12.0.6 FQP Transformer R0 Aug08
12.0.6 FQP Transformer R0 Aug08
FOR
POWER TRANSFORMER
0 01 AUG 2008
Doc. No.
Submiited By Approved By
GETCO/E/FQP/XMER/01
GUJARAT ENERGY TRANSMISSION CORPORATION LTD.
STANDARD FIELD QUALITY PLAN FOR XMER FQP Ref No. GETCO/E/FQP/XMER/01
Name of Contractor:
JE (Const)
9 Ensure use only slinging hooks / bollards for lifting. Visual B 100%
& Cotractor
DE (Const) DE (Const) EE(Const)
2 of 18
GUJARAT ENERGY TRANSMISSION CORPORATION LTD.
STANDARD FIELD QUALITY PLAN FOR XMER FQP Ref No. GETCO/E/FQP/XMER/01
Name of Contractor:
3 of 18
GUJARAT ENERGY TRANSMISSION CORPORATION LTD.
STANDARD FIELD QUALITY PLAN FOR XMER FQP Ref No. GETCO/E/FQP/XMER/01
Name of Contractor:
Ensure all joints are to be assembled with gasket only Supplier JE (Const)
21 Physical
Manual
B 100%
& Cotractor
DE (Const) DE (Const) EE(Const)
and without using compound or grease.
POWER TRANSFORMER
B VERIFICATION OF TRANSFORMER MATERIALS FOR
COMPLETENESS:
4 of 18
GUJARAT ENERGY TRANSMISSION CORPORATION LTD.
STANDARD FIELD QUALITY PLAN FOR XMER FQP Ref No. GETCO/E/FQP/XMER/01
Name of Contractor:
POWER TRANSFORMER
C
VACUUME CYCLE & OIL FILLING:
5 of 18
GUJARAT ENERGY TRANSMISSION CORPORATION LTD.
STANDARD FIELD QUALITY PLAN FOR XMER FQP Ref No. GETCO/E/FQP/XMER/01
Name of Contractor:
POWER TRANSFORMER
D
BUSHING ERECTION:
Ensure while mounting the bushings, ensure that the Supplier JE (Const)
7 Physical
Manual /Drg.
B 100%
& Cotractor
DE (Const) DE (Const) EE(Const)
oil level gauge is oriented away from the transformer.
6 of 18
GUJARAT ENERGY TRANSMISSION CORPORATION LTD.
STANDARD FIELD QUALITY PLAN FOR XMER FQP Ref No. GETCO/E/FQP/XMER/01
Name of Contractor:
POWER TRANSFORMER
E
RADIATOR AND ACCESSORIES ERECTION:
Check before mounting the thermal sensing bulbs,
inside of the pocket should be cleaned thoroughly Supplier JE (Const)
1 Physical
Manual /Drg.
B 100%
& Cotractor
DE (Const) DE (Const) EE(Const)
and filled with tansformer oil upto a depth of half the
pocket
Supplier JE (Const)
2 Ensure Capillary tubes should be clamped properly Physical
Manual /Drg.
B 100%
& Cotractor
DE (Const) DE (Const) EE(Const)
SE (TR)
DE (Const)
Check all air release plugs shall be loosened and Supplier EE and EE
3 Physical
Manual /Drg.
A 100% & DE(Const)
closed after releasing trapped air if any. Contractor (Const) (Const)
jointly
Check for mechanical stops of OLTC at extreme Supplier JE (Const)
4 Physical
Manual /Drg.
B 100%
& Cotractor
DE (Const) DE (Const) EE(Const)
positions by manually opeating with the handle.
7 of 18
GUJARAT ENERGY TRANSMISSION CORPORATION LTD.
STANDARD FIELD QUALITY PLAN FOR XMER FQP Ref No. GETCO/E/FQP/XMER/01
Name of Contractor:
POWER TRANSFORMER
F
COMMISSIONING CHECKS:
Check and confirm that for each pulse given in both
Supplier JE (Const)
1 raise and lower directions, diverter switch operation Physical
Manual /Drg.
B 100%
& Cotractor
DE (Const) DE (Const) EE(Const)
sound is heard before the motor stops.
