DPW-R

ROAD CONSTRUCTION DEPARTMENT, JHARKHAND


(State Highways Wing)
Progress report of On-going works (Roads-Plan)
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial
Progress Name of Contractor Achiev- Scheduled Date
No. (Km) Date/ Ref. Date/ Ref. Achievement
Name Amount Amount Grand Total ement
No. No.

1 2 3 4 5 6 7 8 9 10 11 12

Circle : Hazaribagh
Div : Hazaribagh
Name of EE-Sri Shubash Prasad
1 Widening & Strengthening/ Joint
Reconstruction of Palma Secretary,
Moskodih-Choubey-Keshwari RCD,
road for the Year 2016-17 dt.
Jharkhand
15.09.2017 Hills Trade-
16.790 4706.46 Ranchi's Lt. 3283.29 88.64% 2910.49 98% 14.01.19
18 SBD of RK(JV) Gurgaon
No. 6036
2017-18
(S)
dt.21.09.20
16
2 Widening and Strengthening of
Banaso- Budgadda Road (MDR MORT &
93) under RCD, Road Division, H
Hazaribag (Under CRIF) Total (Zone-1)
Length 28.00Km for the Year Govt. of
2022-23 India vide
(Job. No. : CRF-JHR-2022- 28.00 6845.00 - - - - - -
Lt. No. RW
23/56) Ranchi/CR
F/2021-22
Dt.
06.02.2023
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial
Progress Name of Contractor Achiev- Scheduled Date
No. (Km) Date/ Ref. Date/ Ref. Achievement
Name Amount Amount Grand Total ement
No. No.

1 2 3 4 5 6 7 8 9 10 11 12
3 Widening and Strengthening to 2
Lane of of Duwari to Rol Road MORT &
(MDR-99) under RCD,Road H
Division, Hazaribag (Under (Zone-1)
CRIF) Total Length 25.757Km Govt. of
for the Year 2022-23 dt. 24.11.23 M/S Puja
India vide
(Job. No. CRF-JHR-2022- 25.76 8465.00 8804.87 21 (SBD) - - Enterprises, 5% 23.07.2025
Lt. No. RW
23/55)** of 2023-24 Simaria, Chatra
Ranchi/CR
F/2021-22
Dt.
06.02.2023

4 IRQP Work for Kallu chowk to Joint


Boddom Bazar Road from Km Secretary,
0.00 to 1.10 Km for the Year RCD,
2023-24 Under RCD Road Jharkhand dt. 14.11.23 M/s Narayan
Division Hazaribag 1.10 82.15 Ranchi's Lt. 62.93 18 F2 of - - Construction, 5% 13.02.2024
No. 3968 2023-24 Matwari, Hazaribag
(S)
dt.17.08.20
23
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial
Progress Name of Contractor Achiev- Scheduled Date
No. (Km) Date/ Ref. Date/ Ref. Achievement
Name Amount Amount Grand Total ement
No. No.

1 2 3 4 5 6 7 8 9 10 11 12
5 IRQP Work for the road Around
Matwari Gandhi Maidan to NH- Joint
100 from Km 0.00 to 1.00 Km Secretary,
for the Year 2023-24 Under RCD RCD,
Road Division Hazaribag Jharkhand dt. 16.11.23 M/s Narayan
1.00 68.59 Ranchi's Lt. 52.91 20 F2 of - - Construction, 5% 15.02.2024
No. 3964 2023-24 Matwari, Hazaribag
(S)
dt.
17.08.2023

6 IRQP work of Gauriya Karma Joint


(MDR-096) to Kewta Bridge Secretary,
(MDR-069) road from Km 0.00 RCD,
to 10.48 Km (Total Length 10.48 dt. 24.11.23
Jharkhand M/s Siddhartha
Km) for the Year 2023-24 Under 22 (SBD)
10.48 681.18 Ranchi's Lt. 690.84 - - Construction, Zulu 25% 23.02.2024
RCD, Road Division Hazaribag of
No. 3643 Park, Hazaribag
2023-24
(S)
dt.31.07.20
23
7 IRQP Work for Jain Petrol Joint
Pump(NH-33) to St. Xaviers Secretary,
School (NH-100) Via St. Mary RCD, M/s Ramchandra
Church Suresh Colony Chowk, Jharkhand Yadav,
Electricity Office,St Robert Girls 3.00 278.85 Ranchi's Lt. - - - - Budhiyadih, Kapka, - -
High School, NH office,PWD IB No. 4028 Barkatha,
and PWD office Chowk to (S) Hazaribag.
Hurhuru Durga Mandir Via dt.21.08.20
Carmel School Chowk(NH-33) in 23
7 Km-0.00 toHazaribagh
3.00 Km(Total 86.13 21127.22 0.00 12894.84 0.00 2910.49
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial
Progress Name of Contractor Achiev- Scheduled Date
No. (Km) Date/ Ref. Date/ Ref. Achievement
Name Amount Amount Grand Total ement
No. No.

1 2 3 4 5 6 7 8 9 10 11 12

Circle : Hazaribagh
Div : BOKARO
Name of EE- Sri Amit Singh
1 (A) Reconstruction of Dantu (NH- 31.83 10321.91 05.03.19/ 6801.12 30.07.19/ 106.00 7586.89 Classic Engicon 97% 29.07.2021
23) to Kathara via Sillisadam 1503(S) of 01 SBD of Pvt. Ltd. 3D, Vatika
including Sillisadam to Chalkari J.S., RCD, 2019-20 Apartment, Line
Road.(Total length 31.825 km) Jharkhand, Tank Road, Ranchi.
for the year 18-19 Ranchi

(B) Preparation of Land 8.61 23.07.19/ 4 100.00 8.61 M/S Arun Kumar 100% 22.01.2020
Acqusition Plan (LAP) and F2 of 2019- Jaishwal, Vill.+
Diversion of Forest Land in 20 P.O. -
Construction of Dantu (NH-23) Chandankiyari,
to Kathara via Sillisadam Bokaro
including Sillisadam to Chalkari
Road.(Total length 31.825 km)
(C) Construction of H.L Bridge 302.52 31.10.19/ 60.44 182.84 M/S Sanjay 66% 30.10.2020
over (A) Canal at Ch.11.717 KM 11 SBD of Construction, At. +
of Dantu to Kathara Road, (B) 2019-20 P.O. - Saram,
Canal at Ch. 11.924 KM of Bokaro
Sillisadam- Chalkari Link Road
and (C) Chatnia Nala at Ch.
0.395 KM. of Dantu to Kathara
via Sillisadam Road under Road
Division, Bokaro for the year
2019-20
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial
Progress Name of Contractor Achiev- Scheduled Date
No. (Km) Date/ Ref. Date/ Ref. Achievement
Name Amount Amount Grand Total ement
No. No.

1 2 3 4 5 6 7 8 9 10 11 12
2 Widening & Strengthening/ 4.00 1613.95 09.10.17/ 922.55 05.10.2021/ 93.08 1003.23 HARI NANDAN 96% 04.04.2022
Constructioin of Approach road 5609(S) of 2 SBD of CHOUDHARY
to Mega Food Park J.S., RCD, 2021-22 Behind Hero Honda
Chandankiyari, Bokaro (Total Jharkhand, Showroom,
Length 4.055 KM) for the year Ranchi Dudhani, Bhagalpur
2017-18 Road, Dumka -
814101
Mob. 9801310245.

3 Widening and Strengthening 25.83 4303.68 23.12.21/ 4327.85 05.03.2022/ 92.40 3998.81 M/S ME-SC(JV), 99% 04.09.2023
/Reconstruction of Sarubera (On 4070(S) of 05 SBD of Dumra Harina,
26th km of Dumari –Nawadih J.S., RCD, 2021-22 Dhanbad
Bermo Road) to Pilpilo More Jharkhand,
Road (Total Length 25.832 km) Ranchi
for the year 2021-22

5 Widening and Strengthening 8.67 5164.96 08.07.2022/ 4556.82 03 SBD of 41.70 1899.99 CLASSIC 55% 16.04.2024
Work in Four Lane of Road from 2503(S) of 2022-23/ ENGICON PVT.
I.T.I. More to Ukrid More (Total J.S., RCD, 17.01.2023 LTD., 3D Vatika
Length 8.670 km) for the year Jharkhand, Apartment, Line
2022-23 under Road Division, Ranchi Tank Road, Ranchi
Bokaro – 834001
(Jharkhand)
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial
Progress Name of Contractor Achiev- Scheduled Date
No. (Km) Date/ Ref. Date/ Ref. Achievement
Name Amount Amount Grand Total ement
No. No.

1 2 3 4 5 6 7 8 9 10 11 12
6 Reconstruction and 491.11 29.08.2023/ - - #VALUE! 0.00 - - -
Strengthening Work in Ch. 7th 4161(S) of
km (60 M), 9th Km (170 M), J.S., RCD,
17th km (780 M), 18th km (400 Jharkhand,
M) 19th km (700 M), 21st km Ranchi
(500 M) and 22nd km (800 M) of
Bahadurpur - Kasmar -
Khairachatar - Pirgul - Bengal
Boarder Road (Total length 3.41
km) for the year 2022-23 under
Road Division, Bokaro.
7 Widening and Strengthening/ 11.53 3841.15 13.10.2023/ - - #VALUE! 0.00 - - -
Reconstruction of Nawadih (Dak 4794(S) of
Bangla) (MDR-73) - Vendra - J.S., RCD,
Gomoh (Laxmipur) Road (Total Jharkhand,
Length 11.530 Km) for the year Ranchi
2023-24 under Road Division
Bokaro

8 IRQP Work of Narki – Bokaro 11.00 1161.54 27.10.2023/ - - #VALUE! 0.00 - - -


(MDR -078) Road (Total Length 5004(S) of
11.000 Km) for the year 2023-24 J.S., RCD,
under Road Division Bokaro Jharkhand,
Ranchi

6 Bokaro 92.86 26898.3 16919.5 14680.38


State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial
Progress Name of Contractor Achiev- Scheduled Date
No. (Km) Date/ Ref. Date/ Ref. Achievement
Name Amount Amount Grand Total ement
No. No.

1 2 3 4 5 6 7 8 9 10 11 12

Circle : Hazaribagh
Div : Chatra
Name of EE-Sri Mithilesh Prasad
M/s B.N.
Enterprises.
Block-D, Flat No.
Strengthning/IRQP work of
03/C, Shree Vrinda
Bhadrakali Mandir to Mahane Joint Sec. 01F2/ 2023-
Green Apartment,
1 Bridge Via Bhadrakali Mandir 2.1 136.18 190(S) dt. 107.54 24 dt. 46% 48.79 100% 02.10.2023
Kusum Vihar, Road
road,Under Road division Chatra 18.01.2023 03.07.2023
No. 9, Morabadi
for the year 2022-23
Ranchi
Mob
No.9955542412
Arunaditya
Projects & Mineral,
Joint Sec. 02 (SBD)/ C-188 Vidyalaya
Reconstruction of Tandwa - Rai
Lt. No. 2019-20 Marg, Ashok
- Khelari Road from km 13.450
2 1.55 986.92 4599(S) dt. 829.79 dt. 48.15% 398.72 Nagar, Ranchi 67% 25.04.2020
to 15.00 under Road Division,
16.09.201 26.10.201 Mob No.
Chatra for the Year 2019-20.
9 9 7857924060

Jai Maa Ashtabhuji


Joint Sec. 02 (SBD)/
I.R.Q.P. work of Jihu - Itkhori Construction
Lt. No. 2023-24
road from Km. 9.80 to 29.02 , Hazaribagh,
3 19.22 2080.02 2947(S) dt. 1944.65 dt. ____ ____ 32% 25.02.2024
Under Road division Chatra for Jharkhand Mob No.
13.06.202 26.09.202
the year 2022-2023. - 7352254047
3 3
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial
Progress Name of Contractor Achiev- Scheduled Date
No. (Km) Date/ Ref. Date/ Ref. Achievement
Name Amount Amount Grand Total ement
No. No.

1 2 3 4 5 6 7 8 9 10 11 12
3 Chatra 22.87 3203.12 2881.98 447.51

Circle : Hazaribagh
Div : Dhanbad
Name of EE-Sri Dinesh Prasad
Widening And Strengthening Of
Loharbarwa (On Nh-2) 02 SBD/
Mayurnachna Kadmahara (G.T.G 2017-18 dt.
Road) And Mayurnachna 29.08.17
Amarpur (Nh-2) Road (Total
Lenth-27.506 Km) Under Plan 1490 (S) dt. (i)4989.071 M/s Daroga
1 Head For The Year 2016-17. 27.51 5320.07 5192.47 97.76% 5456.05 98% 28.05.19
10.03.17 66 Pradhan
(ii)203.395
79
(variation)
5192.46745

Widening and Strengthening/


Reconstruction of Mahuda(On
NH-32)-Sindri(Jamadoba)(On 01 SBD/
3561 (S) dt.
2 MDR-055) Road(Length-22.940) 22.94 16319.23 6800.93 2018-19 dt. 31.37% 4904.89 EICC-SRB(JV) 32% 08.11.2020
06.06.16
under Plan Head for the year 09.03.19
2016-17.
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial
Progress Name of Contractor Achiev- Scheduled Date
No. (Km) Date/ Ref. Date/ Ref. Achievement
Name Amount Amount Grand Total ement
No. No.

1 2 3 4 5 6 7 8 9 10 11 12
Strengthening And Widening /
Reconstruction Work Of Jharia 06
To Baliapur Road (Mdr 047) 3511 (S) dt. SBD/2021-
3 (Total Length 11.440 Km) 11.44 4449.78 4645.90 99.46% 4620.89 Daroga Pradhan 95% 10.02.2023
18.11.2021 22 dt.
Under Plan Head For The Year 11.03.2022
2021-22.

I.R.Q.P Work Of Domanpur- 04


Maniadih-Kolhar More Road 1563 (S) dt. SBD/2023-
4 27.54 2074.33 2148.00 82.74% 1777.31 Preeti Enterprises 100% 06.12.2023
(Total Length- 27.544 K.M.) For 29.03.2023 24 dt.
The Year 2022-23. 07.06.2023

08
Rehabilitation Work Of Bank
1561 (S) dt. SBD/2023- Maurer Sanfield
5 More Flyover Under Plan Head 0.00 1579.67 1511.00 0.00 0.00 8% 09.07.2024
29.03.2023 24 dt. India Ltd.
For The Year 2022-23.
08.08.2023

Construction of Approach Road


(Total Length- 300M) for Binod 21 F2/2023-
Bihari Mahto Koylanchal 1877 (S) dt. 24
6 0.30 272.28 195.49 0.00 0.00 M/S Sonu & Saroj 20% 31.01.2024
University Under Road Division 28.04.2023 dt.01.11.20
Dhanbad For The Year 2023-24 23

I.R.Q.P Work in Dumra- 09


Keshargrah Road (Total Length- SBD/2023-
3965 (S) dt.
7 4.60 K.M.) under plan head for 4.60 496.71 499.87 24 0.00 0.00 Preeti Enterprises 60% 17.12.2023
17.08.2023
the year 2023-24. dt.17.11.20
23
7 Dhanbad 94.33 30512.07 20993.66 16759.15
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial
Progress Name of Contractor Achiev- Scheduled Date
No. (Km) Date/ Ref. Date/ Ref. Achievement
Name Amount Amount Grand Total ement
No. No.

1 2 3 4 5 6 7 8 9 10 11 12

DMFT FUND
IRQP/ Strengthening Work Of
Shramik Chowk To Barwadda
Road (MDR- 060) (Total Length - 02
63(S) dt. SBD/2023-
1 8.90 Km) In Km 0.00 To 8.9 Km 8.90 2408.36 2318.48 62.30% 1444.36 Daroga Pradhan 78% 18.10.2023
Under Plan Head For The Year 06.01.2023 24 dt.
2022-23. (DMFT) 19.04.2023

Widening and Strengthening of


Road From Muraidih (MDR-051)
to Sonardih Phatak (MDR 049) 06
1583(S) dt. SBD/2023-
2 via Hindustan Zinc Ltd. And 5.23 2805.34 3000.00 37.14% 1114.06 Preeti Enterprises 40% 25.03.2024
Ram Raj Mandir Under DMFT 31.03.2023 24 dt.
Head For The Year 2023-24. 26.06.2023

I.R.Q.P. /Strengthening Work Of


Patherdih-Sindri Road (MDR- 07
067) From 0.00 Km To 13.71 Km 216 (S) dt. SBD/2023-
3 13.71 3693.43 4443.88 33.19% 1475.00 Daroga Pradhan 35% 11.01.2024
(Total Length- 13.71 K.M.) 19.01.2023 24 dt.
Under Road Division Dhanbad 12.07.2023
For The Year 2022-23
3 DMFT Fund Dhanbad 27.84 8907.13 9762.36 4033.42

Circle : Hazaribagh
Div : Giridih
Name of EE-Sri Prem Prakash Singh
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial
Progress Name of Contractor Achiev- Scheduled Date
No. (Km) Date/ Ref. Date/ Ref. Achievement
Name Amount Amount Grand Total ement
No. No.

1 2 3 4 5 6 7 8 9 10 11 12
Govt. of
Jharkhand
RCD,
Reconstruction/ Strengthening of RNS Construction
Ranchi
CRPF Camp-Azad Nagar- SBD 05 of Pvt. Ltd.,
Letter no
1 Bakshidih (Yogitand) Road 2.71 551.45 544.97 2022-23 Dt. 69% 375.00 Mau, Uttar 80% 15.06.2023
1959(S)
(Total Length – 2.71 Km.) for the 16.12.2022 Pradesh
dt.
year 2022-23
31.05.202
2

Reconstruction of Road From


Banpura (on Jhari More-Banpura- Govt. of
Chichaki-Khunta Chowk- Jharkhand
Chichaki Railway Station Road) RCD,
SBD 06 of M/S Maa Laxmi
Ranchi
2 to Dhibra More Near Dondlo 3.60 700.71 656.83 2022-23 Dt. 101% 664.88 Construction, 90% 19.09.2023
(Including Bridge) (Total Length Letter no.
20.12.2022 Daltonganj
3.60 Km.) Under Road Division, 1166 (S)
Giridih For The Year 2022-23 Dt.
23.03.22

W/S and Reconstruction of Hesla Govt. of


(NH-02) to Aura (NH-02) Via Jharkhand
RNS Construction
Tirla, Alkadih Road (Total L. RCD,
SBD 02 of Pvt. Ltd.,
14.020 Km.) for the year 2022-23 Ranchi
3 14.02 3171.24 2719.71 2022-23 Dt. 31% 850.00 Mau, Uttar 45% 21.08.2023
Letter no.
22.10.2022 Pradesh
1326 (S)
Dt.
31.03.22
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial
Progress Name of Contractor Achiev- Scheduled Date
No. (Km) Date/ Ref. Date/ Ref. Achievement
Name Amount Amount Grand Total ement
No. No.

1 2 3 4 5 6 7 8 9 10 11 12
Reconstruction work of Baba Ji Govt. of
Kutiya More (On SH-13)- Jharkhand
Mugpiti-Narendrapur Open Cast RCD,
Mines-Paparwatand (On NH- Ranchi SBD 07 of
Hari Nandan
4 114A) Road (Total Length – 6.05 6.05 1508.00 Letter no 1297.30 2022-23 Dt. 73% 944.94 96% 23.09.2023
Choudhary, Dumka
Km.) (With Land Acqujition) For 3549 (S) 24.01.2023
the Year 2022-23 dt
06.10.202
2
Widening and Strenthening/
Reconstruction work of Govt. of
Karamjora More (on NH-114A)- Jharkhand
Genro-Patro River of Approach RCD,
Road (on Jamui-Deoghar Road) Ranchi SBD 08 of
Rajeev Kumar,
5 (Total Length - 11.125 Km.) 11.13 3040.02 Letter no 2301.35 2022-23 Dt. 61% 1400.00 73% 26.12.2024
Patna
(Including Land Aquesation 3646 (S) 27.01.2023
Work) Under Road Division, dt
Giridih For the Year 2022-23 13.10.202
2

Widening and Strengthening/ Govt. of


Reconstruction work of Jharkhand
Barwadih Fatak to Baniyadih via RCD,
Centralpit, Baherwatand, Ranchi SBD 01 of
Hari Nandan
6 Kabribad Road (Total Length - 7.59 2992.00 Letter no 2075.12 2023-24 Dt. 69% 1432.32 70% 04.04.2024
Choudhary, Dumka
7.588 Km.) Under Road 4000 (S) 05.04.2023
Division, Giridih For the Year dt
2022-23 04.11.202
2
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial
Progress Name of Contractor Achiev- Scheduled Date
No. (Km) Date/ Ref. Date/ Ref. Achievement
Name Amount Amount Grand Total ement
No. No.

