To

Siemens Pte Ltd

FAO:
Siemens DC 1

Transmittal : MR3-MISC-SIEM-08769
Issue date: 28-07-2022
Originator: Hiew Kok Yin

Remarks: SSBO_RETURN COMMENTS


Documentation:

Document Rev Title

Doc.
status

No. of
copies

Media
size

Issue
code

Due before

MR3-SSBO-INS-TDS-2080XM-31000 C0 S60 & S70 INSTRUMENT DATASHEET - GTG AFD 1 1


Legend:
Issue
code Description
1 Approved - Revise to the Next (Suitable) Revision status

Doc.
status Description
AFD Approved For Design

Condition THE DOCUMENTS ARE DUE TO BE RETURNED BEFORE THE NOTED DUE DATES.

External Transmittal
MISC Berhad

If applicable, please resubmit documents before due date


Please sign a copy of this transmittal and return by mail as acknowledgement of
receipt
Raised by: Neena Binti Johari Received date:
Document Controller Received by:
MISC Berhad Page 1 of 1

To
Siemens Pte Ltd
FAO:
Siemens DC 1

Transmittal : MR3-MISC-SIEM-08754
Issue date: 28-07-2022
Originator: Hiew Kok Yin

Remarks: SSBO_RETURN COMMENTS


Documentation:

Document Rev Title

Doc.
status

No. of
copies

Media
size

Issue
code

Due before

MR3-SSBO-INS-LST-2080XM-31000 F0 S60 & S70 BUS COMMUNICATION LIST - GTG IFF 1 2 12-
08-2022
Ad-hoc / reference:

Document Title

No. of
copies

Media
size

Issue
code
TRX_COMMENT_MR3-MISC-SIEM-08754_87972 Comment document belonging to MR3-MISC-SIEM-
08754_87972 2
Legend:
Issue
code Description
2 Approved with Comments – Refer to CRS for Next Revision
Status

Doc.
status Description
IFF Issued as Final

Condition THE DOCUMENTS ARE DUE TO BE RETURNED BEFORE THE NOTED DUE DATES.

External Transmittal
MISC Berhad
If applicable, please resubmit documents before due date
Please sign a copy of this transmittal and return by mail as acknowledgement of
receipt
Raised by: Neena Binti Johari Received date:
Document Controller Received by:
MISC Berhad Page 1 of 1

To
Siemens Pte Ltd

FAO:
Siemens DC 1

Transmittal : MR3-MISC-SIEM-08744
Issue date: 28-07-2022
Originator: Hiew Kok Yin

Remarks: SSBO_RETURN COMMENTS


Documentation:

Document Rev Title

Doc.
status

No. of
copies

Media
size

Issue
code

Due before

MR3-SSBO-MEC-TDS-2080XM-31001 C0 S60 & S70 DATA SHEET GAS TURBINE - GTG AFD 1 1
Legend:
Issue
code Description
1 Approved - Revise to the Next (Suitable) Revision status

Doc.
status Description
AFD Approved For Design

Condition THE DOCUMENTS ARE DUE TO BE RETURNED BEFORE THE NOTED DUE DATES.

External Transmittal
MISC Berhad

If applicable, please resubmit documents before due date


Please sign a copy of this transmittal and return by mail as acknowledgement of
receipt
Raised by: Neena Binti Johari Received date:
Document Controller Received by:
MISC Berhad Page 1 of 1

To
Siemens Pte Ltd

FAO:
Siemens DC 1

Transmittal : MR3-MISC-SIEM-08738
Issue date: 28-07-2022
Originator: Hiew Kok Yin

Remarks: SSBO_RETURN COMMENTS


Documentation:

Document Rev Title

Doc.
status

No. of
copies

Media
size

Issue
code

Due before

MR3-SSBO-INS-BLD-2080XM-31000 00 S60 & S70 BLOCK DIAGRAM FOR CONTROL


SYSTEM - GTG

AFC 1 1

Legend:
Issue
code Description
1 Approved - Revise to the Next (Suitable) Revision status

Doc.
status Description
AFC Approved for Construction

Condition THE DOCUMENTS ARE DUE TO BE RETURNED BEFORE THE NOTED DUE DATES.

