A bridge is a structure carrying a pathway, roadway or railway across the river, valley or
any obstacle. The purpose is to connect two places. The designs of the bridges depend on the
type of terrain they are built, the material used to construct it and the financial resources
available for it. The Chaotianmen River Bridge is located 1km downstream of Chongqing
Chaotianmen Square, crossing the Yangtze River, and it is a large bridge connecting the north
bank and south bank. The main bridge is a half-through continuous steel truss arch bridge,
providing double decks for highway and railway. Chaotianmen Bridge is the longest arch bridge
in China today and also in the world. The bridge is located in Chongqing City, has a total length
of 1741m. The bridge has double decks, of which the 36.5m upper deck has dual three-lane
motor ways and sidewalks on both sides, and the lower carries two lanes of municipal light
railways and two lanes on either side. The main bridge adopts a cantilever steel truss arch with a
Structural Layout
Considering the two-way navigable condition of navigable hole, the bridge adopts three
span continuous steel truss tied arch bridge, the middle main span is navigable, and the side
spans on both sides are not navigable; the main girder adopts two main trusses, the side spans on
both sides are variable height truss, and the middle span is steel truss tied arch. The upper tie bar
adopts "H" section, and the lower tie bar adopts "H" section. The main bridge is a composite
Last Name 2
structure of "King" shaped section and auxiliary tether. The end of steel structure tie bar is
connected with the lower chord node of arch rib, and the lower auxiliary tether is anchored at the
tie bar end node. The purpose of setting the auxiliary tether is to reduce the tie bar force of the
lower steel structure, control the design size and plate thickness within the appropriate range, and
reduce the steel consumption. Chongqing Chaotianmen Bridge is a three-span continuous bridge
system. The main span is 552m with the truss arch loading characteristic at the middle of 488m.
The distance between the top of the arch and the support at the central span is 142m as shown.
The yield strength σs of steel is adopted according to National Standard. The design
safety coefficient K = 1,7 and the allowable stresses [σ]=σs/K according to different thickness.
The force in the main truss rods on the steel truss girder (arch) has the significant difference
during the construction and service state. In order to make sure of the structure safety, the high
strength steel was used to reduce the cross section of the truss rod, as well as the different cross
section (changed height, 2 different width) of the truss rod was used based on the loading. The
assemble nodes were used except the nodes at the middle support to reduce the fabrication
difficulty and the cost. The double-level truss balance along with the bridge thrust was used at
the main span to simplify the load transfer between the truss components. The double-level truss
consisted of steel plates. The change of the part level theory linear system was used to resolve
the secondary stress in the truss. The pin support (14500t, largest pin support in the world) was
used at the main truss nodes. Orthotropic steel bridge decks were used at the upper and the lower
bridge level, while the parts of the deck were connected by truss. Considering the two-way
Last Name 3
navigable condition of navigable hole, the bridge adopts three span continuous steel truss tied
arch bridge, the middle main span is navigable, and the side spans on both sides are not
navigable. The main truss of Chaotianmen Bridge is connected by 10.9s M30 high strength big
hexagonal head bolts, and the connection system and deck system are connected by 10.9s M24
Foundation System
construction as well as reducing the construction risk, the installation of the cantilever to the
mid-span of chosen. After the closure of the truss arch, the temporary truss was setup at the
suitable location at middle span to form truss arch system. At last, the steel truss was closure at
Conclusion
Please note that short papers containing up to 5 pages do not require a “Conclusion”
header, as well as other headers mentioned in the template, unless they are required in the
instructions. Also, there is no page brake between the last two paragraphs, i.e. conclusion should
not be presented on a separate page. It should restate the thesis statement, summarize the key
ideas presented in the paper, contain no new or outside information, and approximately take 10%
For more information concerning in-text citations of sources containing more than two
authors, other types of references, as well as detailed MLA formatting style requirements please
visit:
Last Name 4
https://owl.purdue.edu/owl/research_and_citation/mla_style/mla_formatting_and_style_guide/
mla_general_format.html