1 2 3 4 5 6 7 8 9 10 11 12
Improvement of Riding Quality Govt. of
of Atka (on NH-19)-Sariya (on Jharkhand
MDR-116) Road (Total Length- RCD,
27.5 Km) under Road Division Ranchi SBD 03 of M/S East India
7 Giridih 27.50 1485.00 Letter no 1326.53 2023-24 Dt. 91% 1203.58 Construction 83% 11.11.2023
4434 (S) 12.05.2023 Company, Bokaro
dt
06.12.202
2
Improvement of Riding Quality Govt. of
of Saria (at MDR-116) -Koyridih- Jharkhand
Kathwara (at SH-14) RCD, Amitabh
(Narayanpur) Road in km 0 to Ranchi SBD 04 of Construction Pvt.
8 44.46 KM (Total Length - 44.46 44.46 2520.86 Letter no 2620.73607 2023-24 Dt. 69% 1800.00 Ltd., 105, Ranchi- 72% 22.02.2024
KM) for the year 2022-23 214(S) 23.06.2023 Patna Road, Coltex
dt Muhalla, Koderma
19.01.202
3
Govt. of
Widening & Strengthening of
Jharkhand
Domanpahari to Chugali,
RCD,
Dhurgargi Via Vijaydih Road in SBD No. M/S East India
Ranchi
9 Km. 0 to 21.265 For the year 21.27 5729.13 4568.61 08 of 2018- 92% 4222.10 Construction 95% 27.11.20
Letter no
2018-19 19 Company, Bokaro
2803 (S)
Bridge At Che. 14+700 dt 28/11/18
dt
Span - 8 X 24.600
11.05.18
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial
Progress Name of Contractor Achiev- Scheduled Date
No. (Km) Date/ Ref. Date/ Ref. Achievement
Name Amount Amount Grand Total ement
No. No.

1 2 3 4 5 6 7 8 9 10 11 12

Reconstruction of Balhara (SH-


Govt. of
13)-Patna-Pihara-Kherda (MDR-
Jharkhand
113) Road (Length 36.950 Km.)
RCD,
and Patna-Gawan Link Road
Ranchi SBD No.07
(Length 2.17 Km.) (Total Length M/S M & S
10 36.95 12831.99 Letter no 8751.62 of 2018-19 106% 9240.96 96% 07.11.20
36.950 Km. for the year 2018-19 Company.
5087 (S) dt 08/11/18
Bridge at
Dt
Che. 16 + 070, Span - 2 X 16
31.08.18
Che. 29+293, Span - 1 X 18
Che. 31 + 513, Span 2 X 21

Govt. of
Widening and Strengthening of Jharkhand
Govindpur-Tundi-Giridih Road RCD,
(Part of SH-13) in Km. 43.77 to Ranchi SBD No.
M/S Daroga
11 51.67 (Total Length 7.90 Km.) 7.90 2635.25 Letter no 2464.64 01 of 2019- 75% 1859.44 80% 23.06.20
Pradhan, Dhanbad.
(With Construction of Bridge) 1234(S) 20
For the year 2018-19 (Span Dt. dt 24/09/19
Bridge 1 X 21.60) 27.02.201
9
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial
Progress Name of Contractor Achiev- Scheduled Date
No. (Km) Date/ Ref. Date/ Ref. Achievement
Name Amount Amount Grand Total ement
No. No.

1 2 3 4 5 6 7 8 9 10 11 12
Widening and Strenthening/
Reconstruction of Hesla-Beko
road (Including Bridges) (Total
Govt. of
Length – 29.925 Km.) For the
Jharkhand
year 2019-20
RCD,
Bridge at SBD No.
Ranchi
Che. 153, Span - 1 X 16 06 of 2019- ACPL-KK (JV)
12 29.93 6924.93 Letter no 4534.01 65% 2955.00 69% 25.06.21
Che. 1779, Span - 2 X 8 20 Koderma
3635(S)
Che. 2865, Span 2 X 8 dt 26/10/19
Dt.
Che. 4518, Span - 2 X 8
22.07.201
Che. 7029, Span - 2 X 8
9
Che. 12828, Span - 1 X 16
Che. 17036, Span - 1 X 16
Che. 17928, Span - 1 X 16
Govt. of
Widening and Strenthening /
Jharkhand
Reconstruction of Fatehpur to
RCD,
Bongi (Bihar Border) Via
Ranchi SBD No. M/S Om Namo
Bhelwaghati Road (Including
13 15.81 5051.63 Letter no 3583.41 02 of 2019- 95% 3405.79 Siwai Construction, 97% 22.06.21
Construction of Bridge) (Total
3558(S) 20 New Delhi.
Length–15.810 Km.) For The
Dt. dt 23/10/19
Year 2019-20 (Bridge at Che.
19.07.201
14+565, Span - 4 X 21)
9
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial
Progress Name of Contractor Achiev- Scheduled Date
No. (Km) Date/ Ref. Date/ Ref. Achievement
Name Amount Amount Grand Total ement
No. No.

1 2 3 4 5 6 7 8 9 10 11 12

Govt. of
Jharkhand
RCD,
Renovation Work of Parasnath SBD No. Sri Sant Kumar
Ranchi
14 Hill Road (MDR-82) (Total 5.00 628.73 529.48 01 of 2021- 19% 99.68 Deo, Krishna 19% 17.06.22
Letter no
Length – 5.00 Km.). 22 Nagar, Giridih.
4541(S)
dt 18/01/22
Dt.
14.09.19

14 Giridih 49770.93 37974.33 30453.68

Circle : Hazaribagh
Div : Koderma
Name of EE-Sri Satendra Prasad Singh
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial
Progress Name of Contractor Achiev- Scheduled Date
No. (Km) Date/ Ref. Date/ Ref. Achievement
Name Amount Amount Grand Total ement
No. No.

1 2 3 4 5 6 7 8 9 10 11 12
RECONSTRUCTION WORK
OF TILAIYA(PIPRADIH)-
JAINAGAR- BAGRO (ON
DOMCHANCH- PIPCHO Dt- M/s R.K Infracop
Dt-
1 ROAD) (TOTAL LENGTH-0.00 18.55 4134.61 3295.65 14.10.2019, 90% 2956.88 Pvt. Ltd, 90% 02.12.2020
to 18.550 Km) UNDER ROAD 10.07.2019,
26SBD/201 Hyderabad.
DIVISION KODERMA FOR 3392(S)
9-20
THE YEAR 2019-20

Strengthening/Reconstruction of
Dhab-Pihra-Satgawan
Dt- M/s Sanjay
Road(MDR-113) in Km. 0.00 to
21.325 Dt- 26.12.2022, Construction,,
2 km. 21.325 (Total Length 2296.36 2386.82 36% 837.35 48% 31.08.2023
07.01.2022, 03 Saram, Bokaro
21.325Km.) Under Road
51(S) SBD/2022-
Division Koderma for the year
23
2021-22
IRQP Work in Urwan-Kanti
Dt-
Road from Km 0.00 to 5.80 Km (
17.08.2023
3 Total Length= 5.80 Km. ) Under 5.80 483.89 _ _ _ _ _ _ _
Lt No-
Road Division ,Koderma for the
3966(s)
Year 2023-2024
IRQP Work of Koderma to
Dt-
Jamua Road from Km. 0.00 to
14.09.2023
4 Km 49.00 under Road 49.00 4497.96 _ _ _ _ _ _ _
Lt No-
Division,Koderma for the Year
4408(s)
2023-24
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial
Progress Name of Contractor Achiev- Scheduled Date
No. (Km) Date/ Ref. Date/ Ref. Achievement
Name Amount Amount Grand Total ement
No. No.

1 2 3 4 5 6 7 8 9 10 11 12
Reconstruction works of
Domchanch-Dhodakola-Saphi- M/S Ganesh Yadav,
Faguni Road (MDR-111) Dt- Anand Nagar,P.O-
Dt-
5 [From 0.00 to 14.500 Km] 14.500 6519.54 4435.73 29.05.2019, 5% 236.00 ISM, 5% 28.09.20
31.08.201
01SBD/201 Dhanbad,Jharkhand
8, 5092(s)
9-20 Pin-826004

Remaining Work of
Reconstruction of Domchanch -
Dhodhakola-Sapahi-Faguni Road Dt-
14.500 6519.54 _ _ _ _ _ _ _
31.08.201
(KM 0.00 to 14.5 upto Bihar
8, 5092(s)
border) .
5 Koderma 102.35 24451.89 10118.19 4030.23

Circle : Hazaribagh
Div : Ramgarh
Name of EE-Sri Rajiv Ranjan Munda
Construction of 4-Lane Road
Work from Naya Chowk Classic Engicon
Ltr. No. 07(SBD)20
(Chitarpur) NH- 320- Sandi (On Pvt. Ltd.,
5065(S) 18-19
1 MDR- 95) & Sandi to Rajrappa 10.139 9891.47 8334.64 82% 7329.90 3D Vatica 85% 23.06.2020
Dt. Dt.- 24-12-
Road (MDR- 95) Total Length- Appartment, Line
31.08.2018 2018
10.139 KM including Tank Road, Ranchi
Construction of Bridge
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial
Progress Name of Contractor Achiev- Scheduled Date
No. (Km) Date/ Ref. Date/ Ref. Achievement
Name Amount Amount Grand Total ement
No. No.

1 2 3 4 5 6 7 8 9 10 11 12

Classic Engicon
Widening and Strengthening of 25(SBD)20
Pvt. Ltd.,
NH-33 Ashok Cinema to NH-23 4667.56 15-16
20.10 3968.79 100% 5365.08 3D Vatica 100% 07.04.2017
Chhattarpur Road in KM 0.00 to Ltr. No. Dt. 08-10-
Appartment, Line
20.10 (Length of Road -20.10) 1995(S) Dt. 2015
Tank Road, Ranchi
20-09-2015
2 5691.47 (Revised)
Ltr. No. M/s Sildilya
Construction of H.L. Bridge at 733(S) Construction,
12(SBD)20
Chainage (A) 2360 Mtr. (B) 4580 Dt. Station Road,
19-20
Mtr. (C) 5825 Mtr. & (D) 19025 - 01.02.2019 1095.45 10% 100.00 Redma, Ward No.- 65% 30.04.2021
Dt.- 31-10-
Mtr. in NH-33 Ashok Cinema to 15, Dist.- Palamu,
2019
NH-320 Chhattarpur Road Jharkhand,
Daltonganj
Widening & Strengthening/
Reconstruction of Lalki Ghati to Sidhartha
Ltr. No. 01(SBD)20
Chhattarmandu Road via Construction
1311(S) 23-24
3 Linching Chowk (Length-10.910 10.91 4220.46 2674.64 18% 485.00 Korambey, Near 23% 16.05.2024
Dt. 31-03- Dt.- 17-07-
KM) under Plan Head for the GPO House, Zullu
2022 2023
year 2022-23 Park, Hazaribagh

IRQP Work of Gola to Charu


Ltr. No.
Road (MDR-101) from KM 0.00
4431(S)
4 to 13.00 Under Road Divison, 13.00 1144.29 0.00 - 0% 0.00 - - -
Dt. 06-12-
Ramgarh for the of Year 2022-23
2022
4 Ramgarh 54.15 20947.7 16073.52 2.10 13279.97
DPW-R
ROAD CONSTRUCTION DEPARTMENT, JHARKHAND
(State Highways Wing)
Progress report of Completed works (Roads-Plan)
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial Scheduled
Progress Grand Name of Contractor Achievemen
No. (Km) Date/ Ref. Date/ Ref. Achievement Date
Name Amount Amount Total t
No. No.

1 2 3 4 5 6 7 8 9 10 11 12

Circle : Hazaribagh
Div : Hazaribagh
Name of EE-Sri Shubash Prasad
IRQP work of Charhi to Ghato
Road from 0.00 to 5.2 Km Under
RCD, Road Division, Hazaribag Joint
for the Year 2022-23 Secretary,
dt. Jai Maa Asthabhuji
RCD.,
01.02.2023 Construction ,
1 5.20 459.17 Jharkhand, 464.11 100.00% 480.94 100% 30.04.23
44 (SBD) Barkagaon Road,
Ranchi Lt.
of 2022-23 Hazaribag.
No.
4263(S) dt.
22.11.2022

IRQP work for Hemilton School


Chowk to Hurhuru Road Via
New Bus Sand, Ram Narayan Joint
Yadav Road-Ravindra Path (St. Secretary,
Dt. M/s Siddharth
Josheph School0, Pandit Ji Road RCD.,
10.03.2023 Construction,
2 and NH-33-Hurhuru Via Forest 3.50 258.89 Jharkhand, 269.66 100.00% 268.86 100% 09.06.2023
51(SBD) of Korambey House,
Colony Road from Km 0.00 to Ranchi Lt.
2022-23 Hazaribag
3.500 Under RCD, Road No.
Division, Hazaribag for the Year 4261(S) dt.
2022-23 22.11.2022
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial Scheduled
Progress Grand Name of Contractor Achievemen
No. (Km) Date/ Ref. Date/ Ref. Achievement Date
Name Amount Amount Total t
No. No.

1 2 3 4 5 6 7 8 9 10 11 12
IRQP work of IRQP work of (A)
Korrah Chowk (NH-100 and
MDR 094 Junction) to Zabra
Road (Zibralter House) from Km
0.00 to 2.00 (Length 2.00Km) (B)
Hurhuru Main Road to Baba Path Joint
from Km 0.00 to 1.30 (Length Secretary,
dt. Ajay Quality
1.30Km) and (C) Mission RCD.,
06.06.2022 Construction Pvt. Ltd.,
3 Hospital Hazaribag-Baarkagaon 3.40 181.02 Jharkhand, 138.62 75% 138.62 100% 05.09.2022
01 F2 of Mission School Road,
road crossing (Near Lambodar Ranchi Lt.
2022-23 Hazaribag
Pathk House) To Khirgaon No.
Chowk (NH 100) (Length 3502(S) dt.
1.00Km) Total Length 4.30Km) 18.11.2021
Under RCD, Road Division,
Hazaribag for the Year 2021-22

Consultancy Services for


Carrying out Road Safety Audit
of existing roads as per Road Joint Cube Engitech
Safety Manual i.e. IRC-SP-88- Secretary, Consultant Pvt. Ltd.,
dt.
2010 or any other latest revision RCD., Jeevan Lok Complex,
26.12.2022
4 of this document under Road - 107.33 Jharkhand, 25.00 70% 17.50 Main Road, Hinoo, 100% -
1(R.S.A.)
Circle, Hazaribag (Total Length Ranchi Lt. Ranchi-834002,
of 2022-23
643.279 Km) for the Year 2021- No. 53(S) Jharkhand
22 dt.
07.01.2022
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial Scheduled
Progress Grand Name of Contractor Achievemen
No. (Km) Date/ Ref. Date/ Ref. Achievement Date
Name Amount Amount Total t
No. No.

1 2 3 4 5 6 7 8 9 10 11 12
IRQP work for Ichak
(Kariyatpur) to Jhumra Road
from KM 0.00 to 9.30 (Total Joint
Length 9.30Km Under RCD, Secretary,
Dt. Jai Maa Asthabhuji
Road Division, Hazaribag for the RCD.,
29.03.2023 Construction ,
5 Year 2022-23 9.30 713.70 Jharkhand, 715.36 90.45% 644.76 100% 28.06.2023
54(SBD) of Barkagaon Road,
Ranchi Lt.
2022-23 Hazaribag.
No.
4765(S) dt.
28.12.2022

Widening & Strengthening of


Demotand (NH-33) to Bhelwara
Under RCD, Road Division, Joint
Hazaribag for the Year 2022-23 Secretary,
M/s Siddharth
RCD., dt. 14.03.23
Construction,
6 1.87 750.95 Jharkhand, 689.79 52 (SBD) 92% 634.95 100% 13.09.2023
Korambey House,
Ranchi Lt. of 2022-23
Hazaribag
No.
3586(S) dt.
10.10.2022

IRQP work of Barkatha-


Surajkund Road from Ch. 0.00 to
2.340 Km Under RCD, Road Joint
Division, Hazaribag for the Year Secretary,
Ajay Quality
2022-23 RCD., dt. 09.05.23
Construction Pvt. Ltd.,
7 2.34 245.48 Jharkhand, 198.74 01 F2 of 100.00% 194.80 100% 08.08.23
Mission School Road,
Ranchi Lt. 2023-24
Hazaribag
No.
4262(S) dt.
22.11.2022
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial Scheduled
Progress Grand Name of Contractor Achievemen
No. (Km) Date/ Ref. Date/ Ref. Achievement Date
Name Amount Amount Total t
No. No.

1 2 3 4 5 6 7 8 9 10 11 12
IRQP work of Hazaribag Control
Room to Simra Rest House (SH-
07 Old alignment) from Ch. 0.00 Joint
to 2.00 Km Under RCD, Road Secretary,
Division, Hazaribag for the Year RCD., 47F2 of 22- M/s Narayan
8 2022-23 2.00 180.92 Jharkhand, 143.33 23 90.70% 130.00 Construction, 100% 16.05.23
Ranchi Lt. dt. 17.02.23 Matwari, Hazaribag
No.
4265(S) dt.
22.11.2022

IRQP work for Jihoo Itkhori road


from Km 0.00 to 9.80 (total
Length 9.80 Km) Under RCD, Joint
Road Division, Hazaribag for the Secretary,
Dt. M/s Siddharth
Year 2022-23 RCD.,
18.05.2023 Construction,
9 9.80 1102.24 Jharkhand, 1169.23 99.14% 1166.23 100% 17.08.23
2(SBD) of Korambey House,
Ranchi Lt.
2023-24 Hazaribag
No.
4763(S) dt.
28.12.2022

10 Widening & Strengthening of


Charhi Ghato Road (For Land Dy.Secretar
Acquisition) y, RCD.,
Dt.
Jharkhand,
20.10.2016
5.20 3454.75 Ranchi Lt. 1482.03 0.00% 2069.22 DLAO, Hazaribag. - -
11(SBD) of
No.
2016-17
3228(S) dt.
23.05.2016
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial Scheduled
Progress Grand Name of Contractor Achievemen
No. (Km) Date/ Ref. Date/ Ref. Achievement Date
Name Amount Amount Total t
No. No.

1 2 3 4 5 6 7 8 9 10 11 12
Widening & Strengthening of Jai Maa Asthabhuji
Hazaribag Barkagaon Tandwa Construction ,
11 - - - - - 100.00% 1168.82 - -
Road in Km 25 to 36 Barkagaon Road,
Hazaribag.
12 Construction of work of Bridge
Ganesh Yadav,
and Road over Koyala River - - - - - 100.00% 5515.30 100% 08.11.19
Saraidhela, Dhanbad
between Malkana and Larahi.
13 Reconstruction work of Jhurjhuri
to Pipcho road (Total Length Joint
27.85 Km) under Road Division, Secretary,
Hzaribag/Koderma for the Year RCD.,
dt. 25.10.19
2018-19 Jharkhand, 4474.15335 M/s Siddhartha-Dilip
22.93 6890.95 39 (SBD) 94.14% 4212.03 100% 24.06.21
Ranchi Lt. (JV), Hazaribag
of 2019-20
22.93 H.-22.93 No. 1239
K 4.92 (S) dt.
27.02.2019
13 Hazaribagh 65.54 14345.38 0.00 5295.86 0.00 16642.04

Circle : Hazaribagh
Div : BOKARO
Name of EE- Sri Amit Singh
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial Scheduled
Progress Grand Name of Contractor Achievemen
No. (Km) Date/ Ref. Date/ Ref. Achievement Date
Name Amount Amount Total t
No. No.

