1.1.1 Provision of all necessary offices and facilities for the Employer and the Engineer complete with all services, 1 Item
furniture, equipment and fixtures as specified.
1.1.2 Provision of all necessary offices, stores and facilities for Contractors' site staff in adequate manner as per 1 Item
the Works required.
1.1.3 Provision of sign boards as per ADCE design and requirement 1 Nos.
1.1.4 Provision of Sign board on top of the tower crane of dimensions (3.00 M X 1.22 M) as specified. 1 Item
1.1.5 Provision of site hoarding as specified with ADCE logo (Stickers 12 pieces). . 1 Item
1.1.6 Submittal of Performance Bond as per the Conditions of the Contract. 1 Item
1.1.7 Submittal of all insurances as per the Conditions of the Contract. 1 Item
1.1.8 Submittal of Programme for the Works and cash flow , whereby Contractor to submit Construction 1 Item
progarmmme (baseline) to the Engineer for approval
Allow for all obligations in accordance with the Contract, which are not mentioned above. The Contractor
1.1.9 shall detail and price below any other obligations indicating the relevant clause reference in the Contract Documents. 1 Item
“Fixed total amount to be paid by the awarded contractor related to third party verification & approval fees during the Design
Stage in case officially requested by the municipality (No OH&P allowable for this item): Fixed amount
1.1.10 1
- Soil investigation, structure third party NOC, Topographic survey (if requested by municipality), Gas NOC (No OH&P)
& TIS (if requested by DOT / municipality).
1.2 Recurring Preliminary Costs incurred during the Execution of the Works
1.2.1 Maintenance of all necessary offices and facilities for the Employer and the Engineer including all services, 1 Item
furniture, equipment and fixtures.
1.2.2 Maintenance of Contractor's site staff office, stores, and facilities. 1 Item
1.2.3 Provision of Contractors site management, administrative and supervisory staff in adequate manner as per 1 Item
the Works needs.
1.2.4 Provision of all required equipment and tools for the successful execution of the Works such as but not 1
limited to :
1.2.10 Provision of all required progress site reports, photos, and other documentation as per the Conditions of the 1 Item
Contract.
1.2.11 Provision of all required shop drawings and samples as specified and required by the Engineer. 1 Item
1.2.12 Provision of all required Quality Assurance and Quality Control as required by the Contract. 1 Item
1.2.13 Provision for all inspections and testing necessary for the acceptance of the Works in accordance with the 1 Item
Specifications and the Conditions of the Contract.
1.3.2 Demobilization and removal of all offices, stores and facilities. 1 Item
1.3.3 Demobilization and removal of all equipment and tools. 1 Item
1.3.4 Provision of all required As Built drawings, Operation and Maintenance Manuals and guarantees. 1 Item
1.3.5 Clearing up and making good site establishment after completion of the Works and demobilization. This 1 Item
includes re-instating surrounding areas affected by the construction works.
Allow for all obligations in accordance with the Contract, which are not mentioned above. The Contractor shall detail and price
1.3.6 below any other obligations indicating the relevant clause reference in the Contract 1 Item
Documents.
1.3.7 Allow for the issuance of the Building Occupancy certificate or any other similar certificates required by the 1 Item
municipality
Allow for Provisional Sum (PS) of AED 3,500/- for Digital Property pictures by Professional Photograph as follows:-a. Property
1.3.8
2 SITE CONSTRUCTION
2.1 Demolition ( IF NEEDED )
The contractor shall allow for demolition of existing building. Removal of reusable items shall be done by others before starting
2.1.1 demolition work. The cost of this item shall include the cost of clearing the site from N/A item
all derbies arising from demolition work and removal of all existing foundations and obstructing piles.
The reusable items are property of the owner and he has the right to appoint a third party to remove it and main contrctor to
2.1.1.1 support and facility this activity .incase the owner elect to assign this task to main contrctor N/A item
then contrctor to remove and transport to the stores of the owner /tion decided by the owner
2.2 Soil investigation
1. Soil Report is for Guidance. The contractor shall perform geotechnical and geophysical investigations as per tender
documents.
2. Minimum no. of boreholes for soil test shall be 4 boreholes, 3 to a depth of 25 Meters below ground level and one to a depth
of 35 Meters with at least 2 meters in the rock strata.
