Professional Documents
Culture Documents
Supplier Audit Report - Arksu Metal
Supplier Audit Report - Arksu Metal
Y N
1 Does the facility have sufficient equipment to process the material?
4 Are the quality certificates and mill tests of the materials available?
5 Is the material steel grade, dimensions and thickness compatible with the project
dimensions?
6 Is there any deformation or corrosion in the steel material?
7 Are the locations and widths of the fasteners compatible with the project dimensions?
8 Have visual checks of factory resources been made? Has it been penetration tested?
13 Do the manufacturer have welding procedure specification & technical drawings of the
welding to be applied
14
15
16
17
18
19
20
Comments:
All preparation, cleaning, cutting, welding process of two sample Tee fittings manufacturing have been witnessed
during the supplier site audit. Required documentations have been collected.
SITE PICTURES
SITE PICTURES
Doc Ref:
IL041-RON-ZZ-ZZ-TS-M-CWTR-0082
Revision:
P02
Purpose of Issue:
S4 – Issued for Construction Review
EQUINIX DATA CENTER PROJECT
Request for Technical Submittal Form
Teknik Sunum Talep Formu
Subject
TEE FITTING FABRICATION FOR CHILLED WATER STEEL PIPING
Konu
Location
General
Lokasyon
Contractor
Arup Equinix
Yüklenici
Name-Suname
(Ad-Soyad)
Signature
İmza
Date
Tarih
Arup Comments
Qa/c Müşavir Yorumları
Reviewer Notes
Notlar
Client Comments
İşveren Yorumları
Result
Sonuç B : Conditional Approval / Şartlı Onay D : Rejected / Red
Feedback Date /
Geri Bildirim Tarihi
Document No.
ATTACHMENTS / EKLER
The welding method should also be presented. The test method included in the
The welding method added. Test method also added; Magnetic
material presentation is insufficient. In addition, according to GDS, 10% of the
1 Particle Inspection (MPI)(%10 homogeneously), Dye Penetrant Kindly refer to revised submittal.
homogeneously welded parts should be subjected to Magnetic Particle Inspection
Inspection Report (%100) and Visiual Examination Report (%100).
(MPI), ultrasonic or radiographic testing to ensure the integrity of the welds..
Page 1 of 1
COMPLIANCE
SHEET
COMPLIANCE SHEET
COMPLIANCE IN
NO. PROJECT REQUIREMENT PROJECT DOCUMENT PROPOSAL MATERIAL REMARKS
PROJECT REQUIREMENT
420 Steel pipeline fittings Mechanical & Public Health Proposed weld shop fabrication tee and unequal tee fittings
Materials & Workmanship for chilled water piping.
Welded: Refer to Equinix GDS standard Specification
or IL04-ARP-DC-ZZ-SP-M-XXXX-1013 Tee fittings shall be produced by using approved steel pipes
To BS EN 10253-1 and BS EN 10253-2. for chilled water and delivered Magnetic Particle Inspection Area of application : Chilled water
(MPI)(%10 homogeneously), Dye Penetrant Inspection Comply as noted
pipes
Report (%100) and Visiual Examination Report (%100)
5
MANUFACTURER
INFORMATION
AND
PROFILE
PRODUCT
DATA SHEET