1 2 3 4 5 6 7 8 9 10 11 12
1 IRQP Work of Narki Gomia 7.40 862.95 06.12.2022/ 696.60 10.03.2023/ 122.22 851.37 Sanjay 100% 09.07.2023
4445(S) of 04 SBD/
Road (Total Length 7.40 Construction,
J.S., RCD, 2022-23
Km) for the year 2022-23 Jharkhand, Saram, Dist. -
under Road Division, Ranchi Bokaro
Bokaro

2 Reconstruction of Ambedkar 2.13 427.88 02.08.2022/ 407.56 20.04.2023/ 86.88 354.10 M/S Sharda 90% 19.08.2023
chowk Gandhinagar to hilltop 2825(S) of 01 SBD/
Construction,
colony kurpaniya chowk (Total J.S., RCD, 2023-24
Jharkhand, Redma Daltonganj,
length 2.125 km) Road for the
year 2022-23 under Road Ranchi Palamau, Jharkhand
Division, Bokaro

3 IRQP work of Bishnugarh 22.96 1569.80 18.11.2021/ 1676.80 09.06.2022/ 109.42 1834.77 Classic Engicon Pvt. 100% 08.12.2022
3507(S) of 01 SBD of Ltd. 3D, Vatika
Naraki Road (Total length
J.S., RCD, 2022-23 Apartment, Line Tank
22.960 km) for the year Jharkhand, Road, Ranchi.
2021-22 under Road Ranchi
Division, Bokaro
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial Scheduled
Progress Grand Name of Contractor Achievemen
No. (Km) Date/ Ref. Date/ Ref. Achievement Date
Name Amount Amount Total t
No. No.

1 2 3 4 5 6 7 8 9 10 11 12
4 Widening & Strengthening / 21.14 3710.68 15.02.2022/ 3884.45 30.07.2022/ 83.61 3247.85 M/S Krishna Kumar 100% 29.10.2023
Reconstruction of Chandrapura 531(S) of 02 SBD of
Singh, At. -
(Dugdha) to Bhalmara J.S., RCD, 2022-23
Jharkhand, Belwatika,
(Kodwadih) (MDR-073) Road
including CTPS DVC Colony Ranchi Daltonganj, Palamu,
link Road (Total Length 21.138 Jharkhand.
KM) for the year 2021-22 under
Road Division, Bokaro

4 Bokaro 53.62 6571.31 6665.41 6288.09

Circle : Hazaribagh
Div : Chatra
Name of EE-Sri Mithilesh Prasad
01 (SBD) of
2016-17 dt. M.G. Contractor Pvt.
Widening and Strengthening of 07.10.2016 Ltd.
Simariya - Tandwa Road (MDR- Revised House No. 1704,
3569(S) dt. Value :
1 72) (With High level Bridge) 26.88 6709.477 7229.18 101.66% 8050.00 Sector-4 100% 26.04.2018
06.06.2016 7918.44314
from Km. 0.00 to 26.880 under Vide Lt. No.
Panchkula, Haryana
RCD, Chatra. CE, (Comm) Mob N0. 9216549449
135 dt. 8789235144
28.01.2020
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial Scheduled
Progress Grand Name of Contractor Achievemen
No. (Km) Date/ Ref. Date/ Ref. Achievement Date
Name Amount Amount Total t
No. No.

1 2 3 4 5 6 7 8 9 10 11 12
M.G. Contractor Pvt.
Widening and strengthening Ltd.
Work of Nimakatu (Pratappur)- 04 (SBD)/ House No. 1704,
1494(S) dt.
2 Gjwa- Lodheya- Ghorighat- 25.825 6766.328 7132.83 17-18 dt. 101.27% 7223.87 Sector-4 100% 19.06.2019
10.03.2017
Kawra Road form Km. 0.00 to 20.10.2017 Panchkula, Haryana
25.825 Mob N0. 9216549449
8789235144
2 Chatra 52.7 13475.8 14362.0 15273.9

Circle : Hazaribagh
Div : Dhanbad
Name of EE-Sri Dinesh Prasad
IRQP WorkOf Binod Bihari
04
Mahto Chowk To Wasseypur
4330(S) dt. SBD/2022-
1 Road (Total Length- 2.1 K.M.) 2.10 303.69 275.29 99.81% 274.77 M/s Santosh Singh 100% 30.04.2023
25.11.2022 23 dt.
Under Road Division Dhanbad
31.01.2023
For The Year 2022-23.
Widening & Strengthening/
Reconstruction Of Dumri N0.2
(In 8th Km Of Putki Bhaga
Bhowra Sudamdih Road) To 05
3113(S) dt. SBD/2022-
2 Telgharia (Dhanbad District) 3.65 480.10 460.72 95.21% 438.63 M/s Ajay Singh 100% 19.05.2023
Road Via Dumri No. 4 (Total 08.10.2021 23 dt.
Length- 3.647 Km) Under Road 20.02.2023
Division Dhanbad For The Year
2021-22.
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial Scheduled
Progress Grand Name of Contractor Achievemen
No. (Km) Date/ Ref. Date/ Ref. Achievement Date
Name Amount Amount Total t
No. No.

1 2 3 4 5 6 7 8 9 10 11 12
IRQP Work in 0.00 km to 14.00
01
km of Katras-panchgarhi-
356(S) dt. SBD/2022-
3 Karkend road under plan head for 14.00 1003.75 888.00 99.99% 887.95 Preeti Enterprises 100% 22.07.2023
30.01.2023 23 dt.
the year 2022-23.
06.04.2023

Widening and Strengthening


Work (Including Bridge
Constrction) of Govindpur - 01 SBD/
1231 (S) dt. Triveni Engicons Pvt.
4 Sindri Road (MDR 066) from 22.16 11722.85 5160.18 2019-20 100% 5811.68 100% 25.11.2020
27.02.19 Ltd.
Km 0.00 to Km 22.157 (Total dt.26.07.19
Lenth -22.157 Km) under Plan
Head for the Year 2019-20.

I.R.Q.P work in Sijua Rajgang 03


road (Total Length- 9.20 Km) 1335 (S) dt. SBD/2023-
5 9.20 845.17 796.30 92.67% 790.30 Preeti Enterprises 100% 06.08.2023
under plan head for the year 18.03.2023 24 dt.
2022-23 07.06.2023

IRQP Work of Mugma -


05
Chirkunda Road From 0.00 Km
1510 (S) dt. SBD/2023- RBA Construction Pvt.
6 To 7.00 Km (Working Length - 7.00 825.08 852.80 99.21% 846.08 100% 06.08.2023
28.03.2023 24 dt. Ltd.
6.15 Km) Under Plan head For
07.06.2023
The Year 2022-23
I.R.Q.P/Strengthening Work Of
06
Kenduadih Link Road (MDR-
4324(S) dt. SBD/2022-
7 056) (Total Length- 2.25 K.M.) 2.25 345.58 291.27 97.40% 283.70 M/s Santosh Singh 100% 03.05.2023
25.11.2022 23 dt.
under Road Division Dhanbad for
15.03.2023
the year 2022-23.
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial Scheduled
Progress Grand Name of Contractor Achievemen
No. (Km) Date/ Ref. Date/ Ref. Achievement Date
Name Amount Amount Total t
No. No.

1 2 3 4 5 6 7 8 9 10 11 12
Widening & Strengthening of
Shankardih (On Govindpur-
Jamtara-Sahebganj) to Kamardih 01
(On Govindpur-Tundi-Giridih 2658 (S) dt. 2323.76 SBD/2022- ABL Infrastructure Pvt.
8 (SH-13) Road (Total length - 12.63 2866.62 114% 2656.11 100% 24.06.2023
02.09.2021 23 dt. Ltd.
12.625 KM) under Road Division 01.08.2023
Dhanbad for the year 2021-22.

IRQP/Srengthening work of Putki


08
- Bhaga- Bhoura- Sudamdih
3805 (S) dt. SBD/2021- Bal Krishna Balotia
9 Road (Total length - 13.15 KM) 13.15 847.83 881.68 35% 310.53000 100% 17.06.2022
07.12.2021 22 dt. Const. Pvt.Ltd.
under Road Division Dhanbad for
11.03.2022
the year 2021-22.
9 Dhanbad 86.13 19240.67 9606.22 12299.76

Circle : Hazaribagh
Div : Giridih
Name of EE-Sri Prem Prakash Singh
Govt. of
Jharkhand
RCD,
Widening and Strengthening of SBD No.03
Ranchi M/S Ganesh Yadav,
1 Chirki-Palma-Rajganj Road in 22.00 6503.37 3898.45 of 2016-17 100% 3898.01 100% 06.03.19
Letter no Dhanbad
Km. 0 to 22 for the year 2016-17. dt 07/03/17
4359 (S)
Dt.
15.07.16
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial Scheduled
Progress Grand Name of Contractor Achievemen
No. (Km) Date/ Ref. Date/ Ref. Achievement Date
Name Amount Amount Total t
No. No.

1 2 3 4 5 6 7 8 9 10 11 12
Reconstruction of Jhari more Govt. of
(N.H-2) Banpoura-Chichaki Upto Jharkhand
Khuta Chowk Road for the year RCD,
2018-19 Ranchi SBD No.
M/S Amitabh
2 Bridge at Km. 0.335, Span - 2 X 14.03 3331.56 Letter no 1931.94 09 of 2018- 100% 2769.49 100% 09.10.19
Construction.
10 5090(S) 19
Dt. dt 10/12/18
31.08.201
8
Improvement of riding Quality of Govt. of
Kowar-Koderma Road (MDR- Jharkhand
090) in Km. 0.00 to Km. 37.00 RCD,
SBD 01 of AC – SCDPL (JV), S.S.
(Total Length = 37.00 Km) Road Ranchi
3 37.00 2104.432 2110.11 2022-23 Dt. 100% 2108.77 High School Road, 100% 28.02.2023
for the year 2021-22 Letter no.
01.09.22 Gumla
48 (S)
Dt.
07.01.22
Strengthening & Widening of Govt. of
Kodambari-Mandro-Ranidih- Jharkhand
Asko Road under Road Division RCD,
SBD 03 of
Giridih (Total Length - 18.85 KM Ranchi
4 18.85 2994.450 1387.41 2022-23 Dt. 99% 1380.00 Amitabh Construction 100% 21.06.2023
) For The Year 2022-23. Letter no
22.10.2022 Pvt. Ltd., 105, Ranchi-
349 (S)
dt Patna Road, Coltex
17.01.12 Muhalla, Koderma
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial Scheduled
Progress Grand Name of Contractor Achievemen
No. (Km) Date/ Ref. Date/ Ref. Achievement Date
Name Amount Amount Total t
No. No.

1 2 3 4 5 6 7 8 9 10 11 12
Improvement of Riding Quality Govt. of
of K.B. Road to Tiranga Chowk Jharkhand
(Nurango) Road in km 0 to 19.7 RCD,
Amitabh Construction
(Total Length-19.7 Km) under Ranchi SBD 02 of
Pvt. Ltd., 105, Ranchi-
5 Road Division Giridih for the 19.70 1079.305 Letter no 1001.59 2023-24 Dt. 100% 999.22 100% 12.08.2023
Patna Road, Coltex
year 2022-23 4454 (S) 13.04.2023
Muhalla, Koderma
dt
06.12.202
2
5 Giridih 16013.1 10329.5 11155.49

Circle : Hazaribagh
Div :Koderma
Name of EE-Sri Satendra Prasad Singh

Dt-
19.07.2022
Strengthening Work of Kowar-
02/S.B.D.
Koderma Road (MDR-090)
OF 2022-
from Ch Km 37.00(38thKm) to
Dt- 23 Amitabh Constructions,
1 Km 79.00(Total Length 42.00 42.00 2486.237 2791.30 100% 2983.03 100% 11.05.2023
07.01.2022, Pvt. Ltd.Koderma
Km) under Road
45(S) 2590.99504
Division,Koderma for the year
+
2021-2022
200.30203=
2791.29707

1 Koderma 42.00 2486.237 2791.29707 2983.03


State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial Scheduled
Progress Grand Name of Contractor Achievemen
No. (Km) Date/ Ref. Date/ Ref. Achievement Date
Name Amount Amount Total t
No. No.

1 2 3 4 5 6 7 8 9 10 11 12

Circle : Hazaribagh
Div : Ramgarh
Name of EE-Sri Rajiv Ranjan Munda

Ltr. No.
Construction/W&S of Road from 31(SBD)20
3371(S) M/S Samleshwari Road
1 NH-320 Kothar to Mandal Kara 2.50 397.85 304.07 14-15 Dt. 100% 476.68 100% 11.07.15
Dt. Builders, Bokaro
Gate, Ramgarh 17.03.2015
15.05.2015

634.35
Ltr. No.
207(S) Dt.
Classic Engicon Pvt.
09.01.2015 01(SBD)20
W&S of Gola Charu Road in KM Ltd., 3D Vatica
2 13.00 2065.00 (Revised) 1961.86 16-17 Dt. 100% 2242.00 100% 14.06.17
0 to 13 (13 KM) Appartment, Line Tank
Ltr. No. 20.07.2016
Road, Ranchi
297(S)
Dt.
12.01.2016

Ltr. No. 08(SBD)20 Classic Engicon Pvt.


W&S of Charhi (NH-33)- Ghato
3228(S) 16-17 Ltd., 3D Vatica
3 Road in KM 0.00 to 11.50 (Part- 6.30 3454.75 1326.66 100% 1457.67 100% 29.11.17
Dt. Dt. 30-11- Appartment, Line Tank
B 5.20 to 11.50 KM)
23.05.2016 2016 Road, Ranchi
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial Scheduled
Progress Grand Name of Contractor Achievemen
No. (Km) Date/ Ref. Date/ Ref. Achievement Date
Name Amount Amount Total t
No. No.

1 2 3 4 5 6 7 8 9 10 11 12
Ltr. No. Classic Engicon Pvt.
25(SBD)20
W&S of Gola-Muri Road from 5453(S) Ltd., 3D Vatica
4 14.50 7964.82 2863.90 16-17 Dt. 100% 2993.30 100% 23.08.18
KM 0.00 to 14.50 Dt. Appartment, Line Tank
24.01.2017
26.08.2016 Road, Ranchi
M/S Siddhartha
Ltr. No.
W&S of Rajrappa to Dhobiajara 26(SBD)20 Construction BCCPL
4919(S)
5 Road including 03 No. High 11.87 2606.58 2520.34 15-16 Dt. 100% 2611.11 (J.V), Korambey 100% 30-11-16
Dt.
Level Bridge 17.12.2015 House, Near GPO,
26.06.2015
Zullu Park, Hzb.

W&S/Re-construction of Saunda
‘D’ (On MDR-103)- Urimari
(13.147 KM) segment including Ltr. No. Classic Engicon Pvt.
01(SBD)20
SH-02 to Bottle More Link Road 2441(S) Ltd., 3D Vatica
6 13.80 3172.24 3435.14 17-18 97% 3806.68 100% 31.01.19
(0.65 KM) Total Length- 13.798 Dt. Appartment, Line Tank
01-11-2017
KM of Patratu Barkagaon Road 03.05.2017 Road, Ranchi
(Including H.L Bridge
Construction)

Ltr. No. Classic Engicon Pvt.


W&S of Badki Pona (On NH-33) 06(SBD)20
5095(S) Ltd., 3D Vatica
7 - Kulhi Road (Total Length 13.85 2798.16 3031.08 18-19 100% 2993.30 100% 23.12.19
Dt. Appartment, Line Tank
13.850 KM) 24-12-2018
31.08.2018 Road, Ranchi
IRQP work in Chas- Ramgarh Ltr. No. Classic Engicon Pvt.
03(SBD)20
Road {Section at Ch. 81.20 to 3836(S) Ltd., 3D Vatica
8 4.560 592.73 709.49 18-19 100% 709.14 100% 26.04.19
85.76 KM of Old Alignment of Dt. Appartment, Line Tank
27.10.2018
NH-320 (Total Length- 4.56)} 02.07.2018 Road, Ranchi
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial Scheduled
Progress Grand Name of Contractor Achievemen
No. (Km) Date/ Ref. Date/ Ref. Achievement Date
Name Amount Amount Total t
No. No.

1 2 3 4 5 6 7 8 9 10 11 12
Ltr. No.
IRQP Work of Sikidri- Kulhi 2680(S)
5.10 272.51 100%
Road in KM 0.00 to 5.10 Dt.
30.05.2019
Ltr. No. Classic Engicon Pvt.
IRQP Work of Naisarai- Giddi 2646(S) Ltd., 3D Vatica
9 17.40 873.60 1889.00 100% 1880.37 100% 16.07.20
‘A’ Road in KM 0.00 to 17.40 Dt. Appartment, Line Tank
28.05.2019 Road, Ranchi
Ltr. No.
IRQP Work of Gola- Rajrappa 2866(S)
12.90 646.53 100%
Road in KM 0.00 to 12.90 Dt.
12.06.2019
Strengthening Work of Kujju- Classic Engicon Pvt.
Ltr. No. 13(SBD)20
Nayamore Road (Total Length- Ltd.,
3198(S) 21-22
10 3.10 KM) under Plan Head for 3.10 577.06 603.09 100% 631.96 3D Vatica Appartment, 100% 02.05.2022
Dt. 18-10- Dt.- 03-02-
the year 2021-22 Line Tank Road,
2021 2022
Ranchi
Strengthening Work of Silli More Classic Engicon Pvt.
Ltr. No. 01(SBD)20
to Dhakagarha Road under Plan Ltd.,
205(S) 22-23
11 Head for the year 2022-23 6.30 546.69 568.96 100% 612.78 3D Vatica Appartment, 100% -
Dt. 24-01- Dt.- 14-10-
Line Tank Road,
2022 2022
Ranchi
W&S of Lalki Ghati (NH-33) to Classic Engicon Pvt.
Ltr. No. 03(SBD)20
Marang Marcha (NH-23) Road Ltd.,
5669(S) 17-18
12 (Including Construction of 25.90 5611.71 5178.40 98% 6722.66 3D Vatica Appartment, 96% 23.08.2019
Dt. Dt.- 24-02-
Bridges) from KM 0.00 to KM Line Tank Road,
11.10.2017 2018
25.900 Ranchi
State Plan Road Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial % Physical
Sl. Length % Financial Scheduled
Progress Grand Name of Contractor Achievemen
No. (Km) Date/ Ref. Date/ Ref. Achievement Date
Name Amount Amount Total t
No. No.