3. It is the contractor’s responsibility to check the soil bearing capacity and its ability to support the structure and the
2.2.1 underground water tank without any settlement, if redesign in required to the structure and shoring system it is to be done by 1 item
the Contractor in coordination with the consultant and to get the necessary approvals from the related authorities then to be
executed at no extra cost or time.
4. Geophysical investigation to be done as per DMA regulations.
5. Materials Testing laboratories to be approved by DMA and registered with ADCE.
2.2.2 Geophysical investigation/Allow for performing geophysical investigations as per relevant authorities 1 item
requirements, rules and regulations.
2.2.3 Allow for any other site investigations needed by Tender Documents ( i.e. topographic surveys or any other 1 item
investigations required by Authorities).
2.3 Dewatering
Allow for design ,installing, maintaining and taking away upon completion, dewatering system as designed by a specialist firm
registered with ADCE and approved by the consultant engineer and local authorities, to lower the water level at least one
2.3.1 meter below bottom level of foundations and to keep all excavations free from water from whatever source. And to keep the N/A Item
site in a safe and secure working conditions all the time.
And should never stop until a written approval from the consultant engineer
2.4 Site Clearance
TMP‐DRM‐030
V3. 28th April 2022
Total Note
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
#VALUE!
#VALUE!
#VALUE!
2.4.1 The Contractor shall allow for the removal from site of all rubbish and debris and any existing foundations 1 Item -
prior to commencement of Works.
2.5.2 Where utilities are to remain in place provide adequate means of support and protection during excavation N/A Item #VALUE!
and shoring operations, pilling works and construction stages.
Allow for diaphragm wall system with min. wall thickness ÄÄ.Ä cm to be used as to be used as permanent shoring, as designed
by a specialist firm registered with ADCE and approved by the consultant engineer and local authorities, constructed using
sulfate resistant Portland cement or as recommended by soil investigation report and having a minimum 28-day compressive
2.6.1.2 strength of ÄÄ.Ä N/Sq.mm as per drawings and specification. Steel reinforcement shall be provided as per drawings and N/A item #VALUE!
specifications.
2.7.3 The Contractor shall be responsible to calculate the depth of piles based on the geotechnical report and to 1 Item -
the consultant’s engineer and Municipality Engineer's approval.
2.8.2 Supply and paint Precast curbstone as per municipality and roads dept. 23 m -
2.8.3 60mm thick colored interlocking tiles as per municipality and roads dept.. 50 m2 -
2.8.4 80mm thick colored interlocking tiles as per municipality and roads dept.. 205 m2 -
2.8.5 Road/traffic markings as specified and as per municipality and roads dept. 1 Item -
2.8.6 Sundries
2.8.6.1 Allow for any other miscellaneous work in connection with site construction. N/A Item #VALUE!
3 CONCRETE WORKS
3.1 FINISHING OF EXPOSED SURFACES OF SECANT PILES
3.1.1 Supply 500 mm. min. thick gunite concrete having a min. compressive strength of 40N/mm2, sprayed at N/A m2 #VALUE!
pressure as specified, including ÄÄ.. welded steel mesh.