External Transmittal
MISC Berhad

If applicable, please resubmit documents before due date


Please sign a copy of this transmittal and return by mail as acknowledgement of
receipt
Raised by: Neena Binti Johari Received date:
Document Controller Received by:
MISC Berhad Page 1 of 1

To
Siemens Pte Ltd

FAO:
Siemens DC 1

Transmittal : MR3-MISC-SIEM-08865
Issue date: 02-08-2022
Originator: Hiew Kok Yin

Remarks: SSBO_RETURN COMMENTS


Documentation:

Document Rev Title

Doc.
status

No. of
copies

Media
size

Issue
code

Due before

MR3-SSBO-MEC-DWG-2080XM-31004 F0 S60 & S70 GA HYDRAULIC START SKID - GTG IFF 1 1


MR3-SSBO-MEC-DWG-2080XM-31006 F0 S60 & S70 GA EXHAUST SYSTEM
INTERFACES - GTG

IFF 1 1

Legend:
Issue
code Description
1 Approved - Revise to the Next (Suitable) Revision status

Doc.
status Description
IFF Issued as Final

Condition THE DOCUMENTS ARE DUE TO BE RETURNED BEFORE THE NOTED DUE DATES.

External Transmittal
MISC Berhad
If applicable, please resubmit documents before due date
Please sign a copy of this transmittal and return by mail as acknowledgement of
receipt
Raised by: Neena Binti Johari Received date:
Document Controller Received by:
MISC Berhad Page 1 of 1

To
Siemens Pte Ltd

FAO:
Siemens DC 1

Transmittal : MR3-MISC-SIEM-08862
Issue date: 02-08-2022
Originator: Hiew Kok Yin

Remarks: SSBO_RETURN COMMENTS


Documentation:

Document Rev Title

Doc.
status

No. of
copies

Media
size

Issue
code

Due before

MR3-SSBO-MEC-DWG-2041HW-31001 F0 S60 S70 GA WHRU - GTG IFF 1 1


Legend:
Issue
code Description
1 Approved - Revise to the Next (Suitable) Revision status

Doc.
status Description
IFF Issued as Final

Condition THE DOCUMENTS ARE DUE TO BE RETURNED BEFORE THE NOTED DUE DATES.

External Transmittal
MISC Berhad

If applicable, please resubmit documents before due date


Please sign a copy of this transmittal and return by mail as acknowledgement of
receipt
Raised by: Neena Binti Johari Received date:
Document Controller Received by:
MISC Berhad Page 1 of 1

To
Siemens Pte Ltd

FAO:
Siemens DC 1

Transmittal : MR3-MISC-SIEM-08866
Issue date: 02-08-2022
Originator: Hiew Kok Yin

Remarks: SSBO_RETURN COMMENTS


Documentation:

Document Rev Title

Doc.
status

No. of
copies

Media
size

Issue
code

Due before

MR3-SSBO-MEC-DWG-2080XM-31007 00 S60 & S70 GA TURBINE LUBE OIL DEMISTER


AND FLAME ARRESTOR - GTG

AFC 1 1

Legend:
Issue
code Description
1 Approved - Revise to the Next (Suitable) Revision status

Doc.
status Description
AFC Approved for Construction

Condition THE DOCUMENTS ARE DUE TO BE RETURNED BEFORE THE NOTED DUE DATES.