1 2 3 4 5 6 7 8 9 10 11 12
Strengthening Work of Ormanjhi-
Ltr. No. 14(SBD)20
Hundrufall Road (Total Length- M/S Swarnim
3510(S) 21-22
13 23.50 KM) under Plan Head for 23.50 1695.56 1779.79 100% 1779.79 Construction Abadganj, 100% 02.08.2022
Dt. 18-11- Dt.- 03-02-
the year 2021-22 Daltonganj
2021 2022
13 Ramgarh 174.6 33275.79 26171.79 28917.46
DPW-B
ROAD CONSTRUCTION DEPARTMENT, JHARKHAND
(State Highways Wing)
Progress report of On-going works (Bridges-Plan)
State Plan Bridge Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial
Sl. Length % Financial % Physical
Progress Grand Name of Contractor Scheduled Date
No. (m) Achievement Achievement
Name Amount Date/ Ref. No. Amount Date/ Ref. No. Total

1 2 3 4 5 6 7 8 9 10 11 12

Circle : Hazaribag
Div : Hazaribag
Name of EE-Sri Shubash Prasad

1 Construction of H.L. Bridge M/s Siddharth


Joint
over Siwane River at 6.150Km Construction, Korambey
Secretary,
of Kariyatpur- Jhumara House, Near GPO,
RCD,
Road.(Span-4x21m) Under dt. 14.03.23 Hazaribag
Jharkhand
RCD, Road Division 86.4 551.21 678.31 53 (SBD) of 10% 69.63 30% 13.09.2024
Ranchi vide
Hazaribag for the Year 2022- 2022-23
Lt. No.
23
3880(S) dt.
16.09.2022
1 Hazaribagh 86.40 551.21 678.31

Circle : Hazaribagh
Div : BOKARO
Name of EE- Sri Amit Singh

1 Construction of H.L. Bridge 108 693.32 3812(s) dt. 560.75 08.12.17/ 5 88.15 494.33 Rakesh Const. Pvt. Ltd., 80% 07.06.2020
over Konar River in 07.07.17 of SBD of 2017- Shivjii Singh Building
Gobindpur Bokaro Thermal J.S., RCD, 18 Dimna Road Mango,
Power Station under RCD Jharkhand Jamshedpur,
Road
2 Construction of High Level 45.00 396.81 2685(s) dt. 282.85 31.10.2019/ 49.76 140.75 M/S Sanjay Constr- 90% 30.01.2021
Bridge in 19 km of Dumari – 30.05.19 of 10 SBD of uction, Vill. + P.O. -
Nawadih – Phusaro Road Near J.S., RCD, 2019-20 Saram, Dist. - Bokaro,
I.B. replacing the old bridge Jharkhand 9631530071
for the year 2019-20
Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial
Sl. Length % Financial % Physical
Progress Grand Name of Contractor Scheduled Date
No. (m) Achievement Achievement
Name Amount Date/ Ref. No. Amount Date/ Ref. No. Total

1 2 3 4 5 6 7 8 9 10 11 12
3 Const. of H. L. Bridge over 31.96 229.94 10.06.15/400 199.48 23.10.2015/ 68.65 136.94 Smt Kiran Devi, 85% 22.10.2016
Gawai river at ch. 22.050 Km 3(S) 26 F2 of 15- Jodhadih More, Chas,
of Bahadurpur Kasmar 16 Bokaro
Petarwar west Bengal Border
road. S.A. - 3 X 10.0 M, A.R.-
2 X 3.5 M
3 Bokaro 185.0 1320.07 1043.08 772.02

Circle : Hazaribagh
Div : Chatra
Name of EE-Sri Mithilesh Prasad

1 Kumar and Roy


Construction,
Construction for High Level
03(SBD) of House no-25, Vill. P.o +
Bridge over Barki (Geruwa)
2574(S) dt. 2021-22 P.s- Manika
river in Simariaya- Tandwa 7 X 24 922.23 996.59 71% 711.27 100% 23.02.2024
27.08.2021 dt. Latehar- 822126,
Road at chainage 26.46
24.02.2022 (Jharkhand.)
under road division, Chatra.
8969020656

2 Construction of High Level Joint Sec. M/s Ashutosh


Minor Bridge Over Local R.C.D., 01(SBD) of Construction,
Nala at Chainage 17+000 Chatra Lt. 2022-23 Vill Jhardag, PO+PS-
1 X 24 392.34 315.47 ___ ___ 32% 24.03.2024
Km. of Jori-Pratappur Road No. 4326(S) dt. Lawalong,
(Span- 1 X 24.6m) in R.C.D., dt. 25.03.2023 Dist- Chatra
Chatra 25.11.2022 8084742884
3
Construction of High Level Joint Sec.
M/s S.R. Construction
Bridge at 12.845 Km in Local R.C.D.,
01(SBD) of B.N. College Road,
Nala of Nimakatu Chatra Lt.
__ 339.65 258.73 2023-24 dt. ___ ___ Hamidganj, Daltonganj, 2% 04.07.2024
(Pratappur)-Gajwa-Lodheya- No. 4440(S)
05.07.2023 Palamu
Gorighat-Kawra Road in dt.
R.C.D. Chatra. 06.12.2022
Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial
Sl. Length % Financial % Physical
Progress Grand Name of Contractor Scheduled Date
No. (m) Achievement Achievement
Name Amount Date/ Ref. No. Amount Date/ Ref. No. Total

1 2 3 4 5 6 7 8 9 10 11 12
4 Construction of High Level
17F2 of 2012- Torpedo Const. Pvt.
Bridge over River Hiroo in 8074(S)
3X18 235.17 216.92 13 dt. 69% 150.70 Ltd. , Thana Chowk, 70% 04.09.14
47th KM of Chauparan - dt. 16.11.12
05.03.2013 Ramghar (9471319600)
Chatra Road.
5

M/S Ranjan
Construction of High Level
16F2 of 2012- Construction
Bridge over River Baksa in 7670(S) dt.
3X16 188.16 180.56 13 dt. 55% 99.17 Jai Prakash Nagar, 60% 17.06.14
16.255 KM of Chauparan - 30.10.12
09.02.2013 Itkhori, Chatra
Chatra Road.
(9771877555)

5 Chatra 0.00 188.16 180.56 99.17

Circle : Hazaribagh
Div : Dhanbad
Name of EE-Sri Dinesh Prasad

Construction of High Level


RW/NH-
Bridge in Mugma-Chirkunda 07
28014/1/201
(MDR-062) Road Over SBD/2019-
1 512 5433.16 9/ JHR/Z-1 5552.58 58% 3214.10 M/s Daroga Pradhan 29% 24.10.2021
Barakar River Under CRF 20 dt.
dt.
Fund Plan Head for the year 25.10.2019
06.03.2019
2018-19
Construction of Box Cell
Culvert (Including
construction of approach road) 03 F2/2023-
427 (S) dt.
2 in 1st k.m. of Bhuli more to 18.20 225.88 _ 24 dt. _ _ Parwez Ahmad Khan 15% 06.12.2023
22.10.2022
Aara more road (near 07.06.2023
wasseypur) under plan head
for the year 2019-20
2 Dhanbad 530.2 5659.04 5552.58 3214.10
Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial
Sl. Length % Financial % Physical
Progress Grand Name of Contractor Scheduled Date
No. (m) Achievement Achievement
Name Amount Date/ Ref. No. Amount Date/ Ref. No. Total

1 2 3 4 5 6 7 8 9 10 11 12

Circle : Hazaribagh
Div : Giridih
Name of EE-Sri Prem Prakash Singh
Govt. of
Jharkhand Dilip Kumar,
Construction of High Level
RCD, Vill. – Hutar, Po. –
Bridge over Usri River in SBD No.04
(8 x Ranchi Mayapur, P.S. –
1 Giridih to Deoghar Road in 617.870 661.60 of 2022-23 39% 255.19 50% 31.10.2024
12.60) Letter no Ramgarh, Distt. –
Sirsiya Block Giridih For the dt 01/11/22
4186(S) dt. Palamau, Jharkhand
year 2022-23
18.07.2018

1 Giridih 617.87 661.60 255.19

Circle : Hazaribagh
Div :Koderma
Name of EE-Sri Satendra Prasad Singh
317.36414
Dt-
Construction of Proposed High M/S B.K. Enterprises,
356.1650 06.10.2017,
Level Bridge Over Meetha At-Madhwatand, P.O-
Dt- 11SBD/2017-
1 Nala Ch-48th Km of Kowar- 39.00 356.1650 317.3641 80% 308.38 Makatpur, 98% 05.12.2018
02.05.2017, 18
Koderma Road Under Plan For P.S-Jai Nagar, Dist. –
2423(s) Revised
the Year 2017-18 Koderma.
296.19033

1 Koderma 39.00 356.17 317.36 308.38

Circle : Hazaribagh
Div :Ramgarh
Name of EE-Sri Rajiv Ranjan Munda
Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Administrative Approval Agreement


Financial
Sl. Length % Financial % Physical
Progress Grand Name of Contractor Scheduled Date
No. (m) Achievement Achievement
Name Amount Date/ Ref. No. Amount Date/ Ref. No. Total

1 2 3 4 5 6 7 8 9 10 11 12

NIL
0 Ramgarh 0.00 0.00 0.00 0.00
DPW-B
ROAD CONSTRUCTION DEPARTMENT, JHARKHAND
(State Highways Wing)
Progress report of Completed works (Bridges-Plan)
State Plan Bridge Works

Month : November, 2023 Amount in Rs. Lakh

Administrative
Sanctioned Scheme Agreement
Approval Financial
Sl. Length % Financial % Physical
Progress Grand Name of Contractor Scheduled Date
No. (m) Date/ Ref. Date/ Ref. Achievement Achievement
Name Amount Amount Total
No. No.
1 2 3 4 5 6 7 8 9 10 11 12

Circle : Hazaribag
Div : Hazaribag
Name of EE-Sri Shubash Prasad

NIL
0 Hazaribagh

Circle : Hazaribagh
Div : BOKARO
Name of EE- Sri Amit Singh
Month : November, 2023 Amount in Rs. Lakh

Administrative
Sanctioned Scheme Agreement
Approval Financial
Sl. Length % Financial % Physical
Progress Grand Name of Contractor Scheduled Date
No. (m) Date/ Ref. Date/ Ref. Achievement Achievement
Name Amount Amount Total
No. No.
1 2 3 4 5 6 7 8 9 10 11 12
1 Construction of High level 504 M 4008.02 2442(s) 3929.26 10.10.17/ 2 109.13 4287.94 Rajbir Construction Pvt. 100% 09.04.2020
bridge across Damodar river dt. SBD of 17- Ltd., 614, Hariom
between Bhandaridih and 03.05.17 18 Tower Commercial
Tupkadih (Including of J.S., Complex, Circular
construction of 3.987 km of RCD, 3375.7470 Road, Lalpur, Ranchi,
approach road to Chandrapura- Jharkha 0 Jharkhand, 9973822247
Gomia Road and Jainamore- nd +
Phusaro Road. 553.511.23
(sup.
Agreement
) = Total
3929.2582
3
1 Bokaro

Circle : Hazaribagh
Div : Chatra
Name of EE-Sri Mithilesh Prasad

NIL

0 Chatra 0.00 0.00 0.00 0.00


Month : November, 2023 Amount in Rs. Lakh

Administrative
Sanctioned Scheme Agreement
Approval Financial
Sl. Length % Financial % Physical
Progress Grand Name of Contractor Scheduled Date
No. (m) Date/ Ref. Date/ Ref. Achievement Achievement
Name Amount Amount Total
No. No.
1 2 3 4 5 6 7 8 9 10 11 12

Circle : Hazaribagh
Div : Dhanbad
Name of EE-Sri Dinesh Prasad

NIL

0 Dhanbad 0.00 0.00 0.00 0.00

Circle : Hazaribagh
Div : Giridih
Name of EE-Sri Prem Prakash Singh

NIL

0 Giridih 0.00 0.00 0.00

Circle : Hazaribagh
Div : Koderma
Name of EE-Sri Satendra Prasad Singh

NIL

0 Koderma 0.00 0.00 0.00


Month : November, 2023 Amount in Rs. Lakh

Administrative
Sanctioned Scheme Agreement
Approval Financial
Sl. Length % Financial % Physical
Progress Grand Name of Contractor Scheduled Date
No. (m) Date/ Ref. Date/ Ref. Achievement Achievement
Name Amount Amount Total
No. No.
1 2 3 4 5 6 7 8 9 10 11 12

Circle : Hazaribagh
Div :Ramgarh
Name of EE-Sri Rajiv Ranjan Munda
Ltr. No
Construction of Bridge and 02(SBD)20 Classic Engicon Pvt.
6936(S)
Approach Road of Bokaro River 16-17 Ltd., 3D Vatica
1 73.80 M 353.31 Dt. 344.69 100% 332.02 100% 19-01-18
3X24 M at 10th KM of Kujju- Dt. Appartment, Line Tank
06.10.20
Ghato Road 20.07.2016 Road, Ranchi
15
3 Ramgarh 0.00 353.31 344.69 332.02
DPW-N
ROAD CONSTRUCTION DEPARTMENT, JHARKHAND
(State Highways Wing)
Progress report of On-going works(Non-Plan)
State Non-Plan Works

Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Sanctioned Agreement


Financial
Sl. Length % Financial % Physical
Progress Name of Contractor Sched-uled Date
No. Name (KM) Amount Date/ Ref. No. Amount Date/ Ref. No. Achievement Achiev-ement
Grand Total

1 2 3 4 5 6 7 8 9 10 11 12
ŀ

Circle : Hazaribagh
Div : Hazaribagh
Name of EE-Sri Shubash Prasad
PQC Work in Barkagaon-Badam Road From
7.00 to 12.4 Km(Total length-5.4km) Under Eng.-in-Chief, RCD, 26 F2 of
1 RCD,Road Division Hazaribag for the year 5.40 35.00 Jharkhand Ranchi's Lt. 34.98 2023-24 - - - - 28.02.2023%
2023-24 (Under Non Plan Head) No. 409(S) dt. 29.11.23
dt. 18.08.2023.
Construction of RCC Drain in Hazaribag
Control Room to Simra Rest House Road Eng.-in-Chief, RCD, Abhishek Ranjan,
07F2 of 2023-24
2 (SH-07 Old Alignment) Under RCD, Road 2.00 24.00 Jharkhand Ranchi's Lt. 23.99 - - Saketpuri, Sadanand Road, - 30.01.2024
dt. 31.10.23
Division, Hazaribag for the year 2023-24 No. 409(S) Hazaribag
(Under Non Plan Head) dt. 18.08.2023.
Road Safety, Signages And Pot Patch work
in Different Road Under RCD Road Division Eng.-in-Chief, RCD, 10 F2 of
Asish Chandan
3 Hazaribag for the year - 2023-24. (Under - 50.00 Jharkhand Ranchi's Lt. 50.00 2023-24 - - - 09.02.2024
Nawabgan, Hazaribag
Non Plan Head) No. 409(S) dt. 10.11.2023
dt. 18.08.2023.
Ordinary repair in Heerabag chowk to PWD
Road Devangana chowk via Matwari,NH- Eng.-in-Chief, RCD, Maa Champeshwari
9F2 of 2023-24
4 100 Road from 0.00 to 2.2 Km for the year 2.20 20.00 Jharkhand Ranchi's Lt. 20.00 - - Construction, - 30.01.2024
dt. 31.10.2023
2023-24 (Under Non Plan Head) No. 409(S) Nawadih, Ichak, Hazaribag
dt. 18.08.2023.
Construction of RCC Drain in Hamilton
School Chowk to Hurhuru Road Via New
Bus Stand, Ramnarayan Yadav Road, Eng.-in-Chief, RCD, 14 F2 of
Ravindra Path, Forest Colony, Pandit Ji Maa Rajrappa Construction,
5 3.50 25.00 Jharkhand Ranchi's Lt. 24.87 2023-24 - - - 31.01.2024
Road and NH -33 Hurhuru Forest Colony Ravindra Path, Hazaribag
No. 409(S) dt. 01.11.2023
Under RCD, Road Division, Hazaribag for
dt. 18.08.2023.
the year 2023-24 (Under Non Plan Head)

Ordinary Repair work of Hawai Adda(NH-33)


Rahul Kumar
to Konar Bridge From Km-30.95 to Km- Eng.-in-Chief, RCD, 19 F2 of
C/o D.K. Nayak Near Ranjeet
6 40.35 (Total length-9.40Km) Road for the 9.40 50.00 Jharkhand Ranchi's Lt. 49.92244.38 2023-24 - - - 13.02.2024
Store, Suresh Colony,
year - 2023-24 Under Non Plan No. 409(S) dt.14.11.2023
Hazaribag
dt. 18.08.2023.
Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Sanctioned Agreement


Financial
Sl. Length % Financial % Physical
Progress Name of Contractor Sched-uled Date
No. Name (KM) Amount Date/ Ref. No. Amount Date/ Ref. No. Achievement Achiev-ement
Grand Total

1 2 3 4 5 6 7 8 9 10 11 12
Construction of RCC Cross Drain in S.P.
Kothi to Hazaribag Power Station Via Eng.-in-Chief, RCD, 13 F2 of
Mangalmurti,
7 Canary Hill Road, Under RCD, Road 4.05 8.00 Jharkhand Ranchi's Lt. 8.00 2023-24 - - - 31.12.2023
Gowaltoli, Hazaribag
Division, Hazaribag for the year 2023-24 No. 409(S) dt.01.11.2023
(Under Non Plan Head) dt. 18.08.2023.
Installation of Missing Kilometre Stone Post
etc Work in Different Roads under Road Eng.-in-Chief, RCD, 8 F2 of Prabhat Kumar Singh,
8 Sub Division No. 1, Under RCD, Road 10.00 Jharkhand Ranchi's Lt. 10.00 2023-24 - - Suresh Colony, Saketpuri, - 30.12.2023
Division, Hazaribag for the year 2023-24 No. 409(S) dt.31.10.2023 Hazaribag
(Non Plan Head) dt. 18.08.2023.
Installation of Missing Kilometre Stone Post
etc Work in Different Roads under Road Eng.-in-Chief, RCD, 10 F2 of Rajendra Prasad Yadav,
9 Sub Division No. 2, Under RCD, Road 10.00 Jharkhand Ranchi's Lt. 10.00 2023-24 - - Banadag, Katkamdag, - 30.12.2023
Division, Hazaribag for the year 2023-24 No. 409(S) dt.31.10.2023 Hazaribag
(Non Plan Head) dt. 18.08.2023.
Deep Boring & Other work in the newly
constructed 'C' Type Qtr. Located to the Eng.-in-Chief, RCD, 23 F2 of
Muktinath Singh,
10 North of Lakra Godown Zulu Park, Under 5.00 Jharkhand Ranchi's Lt. 5.00 2023-24 - - - 23.12.2023
Noora, Hazaribag.
RCD, Road Division, Hazaribag for the year No. 409(S) dt.24.11.2023
2023-24 (Non Plan Head) dt. 18.08.2023.
Construction work of Boundary wall and
Servant house in Executive Engineer, Eng.-in-Chief, RCD,
Ranju Devi,
11 Residence in, Under RCD, Road Division, 25.00 Jharkhand Ranchi's Lt. 25.00 - - - - -
Begusarai
Hazaribag for the year 2023-24 (Non Plan No. 409(S)
Head) dt. 18.08.2023.
Water Supply and general repairs in the
Quality Control Office Building located in the Eng.-in-Chief, RCD, 16 F2 of
Shanker Dayal Singh,
12 Divisional Officer Permisses , Under RCD, 10.00 Jharkhand Ranchi's Lt. 10.00 2023-24 - - - 09.01.2024
Hazaribag
Road Division, Hazaribag for the year 2023- No. 409(S) dt.10.11.2023
24 (Non Plan Head) dt. 18.08.2023.
Ordinary Repair, Electrification and other
works in Barkagaon IB , Under RCD, Road Eng.-in-Chief, RCD, 12 F2 of Rohit Enterprises,
13 Division, Hazaribag for the year 2023-24 10.00 Jharkhand Ranchi's Lt. 8.41 2023-24 - - Anandpuri Colony, - 31.12.2023
(Non Plan Head) No. 409(S) dt.01.11.2023 Korra, Hazaribag
dt. 18.08.2023.
Partition, Plinth proection, Toilet Repair and
Shambhu Prajapati,
other work in Circle Office, Hazaribag , Eng.-in-Chief, RCD, 11 F2 of
210B, Pungmil Mandai Road,
14 Under RCD, Road Division, Hazaribag for 15.00 Jharkhand Ranchi's Lt. 14.37 2023-24 - - - 31.12.2023
Noora,
the year 2023-24 (Non Plan Head) No. 409(S) dt.01.11.2023
PS.-Sadar, Hazaribag
dt. 18.08.2023.
Renovation work of employee Quarter no. 7
and 8 location in the circle office complex , Eng.-in-Chief, RCD, 25 F2 of
Tara Devi,
15 Under RCD, Road Division, Hazaribag for 20.00 Jharkhand Ranchi's Lt. 20.00 2023-24 - - - 28.02.2024
Suresh Colony, Hazaribag
the year 2023-24 (Non Plan Head) No. 409(S) dt.29.11.2023
dt. 18.08.2023.
Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Sanctioned Agreement


Financial
Sl. Length % Financial % Physical
Progress Name of Contractor Sched-uled Date
No. Name (KM) Amount Date/ Ref. No. Amount Date/ Ref. No. Achievement Achiev-ement
Grand Total

1 2 3 4 5 6 7 8 9 10 11 12
Repair, Partition, Furniture, electrical
equpment etc. in Divisional Office, Under Eng.-in-Chief, RCD, 15 F2 of Maa Champeshwari
16 RCD, Road Division, Hazaribag for the year 25.00 Jharkhand Ranchi's Lt. 24.95 2023-24 - - Construction, - 03.02.2024
2023-24 (Non Plan Head) No. 409(S) dt.04.11.2023 Nawadih, Ichak, Hazaribag
dt. 18.08.2023.
Roof Repair and other works in the
reisdence of S.E., Road Circle, Hazaribag , Eng.-in-Chief, RCD, 24 F2 of
R.C.Construction,
17 Under RCD, Road Division, Hazaribag for 10.00 Jharkhand Ranchi's Lt. 10.00 2023-24 - - - 28.01.2024
Noora, Hazaribag
the year 2023-24 (Non Plan Head) No. 409(S) dt.29.11.2023
dt. 18.08.2023.
17 Hazaribagh 26.55 352.00 299.56 0.00