3.2 SUBSTRUCTURE
3.2.1 Concrete work in accordance with specification
3.2.1.1 Plain Concrete
3.2.1.1.1 Plain sulphate resisting cement concrete grade 20.. N
3.2.1.1.1.1 50 mm thick, blinding concrete 8 m3 -
3.2.1.1.1.2 100... mm thick, blinding concrete 75 m3 -
3.2.1.2 Reinforced Concrete
3.2.1.2.1 Reinforced insitu ordinary Portland cement concrete grade 40. N, including Reinforcement and shuttering,
3.2.1.2.1.1 Raft ÄÄÄÄÄ. mm. thick. N/A m3 #VALUE!
3.2.1.2.1.2 Pile caps 62 m3 -
3.2.1.2.1.3 Tie beams for pile caps / Ground beams 85 m3 -
3.2.1.2.1.4 Water tank base slab, 100. mm thick using waterproof additives in concrete mix. 2 m3 -
3.2.1.2.1.5 Basement walls, ÄÄÄÄ...mm thick. N/A m3 #VALUE!
3.2.1.2.1.6 Ramp, ÄÄÄÄ. mm thick N/A m3 #VALUE!
3.2.1.2.1.7 Slab on grade, AAA.. mm thick N/A m3 #VALUE!
3.2.1.2.1.8 Ditto, ÄÄÄÄÄÄ.. mm thick N/A m3 #VALUE!
3.2.1.2.1.9 Thickening of grade slab N/A m3 #VALUE!
3.2.1.2.1.10 Walls of water tank, ÄÄ.. mm. thick using waterproof additives in concrete mix. N/A m3 #VALUE!
3.2.1.2.1.11 Walls, ÄÄÄÄÄÄ.. mm thick N/A m3 #VALUE!
3.2.1.2.1.12 Ditto, ÄÄÄÄÄÄ.. mm thick N/A m3 #VALUE!
3.2.1.2.1.13 Ditto, ÄÄÄÄÄÄ.. mm thick N/A m3 #VALUE!
3.2.1.2.1.14 Columns 5 m3 -
3.2.1.2.1.15 Staircases. N/A m3 #VALUE!
3.2.1.2.1.16 Beams. N/A m3 #VALUE!
3.2.1.2.1.17 Upstands. N/A m3 #VALUE!
3.2.1.2.1.18 Suspended slabs, 200.mm thick. 140 m3 -
3.2.1.2.1.19 Suspended slabs, AAA.mm thick. N/A m3 #VALUE!
3.2.1.2.1.20 Injection System ( IF NEEDED )
3.2.1.2.1.20.1 Allow for re-injectionable system for basement walls and all underground construction joints in contact with N/A item #VALUE!
soil. The Contractor should carry out the injection process when and wherever instructed.
Allow for the review of the Engineering submittals (Materials, Method statements & Shop Drawings) by the QA / QC
Waterproofing manufacturer for the Waterproofing Works in substructure, Roofing & swimming pools.
3.2.1.5.4 1 Item -
5.2.2 Design, fabricate and fix in place steel canopy at ROOF Floor. 1 item -
5.2.3 Design, fabricate and erect powder coated aluminium Pergola N/A item #VALUE!
5.2.4 Sundries N/A
5.2.4.1 Fabricate and fix in place, aluminium decorative mast at elevation. N/A item #VALUE!
5.2.4.2 Supply and fix in place powder coated aluminium air foil blades located at Ground floor. N/A item #VALUE!
5.2.4.3 Fabricate and install in position 200cm high, fence for Gaz Tank at roof, complete with access controlled N/A m #VALUE!
door as per details.
5.2.4.4 Supply and fix in position, epoxy coated, galvanized iron platforms inside the shafts, as per drawings and N/A item #VALUE!
specifications.
5.2.4.5 Provide and fix in the main entrance lobby, a 60x40x.02 cm stainless steel signage plate to declare the N/A No #VALUE!
Building Name, Building No. and ADCP the property manager.
7.2.3.2 Supply and fix on concrete and/or block work behind external cladding, vapor barrier paint. 2400 m2 -
7.2.3.3 SUNDRIES:
7.2.3.3.1 waterproofing system for swimming pool, as detailed N/A item #VALUE!
8 DOORS AND WINDOWS
8.1 WOODEN DOORS
8.1.1 Doors shall be made as per drawings and specifications, provided with all necessary approved accessories
and ironmongery.
9.1.1.5.2 ÄÄ mm thick screed painted with ÄÄ. coats of epoxy resin based floor coating. N/A m2 #VALUE!
9.1.1.6 DOOR MAT
9.1.1.6.1 Ä.. X ÄÄmm door mat, including aluminum gate ribs supporting channel, complete. N/A No. #VALUE!
9.1.1.7 SKIRTING
9.1.1.7.1 600*100 mm ceramic skirting. 900 m -
9.1.1.7.2 ÄÄ mm high, ÄÄmm thick ÄÄ. Granite / marble with curved edge for staircase. N/A m #VALUE!
9.1.1.7.3 2 coats of epoxy resin based coating, ÄÄ mm high. N/A m #VALUE!
9.1.1.8 THRESHOLD
9.1.1.8.1 . Marble threshold, rounded edges, at door frames, 65 m -
9.1.1.8.2 ÄÄÄ.. Marble sills, ÄÄ. mm thick ÄÄÄmm width rounded edge. N/A m #VALUE!
9.1.2 WALL FINISHES
9.1.2.1 Cement/sand plaster finish to internal surfaces as specified
9.1.2.1.1 Walls paint finish 4500 m2 -
9.1.2.1.2 Ditto, ceramic finish 1500 m2 -
9.1.2.2 Wall tiling, fixing and grouting on and including background as specificied
9.1.2.2.1 Ä.. x ÄÄ x ÄÄ.. mm Granite / Marble tiles N/A m2 #VALUE!
