OF DISTRIBUTION TRANSFORMER
1. PURPOSE .............................................................................................................................................. 3
2. SCOPE OF WORK ................................................................................................................................. 3
3. REFERENCE TECHNICAL DOCUMENTS............................................................................................ 3
4. DUTIES AND RESPONSIBILITIES ....................................................................................................... 4
5. HEALTH AND SAFETY ENVIRONMENT.............................................................................................. 4
6. METHOD & QUALITY CONTROL ......................................................................................................... 4
6.1 MATERIAL RECEIPT AND SITE STORAGE ................................................................................................. 4
6.2 PRE – INSTALLATION ............................................................................................................................. 4
6.2.1 Procedure .................................................................................................................................. 4
6.2.2 Check Sheets ............................................................................................................................. 4
6.3 INSTALLATION ....................................................................................................................................... 4
6.3.1 Procedure .................................................................................................................................. 4
6.3.2 Check Sheets ............................................................................................................................. 4
6.4 PRE-COMMISSIONING ........................................................................................................................... 4
6.4.1 Procedure .................................................................................................................................. 4
6.4.2 Test Report ................................................................................................................................ 4
6.5 COMMISSIONING ................................................................................................................................... 5
6.5.1 Procedure .................................................................................................................................. 5
6.5.2 Test Report ................................................................................................................................ 5
7. ATTACHMENTS..................................................................................................................................... 5
Page 2 of 23
1. Purpose
The purpose of this document is to define the site procedures for the Distribution Transformer. This
document has been compiled in compliance with manufacturer recommended specifications and standards
relating to the installation, pre-commissioning and commissioning of the Distribution Transformer.
2. Scope of Work
As per the contract,OXY appointed Installation Contractor shall carry out the site activities for the items as
specified in the table below. The relevant tests formats & check sheets applicable to equipment as referred
in subsequent clauses are attached with this document.
Associate cable
Commissioning
Commissioning
termination
Installation
Equipment
Remarks
Quantity
laying &
Supply
Sl No
Pre -
Area
SS-WTP Transformer
1 Yard, 6.6/0.433kV, 4
1600kVA
RW - SS-8 Transformer
3 Yard, 6.6/.433kV, 2
1250kVA
Page 3 of 23
Electrical Plot Plan – Substation
13 GDES MUK-62-4-12047
Layout SS-8
ASY-316077 to
14 Installation drawing (Typical) ETS
ASY-316081
15 Vendor manual ETS
16 Vendor drawing ETS
5.3 Installation
5.3.1 Procedure
Installation of Distribution Transformer involves foundations, support, mounting, clamping and termination
of cables. Refer Installation procedure for Distribution Transformer (Doc No – QP/EL/DT/IN/P).
5.3.2 Check Sheets
After completion of installation , all equipment shall be identified and check sheets shall be filled based on
the reference documents mentioned above. The check sheets shall be signed and accepted by the
representatives of the main contractor and the client. Refer Installation check sheet for Distribution
Transformer (Doc no – QP/EL/DT/IN/C).
5.4 Pre-Commissioning
5.4.1 Procedure
Pre-commissioning shall be deemed to be complete when all systems and controls within the project have
been checked and successfully functionally tested and results recorded and acknowledged by Client as
ready to start up the plant. Refer pre-commissioning procedure for Distribution Transformer (Doc no –
QP/EL/DT/PG/P).
5.4.2 Test Report
Page 4 of 23
Pre-commissioning test shall be carried out and confirm compliance of project documents. The test results
shall be recorded and are to be signed and accepted by the representatives of the contractor and the client.
The test instruments used shall have a valid calibration certificate. Refer pre-commissioning test report for
Distribution Transformer (Doc no – QP/EL/DT/PG/T).
5.5 Commissioning
5.5.1 Procedure
Commissioning is the final step involved to energize the this equipment. The commissioning period is the
time required to check the performance of the equipment in energized condition. Refer commissioning
procedure for Distribution Transformer (Doc no- QP/EL/DT/CG/P).
5.5.2 Test Report
After energizing the equipment, major electrical parameter readings shall be periodically recorded as per
commissioning test report for Distribution Transformer (Doc no- QP/EL/DT/CG/T).
