification
 Have knowledge about installation, inspection, test commisioning pipeline work.
 Good practical and technical skills
 Good problem solving skills
 Have strong command and leadership skills

WORK EXPERIENCE

PT. NINDYA KARYA (Persero)


Project Name : Proyek Pengembangan Pipa CY3
Location : Cilacap – Jogja
Client : PT Pertamina Patra Niaga
Period : Juny 2021 – Present
Position : QA/QC Inspector
Job Responsibillities :
- Review ITP, WPS, drawing and related inspection documents
- Checked all material and electrode related to welding process
- Monitoring Welding activities and manage inspection for joint fit up, process, and visual welding
joint.
- Witness and monitoring NDT Process (RT & PT)
- Review Radiography film
- Monitoring and inspection civil work
- Analyze and resolve Quality problems and proposed solution to client.

PT. MULIA TEHNIK TOOLSINDO


Project Name : Jasa Perancangan Pengadaan dan Konstruksi Pembangunan Pipa Transmisi Gas
Location : Tambak Lorok – Tambak Rejo , Semarang
Client : Pertamina Gas
Period : February – May 2021
Position : QA/QC Welding Inspector
Job Responsibillities :
- Review ITP, WPS, drawing and related inspection documents
- Checked all material and electrode related to welding process
- Monitoring Welding activities and manage inspection for joint fit up, process, and visual welding
joint.
- Witness and monitoring NDT Process (RT, MT, PT, and UT)
- Review daily inspection report before submit to main contractor
- Coordination with main contractor for inspection at site.

PT. PJTEK MANDIRI


Location : Serpong, South Tangerang
Period : January – December 2020
Position : Welding Inspector
Job Responsibillities :
- Review WPS and PWPS
- Checked all material and electrode related to welding process and specification as per standard
& code.
- Monitoring and performed welder test activity and PQR
- Monitoring Welding activities and manage inspection for joint fit up, process, and visual welding
joint.
- Witness and monitoring NDT Process (RT, MT, PT, and UT)
- Review radiography film and other NDT report (MT,PT, & UT)
- Witness and monitoring DT (Destructive Test) Activity
- Coordinate with all respective parties for defining the results of the test.
- Planning and controlling during testing for Migas/EBTKE Certificate.
r Nomor liozoh: O536/lJ/6.1 .'l 2/ltenos /lY /2O19 I reuas 016682

IUSTITUT TTKNOIOGI NNSIONAL


SK Menteri Pendidikon don Kebudoyoon Republik lndonesio No. 0l8O/O/1985longgol 20 April 1985

menyotokon bohwq

MocnAMMAD leenl SoernlsNo Purnn


(12-2O14-I06)

Lohir di Bondung, podo tonggol 4 Juli I996


Telqh memenuhi semuo persyorolon don dinyotokon lulus progrom pendidikon Soriono tonggol 1l April 2019
Podo Progrom Srudi IEKNIK MESIN

(Stotus BERAKREDITASI berdosorkon Surol Keputuson Bodon Akreditosi Nosionol


Nomor: 7 O 5 /SK/ BAN - PTIAKRED /S / lY /2Ol 9 to ns go I 9 Apri I 2O1 9l
Kepodonyo diberikon gelor

SARJANA TEKNIK (S.T.)


Besertq semuo hqk don kewoiibon yong melekot podo gelor lersebut
'l
Diterbitkqn di Bqndung, podo tonggol 1 April 2019

Dekan, Ia*
rI G A Rektor,
Fakultas Teknologi lndustri
t
IL ,=. I
r
Dani s.T., M.T., Ph.D. Dr. lmom Aschuri, lr., M.T.

t
I

I usnrur Trruoloct NRsloltRl TnansKRrP


sK ribndikbud: 0180/0/1985 tanggal 20 eprir 1985 Nilai
A = 4,00 Sangat baik
AB = 3,50 Antara sangat
baik dan baik
N.I.M. : L2-20L4-L05 rakultas : TERNOLOGT MDUSTRT B = 3,00 Baik
N a m a : UOCIiAIiITIAD IQBAIT SOETRISNO P Progra.$ SEudi r TEKNfK MaSIN BC = 2,50 Cukup baik
C = 2,00 Cukup
TBpat/TgI .Lahir r BANDITNG, 4 ilull 1995 Nomor TranEkrip : 0 53 5/TA/ 5 . L. LZ / !TENAS/IV/2 0 19 D = 1,00 Kurang
E=0 Gagal

il

MATAKULIAH Srs Nrur Mrmruulx Srs Nlt-ar

A usA-{02 T,EWIRAUSIEIA!| AB
I lus--101 BAIIASA IIIDOIIESIA 3
,
lus--roz AGA}TA 3 A r,tsA- { 03 PBNA}ICANGAN SISTEU IIIKUITKAIJ
2 AB
us--103 BAIIISA INGGRIS I 2 A IilsA- { 0 5 ITBX.f,TBOITIRI
!.{sA- 411 PRBSTASI ITBSIN 1
rls--105 P ENDIDI KAN KEWARGANEGAP-MI{ 3 A