9.1.2.2.2 Ditto, Ä... x ÄÄ.. x ÄÄÄ.. mm N/A m2 #VALUE!
9.1.2.2.3 300x600. mm. Ceramic tiles 1350 m2 -
9.1.2.2.4 Ditto, Ä... x ÄÄ.. x ÄÄ.. mm N/A m2 #VALUE!
9.1.2.2.5 Ä.. x Ä.. x ÄÄ. mm. Graniti ceramic tiles N/A m2 #VALUE!
9.1.2.2.6 Ditto, Ä... x ÄÄ..x ÄÄ. mm N/A m2 #VALUE!
9.1.2.2.7 Painting and Decoration
9.1.2.2.7.1 Washable emulsion paint. 4200 m2 -
9.1.2.2.7.2 Ditto, but curved N/A m2 #VALUE!
9.1.2.2.7.3 Oil paint system. N/A m2 #VALUE!
9.1.2.2.7.4 Ditto, but curved N/A m2 #VALUE!
9.1.2.2.7.5 ÄÄ... Epoxy, ÄÄÄÄ... finish paint. N/A m2 #VALUE!
9.1.2.2.7.6 Ditto, but curved N/A m2 #VALUE!
9.1.2.2.7.7 Decorative paint ÄÄÄÄÄÄ.Ä. N/A m2 #VALUE!
9.1.2.2.7.8 Ditto, but curved N/A m2 #VALUE!
9.1.3 Ceiling Finishes
9.1.3.1 Cement/sand plaster finish to ceiling
9.1.3.1.1 Concrete soffit 1200 m2 -
9.1.3.1.2 Ditto, but for sloping soffits N/A m2 #VALUE!
9.1.3.2 Painting and Decoration
9.1.3.2.1 Washable emulsion paint. N/A m2 #VALUE!
9.1.3.2.2 Ditto, slopping soffit N/A m2 #VALUE!
9.1.3.2.3 Oil paint system. N/A m2 #VALUE!
9.1.3.2.4 Ditto, slopping soffit N/A m2 #VALUE!
9.1.3.2.5 ÄÄ... Epoxy, ÄÄÄÄ... finish paint. N/A m2 #VALUE!
9.1.3.2.6 Ditto, slopping soffit N/A m2 #VALUE!
9.1.3.2.7 Decorative paint ÄÄÄÄÄÄ.Ä. N/A m2 #VALUE!
9.1.4 False ceilings
9.1.4.1 C1(plaster+ paint) 402 m2 -
9.1.4.2 C2 (Gypsum board+ paint) 780 m2 -
9.1.4.3 C3 ( Moisture resistant gypsum + paint ) 150 m2 -
9.1.4.4 C4(Aluminum Ceiling) 150 m2 -
9.1.4.5 Bulk head gypsum board. 369 m -
9.1.4.6 Bulk head gypsum moisture resistant. 168 m -
9.2 II- EXTERNAL FINISHES
9.2.1 Floors
9.2.1.1 Granite tiles. 32 m -
9.2.1.2 30 mm thick curved edge Granite for tread. N/A m #VALUE!
9.2.1.3 20 mm thick Granite for riser. N/A m #VALUE!
9.2.2 Walls
9.2.2.1 Cement and sand plaster as specified For Parapet
9.2.2.1.1 Walls 610 m2 -
9.2.2.1.2 Ä. X Ä. X Ä. mm ÄÄÄ. granite / marble tiles, for ÄÄÄÄÄ.. fixed using dry fix method, N/A m2 #VALUE!
9.2.2.1.3 Like stone paint ÄÄ. mm minimum thick, N/A m2 #VALUE!
9.2.2.1.4 Acrylic system paint. 610 m2 -
9.2.2.1.5 ARTIFICIAL STONE 1 1860 m2 -
9.2.2.1.6 ARTIFICIAL STONE 2 400 m2 -
9.2.2.1.7 TRAVANTINE STONE 140 m2 -
9.3 III- SUNDRIES
9.3.1 CAR PARKING
9.3.1.1 Columns protection. N/A m #VALUE!
9.3.1.2 Walls protection. N/A m #VALUE!
9.3.1.3 Ready made rubber speed humps. N/A m #VALUE!
9.3.1.4 ÄÄÄÄÄÄÄÄÄÄÄ.. wheel stoppersÄ. mm. N/A m #VALUE!
