Professional Documents
Culture Documents
PM Clinic
PM Clinic
PM Clinic
BASE INFORMATION
Main Specification
Tires Front / Rear Moldboard - (feet)
16 ft
18 ft
Kind of Job
Construction
Land development
Road
Others
Kind of Soil
Rock Coal
Soft Gravel
Medium Sand
Hard Soil
Kind of Operation
Maintenance Special note:
Site Preparation
General
Scheduled Working Hour
Shifts / day Hours / shift
1 hrs.
3
Machine History
Operator’s Opinion
Any abnormality?
Coolant Temp. Max. Range? T/C, T/M Oil Max. Range? Ambient Temp.
O
White Green Red Green Red Max. C
O
1 2 3 4 5 6 7 1 2 3 4 5 6 7 Min. C
Blow-by Pres. T/C Stall, 6th mm H20 Max. 200 Max. 460
46Max0.
2
Engine Full (SAE30) kg/cm 3-5 Min. 2.0
Lube Oil Pres.
Engine Low (SAE30) Min. 1.2 Min. .7
Steering Inspection
2
Relief Pres. Engine Full kg/cm 170 - 180 170 - 180
Brake Inspection
Set park brake No movement
Parking Brake
switch. Eng: Full
Stopping distance
when brakes Max. 16 Max. 22.8
Service Brake Meters
applied@ travel
speed 32 km/h
(SAEJ1473)
2
Air Pressure Engine @ Full kg/cm 4.2 - 9.5 Min. 3.7
Throttle
Hydraulic Inspection
Priority Valve Relief
Pressure Idle 240 - 260 240 - 260
2
Right Hand kg/cm
240 - 260 240 - 260
Main Control Valve
Relief Pressure High Idle
Differential
Eng: High Idle Min. 25 25 - 30
Manual Lock/Unlock
Comments