02- F01 HAZARD IDENTIFICATION & RISK ASSESSMENT

PRE- START CHECKLIST

Date: 12-05-2023
Project Name: Sea World Abu Dhabi
Time: 10:00 AM
Description of Task / Activity: SWAD _Cables Pulling
Risk Assessment No: Rev No.

002 Emp No. Name


Risk Assessor: Karim MAhmoud
Construction Manager: Ibrahim Adel
PORJECT MANGER: Hossam Hamouda
Safety Department:
Engineer: Himanshu Karayat
SUBJECT MATTER EXPERT: Joseph Xavier
1 Manpower Required for Task:
SWAD _Cables Pulling
2 Work Notification Status:
3 Estimated / Planned Start Date: 09-05-2023
4 Duration of Activity: 30days
5 Night work and Equipment: N/A
6 Equipment and Materials: As per MOS
7 Overhead Services / Underground: N/A
Sequence of Works Activity:
8 Subcontractors to be Used: Non
9 Interface with Public: N/A
10 Adjacent Activities & Interface with YES
other Sub Contractors:
11 Logistics, Loading, Delivery: N/A
12 Specific PPE Required: As per MOS
13 Environmental: N/A
14 Elevated Positions: yes
15 Confined Space Entry: N/A
16 Hoarding / Fencing / Barricading/ N/A
Demarcation:
17 Access / Egress: YES
18 Security Requirements: As per project main contractor requirements
19 Traffic: As per project main contractor requirements
20 Permit to Work Required Details: Mechanical Works PTW
21 Work Near Water: N/A
22 Hazardous Substances: N/A
23 Excavations: N/A
24 Lifting Equipment / Machinery: N/A
25 Special Emergency Arrangements: NA

5.02- F01 HAZARD IDENTIFICATION & RISK ASSESSMENT


Page 1 of 8 Rev. 4 [18-Apr-2019] CRM Controlled Document

Description of Task / Activity: SWAD _Cables Pulling


Risk Assessment No: Rev No.
26 Additional Comments: MSRA to be communicated with all the involved persons by supervision Staff
and MS & RA should be revised if work method, materials/equipment’s are
changed.

Page 2 of 8 Rev. 4 [18-Apr-2019] CRM Controlled Document


Project Name: Sea World Abu Dhabi Project Code:
Description of Task / Activity: SWAD _Cables Pulling
Risk Assessment No. 002 RA Rev No.
Task Site Location: Yas Island, Abu Dhabi, UAE

Page 3 of 8 Rev. 4 [18-Apr-2019]


CRM Controlled Document
RISK/LOSS POTENTIAL ASSESSMENT MATRIX
PROBABILITY of recurrence?
SEVERITY of occurrence Severity Almost Certain Very Likely Likely Unlikely Very Unlikely
Rating 1 or more times a Once every 10 Once in a lifetime/ 100
Once per month Once per year
week years years
Catastrophic
Multiple Fatalities / Low
5 High 25 High 20 High 15 Med 10
Environmental release with detrimental effects requiring external emergency services/ 5
>10m AED
Major
Med Low
Single Fatality/Multiple LTI’s/ Major Illness or Injury, disability/ 4 High 20 High 16 High 12
Environmental release with minimal off site impact/ 1-10m AED
8 4
Moderate
Single LTI/ Serious but non-permanent injury or ill health Med Med Low
3 High 15 High 12
Work days lost/ Restricted Workday 9 6 3
On site release requiring environmental emergency plan to be activated/ 100k-1m AED
Minor
Corrective Medical Treatment. Med Med Med Low Low
2
No work restrictions/ 10 8 6 4 2
Local on-site environmental release treated locally/ 10-100k AED
Negligible
First Aid Case/ Minor cuts & bruises or sickness/Preventive OR Diagnostic Medical Low Low Low Low Low
1
Treatment. 5 4 3 2 1
Nuisance release with no adverse impact/ 1-10k AED
Probability Rating 5 4 3 2 1

Page 4 of 8 Rev. 4 [18-Apr-2019]


CRM Controlled Document
1 3 3

Page 5 of 8 Rev. 4 [18-Apr-2019]