9.3.1.5 Concaved traffic mirrors ÄÄ. X ÄÄ. mm N/A Nos. #VALUE!
10 PLUMBING AND DRAINAGE
10.1 WATER SUPPLY SYSTEM
10.1.1 Supply, install, testing and commissioning of all cold water piping complete with support and all necessary
fittings, valves and accessories; all in accordance with drawings and specification
Complete internal concealed piping in Poly Propylene Random pipes for cold water supply with all necessary fittings, supports
10.1.1.1 and accessories. Rates shall include all flushing, cleaning, testing and
commissioning. For Internal Diameter:
10.1.1.1.1 25Ø 1 L.S -
10.1.1.1.2 32Ø 1 L.S -
10.1.1.1.3 40Ø 1 L.S -
10.1.1.1.4 50Ø 1 L.S -
10.1.1.1.5 65Ø 1 L.S -
10.1.1.1.6 75Ø 1 L.S -
10.1.1.1.7 100Ø 1 L.S -
10.1.1.1.8 125Ø 1 L.S -
10.1.1.1.9 150Ø 1 L.S -
Complete water supply filling lines, transfer pipes, overflow pipes, boosted water riser and gravity riser piping with UPVC
pressure pipes, suitable for system working pressure, with all necessary fittings, supports and accessories as specified and
10.1.1.2
shown on drawings. Rates shall include all flushing, cleaning, testing and
commissioning. For Internal Diameter:
10.1.1.2.1 25Ø 1 L.S -
10.1.1.2.2 32Ø 1 L.S -
10.1.1.2.3 40Ø 1 L.S -
10.1.1.2.4 50Ø 1 L.S -
10.1.1.2.5 65Ø 1 L.S -
10.1.1.2.6 75Ø 1 L.S -
10.1.1.2.7 100Ø 1 L.S -
10.1.1.2.8 125Ø 1 L.S -
10.1.1.2.9 150Ø 1 L.S -
10.1.1.2.10 All exposed Pipes on roof, plant rooms and basement shall be insulated and protected with cladding as 1 L.S -
specified
10.1.1.3 PEX pipes complete with sleeves for all cold water droppers from above false ceiling to the fixtures 1 L.S -
Supply, install, testing and commissioning of all hot water piping Stabilized PPR, PN-20 complete with insulation, supports and
all necessary fittings, valves and accessories; all in accordance with drawings and specification. Rates shall include all flushing,
10.1.2
cleaning, testing and commissioning. For Internal Diameter:
10.1.5 Each Sanitary ware shall have Chromium plated, isolating valve for ease of maintenance. Valves shall be 1 item -
same as fitting's mixers type.
Allow for installation of water meters and all associated cabinet, accessories, controls and for swimming pools, external water
10.1.9.4 features, irrigation..etc. as required by by Estidama with interface to Energy monitoring N/A L.S #VALUE!
system
10.1.9.5 Allow for installation of water meter for fire water tank and all associated cabinet, accessories, controls and N/A L.S #VALUE!
as required by ADDC
10.1.9.6 Allow for emergency water tanks filling line with associated cabinet, inlets, valves, fittings and accessories N/A L.S #VALUE!