!.ts - - 112 MATAMATIKA TEKNIX II 3 A t{sA- 4 51 RI&f,YASA PERPIPIAI| 3 B


45
4 B MSA- 4 57 TGTNIK PIA!{EING 3 AB
l{s - - 113 MENGGA!.{BAR MESIN
A ItsA- 455 TEK}IIX XBEATDTLA}I c
MS--11{ CA.D 2

I !.rsA- { TEI(}IOLOGI DRONI AB


MS--115 MATEMATIXA TEKNIK 3 B 6 6
I
STATTKA STRI'KIUR 3 B usA-{90 PNAXTIX XIRi'A 2 A
lMs--115
FISIK} TBKNIR UESIN 3 c usA- 500 TUGAS AXHIR 5 A
50
10
lus--rrz
i Mg--118 ITATBRIAIJ TEKNIK 4 B
I

us--122 }TETODE XOI{PIITASI 3 c .rudul Skripsi :

us- -202 BAITASA INGGRIS II 2 B RETTJISASI DAN PANCUJIAI| SISTEI( ISOIJAST


MS--211 I'IETAIIIKA XEKUATAII IIATBRIAL 3 B GETARAN P}DA PO!{DASI ATTAT Ui'I GITAR ITBKA}'ISITE ENGKOI,

MS--2L2 PERPIIIDAIIA}I PANAS 4 c PEI,I'NCI'R EIIPAT SII,IIIDER


15 55
us--213 THERMODINAITIXA 4 a
MS- -215 PROSES PRODIXSI 4 D Lulua Program Sarjaaa Ta8ggal 11 April 2019

MS- -215 EI,EMEN MESIN I B ,frurlah SKS Diperoleh : 1{{


us--217 MBTAI.I'RGI TISIK 4 c Indeka Prestasi z 2,93
us- - 219 KIUIA TERAPA}I 2 B Predikat FelulusaD I uesuaskaB 60
20
MS- -221 STATISTIR 2 c
us--311 BI.EI,IEN MESIN II 4 c
ns--312 INSTRI'UENIASI DA}I KONTROI, 4 c
!.rs - - 313 MEKA}IIKA FI,UIDA B

2E us--31{ !,IANA,IEMEN PERAWATAN c


65
MS--315 MBSIN TI,UIDA 4 B

MS--317 TEKNIX KONSERVASI I,INGKI,NGAN 2 B

r{s--318 TENOMENA DASAR MESIN B

MS- -321 IIIANA.'EMEN INDUSTRI DAI{ PROYBK 4 c


!,ts - - {11 cNc 3 B
30 70
r,ts--{1{ IIIDROLIK DAII PNEITIiiAIIK 3 B

r,Is- -r153 TBKNII( PENGE'JASAN 2 B

nsA-209 KINET{ATIX.L c
MSA-212 DINAI.IIKA TEKNIK 3 c
usA-301 PENGBNAI.AN PERAI{GKAT I,UNAX TBKNIK UBSIII 3 A
75
r.rsA- 3 07 GETAN,AN IEKANIK 2 AB

usA-308 rEI(NII( TENAGA I,ISTRIK 2 AB

MSA- 3 11 PEI6II,IIIAN BAIIAN DAN PROSES AB

usA- 3 13 !(ETROITOGI INDUSTRI 3 AB

rds-L- { 01 TBKNOI,OGI ENERGI BAXU & TERBA.R,I'XA}I 2


40

3edug, 23 Aprl1 2019


D€kaa, r v
Rektor,

( teftah
DaaL Rulirawaq, S.4., u.f., Pb.D.
H ll{?r?rfi
Dr.
tiltio(oo x^lroxaa
ImaE A!chu!i, Ir., U'T

Jalan PKH Mustafa 23, Bandung 40124 Telopon : +62 22 727 - 2215 Fax: +62 22720 - 2892 http:rlvww.itenas.ac.id e-mail:baa@itenas.ac.id
INTERNATIONAL
INSTITUTE OF WELDING
Having met the education and training requirements of IIW Guideline
'International Welding Inspector' and by examination
having satisfied the requirements of the Examination Board of the
IIW Authorised Nominated Body

Mochammad Iqbal Soetrisno Putra


Date of Birth:04/07/1996
is hereby awarded the title of

INTERNATIONAL WELDING INSPECTOR


Comprehensive Level

Date: 12/11/2019 Diploma N° ID/001/1WIP-C-0854

Chairman of ANB
Examination Board

Budi Susanto, MT.

M.t )
~!
~
Kementerian
Perindustrian
REPUBLIK INDONESIA
INDONESIAN WELDING SOC'ETY • Approved Training Body
AI1rnORISED NOMINATED BODY Balal SeN.r Bahan Dan Barang Teknik
Jr. Sangkuriang No. 14. Bandung 40135

IIW Authorised Nominated Body


IWS-ANB / INDONESIA
All contents featured on this diploma, including logos and qualification
acronyms are protected by trademarks, copyrights and other protective laws
This diploma is subject to the rules concerning its use and misuse
See overleaf

You might also like