CRM Controlled Document
Description of Task / Activity: SWAD _Cables Pulling
Risk Assessment No: 002 RA Rev No.
Legal Additional control
SI Hazard Details Risk Risk
Task Step P S Current Control Measures Req. P S measures/Responsibl
No. Consequence Details Rank Rank
Y/N e Person
• Contractor must be onboard with
project WW requirements.
• Operatives must complete project HSE +WW inductions.
• All should have their medical insurance cards & Emirates
ID with them.
• All should enter to the site with the Mandatory & Job
specific PPEs. Refer their Mandatory PPE & Job specific
PPE in the Method statement.
• DSTI to be conducted by supervisor near to the work spot
Hazard: prior to start any activity.
• Unauthorized entry • Supervisor & workers should visually inspect their work
Site / Work • Not aware of Hazard / area, equipment, plants, materials etc. prior to start their
Preparatory controls. activity.
Works for
• Slip, trip & fall • Hit with • Ensure that all tools have been inspected and color
01 Mobilization 2 3 6 Y 1 3 3 CES & GFTS
moving coded/tagged to ensure that the plant department
Material (Trays)
machinery inspected them prior to issue
on Car park
Consequence: • Guide the movement of delivery vehicles and control
• Injury from construction work operatives;
• Unauthorized persons not allowed in work area
• Barricade the work area, communicate to the nearby
activities and watch for any moving machineries at the
work spot.
• Ensure safe access/egress into & out of the area
• Ensure effective lighting requirements installed. Min 50
Lux
• All vehicle movement in construction area either with
revolving amber light or under the control of flagman
when reversing.
Transportation of Hazard General measures
material on site Potential for traffic accident,
Page 6 of 8 Rev. •4 [18-Apr-2019]
• Ensure all drivers have valid driving license and fit
Overturning Insecure material,
02 CRM Controlled Document body condition Y 1 3 3 CES & GFTS
Consequences 3 3 9
Serious personal injuries, property
damage
Description of Task / Activity: SWAD _Cables Pulling
Risk Assessment No: 002 RA Rev No.
Legal Additional control
SI Hazard Details Risk Risk
Task Step P S Current Controasures Req. P S measures/Responsibl
No. Consequence Details Rank Rank
Y/N e Person

Page 7 of 8 Rev. 4 [18-Apr-2019]


CRM Controlled Document
• Establish traffic rules including care, speed limits and
adhering all traffic safety rules.
• Provide information on defensively driving
• Prohibit overloading and unsecured materials
• All vehicles to be checked and be roadworthy before
entering s
• Driver to take regular breaks to prevent fatigue and use
journey planning
• Prohibition of driving under the influence of drugs or
alcohol
• Monitor vehicles and driving and take disciplinary action as
required

Description of Task / Activity: SWAD _Cables Pulling


Page 8 of 8 Rev. 4 [18-Apr-2019]
CRM Controlled Document
Risk Assessment No: 002 RA Rev No.
Legal Additional control
SI Hazard Details Risk Risk
Task Step P S Current Control Measures Req. P S measures/Responsibl
No. Consequence Details Rank Rank
Y/N e Person
Manual Handling • Reducing the individual capacity during the process of
Materials of AC Cables drawing and tightening materials
& Cable Trays Hazard • capability
 Slip, trip & fall • the nature of the load
 Hit with moving • environmental conditions
• training
Consequences • work organization
Can cause injury • ppe
3 3 9 • Y 1 3 3
• musculoskeletal disorders,
• All Workers to work in compliance with the Risk
• Hand injuries, Assessment / Method Statement and apply ‘best practice’
• cut & bruises handling techniques.
• Using the Fourl Lift as much as possible and reducing
• Sharp edges the daily effort of the workers
• Property damage • Use team lifting by competent fit personnel
• Supervisors and OHS team to monitor manual
handling.
• Don't lift or handle more than can be easily
managed
• Move smoothly.
• Don't flex the back any further while pulling ,lifting

Page 9 of 8 Rev. 4 [18-Apr-2019]


CRM Controlled Document
03 Pulling Cables (AC Hazard General precautions: Y 1 4 4 CES & GFTS
Cables) • Falling objects. •. Close supervision of work and maintenance of good
To Inverters box • Overhead housekeeping
obstruction • Provide safe access and exit and ensure free occlusion.
• Fall in to sharp • • Drum roller frames, hoists, pulleys and actuators are
3 4 12 appropriately controlled to ensure clean hands when the
Consequences cable is moving.
Fatality & Property damage, • Awareness of maximum allowable cable pulling tensions
Major Injuries, Personal Injury, and minimum radial bending.
Electrocution • Inspect the cable before pulling it for damage.
• Cable drums are stored on flat surfaces.
• Drum roller frames, hoists, pulleys and actuators are
appropriately controlled to ensure clean hands when the
cable is moving.
• Inspect the cable before pulling it for damage.
• Cable drums are stored on flat surfaces.
• The movement of the cable drum is only made using the
rotating rods prepared for this purpose.
• Inspect all towing equipment prior to use.
• Dragging from the top of the cylinder only.
• Remove the screws from the drums.
• Installation of rotating eyes and cylindrical connection.
• Use a dynamometer or an adjustable tension wrench to
ensure safe work loads are not exceeded.
• Winches equipped with automatic cut-off maximum pull.
• Surveying the path before starting work to ensure that the
path is free of obstacles.
• Examine the trench line to ensure it is level and free of
debris.
• Staffs are posted at the end of the cylinder to monitor
rotation.
• No live electrical work to be performed.
• Hearing protection must be worn in environments that
expose workers to 85 dB(A) or higher.
• Gloves and heavy clothing must be worn to protect against
abrasion.
Page 10 of 8 Rev. 4 [18-Apr-2019]
CRM Controlled Document
Provide suitable heavy-duty (scratch-resistant) gloves.
• Daily DSTI briefing must be conducted to the workforce
prior to start work.
• Ensure competent workforce is assigned for the task.
• Job specific training should be conducted to the
04 Use of Hand tools Hazard 3 3 9 workforce regarding safe usage of Hand tools. Y 1 3 3 CES & GFTS
Tool fall from height, • All the tools must be tethered on rigid place while
Substandard tools, Purpose working on the roof.
made tools
• Use right tools for the right job.
• Inspect all hand tools are safe for use prior to start work.