and as required by ADDC
10.1.11 Ablution tap for roof, garbage room, plant rooms and basement complete with isolating valves, back flow 18 No -
preventer, support and accessories
10.1.12 Valves
10.1.12.1 Gate Valves
10.1.12.1.1 25Ø 1 L.S -
10.1.12.1.2 32Ø 1 L.S -
10.1.12.1.3 40Ø 1 L.S -
10.1.12.1.4 50Ø 1 L.S -
10.1.12.1.5 65Ø 1 L.S -
10.1.12.1.6 75Ø 1 L.S -
10.1.12.1.7 100Ø 1 L.S -
10.1.12.1.8 125Ø 1 L.S -
10.1.12.1.9 150Ø 1 L.S -
10.1.12.2 Check valves
10.1.12.2.1 25Ø 1 L.S -
10.1.12.2.2 32Ø 1 L.S -
10.1.12.2.3 40Ø 1 L.S -
10.1.12.2.4 50Ø 1 L.S -
10.1.12.2.5 65Ø 1 L.S -
10.1.12.2.6 75Ø 1 L.S -
10.1.12.2.7 100Ø 1 L.S -
10.1.12.2.8 125Ø 1 L.S -
10.1.12.2.9 150Ø 1 L.S -
10.1.12.3 Allow for Water hammer arrestor in every wet area 1 L.S -
10.1.12.4 Allow for Automatic air vents as shown on drawings, specification and where required for proper system 1 L.S -
operation
10.2.7 Supply and install Rain water outlets as specified, shown on drawings and to engineer/ architect approval 1 L.S -
10.2.8 Supply and install Floor drain with covers as specified and to engineer/ architect approval 1 L.S -
10.2.10 Supply and install manholes with heavy duty grating and sediment bucket as specified and to engineer/ 1 L.S -
architect approval
10.2.11 Supply and install Gulley trap with covers as specified, shown on drawings and required by authorities 1 L.S -
10.2.13 Supply and install balcony drain with cover as specified and to engineer/ architect approval 1 L.S -
10.2.19 Supply and install Clean outs on every change of direction and as required 1 L.S -
10.2.20 Supply and install Catch basins with covers as specified, shown on drawings 1 L.S -
10.4 Toilet & Bathroom
10.4.4.2 Baths shall have the following :
10.4.4.2.1 W.C. 36 Nos. -
10.4.4.2.2 European W.C., floor mounted, syphonic, double trap, with low level cistern, ball valve, Chrome Plated 36 Nos. -
fittings, seat and cover, hose and spray nozzle with hook.
12.8.2 Supply 4-Ways diffusers with associated plenums, flexible ducts, supports and accessories 1 L.S -
12.8.3 Return 4-Ways diffusers complete as shown on drawings and as specified 1 L.S -
12.8.4 Supply Register complete as shown on drawings and as specified 1 L.S -
12.8.5 Return Grilles complete as shown on drawings and as specified 1 L.S -
12.8.6 Extract air grilles complete as shown on drawings and as specified 1 L.S -
12.8.7 Toilet round disc type extract diffuser. 1 L.S -
12.8.8 Supply linear slot diffusers with associated plenums, flexible ducts, supports and accessories
12.8.8.1 SLD-01 1 L.S -
12.8.8.2 SLD-02 1 L.S -
12.8.8.3 SLD-03 1 L.S -
12.8.8.4 SLD-04 1 L.S -
12.8.9 Return Linear slot diffusers
12.8.9.1 RLD-01 1 L.S -
12.8.9.2 RLD-02 1 L.S -
12.8.9.3 RLD-03 1 L.S -
12.8.9.4 RLD-04 1 L.S -
12.8.10 Supply linear bar grilles with associated plenums, flexible ducts, supports and accessories
12.8.10.1 SLBG-01 1 L.S -
12.8.10.2 SLBG-02 1 L.S -
12.8.10.3 SLBG-03 1 L.S -
12.8.10.4 SLBG-04 1 L.S -
12.8.11 Return Linear bar grilles
12.8.11.1 RLBG-01 1 L.S -
12.8.11.2 RLBG-02 1 L.S -
12.8.11.3 RLBG-03 1 L.S -
12.8.11.4 RLBG-04 1 L.S -
12.8.12 Intake and Extract louvers 1 L.S -
13 ELEVATORS AND CRADLE
13.1 ELEVATORS
13.1.1 Passenger Lift
Design, supply and install passenger lifts complete as specified including all motors guide rails, counter weights, elevator car,
13.1.1.1 doors and frames, finishings,buffers, furnishings, accessories, fixings, signals, safety
gear, controls etc. all as per Specification and Drawings
13.1.1.1.1 Elevator No 1 - ÄÄ.. Kg , Ä.. persons capacity ÄÄ.meter / min , Ä..stop, Ä..openings, Ä... wide x ÄÄ.mm No. -
depth clear cabin size, hydroelectric computerised control (indirect side acting) as Specified
13.1.1.1.2 Elevator No 2- ÄÄ.. Kg , Ä.. persons capacity ÄÄ.meter / min , Ä..stop, Ä..openings, Ä... wide x ÄÄ.mm No. -
depth clear cabin size, hydroelectric computerised control (indirect side acting) as Specified
13.1.4 SUNDRIES
13.1.4.1 Allow for production of all working drawings, calculations,specification, operation and maintenance manuals Item -
13.1.4.2 Allow for all general builder's work in connection with the lift installation Item -
13.1.4.3 Allow for testing and commissioning lift installation Item -
13.2 CRADLE
13.2.1 Window Cleaning Cradle System
13.2.1.1 Supply, install, test, commission and maintain window cleaning cradle equipment/system complete in Item -
accordance with specification and drawings.