SPILL OVER
1 SPILL OVER 21.11 176.00 140.62 02 F2 of 2022-23 dt. 102.24 - M/s Real Classic 60% 05.09.2022
Construction of Retaining wall in Sultana Eng.-in-Chief, RCD, 06.06.2022 Construction,
(NH-100) to Chhadwa (MDR 070) and Jharkhand Ranchi's Lt. Dr. Zakir Hussain Road,
Ramnagar-Kasturi Khap-Gadokhar Link No.226(S) Hazaribag
Road at Chainage of 1st KM from Kadma dt.25.01.22
Middle School to Rajesh Ojha Chowk Under
RCD, Road Division, Hazaribag for the Year
2021-22
2 Ordinary repair in Shankarpur (SH-07)- 6.73 31.00 Eng.-in-Chief, RCD, 25.59 19F2 of 2022-23 dt. 25.58 100% Rahul Kumar, 100% 02.03.2023
Narshing Sthan-Kapasiya-Kundilbagi (Total Jharkhand Ranchi's Lt. 03.12.2022 Suresh Colony, Hazaribag
length 6.725Km), Under RCD, Road No.3457(S)
Division, Hazaribag for the Year 2022-23 dt.22.09.22

3 Construction of RCC Culvert 2.0 M x 2.0M 7.25 30.00 Eng.-in-Chief, RCD, 23.67 29F2 of 2022-23 dt. 23.64 100.00% Muktinath Singh, 100% 03.04.2023
in Mukundganj Harhad Hupad Road in 2nd Jharkhand Ranchi's Lt. 04.01.2023 Pagmal Mandai Road, Noora,
Km, Under RCD, Road Division, Hazaribag No.3457(S) Hazaribag
for the Year 2022-23 dt.22.09.22
4 Construction of Drain of Size 600mm x 3.00 50.00 Eng.-in-Chief, RCD, 39.00 25 F2 of 2022-23 38.99 100% Aradhya Construction, New 100% 09.03.2023
900mm From Jain Petrol Pump to St. Xavier Jharkhand Ranchi's Lt. dt. 10.12.22 Colony, Zebra Road, Korrah,
School, Under RCD, Road Division, No.3457(S) Hazaribag
Hazaribag for the Year 2022-23 dt.22.09.22
5 Ordinary repair in Mukundganj-Harhad- 7.25 24.00 Eng.-in-Chief, RCD, 19.89 08 F2 of 2022-23 19.84 100% Rahul Kumar, 100% 27.02.2023
Hupad via Demotand Road from Km 0.00 to Jharkhand Ranchi's Lt. dt. 28.11.22 C/o Late Shambhu Prasad,
7.25, Under Non Plan, RCD, Road Division, No.3457(S) D.K. Nayak Near Ranjit
Hazaribag for the Year 2022-23 dt.22.09.22 Store, Suresh Colony,
Hazaribag
6 Ordinary repair in Kallu Chowk (MDR 070)- 7.97 25.00 Eng.-in-Chief, RCD, 24.99 24F2 of 22-23 24.99 100% Maa Gayatri Enterprises, 100% 09.03.2023
Mandaikhurd-Sindur (NH-33) Road (Total Jharkhand Ranchi's Lt. dt. 10.12.22 Bahimar, Katkamsandi,
length 7.965 Km), Under Non Plan, RCD, No.3457(S) Hazaribag
Road Division, Hazaribag for the Year 2022- dt.22.09.22
23
Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Sanctioned Agreement


Financial
Sl. Length % Financial % Physical
Progress Name of Contractor Sched-uled Date
No. Name (KM) Amount Date/ Ref. No. Amount Date/ Ref. No. Achievement Achiev-ement
Grand Total

1 2 3 4 5 6 7 8 9 10 11 12
7 Special Repair of Annada Chowk to Hurhuru 2.00 55.00 Eng.-in-Chief, RCD, 45.98 41F2 of 22-23 45.98 100% Narayan Construction, 100% 30.04.2023
Road Via Old Bus Stand and Mission Jharkhand Ranchi's Lt. dt. 31.01.23 Matwari, P.O.-Hazaribag,
Hospital from 0.00 to 2.00 Km, Under RCD, No.3457(S) P.S.-Sadar, Hazaribag
Road Division, Hazaribag for the Year 2022- dt.22.09.22
23
8 Construction of RCC Drain in 5th Km of 320.10 70.00 Eng.-in-Chief, RCD, 56.00 38F2 of 22-23 55.96 100% Mahesh Prasad Mehta 100% 16.04.2023
Barkatha-Tetron Road, Under RCD, Road ŀ
Jharkhand Ranchi's Lt. dt. 17.01.23 Construction Pvt. Ltd., Kali
Division, Hazaribag for the Year 2022-23 No.3457(S) Mandir, Road, Jhumri
dt.22.09.22 Telaiya, Koderma
9 Construction of 2 M High Guard wall and 32.10 70.00 Eng.-in-Chief, RCD, 54.36 28F2 of 22-23 54.35 100% M/s Keshav Construction, 100% 03.04.2023
other works in LHS AND RHS at 16th Km Jharkhand Ranchi's Lt. dt. 04.01.23 947, Bhadedih, Naear TOP
over Dulki River H.L. Bridge of Barkatha No.3457(S) No. 2 Jhumri Telaiya,
Tetron Road, Under RCD, Road Division, dt.22.09.22 Koderma
Hazaribag for the Year 2022-23
10 Construction of 2M high Guard wall and 31.38 65.00 Eng.-in-Chief, RCD, 55.23 35 F2 of 22-23 dt. 55.20 100.00% M/s Anand Prakash, 100% 10.04.2023
others works in L.H.S. and R.H.S. at 13th Jharkhand Ranchi's Lt. 11.01.23 Nawadih, Sondimra,
Km Over Furuka River of Ichak-Barkatha No.3457(S) Barlanga, District-Ramgarh
Road, Under RCD, Road Division, dt.22.09.22
Hazaribag for the Year 2022-23
11 Construction of Guard wall at Mahto Aahra- 32.85 80.00 Eng.-in-Chief, RCD, 63.99 33 F2 of 22-23 dt. 63.99 100% Ramswarup Kumar, humri 100% 03.04.2023
Rampur-Basaria (Chauparan) Road in 2nd, Jharkhand Ranchi's Lt. 04.01.23 Telaiaya, Koderma.
10th, 11th and 12th Km, Under RCD, Road No.3457(S)
Division, Hazaribag for the Year 2022-23 dt.22.09.22

12 Ordinary Repair work in Barkatha Tetron 32.10 50.00 Eng.-in-Chief, RCD, 49.99 42 F2 of 22-23 dt. 49.98 100% M/s Ashok Kumar, 100% 30.03.2023
Road, Under RCD, Road Division, Jharkhand Ranchi's Lt. 21.01.23 At & P.O.-Dharguli,
Hazaribag for the Year 2022-23 (Non Plan) No.3457(S) P.S.-Bagodar, Giridih
dt.22.09.22
13 Ordinary Repair work of Different Roads, - 50.00 Eng.-in-Chief, RCD, 49.99 39 F2 of 22-23 dt. 49.99 100% Ashish Chandan, 100% 20.03.2023
Under RCD, Road Division, Hazaribag for Jharkhand Ranchi's Lt. 21.01.23 9/262, Nawabganj, Hazaribag
the Year 2022-23 (Non Plan) No.3457(S)
dt.22.09.22
13 Hazaribagh Spill Over 503.83 776.00 0.00 649.32 0.00 610.73

Vivekadhin
Maintainance of Shoulder & Bush Cutting
Eng.-in-Chief, RCD,
work in Mahto-Aahara-Rampur-Basaria-
Jharkhand Ranchi's Lt. 03 F2 of 23-24 dt. Vijay Vishwakarma,
1 Chouparan Road from Km 21 to 26, Under 32.85 30.00 2.50 2.49 100% 100% 26.07.2023
No… 3037(S) 20.07.23 Noora, Rana Gali, Hazaribag
Road Division, Hazaribag for the Year 2023-
dt.19.06.2023
24
Maintainance of Shoulder & Bush Cutting
Eng.-in-Chief, RCD,
work in Barkatha-Tetron Road From km 24 Shambhu Prajapati,Pugmil
Jharkhand Ranchi's Lt. 04 F2 of 23-24 dt.
2 to 32, Under Road Division, Hazaribag for 32.10 30.00 2.49 2.49 100% ,Mandai road ,Noora, 100% 26.07.2023
No… 3037(S) 5.08.2023
the Year 2023-24 Hazaribag
dt.19.06.2023
Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Sanctioned Agreement


Financial
Sl. Length % Financial % Physical
Progress Name of Contractor Sched-uled Date
No. Name (KM) Amount Date/ Ref. No. Amount Date/ Ref. No. Achievement Achiev-ement
Grand Total

1 2 3 4 5 6 7 8 9 10 11 12
Restoration of Rain cuts,Bushes Cutting &
Shoulder Repair Work in Different Stretches Eng.-in-Chief, RCD,
of Sultana(NH-100) to Chadwa (MDR-070)& Jharkhand Ranchi's Lt. 05 F2 of 23-24 dt. Vijay Vishwakarma,
3 21.13 30.00 2.50 0.00 0% 100% 17.09.2023
Ramnagar-Kasturikhap-Gadokhar Link No… 3037(S) 11.09.2023 Noora, Rana Gali, Hazaribag
Road Under Road Division, Hazaribag for dt.19.06.2023
the Year 2023-24
Bush Cutting & Clearing Rubbish work in ŀ

Eng.-in-Chief, RCD,
Mukundganj-Harhad-Hupad Via Demotand Munshi Prasad Kushwaha,
Jharkhand Ranchi's Lt. 06 F2 of 23-24 dt.
4 (MDR-098) Under RCD, Road Division, 7.25 30.00 2.49 0.00 0% Pakarar, Sultana, Katkamdag, 100% 20.10.2023
No… 3037(S) 14.10.2023
Hazaribag (Vivekadhin) for the year 2023-24 Hazaribag
dt.19.06.2023
4 Hazaribagh Vivekadhin 93.33 120.00 9.98 4.98

Circle : Hazaribagh
Div : BOKARO
Name of EE- Sri Amit Singh
SPILL OVER
1 Construction of 2 x 2 m Size Box Culvert, Drain - 100.00 22.09.2022 / 3457(S) of 74.39 20.04.2023/ 01 F2 0.00 0.00 M/S BDMS Construction, 100% 19.06.2023
and Retaining wall in Chandrapura - Bhandaridih Eng. In Chief, RCD, Jhr, of 2023-24 Dugda Basti, Dugdha Coal
- Phusaro Crossing No. 04 Khathara Gomia Road Ranchi Washery, Bokaro
for the year 2022-23
2 Ordinary Repair work of Nawadih-Vendra 11.50 36.00 do 35.90 29.12.2022/ 21 F2 35.88 99.95 M/S Laxmi Enterprises, Vill. - 100% 28.02.2023
Gomoh road(length 11.50 k.m) for the year 2022- of 2022-23 Katghara, Nawadih, Bokaro
23
3 Special Repair work of Roads connecting various 26.20 60.00 do 60.00 22.02.2023/ 24 F2 57.57 95.96 M/S Sambhu Sharan 100% 21.04.2023
government offices of Bokaro Sector 1 and of 2022-2023 Sudhansu, Add.: Kailash
Camp Area for the year 2022-23 under Road Nagar, Chas, Bokaro,
Division, Bokaro. Jharkhand- 827013
4 Ordinary repair work of Rahawan- Jhumra Road 10.65 27.00 do 20.24 17.12.2022/ 19 F2 20.09 99.30 M/s Sanjay Kr. Gupta, 100% 16.02.2023
for the year 2022-23 of 2022-23 Add. - 1637, Block Colony,
Phusaro Naya Road Ranchi.

5 Construction Of RCC Guard wall in Approach - 50.00 do 49.97 01.12.2022/ 13 F2 48.01 96.08 Shakti Enterprises, Prop. - 100% 31.01.2023
Road of HL bridge over Izari River in 9th Km of of 2022-23 Sanjay Gupta, At. - Laxmi
Chas Chandankiyari Raghunathpur Road for the Nagar, Near Anand Bhawan,
year 2022-23. Hehal Ranchi.
6 Beautification / renovation work of Inspection - 15.00 do 14.99 06.12.2022/ 17 F2 14.97 99.84 M/S Sambhu Sharan 100% 05.02.2023
Banglaw situated at Sector 1/B, Bokaro Steel of 2022-23 Sudhansu,
City for the year 2022-23 Add: Kailash Nagar, Chas,
P.O. + P.S. - Chas, Dist. -
Bokaro- 827013
6 Bokaro 48.35 288.00 255.47 176.52

NON PLAN
Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Sanctioned Agreement


Financial
Sl. Length % Financial % Physical
Progress Name of Contractor Sched-uled Date
No. Name (KM) Amount Date/ Ref. No. Amount Date/ Ref. No. Achievement Achiev-ement
Grand Total

1 2 3 4 5 6 7 8 9 10 11 12
1 Ordinary Repair work of Chas - Chandankiyari - 26.60 50.00 18.08.2023/ 4009(S) of 0.00 0.00 #DIV/0!
Raghunathpur Road (T. Length 26.60 km) for the E.I.C., Jharkhand, Ranchi
year 2023-24
2 Ordinary Repair work of Chandrapura to Bokaro 6.55 25.00 --DO-- 19.47 23.11.2023/ 03 F2 0.00 0.00 M/S R. K. Brothers, 22.01.2024
Road (T. Length 6.55 km) for the year 2023-24 of 2023-24 Sector 12/A, Qtr. No. 1482,
B.S. City, Bokaro
3 Ordinary Repair work of Talgoria More (on NH- 15.20 ŀ

30.00 --DO-- 24.59 28.11.2023/ 10 F2 0.00 0.00 M/S Subodh Kumar Singh 27.01.2024
32) to Talgoria Station Road (Total length 15.20 of 2023-24 Choudhary, At. - Chirudih,
km) for the year 2023-24 Tantri, Dhanbad
4 Ordinary Repair work of Amlo Project to 4.30 25.00 --DO-- 19.23 23.11.2023/ 04 F2 0.00 0.00 M/S R. K. Brothers, 30% 22.01.2024
Gandhi Chowk Road (Total length 4.30 km) for of 2023-24 Sector 12/A, Qtr. No. 1482,
the year 2023-24 B.S. City, Bokaro
5 Ordinary Repair work of Petarwar - Gomia Road 26.20 25.00 --DO-- 0.00 0.00 #DIV/0!
(Total length 26.20 km) for the year 2023-24

6 Ordinary Repair work of Jaridih Link Road 7.04 5.00 --DO-- 0.00 #DIV/0! M/S Raj ConstructionIdgah
(Total length 7.035 km) for the year 2023-24 Mohalla, Jaridih, Bokaro
7 Ordinary Repair work of Bahadurpur - Kasmar - 33.30 50.00 --DO-- 0.00 #DIV/0!
Khairachatar -Pirgul - Sewati Ghati Bengal
Boarder Road (Total length 33.30 km) for the
year 2023-24
8 Ordinary Repair work of Bandhdih - 41.33 10.00 --DO-- 9.90 23.11.2023/ 09 F2 0.00 0.00 M/S M.R. Construction, 22.01.2024
Gopinathpur - Tiro - Beldih - Bhaski - Pirgula of 2023-24 Vill. - Tiro, P.O. - Pathuria,
Road (Total length 41.325 km) for the year 2023- Jaridih, Bokaro
24
9 Construction of Drain in Vishnugar - Naraki - 35.00 --DO-- 29.48 0.00 0.00 M/S Sanjay Kumar Gupta,
Road for the year 2023-24 Block Colony, Phusaro, Naya
Road, Bokaro

10 Construction of RCC Drain in Lohpatti to - 20.00 --DO-- 20.00 23.11.2023/ 07 F2 0.00 0.00 M/S R.K. Enterprises, 30% 22.01.2024
Chandrapura Road for the year 2023-24 of 2023-24 Vill. - Dugdha Basti,
Karmatand, Dugdha, Bokaro

11 Installation of Half Gantry inLohapatti to - 10.00 --DO-- 0.00 #DIV/0!


Chandrapura Road
for the year 2023-24
12 Installation of Full Gantry in 26th km of Chas - - 20.00 --DO-- 0.00 #DIV/0!
Chandankiyari - Raghunathpur Road Road
for the year 2023-24
13 Repair of Building in the campus of Road - 25.00 --DO-- 24.99 23.11.2023/ 06 F2 0.00 0.00 Sitaram Mahato 15% 22.01.2024
Division and Boundary wall at Bokaro for the of 2023-24 At. - Nandhgora, Satanpur,
year 2023-24 Pindrajora, Bokaro
14 Repair of Residence Campus of Assistant - 10.00 --DO-- 9.98 28.11.2023/ 11 F2 0.00 0.00 Harendra Kumar Singh, 7% 27.1.2024
Engineer Chas at Sector 1, B.S. City, Bokaro for of 2023-24 H. No. 1205, Tara Nagar,
the year 2023-24 Chas, Bokaro
15 Repair of Residential Campus of Executive - 10.00 --DO-- 9.99 23.11.2023/ 05 F2 0.00 0.00 Raj Enterprises, 15% 22.01.2024
Engineer Situated in Sector 1, B.S. City, Bokaro of 2023-24 Bandhgora Side, Satanpur,
for the year 2023-24 Pindrajora, Bokaro
Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Sanctioned Agreement


Financial
Sl. Length % Financial % Physical
Progress Name of Contractor Sched-uled Date
No. Name (KM) Amount Date/ Ref. No. Amount Date/ Ref. No. Achievement Achiev-ement
Grand Total

1 2 3 4 5 6 7 8 9 10 11 12
16 Repair work of Bermo Sub - Division Office for - 5.00 --DO-- 4.99 23.11.2023/ 08 F2 0.00 0.00 M/S M.R. Construction, 22.12.2023
the year 2023-24 of 2023-24 Vill. - Tiro, P.O. - Pathuria,
Jaridih, Bokaro
17 Repair work of Bermo Inspection Bunglow for - 10.00 --DO-- 10.00 29.11.2023/ 14 F2 0.00 0.00 Harendra Kumar Singh, 28.01.2024
the year 2023-24 of 2023-24 H. No. 1205, Tara Nagar,
Chas, Bokaro
17 Bokaro ŀ
365.00

VIVEKADHIN
1 Clearing and Grubbing & Maintenance of 16.05 25.00 19.06.2023/3037(S) of 2.40 01.11.2023/ 02 F2 0.00 0.00 M/S Padma Enterprises, Vill + 100% 15.11.2023
Earthen Shoulder of Manjhidih EIC, RCD, Ranchi of 2023-24 P.O. -Bandhdih, Jaridih,
(Jainamore)Phusro Link Road for the year 2023- Bokaro
24 (Vivekadhin)
2 Emergent Repairing work of Irrigation Canal 22.30 2.49 28.11.2023/ 12 F2 0.00 0.00 Ambuj Kumar Mahatha, At- 80% 12.12.2023
situatedin 19th km of Chas - Chandankiyari - of 2023-24 Bandhgora, Satanpur,
Raghunathpur Road for the year 2023-24 Pindrajora, Bokaro
(Vivekadhin)
3 Emergent work of Providing fixing and fitting of 17.20 2.48 28.11.2023/ 13 F2 0.00 0.00 Ambuj Kumar Mahatha, At- 80% 12.12.2023
expension joint of bridge (in 10th km) and Flank of 2023-24 Bandhgora, Satanpur,
maintenance of Mamarkudar - Baramadia - West Pindrajora, Bokaro
Bengal Border Road (Total Length 17.20 km) for
the year 2023-24 (Vivekadhin)

Total 55.55 25.00 7.37 0.00

Circle : Hazaribagh
Div : Chatra
Name of EE-Sri Mithilesh Prasad
SPILL OVER
1 Renovation work of Asst. Engineer’s Quarter
Under R.C.D., Road Division, Chatra for the Sri Suresh Yadav
Year 2021-22 Vill: Tarwagada, PO- Sahi,
Lt. No. 226(S) dt. 01F2 of 2022-23 dt. District: Chatra, Jharkhand -
50.00 36.74 11.92 32% 75% 27.09.2022
25.01.2022 02.04.2022 525403
7654150287
Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Sanctioned Agreement


Financial
Sl. Length % Financial % Physical
Progress Name of Contractor Sched-uled Date
No. Name (KM) Amount Date/ Ref. No. Amount Date/ Ref. No. Achievement Achiev-ement
Grand Total

1 2 3 4 5 6 7 8 9 10 11 12
2 Renovation work of Two Unit Junior Engineer’s
Quarter Under R.C.D., Road Division, Chatra for Sri Suresh Yadav
the Year 2021-22 Vill: Tarwagada, PO- Sahi,
Lt. No. 226(S) dt. 12F2/2021-22 District: Chatra, Jharkhand -
50.00 37.87 10.54 29% 65% 23.09.2022
25.01.2022 dt. 24.03.2022 525403
7654150287
ŀ