Ensure that before commencing the test it should be SE (TR)
DE (Const)
ensured that the secondary terminals of all current EE and EE
2 Physical A 100% & DE(Const)
transformers are kept short-circuited. After test these Contractor (Const) (Const)
shorting connections shall be removed. jointly
JE (Const)
3 Check and confirm tightness of all fasteners. Physical B 100%
& Cotractor
DE (Const) DE (Const) EE(Const)
Check and confirm that valves are either open or Supplier JE (Const)
4 Physical
Manual /Drg.
B 100%
& Cotractor
DE (Const) DE (Const) EE(Const)
closed as indicated the valve schedule plate.
Check all bolted gasket joints and confirm that there JE (Const)
5 Physical B 100%
& Cotractor
DE (Const) DE (Const) EE(Const)
is no oil leak.
8 of 18
GUJARAT ENERGY TRANSMISSION CORPORATION LTD.
STANDARD FIELD QUALITY PLAN FOR XMER
FQP Ref No. GETCO/E/FQP/XMER/01
Name of Contractor:
GETCO/SI
POWER TRANSFORMER R/XMER/02
G & Test
TESTING:
Report
Check and record the Operation checks of pumps and Test JE (Const) & DE
8 Physical B 100% DE (Const) EE(Const)
fans, flow indicators, circuits for pump. Reports/ IM Cotractor (Const)
9 of 18
GUJARAT ENERGY TRANSMISSION CORPORATION LTD.
STANDARD FIELD QUALITY PLAN FOR XMER
FQP Ref No. GETCO/E/FQP/XMER/01
Name of Contractor:
JE (Const) & DE
13 Check and record the CT test of bushing and neutral CT Electrical B 100%
Cotractor (Const)
DE (Const) EE(Const)
POWER TRANSFORMER
H
FINAL PREPAREDNESS BEFORE CHARGING:
Operational checks
As per JE (Const) & DE
1 - Direction of rotation of pumps and fans Physical B DE (Const) EE(Const)
manual Cotractor (Const)
- Direction of oil flow indicator.
POWER TRANSFORMER
I
COMMISSIONING/CHARGING:
SE (TR)
Ensure, after the inspection and precommissioning tests DE (Const)
EE and EE
1 successfully completed, energised the transformer at no Physical A 100% & DE(Const)
(Const) (Const)
load for 24 hrs. Contractor
jointly
Excessive vibration if any on any part of the transformer JE (Const) & DE
2 Physical B 100%
Cotractor (Const)
DE (Const) EE(Const)
shall be located and rectified.
SE (TR)
Ensure that after watching the operation of the transformer DE (Const)
EE and EE
3 at no load for 24 hours and confirming that everthing is Physical A 100% & DE(Const)
(Const) (Const)
normal the transformer shall be put on load. Contractor
jointly
Ensure that a joint inspecstion has been conducted by
JE (Const) & DE
4 contractor / site engineer and a protocol is jointly signed by Physical B 100%
Cotractor (Const)
DE (Const) EE(Const)
both the parties.
Ensure that complete site as built drawings / documents
JE (Const) & DE
5 alongwith test reports & reconcilliation report have been Physical B 100%
Cotractor (Const)
DE (Const) EE(Const)
prepared
10 of 18
GUJARAT ENERGY TRANSMISSION CORPORATION LTD.
STANDARD FIELD QUALITY PLAN FOR XMER
FQP Ref No. GETCO/E/FQP/XMER/01
Name of Contractor:
Collect Oil sample from the main tank before energisation JE (Const) & DE
6 Physical B 100% DE (Const) EE(Const)
and after 24 hrs of energisation with load. Cotractor (Const)
J NOTE:
11 of 18
GUJARAT ENERGY TRANSMISSION CORPORATION LTD.
Detail of Equipment
1 Receipt REMARK
1.1 All Items received as per Delivery Challan/MR
1.2 Documents
Instruction Manual
Test Certificate
Drawing
Applicable instructions
Remark:
12 of 18
GUJARAT ENERGY TRANSMISSION CORPORATION LTD.