INSERT VENDOR LOGO HERE

T R A N S M I T T A L - D O C U M E N T
Project
Name TR No
Package Date

PO Number Response By Date


Attention
To:
S/N DOCUMENT NO DOCUMENT TITLE REV NO. VERSION

NO. ISSUE PURPOSE REMARKS


1 MR3-SSBO-GEN-PHI-2041HW-31000 S60 & S70 CONTROL PHILOSOPHY WHRU - GTG C0 1
APPROVED FOR
DESIGN (AFD)

2 MR3-SSBO-INS-LST-2041HW-31000 S60 & S70 I/O LIST WHRU - GTG 0 1

APPROVED FOR
CONSTRUCTION
(AFC)
3 MR3-SSBO-PRO-PID-2041HW-31000 S60 & S70 P&ID WHRU - GTG F0 1 AS-BUILT (ASB)

FPSO MARECHAL DUQUE DE CAXIAS (MERO 3 PROJECT) TR-20205-SBO-MOD-1055

MODULES S60 & S70 - TURBO GENERATORS 28-Jul-22

4500013015 11-Aug-22

Date 28-Jul-22 Date

kalyani.awate@siemens-energy.com

LEGEND:
IFR = Issued for Review, IFI = Issued for Information, AFD = Approved for Design,
IFC = Issued for Construction, AFC = Approved for Construction, IFF = Issued Final
Issue,
CAN = Cancelled/Superseded

Prepared By Panchashila Awad Received by

INSERT VENDOR LOGO HERE

T R A N S M I T T A L - D O C U M E N T

Project
Name TR No
Package Date

PO Number Response By Date


Attention
To:
S/N DOCUMENT NO DOCUMENT TITLE REV NO. VERSION

NO. ISSUE PURPOSE REMARKS


1 MR3-SSBO-MEC-DWG-2080XM-31024 S60 & S70 GA LUBE OIL COOLERS SLO - GTG F0 1 ISSUED
AS FINAL
(IFF)
2 MR3-SSBO-QAC-LST-2080XM-31002 S60 & S70 INDEX USER OPERATION AND MAINTENANCE
MANUAL - GTG F0 1

ISSUED AS FINAL
(IFF)

3 MR3-SSBO-QAC-RPT-2080XM-31019 S60 TEST REPORT GAS TURBINE - GTG TRAIN B 0 1

APPROVED FOR
CONSTRUCTION
(AFC)

4 MR3-SSBO-QAC-RPT-2080XM-31020 S60 TEST REPORT GAS TURBINE - GTG TRAIN A 0 1

APPROVED FOR
CONSTRUCTION
(AFC)

FPSO MARECHAL DUQUE DE CAXIAS (MERO 3 PROJECT) TR-20205-SBO-MOD-1057

MODULES S60 & S70 - TURBO GENERATORS 1-Aug-22

4500013015 15-Aug-22

Date 1-Aug-22 Date

kalyani.awate@siemens-energy.com

LEGEND:
IFR = Issued for Review, IFI = Issued for Information, AFD = Approved for Design,
IFC = Issued for Construction, AFC = Approved for Construction, IFF = Issued Final
Issue,
CAN = Cancelled/Superseded

Prepared By Panchashila Awad Received by

External Transmittal
MISC Berhad

If applicable, please resubmit documents before due date


Please sign a copy of this transmittal and return by mail as acknowledgement of
receipt
Raised by: Neena Binti Johari Received date:
Document Controller Received by:
MISC Berhad Page 1 of 1

To
Siemens Pte Ltd

FAO:
Siemens DC 1

Transmittal : MR3-MISC-SIEM-08903
Issue date: 03-08-2022
Originator: Hiew Kok Yin
Remarks: SSBO_RETURN COMMENTS
Documentation:

Document Rev Title

Doc.
status

No. of
copies

Media
size

Issue
code

Due before

MR3-SSBO-PRO-PID-2080XM-31010 F0 S60 & S70 PID FIRE AND GAS


INTRUMENTATION WATER MIST HP SINGLE
AGENT - GTG

IFF 1 1

Legend:
Issue
code Description
1 Approved - Revise to the Next (Suitable) Revision status

Doc.
status Description
IFF Issued as Final

Condition THE DOCUMENTS ARE DUE TO BE RETURNED BEFORE THE NOTED DUE DATES