3 Ordinary reapaire work of Hunterganj- Nand Kishore Prasad Verma,


Pandeypura-Pratappur Road in partial stretches Vill- Bhagewar, PO-
from KM 0.000 to 29.750 under Road Division Hunterganj,
Eng in Chief vide Lt. No. 12F2/2022-23 dt.
Chatra for the year 2022-23 50.00 36.91 36.47 99% District- Chatra 100% 04.04.2023
3457 (S) dt. 22-09-2022 05.01.2023
9304505426

4 Construction of RCC Drain (Guard wall) 200m Sunil Kumar


both side in 12th KM of Simariya-Tandwa road Vill- Adarsh Nagar,
Eng in Chief vide Lt. No. 11F2/2022-23 dt.
under Road division Chatra for the year of 2022- 20.00 14.69 14.65 100% District -Chatra 100% 04.02.2023
3457 (S) dt. 22-09-2022 05.01.2023
23 6200094390

5 Ordinary Repair of Nagwan Bypass Road from Chandra Sekhar Singh


Km. 0.00 to 2.96 Km. under RCD Chatra for the Vill- Holomgada, Moktama,
Eng in Chief vide Lt. No. 15F2/2022-23 dt.
year of 2022-23. 20.00 15.07 14.46 96% Rajpur, District - Chatra 100% 18.02.2023
3457 (S) dt. 22-09-2022 19.01.2023
9971575264

6 Construction of Box Cell Culvert (2.0mx1.5m) Ajay Kumar


of Itkhori-Bhadrakali Temple Link Road at Km. Vill- Kanodi, PO- Kamta
Eng in Chief vide Lt. No. 16F2/2022-23 dt.
1st and 2nd under RCD, Chatra for the year 2022- 50.00 35.93 30.26 84% District- Chatra (Jharkhand) 100% 24.04.2023
3457 (S) dt. 22-09-2022 25.01.2023
23. 9110108850

7 Construction of 500m Drain over 25th Km. of Shardendu Bhushan


Chauparan-Chatra Road under R.C.D., Chatra S/o Dhruva Deo Kumar
for the Year 2022- 23 Sharma
Eng in Chief vide Lt. No. 08F2/2022-23 dt.
60.00 47.99 0.00 79% At+PO- Daltonganj, 100% 21.03.2023
3457 (S) dt. 22-09-2022 22.12.2022
Nawatoli Shivaji Maidan
Raod, Palamu
9431364866
8 RCC Box Cell Culvert (3.0mx3.0m) in 21st Shiv Shankar Yadav
KM of Pratappur-Dumarwar Road under RCD Vill - Vhanghri, Varest
Chatra for the year of 2022-23. Nagar,
Eng in Chief vide Lt. No. 14F2/2022-23 dt.
50.00 36.95 26.03 70% District - Chatra 100% 18.04.2023
3457 (S) dt. 22-09-2022 19.01.2023
9304322818

9 Construction of R.C.D. Drain In Km. 1 st and Vivek Yadav


2nd in 300m Both Side in Nagwan By Pass Road Eng in Chief vide Lt. No. Vill- Saradu, PO- Tandwa,
30.00 21.86 18 F2 dt. 28.01.2023 13.14 60% 70% 27.04.2023
from 2.96 under RCD Chatra for the year of 3457 (S) dt. 22-09-2022 District - Chatra
2022-23 8825134830
Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Sanctioned Agreement


Financial
Sl. Length % Financial % Physical
Progress Name of Contractor Sched-uled Date
No. Name (KM) Amount Date/ Ref. No. Amount Date/ Ref. No. Achievement Achiev-ement
Grand Total

1 2 3 4 5 6 7 8 9 10 11 12
10 Construction of RCC Drain (Guard wall) 200m Suresh Yadav
both side in 17th KM of Simariya-Tandwa road Eng in Chief vide Lt. No. 17F2/2022-23 dt. Vill - Hunterganj,
20.00 13.58 0.00 ___ 40% 24.02.2023
under Road division Chatra for the year of 2022- 3457 (S) dt. 22-09-2022 25.01.2023 District - Chatra
23. 7654150287
11 RCC Guard Wall 100m (Both Side) in 21st KM Shivnandan Kumar
of Pratappur-Dumarwar Road under RCD Chatra Vill- Gangta, PO-
Eng in Chief vide Lt. No.
for the year of 2022-23. ŀ

40.00 _____ _____ 0.00 ___ Hunterganj, ____ ____


3457 (S) dt. 22-09-2022
District - Chatra

12 Ordinary Repair of Chauparan-Chatra Rod Suresh Yadav


(MDR-68) in 48th Km. (Vikash Bhwan to Eng in Chief vide Lt. No. 10F2/2022-23 dt. Vill - Hunterganj,
15.00 10.69 0.00 ___ 86% 03.02.2023
Nagwan Bypass Road under RCD Chatra for the 3457 (S) dt. 22-09-2022 04.01.2023 District - Chatra
year of 2022-23. 7654150287
12 Total 0.00 455.00 308.28 157.47

VIVEKADHIN
Chandrashekhar Singh
Vill- Holomgada, PO,
Removal of Unserviceable materials in
05F2/2023-24 dt. Moktama, PS- Rajpur, Dist-
1 Hunterganj Pratappur Road in km 0.00 to15.00 2.50 2.50 100% 100% 22.09.2023
15.09.2023 Chatra
for Year 2023-24.
Eic, RCD, Jhr, Ranchi Lt.
Flank repair, Jungle Clearance and unline drain 20.00 No. 3037(S) dt.
09F2/2023-24 dt. M/s Gajraj Construction
2 in Unta more to Tulbul Tamashin road, Under 19.06.2023 2.49968 0.00 0% 100% 13.11.2023
06.11.2023 Dist- Chatra (Jharkhand)
Road division Chatra for the year 2023-24.
Sikandar Kumar Yadav
Flank repair, Jungle Clearance and unline drain
Vill+PO- Pitiz, PS- Itkhori,
3 in Chauparan-Chatra Road Under Road division 100%
District- Chatra (Jharkhand)
Chatra for the year 2023-24.
20.00 5.00 2.50

Circle : Hazaribagh
Div : Dhanbad
Name of EE-Sri Dinesh Prasad
SPILL OVER
Construction of Cross Drain in Telephone
01 F2/2023-24 dt.
1 Exchange to Joraphatak (MDR- 059) Road 1.10 5.00 1248(S) dt-16.03.2023 5.00 4.99 100% Tarun Kr. Singh 100% 07.05.2023
08.04.2023
under Non plan head for the year 2022-23.
Construction of RCC Slab culvert (6.0mX 4.0m)
with retaining wall in Bekar Bandh to Binod 02 F2/2023-24 dt.
2 3.20 70.00 1248(S) dt-16.03.2023 69.82 58.71 84% Preeti Enterprises 100% 27.06.2023
Bihari Mato Chowk via Babudih Road under 09.05.2023
Non plan head for the year 2022-23.
Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Sanctioned Agreement


Financial
Sl. Length % Financial % Physical
Progress Name of Contractor Sched-uled Date
No. Name (KM) Amount Date/ Ref. No. Amount Date/ Ref. No. Achievement Achiev-ement
Grand Total

1 2 3 4 5 6 7 8 9 10 11 12

Ordinary Repair work of Shramik Chowk to J.P.


06 F2/2023-24 dt.
3 Chowk Road (Ch-0.00 km to Ch- 1.10 Km) 1.10 70.00 1248(S) dt-16.03.2023 59.29 0 - Man Mohan Grouer 100% 09.10.2023
10.08.2023
under Non plan head for the year 2022-23.
3 Dhanbad 5.40 145.00 134.10 63.70

NON PLAN
Ordinary Repair Work Of Jharia - Kenduadih 24 F2/2023-24
1 Road From Km Ch 0.00 To Km 6.0 Km Under 6.00 20.00 4009(S) Dt.- 18.08.2023 19.98 Dt.- 13.10.2023 Sri Sushil Kr. Singh 100% 26.11.2023
Non Plan Head For The Year 2023-24.
Ordinary repair work in km 0.00 to km 2.50 of 15 F2/2023-24
2 Baliapur - Sindri Agriculture road (MDR- 046) 2.50 10.00 4009(S) Dt.- 18.08.2023 9.99 Dt.- 16.10.2023 Sri Umesh Prasad 100% 15.11.2023
under non plan head for the year 2023-24.
Ordinary Repair Work In Km 13.15 To Km 16 F2/2023-24
3 14.00 Of Putki Bhaga Bhoura Sudamdih Road 0.85 5.00 4009(S) Dt.- 18.08.2023 4.99 Dt.- 13.10.2023 Sri Pradyot Kumar 100% 12.11.2023
Under Non Plan Head For The Year 2023-24.
Ordinary repair work in Km 0.00 to Km 1.10 of 29 F2/2023-24
4 Bus stand to Housing colony road under Non 1.10 10.00 4009(S) Dt.- 18.08.2023 9.76 Dt.- 13.10.2023 Sri Shiv Pratap Singh 70% 12.11.2023
plan head for the year 2023-24.
Ordinary Repair Work Of Bankmore Old
13 F2/2023-24
Market Water Tank- Joraphatak Road From Km
5 1.90 15.00 4009(S) Dt.- 18.08.2023 14.97 Dt.- 11.10.2023 Sri Trun Kr. Singh 100% 10.11.2023
Ch 0.00 To Km 1.9 Km Under Non Plan Head
For The Year 2023-24.
Ordinary Repair Work Of Hatia More Hirapur -
14 F2/2023-24
Barmasia Howrah Motor Road From Km Ch
6 4.50 15.00 4009(S) Dt.- 18.08.2023 14.97 Dt.- 12.10.2023 Sri Deepak Singh Choudhary 100% 25.11.2023
0.00 To Km 4.5 Km Under Non Plan Head For
The Year 2023-24.
Ordinary repair work in (km 0.00 to 3.00 km) 23 F2/2023-24
7 Bus stand to Sarveswari road road under Non 3.00 30.00 4009(S) Dt.- 18.08.2023 29.99 Dt.- 16.12.2023 M/s A.K. Enterprises 70% 15.12.2023
plan head for the year 2023-24.
Ordinary repair work in Km 0.00 to Km 1.50 of 27 F2/2023-24
8 Dhanbad Link road under Non plan head for the 1.50 8.00 4009(S) Dt.- 18.08.2023 7.99 Dt.- 13.10.2023 Sri S.B.Rai 100% 12.11.2023
year 2023-24.
ordinary repair work in Km 0.00 to Km 1.60 of 25 F2/2023-24
9 Lohapatti-Chandrapura road under Non plan 1.60 10.00 4009(S) Dt.- 18.08.2023 9.99 Dt.- 13.10.2023 Sri Rajendra Rawani 100% 12.11.2023
head for the year 2023-24.
ordinary repair work in khalsa more (settling 30 F2/2023-24
10 tank ) to RMK-4 road under Non plan head for 4.462 10.00 4009(S) Dt.- 18.08.2023 9.99 Dt.- 13.10.2023 Sri Sirazul Ansari 100% 12.11.2023
the year 2023-24.
Ordinary repair work of SL-2 Tower (Sindri) - 31 F2/2023-24
11 Hatia (Shaharpura) Road 0.00 K.m to 2.837 K.m 2.837 10.00 4009(S) Dt.- 18.08.2023 9.99 Dt.- 13.10.2023 Sri Punit Kr. Sandil 100% 12.11.2023
under non plan head for the year 2023-24.
Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Sanctioned Agreement


Financial
Sl. Length % Financial % Physical
Progress Name of Contractor Sched-uled Date
No. Name (KM) Amount Date/ Ref. No. Amount Date/ Ref. No. Achievement Achiev-ement
Grand Total

1 2 3 4 5 6 7 8 9 10 11 12
Ordinary repair work in Km 0.00 to Km 4.30 of
18 F2/2023-24
R.O.B Wasseypur to Jharkhand more via tempu
12 4.30 10.00 4009(S) Dt.- 18.08.2023 9.99 Dt.- 25.10.2023 M/s A.K. Enterprises 100% 08.12.2023
stand Bhuli "B"block road under Non plan head
for the year 2023-24.
Ordinary Repair Work Of Old Nh-32 To- Hirak 28 F2/2023-24
13 Road Via Piprabera (Total Length = 1.70 Km) 1.70 30.00 4009(S) Dt.- 18.08.2023 29.98 Dt.- 13.10.2023 Sri Shankar Pratap Dubey 70% 26.11.2023
Under Non Plan Head For The Year 2023-24.
Ordinary Repair Work Of Bhuiphore Baliapur -
25 F2/2023-24
Vastu Vihar Colony-NH 32 Road (Total Length
14 2.50 50.00 4009(S) Dt.- 18.08.2023 49.98 Dt.- 13.10.2023 M/s Indra Enterprises 100% 26.11.2023
= 2.50 Km) Under Non Plan Head For The Year
2023-24.
Ordinary repair work in Km 0.00 to Km 4.20 of 26 F2/2023-24
15 Bhelatand-Malkera road under Non plan head 4.20 10.00 4009(S) Dt.- 18.08.2023 9.99 Dt.- 13.10.2023 MD Shakil Ahamad 100% 12.11.2023
for the year 2023-24.
construction of Bridge railing ,stone pitching and
safety work in khalsa more (settling tank) to 12 F2/2023-24
16 4.462 20.00 4009(S) Dt.- 18.08.2023 19.99 Sri Amardeep Kumar 100% 09.11.2023
RMK-4 road under Non plan head for the year 26.09.2023
2023-24.
Renovation/Special Repair Work Of Dhanbad
19 F2/2023-24
17 Quality Control Office Under Non Plan Head For 0.00 20.00 4009(S) Dt.- 18.08.2023 19.86 M/s Grand Construction 70% 12.12.2023
13.10.2023
The Year 2022-24.
Work of concertina coil on boundary of
08 F2/2023-24
18 inspection building at baliapur, Dhanbad under 0.00 5.00 4009(S) Dt.- 18.08.2023 4.99 Sri Mithila Traders 100% 15.10.2023
16.09.2023
non plan head for the year 2023-24.
1 No Deep borring & Repair work of Garage
36 F2/2023-24
19 inside Chirkunda I.B campus Under non plan 0.00 7.00 4009(S) Dt.- 18.08.2023 6.99 Sri Sushil Kr. Singh 100% 03.12.2023
04.11.2023
head for the year 2023-24.
Ordinary repair work in Km 0.00 to 19.50 Km of
32 F2/2023-24
20 Nawagarh-Topchanchi Road under Non plan 19.50 15.00 4009(S) Dt.- 18.08.2023 14.99 Sri Ajay Kumar 100% 12.11.2023
13.10.2023
head for the year 2023-24
Ordinary repair work of Chirkunda-Panchet
11 F2/2023-24
21 Road Length (Ch-0.00 Km to Ch- 7.20 Km) 7.20 15.00 4009(S) Dt.- 18.08.2023 14.99 Sri Amardeep Kumar 100% 25.10.2023
26.09.2023
under Non plan head for the year 2023-24.
Ordinary repair work of Nehru Link road form
35 F2/2023-24
22 0.00 K.m to 1.80 K.m under non plan head for 1.80 10.00 4009(S) Dt.- 18.08.2023 9.99 Sri Sushil Kr. Singh 100% 12.11.2023
04.11.2023
the year 2023-24
Ordinary repair work in Jamtara Nirsa Via
22 F2/2023-24
Birgram road (Ch- 15.27km to Ch- 24.00 Km)
23 8.70 20.00 4009(S) Dt.- 18.08.2023 19.99 13.10.2023 Sri Rajesh Kumar 100% 12.11.2023
total length 8.70 Km under non plan head for the
year 2023-24.
Ordinary Repair Of Sanjay Chowk to Maithon 33 F2/2023-24
24 More from Km 0.00 to 1.80 Km under non plan 1.80 60.00 - 49.97 13.10.2023 M/s Ram Chandra Yadav 100% 12.11.2023
head for the year 2023-24.
86.41 415.00 404.31 0.00
Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Sanctioned Agreement


Financial
Sl. Length % Financial % Physical
Progress Name of Contractor Sched-uled Date
No. Name (KM) Amount Date/ Ref. No. Amount Date/ Ref. No. Achievement Achiev-ement
Grand Total

1 2 3 4 5 6 7 8 9 10 11 12
VIVEKADHIN
Repair Work of Protection wall in Govindpur-
04 F2/2023-24
Tundi-Govindpur Road from Ch-0+020 to 0+060
1 2.49 10.06.2023 2.49 99.96% Sirazul Ansari 100% 24.06.2023
under Non plan (Vivekadhin) head for the year
2023-24
Repair Work of Protection wall in Govindpur-
05 F2/2023-24
Tundi-Govindpur Road from Ch-0+061 to 0+097 ŀ

2 2.49 16.06.2023 2.49 100% Sirazul Ansari 100% 30.06.2023


under Non plan (Vivekadhin) head for the year
2023-24
Emergent Repair Work of Different Road of 30.00 3037 (S) 19.06.2023 07 F2/2023-24
3 Road Division Dhanbad under Non Plan 2.46 12.08.2023 2.45 99.76% Sirazul Ansari 100% 26.08.2023
(Vivekadhin) head for the year 2023-24.
Emergent Repair Work of Third Grade Quarter 09 F2/2023-24
4 Near Park Market, Hirapur under Non Plan 2.49 30.10.2023 2.49 100% Sri Birendra Yadav 100% 05.10.2023
(Vivekadhin) head for the year 2023-24.
Emergent repair work of bhuiphore mandir to 20 F2/2023-24
5 binod bihari mahto chowk baliapur (Ch. 3.00 to 2.47 30.10.2023 2.47 100% Sri Pradyot Kumar 100% 05.11.2023
10.00 Km) under non plan (vivekadhin) Head for
32 Dhanbad 30.00 12.41 12.40

Circle : Hazaribagh
Div : Giridih
Name of EE-Sri Prem Prakash Singh

SPILL OVER
Special Repair of Parasnth Branch Road
E.I.C., RCD, Jharkhand,
(PWD Road) to Sammed Sikhar Hill on 45F2 of 2021-22
1 80.00 Ranchi Letter No. 76.00 0.00 0% Sri Ajay Roy, Giridih 21.05.2022
Wandana Path (Total length – 9.60 Km.) For dt. 22.03.2022
226(S) Dt. 25.01.2022
The Year 2021-22
Construction of RCC Drain (With Cover) in
E.I.C., RCD, Jharkhand,
Dumri More-Isri Bazar-Rangamati More (Old 47F2 of 2021-22 M/S Real Classic
2 70.00 Ranchi Letter No. 58.43 23.46 40% 60% 02.05.2022
NH-2) (Total Length – 900 M) For The Year dt. 03.03.2022 Construction, Hazaribag.
226(S) Dt. 25.01.2022
2021-22
Ordinary Repair Work in Sariya-Koiridih- E.I.C., RCD, Jharkhand,
42F2 of 2021-22 Sri Ashok Kumar,
3 Katwara (Narayanpur More) for the year 25.00 Ranchi Letter No. 24.99 24.28 97% 100% 13.03.2022
dt. 14.02.2022 Dhargulli, Giridih.
2021-22 226(S) Dt. 25.01.2022

Construction of Drain in Giridih - Jamua Engineer In Chief, RCD,


31F2 of 2022-23 Pradeep Enterprises,
4 Road under Road Division Giridih for the 60.00 Ranchi Letter No. 49.70 0.00 0% 16.05.2023
dt. 17.01.2023 Dhanbad.
year 2022-23 3457(S) Dt. 22.09.2022

Ordinary Repair of Giridih-Jamua Road (SH- Engineer In Chief, RCD,


22F2 of 2022-23 Jay Baba Baidyanath,
5 13) From KM 0 to 35 for the year 2022-23 70.00 Ranchi Letter No. 63.97 62.47 98% 100% 04.04.2023
dt. 05.12.2022 Giridih
under Road Division Giridih 3457(S) Dt. 22.09.2022
Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Sanctioned Agreement


Financial
Sl. Length % Financial % Physical
Progress Name of Contractor Sched-uled Date
No. Name (KM) Amount Date/ Ref. No. Amount Date/ Ref. No. Achievement Achiev-ement
Grand Total