Checked that the foundation for mounting transformer cleared from civil end
Checked size & type of hardware / accessories required as per the drawing /
BOQ
Checked that no physical damage to trafo body / bushing etc. is observed.
Checked that no oil leakage is observed, oil level is OK and drain / sampling
valves is tightly closed.
Checked Matching of rail and wheels on trafo and mounting foundation
Tools /tackles/crane etc. for lifting/ erection
Checked and ensure that level of all the foundations for cooler support are in
the same level and Level difference is compensated.
Checked Top and bottom butterfly valves of each radiator in the same vertical
ine & confirmed by a plumb.
Checked oil pump and oil flow indicators arrows indicating oil flow direction
are towards the transformer tank.
13 of 18
GUJARAT ENERGY TRANSMISSION CORPORATION LTD.
Checked all bolted gasket joints and confirm that there is no oil leak.
Checked all blanking plates and spares including spare gasket is stored
carefully for future use.
Checked all cable terminations and cables are properly connected and cable
nubering ferrules are provided.
14 of 18
GUJARAT ENERGY TRANSMISSION CORPORATION LTD.
Checked that all bushing porcelain are cleaned thoroughly and are without
damage.
Ensured removal of the cap provided at the bottom of silicagel breather for
the transportation purpose.
Remark:
15 of 18
GUJARAT ENERGY TRANSMISSION CORPORATION LTD.
Ensured that eretion work of the transforer and associated equipments are
complete in all respect
Checked that labelling and identification is permanent and satisafactory
Checked that all external fittings are as per the drawing
Examined the transformer for oil leaks from all gasket joints, valves, buchholz
relay, air release cocks etc. If found necessary tightening, replacement of
gasket and "O" ring should be done.
Checked the air has been released from all points of the oil circuits as per
manufacture's recommendation (Main tank, radiators, bushings, buchholz
relay, OLTC, chambers, bushing turrents etc.). Open all air relase plugs /
screws on main tank cover, radiators, bushing,s buchohlz relay, OLTC &
bushing turret.
Checked that oil levels are correct in OLTC conservator, main tank and all oil
filled chambers. Also check MOLG operation by depressing the float
Ensure that all the thermometer pockets are filled with transformer oil.
Ensure that clearane between live part of transformer and earth / tank is
sufficient and as per the drawing.
Following valves are to be kept open for service condition:
a) Radiator valves both bottom and top.
b) Conservator to ain tank connecting valves
Ensured that following valves are kept closed
a) Drain valves of transformer and load tap changer
b) Oil sapling valves of main tank and tap changer
c) The conservator top filling hold and drain valve.
16 of 18
GUJARAT ENERGY TRANSMISSION CORPORATION LTD.
Check the Buchohlz relay practically by injecting the air from test cock or
draining the oil from buchohlz relay by closing both side valves. Ensure that,
buchohlz floats are not locked and the elay is set at the desired positeion
Check that the color of silica gel in the breather is fully activated/dark blue.
Also the oil in oil seal to eb filled up to the level indicator. Check that the air
passag of breather is not bloced.
Ensure that the Transformer is effectively earthed to the station earth main
tank/radiator bank/Neutral / M K box Etc etc as per drg. Paint between
earthing terminal and earthin strip should cleaned properly for better
connectivity. Also OLTC, Marshalling box, cable box, should also be earthed
with proper size of GI flat.
Check the incoming voltage and set the OLTC on the corresponding tap
position. In case of off circuit tap changer brought to desired position and
locked with bolt in plate hole. AVR can also set as per required voltae
variation, if applicable.
Continuity test between HV winding and neutral, while OLTC in operation.
Check functioning of tap changer manually.
17 of 18
GUJARAT ENERGY TRANSMISSION CORPORATION LTD.
Check oil level in OIP bushing from glass or small MOG (Mounted on
bushing). It should be in required level.
Checked BDV is greater then 60 KV
Carried out all tests as as specified in specification
Joint inspection has conducted by contactor / site engineer and a protocol jointly
signed by both the parties.
Transformer kept under observation after energisation for vibrations / oil leakage
etc.
The As build drawings / documents alongwith test reports & reconciliation report
have been completed
Testing Squad's Site Test completed and SITE TEST REPORT collected
Remark: