ID Resource Name Type Material Label Initials Group Max.

Units
1 Semen Portland Material zak SP
2 Pasir Pasang Material m3 PP
3 Kerikil Material m3 KR
4 Bahan besi beton d10 Material kg BB D10

5 Bahan besi beton d8 Material kg BB D8

6 Kayu Kamper Balok Material m3 KKB 8/12


8/12
7 Kayu Bekisting Material m2 KB
8 Batu bata Material bh BB
9 Usuk meranti 5/7 Material m³ UM 5/7
10 Paku biasa 2"-5" Material kg PK 2"-5"
11 Papan Meranti 3/20 Material m³ PM 3/20
12 Bata pasang 5 x 11 x Material bh Bata
22 cm Pasang
13 Bekisting Material m2 B
14 Balok kamper 8/12 Material m3 BK 8/2
15 Besi strip Material kg BS
16 Paku usuk Material kg PU
17 Papan Kamper Material m3 P
18 Paku reng Material kg PR
19 Genteng press Material bh GP
20 Bubungan press Material bh BP
21 Paras ex Material bj PS
Sarwagenep/ex Gerana

22 Kruing usuk 4/6 Material m3 KU 4/6


23 Kalsiboard Material lbr K
24 Kaca bening 5 mm Material m2 KB 5 M''
25 Kunci tanam Material bh KT
26 Engsel pintu Material bh EP
27 Engsel jendela Material bh EJ
28 Grendel kuningan Material bh GK
29 Kait angin Material bh KA
30 Espanolet Material bh E
31 Plamur tembok Material kg PT
32 Cat penutup 2x emco Material kg CP

33 Cat tembok/cat penutup Material kg CP


vinilek 2x
34 Cat tembok/cat dasar Material kg CT/CD
vinilek
35 Cat meni Material kg CM
36 Dempul Material kg D
37 Cat dasar emco Material kg CDE
38 Paras gosok Material bj PG
39 Bata gosok Material bj BG

Page 1 Praktikum 6-Aplikom M.SYUKUR_053120043


ID Resource Name Type Material Label Initials Group Max. Units
40 Tukang kayu Work TK 2.000%
41 Tukang batu Work TB 400%
42 Tukang besi Work TBESI 500%
43 Tukang cat Work TC 1.200%
44 Tukang style Bali Work TSB 900%
45 Tukang kaca Work TK 100%
46 Kepala tukang Work KP 600%
47 Mandor Work M 600%
48 Pekerja Work P 1.500%
49 Proyek Manajer Material Ls S
50 Site Manajer Material Ls S
51 Site Engineer Material Ls S
52 Drafter Material Ls S
53 Pelaksana Material Ls S
54 Office boy Material Ls S
55 Biaya Selamatan Material Ls S
56 Biaya Security Material Ls S
57 Sumbangan Material Ls S
Kepemudaan
58 Sumbangan Agustusan Material Ls S

59 Biaya Pengawas Material Ls S


60 Biaya Tamu dll Material Ls S

Page 2 Praktikum 6-Aplikom M.SYUKUR_053120043


Std. Rate Ovt. Rate Cost/Use Accrue At Base Calendar Code
Rp 66.000 Rp 0 Prorated
Rp 152.000 Rp 0 Prorated
Rp 167.000 Rp 0 Prorated
Rp 18.500 Rp 0 Prorated

Rp 18.500 Rp 0 Prorated

Rp 8.257.000 Rp 0 Prorated

Rp 1.757.000 Rp 0 Prorated
Rp 8.100 Rp 0 Prorated
Rp 1.757.000 Rp 0 Prorated
Rp 24.000 Rp 0 Prorated
Rp 2.007.000 Rp 0 Prorated
Rp 8.100 Rp 0 Prorated

Rp 1.757.000 Rp 0 Prorated
Rp 8.257.000 Rp 0 Prorated
Rp 25.000 Rp 0 Prorated
Rp 24.000 Rp 0 Prorated
Rp 8.507.000 Rp 0 Prorated
Rp 24.000 Rp 0 Prorated
Rp 8.400 Rp 0 Prorated
Rp 10.500 Rp 0 Prorated
Rp 16.500 Rp 0 Prorated

Rp 6.207.000 Rp 0 Prorated
Rp 75.000 Rp 0 Prorated
Rp 99.500 Rp 0 Prorated
Rp 182.000 Rp 0 Prorated
Rp 29.500 Rp 0 Prorated
Rp 24.500 Rp 0 Prorated
Rp 33.000 Rp 0 Prorated
Rp 35.000 Rp 0 Prorated
Rp 72.000 Rp 0 Prorated
Rp 22.000 Rp 0 Prorated
Rp 60.000 Rp 0 Prorated

Rp 29.000 Rp 0 Prorated

Rp 29.000 Rp 0 Prorated

Rp 30.000 Rp 0 Prorated
Rp 33.000 Rp 0 Prorated
Rp 60.000 Rp 0 Prorated
Rp 19.500 Rp 0 Prorated
Rp 9.600 Rp 0 Prorated

Page 3 Praktikum 6-Aplikom M.SYUKUR_053120043


Std. Rate Ovt. Rate Cost/Use Accrue At Base Calendar Code
Rp 24.250/hour Rp 0/hour Rp 0 Prorated Standard
Rp 24.250/hour Rp 0/hour Rp 0 Prorated Standard
Rp 24.250/hour Rp 0/hour Rp 0 Prorated Standard
Rp 24.250/hour Rp 0/hour Rp 0 Prorated Standard
Rp 24.250/hour Rp 0/hour Rp 0 Prorated Standard
Rp 24.250/hour Rp 0/hour Rp 0 Prorated Standard
Rp 35.063/hour Rp 0/hour Rp 0 Prorated Standard
Rp 39.000/hour Rp 0/hour Rp 0 Prorated Standard
Rp 24.000/hour Rp 0/hour Rp 0 Prorated Standard
Rp 7.500.000 Rp 0 Prorated
Rp 5.000.000 Rp 0 Prorated
Rp 5.000.000 Rp 0 Prorated
Rp 3.500.000 Rp 0 Prorated
Rp 3.500.000 Rp 0 Prorated
Rp 1.500.000 Rp 0 Prorated
Rp 1.500.000 Rp 0 Prorated
Rp 3.000.000 Rp 0 Prorated
Rp 1.000.000 Rp 0 Prorated

Rp 1.000.000 Rp 0 Prorated

Rp 2.500.000 Rp 0 Prorated
Rp 500.000 Rp 0 Prorated