6. Attachments
Sl Applicable
Document no Revision Description
No X = Yes
1 M/QAP/01/07 0 Receiving, inspection, storage and issue of materials X
2 M/QAF/01/08 0 Goods Received and Inspection Report form X
3 QP/EL/DT/PN/P 0 Procedure for pre-installation of Distribution Transformer X
Check sheet for pre-installation of Distribution
4 QP/EL/DT/PN/C 0 X
Transformer
5 QP/EL/DT/IN/P 0 Procedure for installation of Distribution Transformer X
6 QP/EL/DT/IN/C 0 Check sheet for installation of Distribution Transformer X
Procedure for pre-commissioning of Distribution
7 QP/EL/DT/PG/P 0 X
Transformer
Check sheet for pre-commissioning of Distribution
8 QP/EL/DT/PG/C 0 X
Transformer
9 QP/EL/DT/PG/T01 0 IR for CT X
10 QP/EL/DT/PG/T02 0 Ratio check CT X
11 QP/EL/DT/PG/T03 0 Polarity check CT X
12 QP/EL/DT/PG/T04 0 Insulation resistance X
13 QP/EL/DT/PG/T05 0 Transformer ratio measurement X
X(Buchhloz
14 QP/EL/DT/PG/T06 0 Buchholz Relay and Pressure-relief Device relay not
applicable)
15 QP/EL/DT/PG/T07 0 Temperature Device X
16 QP/EL/DT/PG/T08 0 Oil BDV test X
17 QP/EL/DT/PG/T09 0 Trip and Alarms - Functional Test X
18 QP/EL/DT/CG/P 0 Procedure for commissioning of Distribution Transformer X
Check sheet for commissioning of Distribution
19 QP/EL/DT/CG/C 0 X
Transformer
20 QP/EL/DT/CG/T 0 Test report for commissioning of Distribution Transformer X
Page 5 of 23
1. Purpose
The purpose of this document is to define the pre-installation procedure for Distribution Transformer.
2. Procedure
1. It is assumed that the Distribution Transformer factory acceptance test (FAT) has been performed
at the manufacturers works. The acceptance test shall generally include a functional test, and a
conformity test to ensure that all hardware is in accordance with the project requirement. The
following checking shall be carried out at site.
2. Remove any temporary weatherproofing and silica gel drying agents from transformer. Inspect the
inner and outer part of the transformer for cleanliness and mechanical damage.
3. Verify that the equipment certificates meet the area classification and specification requirements,
including weather, dust and vermin proofing.
4. Check the transformer data with the equipment schedule, paying particular attention to the
equipment rating and project requirement.
6. Check firmly the Internal and external components of the transformer if all are in good condition and
in accordance with the specification requirements.
7. Any missing components or damage must be reported on the check sheet and must be repaired as
necessary before commissioning.
9. After the physical check, the pre–installation checklist for Distribution Transformer shall be
completely filled (Doc No – QP/EL/DT/PN/C).
Page 6 of 23
ITEM TAG :
DESCRIPTION :
SERVICE :
MANUFACTURER/
:
MODEL NO.
5. 5.
4. Vendor manual 4.
3. Single line diagram 3.
2. Equipment layout and installation detail 2.
1. Vendor drawing 1.
CALIBRATION
REFERENCE DOCUMENT TEST EQUIPMENT
DUE DATE
Page 7 of 23
1. Purpose
The purpose of this document is to define the installation procedure for Distribution Transformer.
2. Procedure
1. Verify and identify the exact location of Transformer from the plan layout.
2. Check all material and accessories, safety equipments, etc. are available for the entire work in the
works spot.
Page 8 of 23
ITEM TAG :
DESCRIPTION :
SERVICE :
MANUFACTURER/
:
MODEL NO.
5. Vendor manual 5.
4. Cable schedule 4.
3. Single line diagram 3.
2. Equipment layout and installation detail 2.
1. Vendor diagram 1.
CALIBRATION
REFERENCE DOCUMENT TEST EQUIPMENT
DUE DATE
Page 9 of 23
1. Purpose
The purpose of this document is to define the pre-commissioning procedure for Distribution Transformer.
2. Procedure
1. Check tightness of connections for all power and control components line, fuses, breakers,
overloads and starters.
2. Ensure all external power and control cable is disconnected except control supply cable for pre-
commissioning.
4. Check that all accessories and other components are in correct rating, position and tightness and
totally capable of working for its function.
5. Ensure that the assembly is thoroughly cleaned and free from any metallic powders, loose
fasteners, bits and pieces of wires and any other unwanted components or parts.
6. Ensure that all the tests necessary before operation of the equipment has been done accordingly,
result recorded, approved and signed by the client.
Page 10 of 23
ITEM TAG :
DESCRIPTION :
SERVICE :
MANUFACTURER/
:
MODEL NO.
5. 5.
4. Component catalog 4.
3. Cable schedule 3.
2. Single line diagram 2.
1. Vendor drawing 1.
CALIBRATION
REFERENCE DOCUMENT TEST EQUIPMENT
DUE DATE
Page 11 of 23
ITEM TAG :
DESCRIPTION :
SERVICE :
MANUFACTURER /
:
MODEL NO.
5. 5.
4. 4.
3. Supplier internal test report 3.
2. Single line diagram 2.
1. Vendor wiring diagram 1. Megger
CALIBRATION
REFERENCE DOCUMENT TEST EQUIPMENT
DUE DATE
Page 12 of 23
ITEM TAG :
DESCRIPTION :
SERVICE :
MANUFACTURER /
:
MODEL NO.
5. 5.
4. 4.
3. Supplier internal test report 3.
2. Single line diagram 2. Primary injection kit
1. Vendor wiring diagram 1. Multimeter
CALIBRATION
REFERENCE DOCUMENT TEST EQUIPMENT
DUE DATE
Page 13 of 23
ITEM TAG :
DESCRIPTION :
SERVICE :
MANUFACTURER /
:
MODEL NO.
5. 5.
4. 4.
3. Supplier internal test report 3.
2. Single line diagram 2. Polarity check device
1. Vendor wiring diagram 1. 9V Battery
CALIBRATION
REFERENCE DOCUMENT TEST EQUIPMENT
DUE DATE
Page 14 of 23
ITEM TAG :
DESCRIPTION :
SERVICE :
MANUFACTURER /
:
MODEL NO.
MV to E
with LV earthed
LV to E
with MV earthed
MV-LV
CORE-E
5. 5.
4. 4.
3. Supplier internal test report 3.
2. Single line diagram 2.
1. Vendor wiring diagram 1. Megger
CALIBRATION
REFERENCE DOCUMENT TEST EQUIPMENT
DUE DATE
Page 15 of 23
ITEM TAG :
DESCRIPTION :
SERVICE :
MANUFACTURER /
:
MODEL NO.
5. 5.
4. 4.
3. Supplier internal test report 3.
2. Single line diagram 2.
1. Vendor wiring diagram 1. Multimeter
CALIBRATION
REFERENCE DOCUMENT TEST EQUIPMENT
DUE DATE
Page 16 of 23
ITEM TAG :
DESCRIPTION :
SERVICE :
MANUFACTURER /
:
MODEL NO.
5. 5.
4. 4.
3. Supplier internal test report 3.
2. Single line diagram 2. Secondary injection kit
1. Vendor wiring diagram 1. Multimeter
CALIBRATION
REFERENCE DOCUMENT TEST EQUIPMENT
DUE DATE
Page 17 of 23
ITEM TAG :
DESCRIPTION :
SERVICE :
MANUFACTURER /
:
MODEL NO.
5. 5.
4. 4.
3. Supplier internal test report 3.
2. Single line diagram 2. Secondary injection kit
1. Vendor wiring diagram 1. Multimeter
CALIBRATION
REFERENCE DOCUMENT TEST EQUIPMENT
DUE DATE
Page 18 of 23
ITEM TAG :
DESCRIPTION :
SERVICE :
MANUFACTURER /
:
MODEL NO.
Signed
Breakdown Voltage
No. of Test Test Date
(kV)
EC MC EO
Mean (kV)
Acceptable YES / NO
5. 5.
4. 4.
3. Supplier internal test report 3.
2. Single line diagram 2.
1. Vendor wiring diagram 1. Oil BDV test set
CALIBRATION
REFERENCE DOCUMENT TEST EQUIPMENT
DUE DATE
Page 19 of 23
ITEM TAG :
DESCRIPTION :
SERVICE :
MANUFACTURER /
:
MODEL NO.
Signed
Trip to LV Alarm to LV Trip to MV Alarm to
Transformer Relay Test Date
Breaker Breaker Breaker MV Breaker
EC MC EO
Buchholz trip
5. 5.
4. 4.
3. Supplier internal test report 3.
2. Single line diagram 2.
1. Vendor wiring diagram 1. Multimeter
CALIBRATION
REFERENCE DOCUMENT TEST EQUIPMENT
DUE DATE
Page 20 of 23
1. Purpose
The purpose of this document is to define the commissioning procedure for Distribution Transformer.
2. Procedure
1. Ensure that there are no unwanted items around the equipment.
4. Close the MV breaker and put the transformer under monitoring for eight (8) hours before closing
downstream LV breaker.
Page 21 of 23
ITEM TAG :
DESCRIPTION :
SERVICE :
MANUFACTURER/
:
MODEL NO.
5. Vendor manual 5.
4. Cable schedule 4.
3. Single line diagram 3.
2. Equipment layout and installation detail 2.
1. Vendor drawing 1.
CALIBRATION
REFERENCE DOCUMENT TEST EQUIPMENT
DUE DATE
Page 22 of 23
ITEM TAG :
DESCRIPTION :
SERVICE :
MANUFACTURER /
:
MODEL NO.
EQUIPMENT COMPONENT
Type :
Range :
Serial No. :
Make/ Model :
MV LV
Signed
Voltage Current Voltage Current Wind Oil
Date Time
(V) (A) (V) (A) Temp Temp
(°C) (°C)
R-Y Y-B B-R R Y B R-Y Y-B B-R R Y B EC MC EO
5. 5.
4. 4.
3. Supplier internal test report 3.
2. Single line diagram 2.
1. Vendor wiring diagram 1. Multimeter
CALIBRATION DUE
REFERENCE DOCUMENT TEST EQUIPMENT
DATE
Page 23 of 23