Description of Task / Activity: SWAD _Cables Pulling


Risk Assessment No: 002 RA Rev No.
Legal Additional control
SI Hazard Details Risk Risk
Task Step P S Current Control Measures Req. P S measures/Responsibl
No. Consequence Details Rank Rank
Y/N e Person
• Concerned work in charge should inspect all tools prior to
start the work.
Consequences
Serious injury to personnel Cuts, • Tools should be used for its proposed purpose only
bruises • Ensure appropriate PPE’s are provided (Goggles, Hand
Gloves, Ear Plugs) etc.
• Ensure protruded sharp edges are secured properly to
avoid injury
• Do not use homemade tools
• All the hand tools should be maintained in way that neat
and clean always.
• Homemade alterations or modifications of tools are not
permitted.
• Work should be performed in presence of concerned
work in charge.
• Close supervision at all times.
• Maintain proper cable management on workplace.
• Maintain proper storage for all power operated

Page 11 of 8 Rev. 4 [18-Apr-2019]


CRM Controlled Document
equipment’s.
• Only authorized personnel allowed in the work area
Hazard • Signage to identify and demarcate the work area must be
Adjacent work in Unauthorized personnel in area display
CES & GFTS /
05 other project 3 2 6 • Coordinate activities with adjacent work teams to prevent Y 1 2 2
ALEC
areas Consequences • Clashes in the work place
Personal injuries • Highlight adjacent teams and hazards to the work team
during DSTI
General Measures
• Stop working in bad weather conditions
• Provide care facilities (drinking water and rest areas)
during high temperatures
Measures above the line
Hazard
• Before the work carried out weather monitoring should
• Height Heat
be carried out.
• Rainy
• Set the maximum safe wind speed for operation
• Windy
• Stop the work if the wind speed is above 9.8m/s .If any
Environment • Foggy
other risk is identified during lifting operation work should
condition • Dust Storme
06 2 3 6 be stopped even under lesser wind speed. y 1 3 3
Consequences
• Stopping work during the high temperature and
(Weather/climate) • (people& property)
obligatory during the summer at noon (UAE OSHAD)
• Serious injury to personnel
• Lone working strictly prohibited at site.
Cuts, bruises
• Arrange for rest area that is significantly cooler
• Heat stress and stork,
(Ventilated) than the work area
dizziness, Serious injuries
• Restricted working hours in accordance with ministry of
labor requirements.
• All work is to be suspended during sandstorm or where
visibility is <5m during heavy downpour and/or strong wind
condition.
• Present a briefing talk emphasizing heat stress
Hazard management both on and off the job
Working in
Exposure to high temperatures
External • Initiate buddy system to early recognition of heat stress
07 Consequences 3 3 9 Y 1 3 3 CES & GFTS
areas/direct symptoms of co-workers and no lone working.
Heat stress and stork, dizziness,
sunlight. • Arrange for rest area that is significantly cooler (Ventilated)
Serious injuries.
than the work area
Page 12 of 8 Rev. 4 [18-Apr-2019]
CRM Controlled Document
Description of Task / Activity: SWAD _Cables Pulling
Risk Assessment No: 002 RA Rev No.

Legal Additional control


SI Hazard Details Risk Risk
Task Step P S Current Control Measures Req. P S measures/Responsibl
No. Consequence Details Rank Rank
Y/N e Person
• Restricted working hours in accordance with ministry of
labor requirements.
• All work is to be suspended during sandstorm or where
visibility is <5m during heavy downpour and/or strong wind
condition.
• The lifting activities to be suspended when the wind speed
is over 38km/h
• Cold drinking water to all.
• All the operatives must hold personal water bottle (project
approved) at work areas.
• Enough number of coveralls to periodically wash and use
• Cover body as much as possible from UV rays, dust etc.
• Lone working strictly prohibited at site.