13.2.1.2 SUNDRIES
13.2.1.2.1 Allow for production of all working drawings, calculations,specification, operation and maintenance manuals Item -
16.2.5 Cost of protection, relocation and other related work are to be beard by Contractor. 1 L.S -
16.2.6 New route reservation is to be considered for future LV network expansion 1 L.S -
16.2.7 Allow for all works required by the specifications and shown on the drawings for providing incoming mains 1 L.S -
installation through ADDC including liaison, and all builder's work.
16.2.8 Paying statutory ADDC charges, connection fees for acquiring main supply including but not limited to the 1 L.S -
following (LV Panels, Energy Meters, etc...) Rates and Insurance.
Supply, install and testing of Main Distribution Board (MDB) (FORM 2B) switch board comprising of all
16.3.2 switch gear, bus bar, meters, indicator lights complete as specified, shown on the drawings and As per authorities requirements 1 L.S -
16.3.3 Sub - main distribution boards as specified and shown on the drawings. 6 No -
16.3.4 Supply, install and testing of Final distribution boards as specified and shown on the 20 No -
drawings.
16.3.5 Supply, install and testing of Capacitor Bankas AS required by the local authority and 1 No -
as specified and shown on the drawings.(100KVAR )
16.3.6 Ducts, earthing, manholes and manhole cover grade A as required by Authorities & 1 L.S -
ADDC
Supply and install, Test, Commission and maintain main and sub feeder copper cables as shown on drawings including
16.3.7 termination, cable ties, and all necessary accessories 1 L.S -
and related ancillaries works specified as a required by the drawings and as per ADDC requirments.
16.4 Low Voltage cables
Supply and install, Test, Commission and maintain main and sub feeder copper cables as shown on drawings including
16.4.1 termination, cable ties, and all necessary accessories and related ancillaries works 1 L.S -
specified as a required by the drawings
16.4.2 Armored cables, cable cleats, cable terminals etc. 1 L.S -
16.4.3 Fire rated cables FP400 1 L.S -
16.4.4 2 core cables including terminations, supports etc.. 1 L.S -
16.4.5 Single core cables and wires drawn into conduits/ducts including terminations, supports etc. 1 L.S -
16.5 Cable Trays, Ducts, and Accessories
16.6.1 Supply and installation of the cCable Trays, Ducts, and Accessories including required supports as per site 1 L.S -
requirement, hardwares, etc... As shown in the drawings
16.6.2 GI cable trays, with covers for external area with supports 1 L.S -
16.6.3 GI cable trays for internal area with supports 1 L.S -
16.6.4 Cable ducts and accessories. 1 L.S -
16.7 Wiring Accessories
Socket outlets Supply, install, test, commission and maintain socket outlets including boxes, conduits, conduits fittings, wiring,
16.7.1 plugs and accessories connecting from the branch circuit and back to the panel 1 L.S -
board as specified and as required by the drawings
16.7.2 Double pole + earth 13A Single switch socket outlets 60 No -
16.7.3 Ditto Double pole + earth 13A Duplex /twin switch socket outlets 160 No -
16.7.4 Ditto Double pole + earth 13A Single switch socket, W.P. 36 No -
16.7.5 Ditto but 20 A DP FUSED FLEXIBLE switch outlet and neon indicator . 21 No -
16.7.6 Ditto but 20 A DP FUSED FLEXIBLE switch and outlet neon indicator (FCU). 60 No -
16.7.7 Ditto but 20 A DP FUSED FLEXIBLE switch and outlet neon indicator for water heater. 60 No -
16.7.8 Ditto but shaver socket. 18 No -
16.7.9 Ditto but 13A fused spur outlet. 18 No -
16.7.10 Ditto but single phase isolator. 30 No -
16.7.11 Ditto but 3 phase isolators. 30 No -
16.7.12 Ditto but for Double pole 45 Amp Cooker control unit with flexible outlet . 6 No -
16.7.13 kitchen hood power outlet 6 No -
16.7.14 Bell and Bell push. 6 No -
16.7.15 exhaust fan outlet 23 No -
Lighting switches Supply, install, test, commission and maintain lighting switches including boxes, conduits fitting, switches,
16.7.16 termination conduits and wiring from switches to branch circuits as specified and as 1 L.S -
required by the drawings
16.7.17 push switch with timer for stair case 18 No -
16.7.18 Ditto but-- One way switch, -- One gang switch 72 No -