1 2 3 4 5 6 7 8 9 10 11 12
Ordinary Repair of Ghorthaba to Etasani
Engineer In Chief, RCD,
Road via Barjo, Kubri, Gorhand, Nawaghar 27F2 of 2022-23 Sri Ramswaroop Kumar,
6 80.00 Ranchi Letter No. 66.29 65.51 99% 100% 27.04.2023
chatti Road (Total Length - 38.950 Km.) for dt. 28.12.2022 Giridih
3457(S) Dt. 22.09.2022
the year 2022-23
Road furniture work in 26km and 32 km of
Engineer In Chief, RCD,
apprroch road and other work in Tisri 30F2 of 2022-23
7 25.00 Ranchi Letter No. 15.94 15.85 99% Sri Uday Saw, Giridih 100% 16.03.2023
Thansighdih Kowakol road for financial dt. 17.01.2023
ŀ

3457(S) Dt. 22.09.2022


Year 2022-23
Construction of 600mm X 750mm size Engineer In Chief, RCD,
18F2 of 2022-23 Sri Vinod Kumar Yadav,
8 R.C.C. Drain in Bengabad-Chatro Road 30.00 Ranchi Letter No. 29.96 29.95 100% 100% 23.02.2023
dt. 24.11.2022 Giridih
(Total Length – 400 M.) for the year 2022-23 3457(S) Dt. 22.09.2022

Construction of Guard Wall in Tisri- Engineer In Chief, RCD,


23F2 of 2022-23 Sri Rajendra Yadav,
9 Thansinghdih Kowakol Road in km 15, 16, 50.00 Ranchi Letter No. 49.99 49.97 100% 100% 12.03.2023
dt. 13.12.2022 Giridih
18 and 19 for the Year 2022-23 3457(S) Dt. 22.09.2022
Ordinary Repair of Govindpur-Tundi-Giridih
Engineer In Chief, RCD,
Road in Km. 42.0 More to Ushri Fall road 9F2 of 2022-23 dt. Sri Shashi Kant Singh,
10 2.75 9.00 Ranchi Letter No. 7.87 6.00 76% 100% 17.01.2023
(Total Length – 2.75 Km.) for the year 2022- 18.11.2022 Giridih
3457(S) Dt. 22.09.2022
23
Ordinary Repair of Power House More to Engineer In Chief, RCD,
25F2 of 2022-23
11 Collage More Road (Old Ushri Bridge) (Total 2.40 7.50 Ranchi Letter No. 7.49 7.49 100% Shekh Afridi, Giridih 100% 14.02.2023
dt. 15.12.2022
Length – 2.4 Km.) for the year 2022-23 3457(S) Dt. 22.09.2022

Construction of R.C.C. Drain in 600mm X


Engineer In Chief, RCD,
750mm Size (Total Length – 180 M.) Power 16F2 of 2022-23 Sri Kamlesh Lohani,
12 15.00 Ranchi Letter No. 11.51 11.48 100% 100% 23.01.2023
House More to Callege More Road (Old dt. 24.11.2022 Giridih
3457(S) Dt. 22.09.2022
Ushri Bridge) for the year 2022-23
12 Giridih Spill over 5.15 521.50 462.14 296.46

Non-Plan
Ordinary Repair of S.P. Kothi to Ambedkar
Engineer In Chief, RCD,
Chowk via New Circuit House, Busstand 10F2 of 2023-24 Sri Pintu Kumar Singh,
1 10.00 Ranchi Letter No. 8.04 0.00 0% 07.01.2024
(Total Length – 1.2 Km.) Road for the year dt. 06.11.2023 Sonbad, Hemrodih, Giridih
4009(S) Dt. 18.08.2023
2023-24
Engineer In Chief, RCD,
Ordinary Repair of Giridih-Jamua Road in 9F2 of 2022-23 dt. Sri Uday Saw, Krishna
2 50.00 Ranchi Letter No. 37.25 0.00 0%
Km. 0.00 to 35 For The Year 2023-24 18.11.2022 Nagar, Narotand, Giridih
4009(S) Dt. 18.08.2023

Ordinary Repair of Giridih-Bengabad- Engineer In Chief, RCD,


11F2 of 2023-24 Sri Vikash Kumar Gupta,
3 Madhupur Road to Khandoli Dam Road in 10.00 Ranchi Letter No. 9.98 0.00 0% 15.01.2024
dt. 16.11.2023 Barganda, Giridih
Km. 0 to 2.87 for the year 2023-24 4009(S) Dt. 18.08.2023

Ordinary Repair of Jamua-Kharagdiha- Engineer In Chief, RCD,


13F2 of 2023-24 Mrs. Chinta Devi, Gawan,
4 Chatro Road in Km. 0 to 23.60 For The Year 20.00 Ranchi Letter No. 19.97 0.00 0% 22.01.2024
dt. 23.11.2023 Giridih.
23-24 4009(S) Dt. 18.08.2023
Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Sanctioned Agreement


Financial
Sl. Length % Financial % Physical
Progress Name of Contractor Sched-uled Date
No. Name (KM) Amount Date/ Ref. No. Amount Date/ Ref. No. Achievement Achiev-ement
Grand Total

1 2 3 4 5 6 7 8 9 10 11 12

Engineer In Chief, RCD, Sri Vinod Kumar Yadav,


Ordinary Repair of Kharagdiha-Khijuri Road 8F2 of 2023-24 dt.
5 10.00 Ranchi Letter No. 9.97 0.00 0% Chihutiya, Birne, Gawan, 01.01.2024
in Km. 0 to 16.40 for the year 2023-24 02.11.2023
4009(S) Dt. 18.08.2023 Giridih.
Ordinary Repair of Pataldih-Deori-Gawan-
Engineer In Chief, RCD,
Satgawan Road in Km. 34 (Part), 35 (part) 14F2 of 2023-24 Sri Uday Saw, Krishna
6 20.00 Ranchi Letter No. 14.85 0.00 0% 22.02.2024
(Old Exiting Alignment) Link Road For The dt. 23.11.2023 Nagar, Narotand, Giridih
ŀ

4009(S) Dt. 18.08.2023


Year 2023-24
Engineer In Chief, RCD,
Ordinary Repair of Pachamba-Jamua Link 9F2 of 2022-23 dt. Sri Pintu Kumar Singh,
7 8.00 Ranchi Letter No. 7.99 0.00 0%
Road in Km. 1.00 For The Year 2023-24 18.11.2022 Sonbad, Hemrodih, Giridih
4009(S) Dt. 18.08.2023

Repair of Executive Engineer, RCd, Road Engineer In Chief, RCD, Sri Sanjay Kumar
9F2 of 2023-24 dt.
8 Division, Giridih Residence for the year 2023- 15.00 Ranchi Letter No. 9.60 0.00 0% Chourasiya, Sir J.C. Bose 05.02.2024
06.11.2023
24 4009(S) Dt. 18.08.2023 Road, Giridih.

Engineer In Chief, RCD, Sri Piyush Kumar,


Spacial Repair of Road Division, Giridih 9F2 of 2022-23 dt.
9 15.00 Ranchi Letter No. 9.90 0.00 0% Chiraiyaghat Road,
Inspection Banglow For The Year 2023-24 18.11.2022
4009(S) Dt. 18.08.2023 Barmasiya, Giridih
Construction of 200M Wearing Coat and
Engineer In Chief, RCD,
Expansion Joint in High Level Bridge in 14th 9F2 of 2022-23 dt. Sri Vishal Kumar Bhaskar,
10 80.00 Ranchi Letter No. 55.90 0.00 0%
Km. of Dwarpahri-Karmatand Road for the 18.11.2022 Latehar.
4009(S) Dt. 18.08.2023
year 2023-24
Giridih Non-Plan 238.00 183.45 0.00

VIVEKADHIN
Flank Repair of Palma-Keshwari-Choubey
Road and Giridih-Bengabad- Madhupur 01 F2 of 2023-24 Sri Sanjay kumar
1 2.50 2.48 2.48 100% 17.07.2023
Road to Khandoli Dam Road for the year Dt. 11.07.2023 chourasiya, Giridih
2023-24
Pot Holes Restoration and Flank Repair
02 F2 of 2023-24
2 work of Jamua-Kharagdiha- Khijuri Road for 2.50 2.49 2.49 Sri Piyush Kumar, Giridih 100% 23.07.2023
Dt. 18.07.2023
the year 2023-24
Flank repair of Ahilyapur More to Dakbangla 03 F2 of 2023-24 Sri Vikash kumar gupta,
3 2.50 2.49 2.49 100% 08.08.2023
Road for the year 2023-24 Dt. 03.08.2023 Giridih.
Giridih 7.50 7.46 7.46

Circle : Hazaribagh
Div : Koderma
Name of EE-Sri Satendra Prasad Singh
Traffic Restoration work in Domchanch - Dhab Sri Balram Bharti,
Dt-01.08.2023
Road(Total Length 16.4 KM.) under Vivekadhin Dt-19.06.2023 Vill. – Nawadih,
1 16.40 2.28 Ref No- 01 F2 2.28 100% 100% 31.08.2023
for the year 2023-24 Ref No.-3037(s) P.O. – Domchanch Bazar
of 2023-24
25.00 Dist.-Koderma
Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Sanctioned Agreement


Financial
Sl. Length % Financial % Physical
Progress Name of Contractor Sched-uled Date
No. Name (KM) Amount Date/ Ref. No. Amount Date/ Ref. No. Achievement Achiev-ement
Grand Total

1 2 3 25.00
4 5 6 7 8 9 10 11 12
Bushes cutting in Urwan- Kati Road (MDR-108)
Dt-21.08.2023 M/s Ranjeet Kumar,
from 0.00 to 5.80 km (length=5.80 km ) under Dt-19.06.2023
2 5.80 1.48 Ref No- 03 F2 1.48 100% Nawada Basti,Ward No-01, 100% 20.09.2023
Road Division Koderma for the year 2023-24 ( Lt No-3037(s)
of 2023-24 Jhumri Telaiya,Koderma
Under Vivekadhin )
Jhari cutting and Flank filling in Koderma -
Jamua Road (SH-13) from 11.00 to 31.00 km R.K Construction,
Dt-01.08.2023
(length=21.00 km ) under Road Division ŀ

Dt-19.06.2023 Pratham Kumar Jaiswal,


3 21.00 2.47 Ref No- 02 F2 2.47 100% 100% 31.08.2023
Koderma for the year 2023-24 Lt No-3037(s) Nawada Basti,Ward No-01,
of 2023-24
Jhumri Telaiya,Koderma

Ordinary Repair of Rajauli-Chandwara-Barhi


Sonu Kumar,
Road(Total Length-2.9 Km) under vivekadhin Dt-11.10.2023
Dt-19.06.2023 Ward No-01, Nawada Basti,
4 for the year 2023-2024. 2.90 8.01 Ref No- 06 F2 0.00 _ 1% 10.11.2023
Lt No-3037(s) Jhumari Telaiya,Koderma
of 2023-24

Restotration of Traffic in Bagitand -Lokai Road


Dt-11.10.2023 Aman Kumar,
(Total Length = 2.88 K.M ) under vivekadhin Dt-19.06.2023
5 2.88 2.50 Ref No- 05 F2 0.00 _ At-Jhanda Chowk,Koderma, 100% 10.11.2023
for the year 2023-2024. Lt No-3037(s)
of 2023-24 Jharkhand-825410
Restoration of Traffic and jungle clearance in SHISHU PANDAY,
Jharkhand Dham Sampark Road From 0.00 to Dt-11.10.2023 Bishunpur Ashram Road,
Dt-19.06.2023
6 24.00 km under Vivekadhin Head for the Year 24.00 2.49 Ref No- 04 F2 0.00 _ Durga Mandir,Jhumri 100% 10.11.2023
Lt No-3037(s)
2023-24. of 2023-24 Telaiya,Dist-Koderma,
Pin-825409
Ordinary Repair work in Birni Link path (Total Ashok Yadav,
Dt-30.10.2023
Length = 1.63 K.M ) for the year 2023-2024 Dt-18.08.2023 Bela,P.O-Murukmanai,
7 1.63 10.00 9.99 Ref No- 13 F2 0.00 _ 0% 29.12.2023
Lt No-4009(s) PS-Markacho,Koderma
of 2023-24
Ordinary Repair in Pataldih-Deori-Gawan- Raju Kumar,
Satgawan Road(Total Length=30.56 Km ) under Dt-30.10.2023 58,Shyam Baba Path,
Dt-18.08.2023
8 Road Division Koderma for the F.Y. 2023-24 30.56 20.00 20.00 Ref No- 11 F2 0.00 _ Bhalotia Dharamsala, 0% 29.01.2024
Lt No-4009(s)
of 2023-24 Jhumari Telaiya,Koderma,
Jharkhand-825409
Junction improvement in Kowar-Koderma Road M/S Deep Construction,
Dt-31.10.2023
in Madhwatand chowk & nearby areas under Dt-18.08.2023 At-Madhwatand,P.O-
9 _ 30.00 29.94 Ref No- 16 F2 0.00 _ 5% 30.01.2024
Road Division Koderma for the F.Y 2023-24 Lt No-4009(s) Makatpur,P.S-Jainagar,
of 2023-24
Dist-Koderma
Construction of Drain with cover and cross drain Manjay Kumar,
Dt-18.10.2023
in KM 12.00 of Pataldih-Deori-Gawan- Dt-18.08.2023 Vaishali Press Gali,Guru
10 12.00 25.00 20.49 Ref No- 8 F2 0.00 _ 20% 17.01.2024
Satgawan Road under road division Koderma for Lt No-4009(s) Nanak Pura,Jhumari Telaiya,
the year 2023-24 of 2023-24
Koderma-825409
Construction of Drain with cover and Cross Manoj Prasad Yadav,
Dt-31.10.2023
Drain in D.V.C. Chauk ( New Mandir ) to Dt-18.08.2023 Nawada Basti,Jhumari
11 1.20 30.00 26.54 Ref No- 15 0.00 _ 8% 30.01.2024
Koriadih Road (Total length=1.20 Km ) under Lt No-4009(s) Telaiya,Koderma-825409
road division Koderma for the year 2023-24 F2 of 2023-24
Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Sanctioned Agreement


Financial
Sl. Length % Financial % Physical
Progress Name of Contractor Sched-uled Date
No. Name (KM) Amount Date/ Ref. No. Amount Date/ Ref. No. Achievement Achiev-ement
Grand Total

1 2 3 4 5 6 7 8 9 10 11 12
Repair and Maintainence of Half and Full Gantry R.K Construction,
Dt-18.10.2023
under road Koderma for FY- 2023-24 Dt-18.08.2023 Pratham Kumar Jaiswal,
12 _ 10.00 9.41 Ref No- 9 F2 0.00 _ 70% 17.12.2023
Lt No-4009(s) Nawada Basti,Ward No-01,
of 2023-24
Jhumri Telaiya,Koderma
Repair and Decoration of Executive Engineer M/S Ram Swarup Kumar,
Residence under Road Division Koderma for the Sunaina Devi,Gandhi School
Dt-17.10.2023
Year 2023-24 ŀ

Dt-18.08.2023 Road,Near Saraawati Bidya


13 _ 20.00 19.99 Ref No- 7 F2 0.00 _ 60% 16.01.2024
Lt No-4009(s) Mandir, Ward No-22,
of 2023-24
Jhumari Telaiya,Koderma-
825409
Repair and varnishing work of K.M. stone , Balram Bharti,
Dt-31.10.2023
Parapet and railing of Culverts /Bridges under Dt-18.08.2023 Nawadih,Behradih,
14 _ 30.00 30.00 Ref No- 14 0.00 _ 30% 30.01.2024
road division Koderma for the year 2023-2024 Lt No-4009(s) Domchanch,Koderma,
F2 of 2023-24
Jharkhand-825407
Installation of Solar Traffic Blinker at Various
BBKS Construction Private
Locations in Different Roads under Road
Dt-19.10.2023 Limited,Near Old SBI
Division Koderma for the year 2023-24. Dt-18.08.2023
15 _ 24.00 23.78 Ref No- 10 0.00 _ Building,Agrasen Bhawan 50% 18.01.2024
Lt No-4009(s)
F2 of 2023-24 Gali,Jhumari Telaiya,
Koderma,Jharkhand-825409
Repair and Painting of Inspection Bungalow Jai Maa Tara Construction
(IB) & Boundary Wall and Landscaping & Street Dt-30.10.2023 Pvt. Ltd,Ward No-9, Post-
Dt-18.08.2023
16 Light Work under Road Division Koderma for _ 20.00 16.90 Ref No- 12 0.00 _ Koderma,Thana-Koderma, 15% 29.01.2024
Lt No-4009(s)
the Year 2023-24 F2 of 2023-24 Chandrodih,Koderma,Dist-
Koderma
16 Koderma 118.37 219.00 6.23

Circle : Hazaribagh
Div :Ramgarh
Name of EE-Sri Rajiv Ranjan Munda
SPILL OVER
Agarwal Chapakal
Construction Work of Guard Wall in Badki Pona Ltr. No. 3457(S) 16 F2 2022-23 Dt.-
1 - 45.00 35.10 35.08 100% Construction 100% -
to Kulhi Road for the year 2022-23 Dt. 22-09-2022 26-11.2022
Ramgarh
Purchase of Furniture for Divisional Office &
Ltr. No. 3457(S) 27 F2 2022-23 Jilani Ahmad
2 Naisarai Inspection Bunglow at Ramgarh for the - 10.00 9.99 9.99 100% 100% -
Dt. 22-09-2022 Dt.- 14-03-2023 Ramgarh
year 2022-23
2 Ramgarh Spill Over 55.00 45.09 45.07

Non Plan
Ordinary Repair Work of Sandi to Bijuliya Road
Ltr. No.- 4009(S) Dt.- 18- 18 F2 2023-24 Dt.- Ganpati Traders
1 in KM 0.00 to 13.00 under Non-Plan Head for 13.000 20.00 15.49 0.00 0% -
08-2023 26-11.2022 Ranchi
the year 2023-24
Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Sanctioned Agreement


Financial
Sl. Length % Financial % Physical
Progress Name of Contractor Sched-uled Date
No. Name (KM) Amount Date/ Ref. No. Amount Date/ Ref. No. Achievement Achiev-ement
Grand Total

1 2 3 4 5 6 7 8 9 10 11 12
Ordinary Repair Work of Patratu to Saunda ‘D’
Ltr. No.- 4009(S) Dt.- 18- 15 F2 2023-24 Dt.- Manav Construction
2 Road in KM 0.00 to 11.350 under Non-Plan 11.350 10.00 0.00 0.00 0% -
08-2023 14-11-2023 Ramgarh
Head for the year 2023-24
Ordinary Repair Work of Kujju to Ghato Road in
Ltr. No.- 4009(S) Dt.- 18- 09 F2 2023-24 Dt.- Kedar Prasad
3 KM 0.00 to 19.40 under Non-Plan Head for the 19.400 10.00 8.15 0.00 0% -
08-2023 06-11-2023 Ramgarh
year 2023-24
ŀ