16.7.19 Ditto but-- One way switch, -- One gang switch --- WP 24 No -
16.7.20 Ditto but-- One way switch, -- Two gang switch 28 No -
16.7.21 Ditto but-- One way switch, -- Three gang switch 42 No -
16.7.22 Ditto but-- Two way switch, -- One gang switch 18 No -
16.7.23 Ditto but-- Two way switch, -- Two gang switch 60 No -
16.7.24 Ditto but-- Two way switch, -- Two gang switch -- intermediate 18 No -
16.7.25 Ditto but-- Three way switch, -- Three gang switch 6 No -
16.7.26 switch with timer 1 No -
16.8 Busbar Trunking
Supply, install, test, commission and maintain low voltage busway system complete with all special fittings, hanging and
16.8.1 mounting components, materials and ancillary works required for the complete operative 1 L.S -
system in accordance with the specification and drawings
16.9 Light Fixtures:
16.9.1 Supply, install, testing and commissioning of Lighting system in accordance with technical specification & 1 L.S -
drawings complete with necessary accessories ceiling rose,supports and anxillaries works
Supply, installation, testing and commissioning of a complete fire-alarm system, detector but not limited to hardware and
software , keyboard, relays,fire telephone , fire pump monitoring and alarm emergency generators monitoring, elevator recall
control and relays, interface unit with: lifts HVAC, access control system, lighting control system, central battery and emrgency
16.11.1 light system, auto dial to local authority, mimic panel, battery and battery charger, all interfaces with other trades, Graphic 1 L.S -
command centre with PC., printer etc. and all necessary complete ancillary works and accessories required for the complete
installation as specified & shown on the drawings and as required by UAE fire and life safety code of practice
16.14.2 Emergeny ight fixtures Type SELF CONTAINED TYPE (3HRS) AS PER INDICATED ON DRAWINGS IP 40 40 No -
16.15.2 Ducts, earthing and manholes as required by Authorities & ETISALAT 1 L.S -
16.15.3 Conduits, conduit accessories, draw boxes, wires, GI accessory boxes, fiber optic cables, fixing, etc.., 1 L.S -
complete for telephone socket outlet as "Authorities & ETISALAT " approval.
16.25.6 Allow for all electrical items not included above but needed to complete the installation as detailed & 1 Item -
specified
16.28 Sundries
16.28.1 Allow for producing all working drawings for the approval of the Engineer 1 Item
16.28.2 Allow for testing and commissioning the installations on completion to the satisfaction of the Engineer 1 Item
16.28.3 Provision of sign boards as per ADCE design and requirement 1 Item
16.28.4 Allow for providing all spares and handing to the Engineer all as specified 1 Item
16.28.5 Allow for providing all painting plates, disks, labels etc. for the identification of plant, equipment cables, 1 Item
switches and the like as specified
16.28.6 Allow for providing drawings showing the installations –as fitted” 1 Item
16.28.7 Allow for provision of operating and maintenance manuals to the satisfaction of the Engineer as specified 1 Item
16.28.8 Allow for any other necessary items required for the completion of the work as described in the relevant 1 Item
sections of the specifications and drawings and not mentioned herein.
16.29 Emergency, Operation & Maintenance contract (EOM) during the DLP, all as per preventive & reactive
maintenance in accordance with the manufacturers recommendation.
17.2 Allow for Provisional Sum (PS) of AED 12,000/- for Building Reception: 12,000.00
. Synthetic leather sofa set 3 +2 or 3+1+1 and Center Coffee Table.
Allow for Provisional Sum (PS) of AED 12,000/- for Swimming Pool Furniture:
. 8 Sunlounger made of glassfiber technopolymer frame with texteline / mesh fabric seat. Size min (190x70)cm.
. 4 side tables made of technopolymer.
17.3 . 4 Umbrellas made of aluminum single pole & ribs with polyester cover. Size (300cm Dia) with 50kgs Granite base with wheels. 12,000.00
17.4 Allow for Contractor Overhead and Profit (@7%) on the above 17.1, 17.2 & 17.3 including transportation, %
unloading, storage, fixtures, coordination and all other related services for the subcontractors / vendors.
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-