Ordinary Repair Work of 22-Court &


Ltr. No.- 4009(S) Dt.- 18- 07 F2 2023-24 Dt.- Jitendra Kumar
4 Collectorate Campus Road in KM 0.00 to 5.528 5.528 5.00 3.58 0.00 0% -
08-2023 03-11-2023 Ramgarh
under Non-Plan Head for the year 2023-24
Ordinary Repair Work of Kothar to Mandal Kara
Ltr. No.- 4009(S) Dt.- 18- 11 F2 2023-24 Dt.- Santosh Kumar
5 Road in KM 0.00 to 2.50 under Non-Plan Head 2.500 10.00 7.48 0.00 0% -
08-2023 06-11-2023 Lari, Ramgarh
for the year 2023-24
Ordinary Repair Work of Saunda ‘D’ to Urimari
Ltr. No.- 4009(S) Dt.- 18- 06 F2 2023-24 Dt.- Randhir Pratap Singh
6 Road in KM 0.00 to 13.798 under Non-Plan 13.798 20.00 16.00 0.00 0% -
08-2023 30-10-2023 Ranchi, Jharkhand
Head for the year 2023-24
Ordinary Repair Work of Chitarpur to Rajrappa
Ltr. No.- 4009(S) Dt.- 18- 08 F2 2023-24 Dt.- Harshbardhan Enterprises
7 Road (Old Alignment) in KM 0.00 to 1.80 under 1.800 10.00 8.27 0.00 0% -
08-2023 06-11-2023 Ranibaghi, Ramgarh
Non-Plan Head for the year 2023-24
Ordinary Repair Work of Lalpania More via
Petarwar- Gomia- Kujju to Naya More Road in Ltr. No.- 4009(S) Dt.- 18- 12 F2 2023-24 Dt.- M/s Shah & Sons
8 8.625 10.00 7.95 0.00 0% -
KM 0.00 to 8.625 under Non-Plan Head for the 08-2023 06-11-2023 Ramgarh
year 2023-24
Ordinary Repair Work of Badki Pona to Kulhi
Ltr. No.- 4009(S) Dt.- 18- 19 F2 2023-24 Dt.- Ganpati Traders
9 Road in KM 0.00 to 13.850 under Non-Plan 13.850 15.00 11.14 0.00 0% -
08-2023 30-11-2023 Ranchi
Head for the year 2023-24
Ordinary Repair Work of Naya More- Chainpur
Ltr. No.- 4009(S) Dt.- 18- 10 F2 2023-24 Dt.- Santosh Kumar
10 to Rajrappa Road in KM 0.00 to 29.680 under 29.680 20.00 15.40 0.00 0% -
08-2023 06-11-2023 Lari, Ramgarh
Non-Plan Head for the year 2023-24
Ordinary Repair Work of Chas to Ramgarh Road
Ltr. No.- 4009(S) Dt.- 18- 14 F2 2023-24 Dt.- Shailendra Pratap Singh
11 in KM 0.00 to 4.560 under Non-Plan Head for 4.560 30.00 22.24 0.00 0% -
08-2023 11-11-2023 Ranchi, Jharkhand
the year 2023-24
Construction of Box Culvert (4.00 x 5.00 M)
Ltr. No.- 4009(S) Dt.- 18-
12 Work in Hesapoda to Kusumdih Road under Non- - 35.00 0.00 - 0.00 0% - -
08-2023
Plan Head for the year 2023-24
Construction of Guardwall (3.00 M Height)
Ltr. No.- 4009(S) Dt.- 18- Shere Alam
13 Work in Badki Pona to Kulhi Road under Non- - 30.00 20.83 - 0.00 0% -
08-2023 Ramgarh
Plan Head for the year 2023-24
Construction of RCC Pier Protection Work in
Ltr. No.- 4009(S) Dt.- 18-
14 Naisarai to Giddi ‘A’ Road under Non-Plan - 30.00 0.00 - 0.00 0% - -
08-2023
Head for the year 2023-24
Construction of RCC Drain in Ormanjhi to
Ltr. No.- 4009(S) Dt.- 18- 16 F2 2023-24 Dt.-
15 Hundrufall Road under Non - Plan Head for the - 100.00 70.60 0.00 0% Sunil Kumar -
08-2023 14-11-2023
year 2023-24
Ordinary Repair Work of Gola to Muri Road Ltr. No.- 4009(S) Dt.- 18- 13 F2 2023-24 Dt.- Randhir Pratap Singh
16 - 100.00 76.75 0.00 0% 100%
under Non-Plan Head for the year 2023-24 08-2023 11-11-2023 Ranchi, Jharkhand
Month : November, 2023 Amount in Rs. Lakh

Sanctioned Scheme Sanctioned Agreement


Financial
Sl. Length % Financial % Physical
Progress Name of Contractor Sched-uled Date
No. Name (KM) Amount Date/ Ref. No. Amount Date/ Ref. No. Achievement Achiev-ement
Grand Total

1 2 3 4 5 6 7 8 9 10 11 12
Housekeeping work of Divisional Office and
Ltr. No.- 4009(S) Dt.- 18-
17 Naisarai Inspection Bunglow under Non-Plan - 10.00 0.00 - 0.00 0% - -
08-2023
Head for the year of 2023-24
17 Ramgarh Non Plan 465.00 0.00 283.88 0.00 0.00

VIVEKADHIN
Clearing, Striping excess soil and surface drain
in Patratu to Saunda ‘D’ Road and Saunda ‘D’ to Ltr. No.- 113(S) Dt.- 03- 02 F2 of 2023-24 M/s Ramashish
1 - 2.45 2.45 2.45 100% -
Urimari Road under Vivekadhin Head for the 07-2023 Dt.- 23-08-2023 Ranchi, Jharkhand
year 2023-24
Clearing, Striping excess soil and surface drain
in Kujju to Ghato Road and Naisarai to Giddi Ltr. No.- 113(S) Dt.- 03- 03 F2 of 2023-24 M/s Sahil Construction
2 - 2.46 2.46 2.46 100% -
‘A’ Road under Vivekadhin Head for the year 07-2024 Dt.- 23-08-2023 Ormanjhi, Ranchi, Jharkhand
2023-24
Clearing, Stripping Excess Soil & Surface Drain
in Sandi- Bijuliya (Remaining Part of NH-33) Ltr. No.- 113(S) Dt.- 03- 04 F2 of 2023-24 Jilani Ahmad
3 - 2.46 2.46 0.00 0% -
and 22-Court & Chas- Ramgarh Road under 07-2025 Dt.- 13-10-2023 Ramgarh
Vivekadhin Head for the year 2023-24

Clearing, Stripping Excess Soil & Surface Drain


Ltr. No.- 113(S) Dt.- 03- 05 F2 of 2023-24 Ansh Enterprises
4 in Gola- Muri & Sikidri- Kulhi Road under - 2.47 2.46 0.00 0% -
07-2026 Dt.- 25-10-2023 Gola, Ramgarh
Vivekadhin Head for the year 2023-24

9.84 9.83 4.91

23 Ramgarh 529.84 338.80 49.98


DPW-B
ROAD CONSTRUCTION DEPARTMENT, JHARKHAND
(State Highways Wing)
Progress report of On-going / Completed works (ROB)

Month : November, 2023 Amount in Rs. Lakh

Administrative
Sanctioned Scheme Agreement by State
Approval
Financial
Sl. Length % Financial % Physical Scheduled
Progress Name of Contractor
No. (m) Date/ Date/ Ref. Achievement Achievement Date
Name Amount Amount Grand Total
Ref. No. No.

1 2 3 4 5 6 7 8 9 10 11 12

Circle : Hazaribagh
Div : BOKARO
Name of EE- Sri Amit Singh
Month : November, 2023 Amount in Rs. Lakh

Administrative
Sanctioned Scheme Agreement by State
Approval
Financial
Sl. Length % Financial % Physical Scheduled
Progress Name of Contractor
No. (m) Date/ Date/ Ref. Achievement Achievement Date
Name Amount Amount Grand Total
Ref. No. No.

1 2 3 4 5 6 7 8 9 10 11 12
1 Construction of ROB in - 8331.96 30.08.20 5591.25 15.12.202 10% 555.03 M/S GPT-GSM JV, 10% 14.12.2023
Ch. 26.150 km of Petarwar 22/ 1 ADARSH NAGAR,
Gomia Naraki Bishnugarh RCD/06- NEAR NEW BUS
Road in lieu of L.C. No. Plan - STAND, BIJULIA,
11/A/T between Gomia 29/2022- RAMGARH CANTT. -
and Dumari Bihar Station. 3172(s) 829122, JHARKHAND
of DS,
R.C.D.,
Jharkha
nd,
Ranchi.

1 Bokaro 0.00 8331.96 5591.25 555.03

Circle : Hazaribagh
Div : Dhanbad
Name of EE-Sri Dinesh Prasad
Month : November, 2023 Amount in Rs. Lakh

Administrative
Sanctioned Scheme Agreement by State
Approval
Financial
Sl. Length % Financial % Physical Scheduled
Progress Name of Contractor
No. (m) Date/ Date/ Ref. Achievement Achievement Date
Name Amount Amount Grand Total
Ref. No. No.

1 2 3 4 5 6 7 8 9 10 11 12
Bhuli-Tetulmari ROB in 2235.8709
Lieu of Level crossing No. 0 2820(S) FA & CAO Con/E.C.
1 2-SPL/T 1129.9354 dt. _ _ 100% 1129.94 Railway, 54% _
5 21.03.13 Mahendrughat, Patna.

Construction Work of
ROB in place of Present
RUB No. 20 between 3781.9708
Kumardhubi Mugma Rly 5 6337(s) F.A. & CAO/Const
2 station of Grand chord - 2064.5305 dt. _ _ 100% 2359.93 /Eastern Railway, 100% _
section in Mugma- 4 08.9.15 Kolkata.
Chirkunda Road (NH2 old
alignment).
3 Construction Work of - 2623.2482 1235(s) _ _ _ _ South Easten Railway _ _
ROB in Lieu of Level 8 dt. Adra, Purulia, Dy Chief
Crossing No. AM-34 1413.0841 27.02.20 Engineer (Con)
Between Jamadoba and 4 19
Bhaga Station
Chota Ambona-Pradhan- 4151.4091
khanta ROB in Lieu of 4 2985(S) FA & CAO Con/E.C.
4 Level Crossing No. 15- _ 2081.7578 dt. _ _ 127% 2654.04 Railway, 100% _
Spl/T. 2 25.03.13 Mahendrughat, Patna.

Matari-Gomoh (LC No. - 6937.6026


9B), Gomoh-Telo (LC No. 1 6372(S) FA & CAO Con/E.C.
5 9-B/CIC) & Gomoh- _ 3614.1524 dt. _ _ 100% 3614.15 Railway, 100% _
Khanudih (LC No. 9-B) 5 08.07.13 Mahendrughat, Patna.
Road over Bridge.
Month : November, 2023 Amount in Rs. Lakh

Administrative
Sanctioned Scheme Agreement by State
Approval
Financial
Sl. Length % Financial % Physical Scheduled
Progress Name of Contractor
No. (m) Date/ Date/ Ref. Achievement Achievement Date
Name Amount Amount Grand Total
Ref. No. No.

1 2 3 4 5 6 7 8 9 10 11 12
Construction of new ROB
in replacement of existing
ROB No. 6A on cost 440.28276 4285(s) F.A. & CON/Con/S.E.
6 sharing basis (50:50) at _ 220.14138 dt. _ _ 100% 217.74 Railway, Garden Reach, 100% _
Km 340/5-6 between 20.7.11 Kolkata.
Mahuda-Jamuniatand in
Adra Division
6 Dhanbad 0.00 0.00 0.00 9975.81

Circle : Hazaribagh
Div :Ramgarh
Name of EE-Sri Rajiv Ranjan Munda

Construction of ROB in
Sandi-Bijuliya Road (Old
F.A & C.A.O (Cons.)/
1 NH-33) near Ranchi Road - 2908.90 - - - 66% 1931.24 100% -
E.C.R (M.H.X) Patna
Railway Station (Ch.-83
KM)
Construction of ROB in
Muri-Barkakana Section F.A & C.A.O (Cons.)/
2 - 866.59 - - - 100% 866.59 100% -
KM 406/1-12 (88th KM of S.E Railway Kolkata
old NH-33)

Construction of ROB in Ltr. No.-


F.A & C.A.O
Chandrapura Route in Leu 3642
3 - 5469.71 - - 44% 2696.31 (Cons.)/C/ECR/ MHX, 0% -
of LC No.- 26Spl/T at KM Dt.- 13-
Patna
80/1-2 10-2022
Month : November, 2023 Amount in Rs. Lakh

Administrative
Sanctioned Scheme Agreement by State
Approval
Financial
Sl. Length % Financial % Physical Scheduled
Progress Name of Contractor
No. (m) Date/ Date/ Ref. Achievement Achievement Date
Name Amount Amount Grand Total
Ref. No. No.

1 2 3 4 5 6 7 8 9 10 11 12
Construction of Approach
& Proposed ROB near L.C
No.- MB-21 at KM 383/16-
4 - 3495.00 - - - 0% 0.00 - 100% -
17 between Muri to
Barkakana under Ranchi
Railway Division.
4 Ramgarh 0.00 12740.20 0.00 0.00 0.00 5494.14

Circle : Dumka
Div : Deoghar
Name of EE-Sri Manoj Kumar Mahto
Month : November, 2023 Amount in Rs. Lakh

Administrative
Sanctioned Scheme Agreement by State
Approval
Financial
Sl. Length % Financial % Physical Scheduled
Progress Name of Contractor
No. (m) Date/ Date/ Ref. Achievement Achievement Date
Name Amount Amount Grand Total
Ref. No. No.

1 2 3 4 5 6 7 8 9 10 11 12
1 Construction of ROB no- - 4527.20 3238(S) 42437.0 2891.14 Estern Railway, - -
618 on Giridih-Sarath road dt- Kolkatta
between Madhupur Station 01.07.19
Joramaw station

2 Construction of ROB on - 4056.41 732(S), 42437.0 3208.93 Estern Railway,


Satsang-Bhirkhibad road Date- 01- Kolkatta
bitween Jasidih- 02-2019
Baijnathdham Station
( LC No. 04/T)
Month : November, 2023 Amount in Rs. Lakh

Administrative
Sanctioned Scheme Agreement by State
Approval
Financial
Sl. Length % Financial % Physical Scheduled
Progress Name of Contractor
No. (m) Date/ Date/ Ref. Achievement Achievement Date
Name Amount Amount Grand Total
Ref. No. No.

1 2 3 4 5 6 7 8 9 10 11 12
3 Construction of ROB on - 3755.00 3231(S) - 42437.0 2545.20 Estern Railway, - -
Satsang-Bhirkhibad road dt- Kolkatta
bitween Shankarpur- 23.05.16
Jasidih Station
( LC No. 27C/E)
4 Construction of ROB 9364.00 RW - -
(ROB proper and Ranchi/
Approach portion) at CRF/
Santhali Village near Br. 2021-
653 between Sankarpur - 22,
Jasidih at km 321/19-21 dt-
from Howrah (Job No.- 06.03.23
CRF-JHR-2022-23/67)
5 Construction of ROB for 8196.00 RW - -
Jasidih-Baidyanath Dham Ranchi/
Section (LC Gate No.-1) CRF/
(Job No. CRF-JHR-2022- 2021-
23-70) 22,
dt-
06.03.23

5 Deoghar 0.00 29898.6 0.00 0.00 8645.27

Circle : Dumka
Div : Pakur
Name of EE-Sri Veer Raghwan
Month : November, 2023 Amount in Rs. Lakh

Administrative
Sanctioned Scheme Agreement by State
Approval
Financial
Sl. Length % Financial % Physical Scheduled
Progress Name of Contractor
No. (m) Date/ Date/ Ref. Achievement Achievement Date
Name Amount Amount Grand Total
Ref. No. No.

1 2 3 4 5 6 7 8 9 10 11 12

Construction of ROB in
01 6333.68
Pakur-Barharwa Road

01 Pakur 0.00 0.00 0.00 6333.68

Circle : Dumka
Div : Sahebganj
Name of EE-Sri Ajay Kumar-2

Construction of proposed Joint


ROB in lieu of Level Secretar
Crossing No. - 47/C in y RCD,
between Tinpahar- Jharkhan
d, letter
1 Dhamdhamia Section of 9394.54 no. 1233
7630.68
Malda Division to be (S),
executed by Railway in dated
Deposit term of Jharkhand 27.02.20
Government. 19
Month : November, 2023 Amount in Rs. Lakh

Administrative
Sanctioned Scheme Agreement by State
Approval
Financial
Sl. Length % Financial % Physical Scheduled
Progress Name of Contractor
No. (m) Date/ Date/ Ref. Achievement Achievement Date
Name Amount Amount Grand Total
Ref. No. No.

1 2 3 4 5 6 7 8 9 10 11 12

Joint
Secretar
y RCD,
Pakur-Barharwa Road Jharkhan
d, letter
2 ROB in lieu of LC No. 95.47 no. 1327
19/B & 45 C/E (S),
dated
31.03.20
22

Joint
Secretar
y RCD,
Jharkhan
Sahibganj West Cabin d, letter
3 38.25 no. 2725
ROB in lieu of 82 B/T
(S),
dated
26.07.20
22

3 Sahebganj 0.00 9528.26 0.00 7630.68

Circle : Chaibasa
Div : Chaibasa
Name of EE-Sri Raj Ranjan
Month : November, 2023 Amount in Rs. Lakh

Administrative
Sanctioned Scheme Agreement by State
Approval
Financial
Sl. Length % Financial % Physical Scheduled
Progress Name of Contractor
No. (m) Date/ Date/ Ref. Achievement Achievement Date
Name Amount Amount Grand Total
Ref. No. No.

1 2 3 4 5 6 7 8 9 10 11 12

Construction of Road Over


bridge between Kendposi
and Maluka stations under 27.12.20 04.01.201
1 the jurisdiction of Dy. 953.7 4042.2786 17 4201.754 9 73.554 3102.2543 M/S Shyamsree Tribeni 100 03.01.2021
Chief Engineer (Con). /2776(S) /Agt. No- (JV), EN-32,
Tantnagar in SER Shyam Towers, Sector-
Chakradharpur division of /CON-HQ V, Salt Lake, Kolkata
SER. /TATA/6 West Bengal, PIN-
4/2018 700091
1 Chaibasa 953.7 4042.28 4201.75 3102.25

Circle :- Chaibasa
Div:- Jamshedpur
Name of EE-Sri Dipak Sahay
Month : November, 2023 Amount in Rs. Lakh

Administrative
Sanctioned Scheme Agreement by State
Approval
Financial
Sl. Length % Financial % Physical Scheduled
Progress Name of Contractor
No. (m) Date/ Date/ Ref. Achievement Achievement Date
Name Amount Amount Grand Total
Ref. No. No.

1 2 3 4 5 6 7 8 9 10 11 12

Construction of
approach of proposed
Letter
ROB No.26B at km
No.
251/13-15 lieu of Level
2891(S TRIVENI ENGICONS
crossing no.141/Spl.
) PRIVATE LIMITED,
Class at km 251/3-5
1 0.25 4404.95 Dt. 1829.12 44.28 3373.52 Add.-3/6, H.S. Tower, 100% 31.12.2022
between Tata-Aditaypur
21.09.2 L Road, Bistupur,
stn. Under CKP railway
021 Jamshedpur.
division in S.E. Railway
in Year 2017-18 Under
R/E Rs.
Road Division,
Jamshedpur

Construction of ROB in 1230(S


lieu of LC No.137 near )
2 km 242/23-25 between 4385.96 Dt. 0.00 - - 0.00 - - -
Asanbani and Salgajori 27.02.2
station under SER. 019

0.25 8790.91 1829.12 3373.52

Circle : Chaibasa
Div : Seraikella-Kharsawan
Name of EE-Sri Genesh Ram Hembrom
Month : November, 2023 Amount in Rs. Lakh

Administrative
Sanctioned Scheme Agreement by State
Approval
Financial
Sl. Length % Financial % Physical Scheduled
Progress Name of Contractor
No. (m) Date/ Date/ Ref. Achievement Achievement Date
Name Amount Amount Grand Total
Ref. No. No.

1 2 3 4 5 6 7 8 9 10 11 12
Construction of Road Over FA & CAO, S.E. Rly,
Bridge in Lieu of Level Kolkata
Crossing No.-160 in
between Mahalimurup &
1 Rajkharsawan Station at 99 2051.76 100%
Km. 286/23-25 of
Seraikella-Kharsawan
Road (MDR-144)

Plantation of tree 540 M/s Krishna


Nos. with iron gabion and 3780.59 Construction,
transplant of 28 Nos. At/Po-Seraikella, Ward
trees for ROB No. 160 in No.-07, Dist-Seraikella-
21 F2 of
between Kharsawan and Kharsawan
2019-20
Mahalimoorum Station in 20.41772
2 Dt. 92 18.74 100% 22.10.2023
Seraikella-Kharsawan
23.10.201
Road in Km. 9.90 under
9
RCD, Road Division,
Seraikella-Kharsawan

2 Seraikella-Kharsawan 3780.59 0.00 2051.76


Month : November, 2023 Amount in Rs. Lakh

Administrative
Sanctioned Scheme Agreement by State
Approval
Financial
Sl. Length % Financial % Physical Scheduled
Progress Name of Contractor
No. (m) Date/ Date/ Ref. Achievement Achievement Date
Name Amount Amount Grand Total
Ref. No. No.

1 2 3 4 5 6 7 8 9 10 11 12

Circle : Daltonganj
Div : Daltonganj
Name of EE-Sri Anil Kumar

C.R.F
Construction of ROB at EP
16.03.2
No.-291/27, 291/28
3RWRan
between Daltonganj to
chi/CRF/
rajhara railway near
1 596.1 8354.00 2021-
Bajrha village at Palamau
22/I/40
in the state of Jharkhand
36939/2
under Central Road Fund
023
for the year 2022-23. Job
No. (CRF-JHR-2022-23-65)

596.1 8354.0 0.0 0.0 0.0